Show Job Controls
Bid Cobra

LIPSCOMB SH 15 (0355-01-050)

Items: 87

County: LIPSCOMB
Length: N/A
Highway: SH 15
District: AMARILLO
Control Number: 0355-01-050
DBE Goal: N/A
Project: BR 1902(140)
Guaranty: N/A
Time: 281 WORKING DAYS
Engineer's Estimate: $3,039,978.00
Date: 07/09/2019 (6 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$3,039,978.00
$3,368,933.00
Over/Under Est: 10.82% $328,955.00
Over/Under Est: 26.4% $802,635.50
Amt Left: 14.06% $473,680.50
$4,492,871.90
Over/Under Est: 47.79% $1,452,893.90
Amt Left: 33.36% $1,123,938.90
Delta: -16.92% -$650,258.40

Bid Items & Bid Tabulations

87 Total 0 of 87
LIPSCOMB  |  SH 15  |  AMARILLO  |  0355-01-050  |  07/09/2019  |  $3,039,978.00  |  BR 1902(140)  |  BRIDGE REPL  |  281 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
EARTH BUILDERS, L.P.
STATELINE CONSTRUCTION, LLC
GILVIN-TERRILL, LTD.
PREPARING ROW
STA 10.000 $4,500.000 $30,000.000 $7,500.000 $650.000
PREPARING ROW(TREE)(24" TO 36" DIA.)
EA 16.000 $1,500.000 $1,000.000 $1,000.000 $400.000
EXCAVATION (ROADWAY AND CHANNEL)
CY 1,107.000 $15.000 $15.000 $26.000 $30.000
SUBGRADE WIDENING (DENS CONT)
STA 3.400 $1,800.000 $2,000.000 $8,500.000 $7,000.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 702.000 $33.000 $20.000 $38.000 $40.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 1,646.000 $1.650 $2.000 $4.000 $3.000
DRILL SEED (TEMP)(WARM OR COOL)
SY 823.000 $3.000 $2.000 $2.000 $2.500
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 120.000 $2.000 $10.000 $7.000 $5.000
FL BS (CMP IN PLC)(TY A GR 4)(FNAL POS)
CY 89.000 $75.000 $200.000 $216.000 $165.000
D-GR HMA TY-B PG64-22
TON 42.000 $220.000 $250.000 $400.000 $190.000
SUPERPAVE MIXTURES SP-C SAC-A PG70-28
TON 348.000 $180.000 $250.000 $300.000 $195.000
PLANE ASPH CONC PAV (2")
SY 486.000 $10.000 $40.000 $51.000 $42.000
CEM STABIL BKFL
CY 295.000 $225.000 $325.000 $485.000 $180.000
TEMPORARY SPL SHORING
SF 402.000 $25.000 $20.000 $45.000 $45.000
DRILL SHAFT (18 IN)
LF 102.000 $160.000 $200.000 $75.000 $150.000
CL C CONC (ABUT)(HPC)
CY 116.900 $1,500.000 $1,750.000 $1,495.000 $2,100.000
CL C CONC (CAP)(HPC)
CY 15.000 $1,500.000 $2,000.000 $2,125.000 $3,500.000
REINF CONC SLAB (HPC)
SF 8,700.000 $26.000 $35.000 $29.750 $50.000
BRIDGE SIDEWALK (HPC)
SF 800.000 $8.000 $30.000 $31.000 $60.000
APPROACH SLAB (HPC)
CY 122.100 $1,100.000 $1,000.000 $795.000 $1,050.000
PRESTR CONC GIRDER (TX28)
LF 396.000 $175.000 $275.000 $265.000 $230.000
PRESTR CONC GIRDER (TX46)
LF 796.000 $200.000 $275.000 $265.000 $240.000
SILICONE RESIN PAINT FINISH
SF 1,650.000 $7.000 $10.000 $16.000 $21.000
RIPRAP (CONC)(5 IN)
CY 211.400 $500.000 $700.000 $525.000 $721.000
RIPRAP (MOW STRIP)(4 IN)
CY 9.000 $510.000 $750.000 $1,000.000 $630.000
STR STEEL (MISC NON - BRIDGE)
LB 168.000 $17.000 $50.000 $35.000 $15.000
RAIL (TY T223)(HPC)
LF 480.000 $110.000 $150.000 $385.000 $245.000
RAIL (TY C223)(HPC)
LF 132.000 $155.000 $200.000 $385.000 $300.000
HEADER TYPE EXPANSION JOINT
LF 166.000 $100.000 $150.000 $95.000 $200.000
GABION MATTRESSES (GALV)(18 IN)
SY 100.000 $170.000 $200.000 $265.000 $230.000
GABIONS (3' X 3')(GALV)
CY 15.000 $214.000 $300.000 $385.000 $1,000.000
CONC BOX CULV (9 FT X 7 FT)
LF 68.000 $1,000.000 $1,500.000 $3,295.000 $2,200.000
RC PIPE (CL III)(24 IN)
LF 110.000 $150.000 $150.000 $85.000 $275.000
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $50,000.000 $30,000.000 $78,500.000 $100,000.000
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 1.000 $1,600.000 $5,000.000 $2,200.000 $30,000.000
REMOV STR (PIPE)
LF 5.000 $30.000 $20.000 $500.000 $2,000.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 3.000 $120,000.000 $30,000.000 $51,500.000 $185,000.000
MOBILIZATION
LS 1.000 $300,000.000 $375,000.000 $380,000.000 $450,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $15,000.000 $6,000.000 $22,550.000 $20,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,655.000 $5.000 $5.000 $5.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,655.000 $1.000 $1.000 $3.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 240.000 $5.000 $10.000 $8.000 $13.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 240.000 $2.000 $1.000 $5.000 $10.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 510.000 $20.000 $50.000 $45.000 $15.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 510.000 $15.000 $10.000 $45.000 $6.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 510.000 $20.000 $25.000 $45.000 $15.000
CONC CURB (TY II)
LF 50.000 $15.000 $25.000 $35.000 $120.000
CONC SIDEWALKS (6")
SY 193.000 $75.000 $75.000 $69.000 $95.000
CURB RAMPS (TY 1)
SY 22.000 $250.000 $100.000 $650.000 $225.000
MTL W-BEAM GD FEN (STEEL POST)
LF 500.000 $28.000 $40.000 $45.000 $45.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,140.000 $2,500.000 $2,300.000 $1,600.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 2.000 $1,250.000 $2,500.000 $1,300.000 $4,500.000
REMOVE METAL BEAM GUARD FENCE
LF 750.000 $3.000 $5.000 $4.000 $8.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $750.000 $100.000 $500.000 $450.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $2,800.000 $2,500.000 $3,250.000 $4,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $500.000 $500.000 $500.000 $900.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,000.000 $2,500.000 $3,000.000 $2,200.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $500.000 $1,000.000 $1,500.000 $2,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL2)
EA 2.000 $14,000.000 $7,500.000 $11,550.000 $9,135.000
WIRE FENCE (TY A)
LF 634.000 $25.000 $20.000 $26.000 $15.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $1,000.000 $500.000 $1,000.000 $645.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $1,000.000 $500.000 $1,000.000 $585.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $1,050.000 $500.000 $1,000.000 $920.000
REMOVE SM RD SN SUP&AM
EA 14.000 $150.000 $50.000 $500.000 $60.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 20.000 $25.000 $50.000 $65.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 26.000 $25.000 $50.000 $65.000 $45.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 720.000 $0.400 $2.000 $2.500 $2.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 80.000 $8.000 $10.000 $11.000 $10.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 1,540.000 $0.660 $2.000 $2.500 $2.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 24.000 $25.000 $25.000 $27.000 $25.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 2,870.000 $0.810 $1.500 $1.750 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 160.000 $1.000 $2.000 $6.000 $1.000
PAVEMENT SEALER 4"
LF 600.000 $0.990 $3.000 $3.500 $3.000
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 1,692.000 $2.000 $10.000 $11.000 $10.000
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 190.000 $2.000 $10.000 $11.000 $10.000
REFL PAV MRKR TY II-A-A
EA 10.000 $7.000 $20.000 $25.000 $20.000
ELIM EXT PAV MRK & MRKS (4")
LF 4,000.000 $1.480 $1.500 $2.000 $1.500
PAV SURF PREP FOR MRK (4")
LF 600.000 $0.740 $3.000 $3.500 $3.000
TEMP TRAF SIGNALS
EA 1.000 $50,000.000 $75,000.000 $100,000.000 $20,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $15,000.000 $15,000.000 $17,500.000
TMA (STATIONARY)
DAY 300.000 $650.000 $75.000 $165.000 $435.000
TMA (MOBILE OPERATION)
HR 40.000 $50.000 $250.000 $200.000 $10.000
1
DRILL SHAFT (36 IN)
LF 819.000 $180.000 $350.000 $233.000 $470.000
1
CL C CONC (COLUMN)(HPC)
CY 4.900 $1,200.000 $2,000.000 $3,850.000 $4,000.000
1A
PRESTR CONC PIL (18 IN SQ)
LF 496.000 $145.500 $0.000 $0.000 $0.000
1A
PRESTR CONC PIL (20 IN SQ)
LF 176.000 $200.180 $0.000 $0.000 $0.000
1A
DRILL SHAFT (36 IN)
LF 255.000 $180.000 $0.000 $0.000 $0.000
Totals: $3,193,277.680 $3,368,933.000 $3,842,613.500 $4,492,871.900