Show Job Controls
Bid Cobra

TRAVIS RM 1431 (1378-01-041)

Items: 58

County: TRAVIS
Length: N/A
Highway: RM 1431
District: AUSTIN
Control Number: 1378-01-041
DBE Goal: N/A
Project: STP 1902(187)
Guaranty: N/A
Time: 89 WORKING DAYS
Engineer's Estimate: $1,271,682.05
Date: 07/10/2019 (6 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$1,271,682.05
$2,046,650.35
Over/Under Est: 60.94% $774,968.30
Over/Under Est: 104.45% $1,328,306.45
Amt Left: 27.04% $553,338.15

Bid Items & Bid Tabulations

58 Total 0 of 58
TRAVIS  |  RM 1431  |  AUSTIN  |  1378-01-041  |  07/10/2019  |  $1,271,682.05  |  STP 1902(187)  |  HWY IMPRV  |  89 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AARON CONCRETE CONTRACTORS, L.P.
ANGEL BROTHERS HOLDINGS CORP.
PREPARING ROW
STA 73.300 $1,100.000 $1,800.000 $2,500.000
EXCAVATION (ROADWAY)
CY 1,694.000 $8.000 $50.000 $88.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,675.000 $6.500 $40.000 $98.000
FURNISHING AND PLACING TOPSOIL (4")
SY 13,570.000 $1.000 $4.000 $5.500
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 13,570.000 $0.250 $0.500 $0.500
VEGETATIVE WATERING
MG 229.000 $30.000 $35.000 $50.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 11,847.000 $1.000 $2.200 $2.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 1,723.000 $1.000 $1.300 $2.000
ASPH (TIER I)
GAL 60,586.000 $2.400 $4.500 $5.700
AGGR(TY-PD GR-4 SAC-A)
CY 1,329.000 $90.000 $130.000 $150.000
D-GR HMA(SQ) TY-B PG64-22
TON 3,252.000 $80.000 $120.000 $139.000
D-GR HMA(SQ) TY-D SAC-B PG70-22
TON 813.000 $95.000 $150.000 $151.000
RIPRAP (CONC)(5 IN)
CY 94.000 $350.000 $670.000 $650.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 7.000 $150.000 $650.000 $650.000
RIPRAP (MOW STRIP)(4 IN)
CY 62.000 $425.000 $540.000 $650.000
RC PIPE (CL III)(30 IN)
LF 40.000 $100.000 $300.000 $220.000
RC PIPE (CL III)(36 IN)
LF 44.000 $125.000 $350.000 $245.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 2.000 $7,000.000 $13,000.000 $20,000.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 2.000 $8,500.000 $14,000.000 $24,000.000
MOBILIZATION
LS 1.000 $120,000.000 $170,000.000 $259,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $5,000.000 $20,000.000 $25,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 50.000 $28.000 $54.000 $120.000
ROCK FILTER DAMS (REMOVE)
LF 50.000 $10.000 $17.000 $40.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,500.000 $2.500 $2.150 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,500.000 $0.750 $0.300 $1.000
INTERSECTIONS (ACP)
SY 192.000 $35.000 $42.000 $67.250
MTL W-BEAM GD FEN (TIM POST)
LF 700.000 $20.000 $28.000 $25.500
REMOVE METAL BEAM GUARD FENCE
LF 750.000 $2.000 $6.000 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $2,500.000 $3,300.000 $2,930.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $250.000 $335.000 $300.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 2.000 $200.000 $190.000 $176.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 42.000 $475.000 $470.000 $453.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 12.000 $550.000 $565.000 $527.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $550.000 $630.000 $596.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 8.000 $700.000 $850.000 $685.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 18.000 $20.000 $20.000 $13.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 2.000 $75.000 $73.000 $40.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,133.000 $1.000 $0.850 $1.050
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 6,546.000 $0.750 $1.700 $1.050
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 940.000 $1.500 $1.100 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,148.000 $0.750 $0.800 $0.700
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 12.000 $140.000 $90.000 $80.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 12.000 $150.000 $95.000 $85.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 24.000 $40.000 $62.000 $55.000
REFL PAV MRK TY II (W) 12" (SLD)
LF 3,086.000 $1.750 $0.850 $0.750
REFL PAV MRK TY II (W) 24" (SLD)
LF 12.000 $3.000 $3.350 $3.000
REFL PAV MRK TY II (W) (LNDP ARW)
EA 1.000 $100.000 $190.000 $170.000
REFL PAV MRK TY II (Y) 12" (SLD)
LF 775.000 $1.250 $0.850 $0.750
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 97,800.000 $0.650 $0.350 $0.300
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 530.000 $0.650 $0.350 $0.310
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 104,211.000 $0.650 $0.350 $0.300
REFL PAV MRKR TY I-C
EA 24.000 $3.250 $5.600 $5.000
REFL PAV MRKR TY II-A-A
EA 1,762.000 $3.250 $4.700 $4.200
TRAFFIC BUTTON TY I-C
EA 87.000 $3.250 $5.600 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 1,040.000 $0.400 $1.100 $4.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 80.000 $100.000 $82.000 $125.000
TMA (STATIONARY)
DAY 66.000 $250.000 $195.000 $300.000
TMA (MOBILE OPERATION)
HR 140.000 $57.000 $96.000 $30.000
Totals: $1,271,682.050 $2,046,650.350 $2,599,988.500