Show Job Controls
Bid Cobra

EL PASO SL 375 (2552-01-058)

Items: 77

County: EL PASO
Length: N/A
Highway: SL 375
District: EL PASO
Control Number: 2552-01-058
DBE Goal: N/A
Project: STP 1902(114)HES
Guaranty: N/A
Time: 280 WORKING DAYS
Engineer's Estimate: $16,799,427.64
Date: 07/10/2019 (6 years ago)
Contract Number: N/A
Type: REHABILITATION OF EXISTING ROAD
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$16,799,427.64
$13,858,443.35
Over/Under Est: -17.51% -$2,940,984.29
Over/Under Est: -15.03% -$2,524,636.54
Amt Left: 3% $416,347.75
$14,324,899.55
Over/Under Est: -14.73% -$2,474,528.09
Amt Left: 3.37% $466,456.20
Delta: -0.35% -$50,108.45
Over/Under Est: -11.56% -$1,942,404.74
Amt Left: 7.21% $998,579.55
Delta: -3.71% -$532,123.35
$14,882,201.56
Over/Under Est: -11.41% -$1,917,226.08
Amt Left: 7.39% $1,023,758.21
Delta: -0.17% -$25,178.66
$14,941,925.00
Over/Under Est: -11.06% -$1,857,502.64
Amt Left: 7.82% $1,083,481.65
Delta: -0.40% -$59,723.44
Subcontractor Percentage Amount
HAWK CONSTRUCTION 6.57% $996,399.24
HAWK CONSTRUCTION 6.25% $947,868.38
PMI PAVEMENT MARKING, LLC 4.66% $706,730.67
F A L C ENTERPRISES, LLC. 4.48% $679,432.06
MAJOR MOTION LOGISTICS, LLC 4.48% $679,432.06
TRI STATE ELECTRIC, LTD. 1.15% $174,407.78
DUSTROL, INC. 1.11% $168,341.42
TRAFFIC BARRICADE SERVICE, INC. 1.06% $160,758.48
ALLIED PAVING CO. 0.51% $77,346.06
HARDY HOLE DRILLING 0.23% $34,881.56
915 HAULER, INC. 0.22% $33,364.97
TRIPLE F TRUCKING, LLC 0.11% $16,682.48
X GOMEZ LOGISTICS LLC 0.11% $16,682.48
NATIONWIDE REBAR INC. 0.06% $9,099.54
Total: 31.00% $4,701,427.18

Bid Items & Bid Tabulations

77 Total 0 of 77
EL PASO  |  SL 375  |  EL PASO  |  2552-01-058  |  07/10/2019  |  $16,799,427.64  |  STP 1902(114)HES  |  REHAB OF EXIST ROAD  |  280 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. A. R. CONCRETE, INC.
LESNA CONSTRUCTION, INC.
DAN WILLIAMS COMPANY
JORDAN FOSTER CONSTRUCTION, LLC
ALLIED PAVING CO.
J.D. ABRAMS, L.P.
PREPARING ROW
STA 344.800 $1,000.000 $250.000 $500.000 $600.000 $280.000 $216.000 $1,000.000
REMOVING CONC (CURB)
LF 5,899.000 $4.500 $5.000 $3.000 $4.000 $3.500 $6.750 $5.000
REMOVING CONCRETE(MOW STRIP)
LF 22,182.000 $9.000 $3.000 $3.000 $3.750 $6.000 $5.670 $10.000
EXCAVATION (CHANNEL)
CY 61,301.000 $30.000 $14.000 $14.000 $25.000 $25.500 $12.600 $15.000
BACKFILL (TY B)
STA 677.500 $120.000 $144.000 $160.000 $175.000 $150.000 $382.910 $180.000
BLADING
HR 120.000 $130.000 $103.000 $95.000 $105.000 $115.000 $97.200 $120.000
SUPERPAVE MIXTURES SP-C SAC-A PG70-22
TON 33,419.000 $70.000 $75.000 $75.000 $75.000 $77.000 $73.310 $67.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 36,172.000 $41.000 $33.000 $38.500 $45.000 $52.000 $43.170 $48.000
PLANE ASPH CONC PAV(0" TO 2")
SY 3,179.000 $3.000 $3.000 $1.750 $1.750 $1.500 $2.190 $3.000
PLANE ASPH CONC PAV (1/2")
SY 303,979.000 $0.650 $1.000 $0.400 $0.500 $0.600 $0.340 $0.500
RIPRAP (CONC)(5 IN)
CY 245.000 $480.000 $330.000 $350.000 $450.000 $450.000 $385.880 $400.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 14,802.000 $100.000 $64.000 $55.000 $50.000 $63.000 $86.400 $45.000
RIPRAP (MOW STRIP)(4 IN)
CY 3,835.000 $420.000 $325.000 $350.000 $300.000 $380.000 $358.310 $260.000
RC PIPE (CL III)(18 IN)
LF 2,400.000 $65.000 $67.000 $90.000 $72.000 $90.000 $81.590 $55.000
SET (TY II) (18 IN) (RCP) (4: 1) (P)
EA 10.000 $1,500.000 $3,000.000 $1,250.000 $1,400.000 $2,400.000 $1,323.000 $1,140.000
MOBILIZATION
LS 1.000 $755,119.840 $1,113,000.000 $1,400,000.000 $875,000.000 $1,100,000.000 $324,000.000 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $10,000.000 $14,000.000 $10,500.000 $30,000.000 $18,000.000 $17,325.000 $35,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 2,275.000 $53.000 $20.000 $26.000 $25.500 $30.000 $32.630 $30.000
ROCK FILTER DAMS (REMOVE)
LF 2,275.000 $8.000 $8.000 $8.000 $11.000 $9.000 $13.280 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 3,744.000 $21.000 $17.000 $22.000 $18.000 $17.000 $22.680 $25.000
CONSTRUCTION EXITS (REMOVE)
SY 3,744.000 $6.500 $9.000 $7.250 $8.500 $7.000 $11.110 $7.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 29,040.000 $3.250 $2.000 $3.000 $3.000 $2.500 $3.780 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 29,040.000 $0.850 $1.000 $0.500 $0.850 $0.650 $1.620 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 5,190.000 $2.350 $4.000 $3.000 $7.500 $4.300 $5.020 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 5,190.000 $1.500 $1.000 $0.500 $1.050 $1.000 $1.620 $2.000
CONSTRUCTING DETOURS
SY 11,439.000 $33.000 $35.000 $47.000 $40.000 $33.500 $48.080 $60.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 15,280.000 $13.000 $7.000 $7.000 $12.000 $4.500 $5.510 $6.500
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 154,660.000 $5.000 $6.000 $5.000 $3.500 $2.050 $5.250 $5.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 15,280.000 $5.500 $7.000 $7.000 $6.000 $4.500 $5.510 $6.500
CONC CURB (TY IV)
LF 4,603.000 $15.000 $7.000 $12.000 $14.000 $11.000 $9.000 $16.000
MTL W-BEAM GD FEN (TIM POST)
LF 34,975.000 $25.000 $24.000 $25.000 $24.000 $22.000 $30.450 $26.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 9.000 $2,800.000 $1,600.000 $2,250.000 $2,400.000 $2,100.000 $2,094.750 $3,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 22.000 $1,850.000 $1,300.000 $1,100.000 $1,600.000 $1,600.000 $1,417.500 $150.000
REMOVE METAL BEAM GUARD FENCE
LF 26,585.000 $4.250 $2.500 $2.500 $2.500 $3.000 $3.520 $4.000
REMOVE TERMINAL ANCHOR SECTION
EA 20.000 $350.000 $450.000 $200.000 $250.000 $320.000 $420.000 $550.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 15.000 $75.000 $450.000 $125.000 $250.000 $320.000 $420.000 $550.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 9.000 $325.000 $400.000 $200.000 $275.000 $420.000 $351.750 $500.000
CABLE BARRIER SYSTEM (TL-4)
LF 58,065.000 $20.250 $7.000 $8.000 $9.000 $11.000 $15.490 $12.500
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 68.000 $4,000.000 $2,500.000 $2,200.000 $2,600.000 $2,100.000 $3,465.000 $4,000.000
REMOVE CABLE BARRIER
LF 21,802.000 $4.250 $3.000 $2.500 $3.500 $3.000 $4.990 $5.000
REMOVE CABLE BARRIER TERMINAL SECTION
EA 18.000 $700.000 $370.000 $300.000 $650.000 $500.000 $1,050.000 $550.000
GUARDRAIL END TREATMENT (INSTALL)
EA 29.000 $3,500.000 $2,500.000 $2,600.000 $3,200.000 $3,100.000 $3,990.000 $2,500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 40.000 $1,850.000 $1,900.000 $1,200.000 $750.000 $1,400.000 $1,890.000 $1,200.000
CRASH CUSH ATTEN (REMOVE)
EA 7.000 $825.000 $1,700.000 $500.000 $600.000 $850.000 $840.000 $310.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 7.000 $14,000.000 $9,200.000 $8,400.000 $8,500.000 $8,500.000 $11,220.000 $15,000.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 176.000 $40.000 $44.000 $42.000 $40.000 $40.000 $42.900 $41.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 44.000 $750.000 $700.000 $638.000 $600.000 $600.000 $655.230 $630.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 26.000 $775.000 $850.000 $794.000 $750.000 $800.000 $815.600 $780.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 93.000 $795.000 $800.000 $754.000 $715.000 $720.000 $774.770 $740.000
IN SM RD SN SUP&AM TY10BWG(2)SA(P-EXAL)
EA 8.000 $2,000.000 $2,000.000 $1,868.000 $1,800.000 $1,800.000 $1,919.780 $1,850.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 6.000 $940.000 $900.000 $848.000 $800.000 $800.000 $871.590 $835.000
IN SM RD SN SUP&AM TYS80(1)SA(T-EXAL)
EA 4.000 $1,050.000 $1,000.000 $948.000 $900.000 $900.000 $974.730 $935.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 11.000 $1,100.000 $1,100.000 $992.000 $950.000 $1,000.000 $1,019.690 $975.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 2.000 $1,150.000 $1,500.000 $1,229.000 $1,200.000 $1,200.000 $1,263.310 $1,210.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 3.000 $1,500.000 $2,000.000 $1,990.000 $2,000.000 $1,900.000 $2,045.980 $2,000.000
REMOVE SM RD SN SUP&AM
EA 174.000 $175.000 $105.000 $102.000 $100.000 $100.000 $104.500 $100.000
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
EA 16.000 $115.000 $89.000 $55.000 $50.000 $110.000 $121.010 $95.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 319.000 $55.000 $39.000 $28.000 $30.000 $30.000 $78.750 $63.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 5,964.000 $1.500 $1.500 $1.500 $1.350 $1.300 $1.470 $1.500
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 176,726.000 $1.600 $1.500 $1.500 $1.350 $1.300 $1.470 $1.500
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 183,760.000 $1.500 $1.500 $1.500 $1.350 $1.300 $1.470 $1.500
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 114.000 $1.150 $1.000 $1.700 $0.850 $1.000 $1.580 $1.000
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
LF 471.000 $1.250 $1.000 $1.150 $1.100 $1.200 $1.160 $1.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,455.000 $1.400 $1.000 $1.200 $1.100 $1.200 $1.160 $1.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 96.000 $8.000 $5.000 $6.000 $4.750 $5.000 $5.780 $5.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 6.000 $95.000 $75.000 $175.000 $70.000 $70.000 $157.500 $70.000
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 8.000 $300.000 $90.000 $280.000 $85.000 $85.000 $283.500 $90.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 12.000 $100.000 $75.000 $180.000 $70.000 $70.000 $183.750 $70.000
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
EA 72.000 $75.000 $125.000 $200.000 $110.000 $110.000 $194.250 $110.000
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
EA 72.000 $215.000 $275.000 $140.000 $245.000 $250.000 $126.000 $250.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 19,810.000 $0.950 $1.000 $1.000 $1.000 $1.000 $0.890 $1.000
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 78,299.000 $0.650 $1.000 $0.950 $0.700 $0.700 $0.800 $1.000
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 78,428.000 $0.800 $1.000 $0.950 $0.700 $0.700 $0.800 $1.000
ELIM EXT PAV MRK & MRKS (4")
LF 87,249.000 $0.750 $0.650 $0.850 $0.600 $0.600 $0.760 $2.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 12.000 $12,000.000 $9,000.000 $14,500.000 $1,000.000 $8,000.000 $10,392.000 $500.000
TMA (MOBILE OPERATION)
HR 500.000 $50.000 $150.000 $50.000 $50.000 $60.000 $77.000 $60.000
REC REFL PAV MRKR TY II-C-R
EA 1,272.000 $10.000 $11.000 $25.000 $10.000 $10.000 $23.100 $10.000
Totals: $16,799,427.640 $13,858,443.350 $14,274,791.100 $14,324,899.550 $14,857,022.900 $14,882,201.565 $14,941,925.000