|
|
PREPARING ROW
|
STA
|
123.080
|
$200.000
|
$4,900.000
|
$7,400.000
|
$3,123.000
|
$4,000.000
|
$7,295.000
|
$1,812.300
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
811.000
|
$20.000
|
$10.000
|
$7.200
|
$15.000
|
$9.330
|
$5.500
|
$8.700
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
581.000
|
$20.000
|
$10.000
|
$5.800
|
$15.000
|
$7.330
|
$25.000
|
$8.700
|
|
|
REMOVING CONC (CURB)
|
LF
|
1,544.000
|
$3.500
|
$10.000
|
$2.500
|
$7.500
|
$10.800
|
$8.000
|
$10.900
|
|
|
REMOVING STAB BASE & ASPH PAV(16")
|
SY
|
31,662.000
|
$3.500
|
$2.000
|
$4.400
|
$0.640
|
$5.000
|
$5.000
|
$4.400
|
|
|
REMOVING STAB BASE AND ASPH PAV (10")
|
SY
|
16,150.000
|
$5.000
|
$0.100
|
$3.000
|
$0.400
|
$5.000
|
$3.000
|
$2.900
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
41,462.000
|
$6.000
|
$10.000
|
$5.800
|
$11.000
|
$10.000
|
$8.000
|
$6.900
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
67,435.000
|
$10.000
|
$2.000
|
$7.200
|
$5.000
|
$10.000
|
$8.000
|
$5.800
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
43,685.000
|
$0.250
|
$0.110
|
$0.050
|
$0.100
|
$0.050
|
$0.070
|
$0.100
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
43,685.000
|
$0.250
|
$0.130
|
$0.050
|
$0.100
|
$0.060
|
$0.070
|
$0.100
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
87,369.000
|
$0.500
|
$0.260
|
$0.200
|
$0.500
|
$0.190
|
$0.210
|
$0.200
|
|
|
VEGETATIVE WATERING
|
MG
|
525.000
|
$10.000
|
$75.000
|
$30.000
|
$42.000
|
$45.000
|
$20.000
|
$21.500
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
14,423.000
|
$1.500
|
$1.000
|
$1.050
|
$3.500
|
$1.100
|
$0.950
|
$1.000
|
|
|
PROOF ROLLING
|
HR
|
10.000
|
$75.000
|
$85.000
|
$130.000
|
$125.000
|
$304.300
|
$112.000
|
$77.300
|
|
|
FL BS (CMP IN PLC)(TY D GR 4)(4")
|
SY
|
4,841.000
|
$15.000
|
$7.000
|
$6.100
|
$9.000
|
$9.000
|
$10.000
|
$6.600
|
|
|
FL BS (CMP IN PLC)(TY D GR 4)(10")
|
SY
|
16,150.000
|
$16.500
|
$18.000
|
$13.500
|
$18.000
|
$18.000
|
$20.000
|
$16.600
|
|
|
REWORK BS MTL(TY B)(16")(ORD COMP)
|
SY
|
2,472.000
|
$6.000
|
$15.000
|
$12.000
|
$3.000
|
$14.000
|
$3.500
|
$4.600
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
2,522.000
|
$190.000
|
$156.000
|
$154.000
|
$165.000
|
$156.000
|
$178.000
|
$177.300
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
95,541.000
|
$2.500
|
$3.500
|
$3.500
|
$2.500
|
$5.000
|
$2.800
|
$3.800
|
|
|
CEMENT
|
TON
|
41.000
|
$150.000
|
$260.000
|
$200.000
|
$165.000
|
$146.160
|
$165.000
|
$154.500
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
5,047.000
|
$5.000
|
$3.000
|
$3.100
|
$2.500
|
$3.000
|
$3.000
|
$4.100
|
|
|
ASPH (RC-250)
|
GAL
|
5,879.000
|
$5.400
|
$6.100
|
$5.200
|
$6.150
|
$6.100
|
$7.000
|
$6.800
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
152.000
|
$90.000
|
$295.000
|
$215.000
|
$296.000
|
$295.000
|
$455.000
|
$483.500
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
9,667.000
|
$5.000
|
$5.400
|
$5.200
|
$5.450
|
$5.400
|
$7.000
|
$6.800
|
|
|
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
|
CY
|
40.000
|
$90.000
|
$480.000
|
$215.000
|
$483.000
|
$480.000
|
$585.000
|
$612.500
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
163.000
|
$105.000
|
$260.000
|
$215.000
|
$263.000
|
$260.000
|
$515.000
|
$542.600
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
410.000
|
$120.000
|
$90.000
|
$90.000
|
$88.000
|
$90.000
|
$87.000
|
$107.100
|
|
|
D-GR HMA(SQ) TY-D SAC-A PG64-22
|
TON
|
533.000
|
$130.000
|
$92.000
|
$95.000
|
$94.000
|
$91.100
|
$95.000
|
$109.300
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
19,326.000
|
$75.000
|
$72.250
|
$79.000
|
$79.000
|
$75.000
|
$78.000
|
$87.900
|
|
|
CONC PVMT (CONT REINF - CRCP) (9")
|
SY
|
82,967.000
|
$40.000
|
$48.000
|
$47.000
|
$55.400
|
$59.070
|
$63.000
|
$70.700
|
|
|
CURB (TYPE II)
|
LF
|
1,544.000
|
$5.250
|
$25.000
|
$21.000
|
$11.000
|
$5.000
|
$15.000
|
$8.500
|
|
|
CEM STABIL BKFL
|
CY
|
907.000
|
$125.000
|
$125.000
|
$105.000
|
$189.000
|
$130.000
|
$200.000
|
$117.100
|
|
|
CUT & RESTORING PAV
|
SY
|
77.000
|
$150.000
|
$200.000
|
$94.000
|
$150.000
|
$97.950
|
$139.000
|
$79.900
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
244.000
|
$2.000
|
$1.000
|
$25.000
|
$10.000
|
$26.620
|
$0.500
|
$6.800
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,620.000
|
$25.000
|
$33.000
|
$47.000
|
$37.710
|
$37.710
|
$20.000
|
$25.200
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
294.000
|
$100.000
|
$100.000
|
$72.000
|
$125.000
|
$100.000
|
$100.000
|
$201.800
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,076.000
|
$150.000
|
$150.000
|
$148.000
|
$190.000
|
$160.000
|
$155.000
|
$274.300
|
|
|
CL C CONC (ABUT)
|
CY
|
270.700
|
$1,100.000
|
$1,000.000
|
$800.000
|
$1,000.000
|
$1,500.000
|
$1,530.000
|
$843.000
|
|
|
REINF CONC SLAB
|
SF
|
20,160.000
|
$15.000
|
$19.240
|
$16.200
|
$25.000
|
$19.570
|
$21.000
|
$22.700
|
|
|
APPROACH SLAB
|
CY
|
501.500
|
$450.000
|
$440.000
|
$425.000
|
$500.000
|
$382.680
|
$437.000
|
$512.100
|
|
|
RETAINING WALL (MSE)
|
SF
|
295.000
|
$45.000
|
$30.000
|
$48.000
|
$20.000
|
$56.840
|
$60.000
|
$46.500
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
2,626.810
|
$140.000
|
$137.000
|
$155.000
|
$225.000
|
$165.220
|
$181.000
|
$165.700
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
184.000
|
$450.000
|
$800.000
|
$395.000
|
$600.000
|
$556.270
|
$528.000
|
$486.700
|
|
|
RIPRAP (STONE PROTECTION)(15 IN)
|
CY
|
1,094.000
|
$120.000
|
$110.000
|
$100.000
|
$125.000
|
$85.000
|
$95.000
|
$121.400
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,721.000
|
$140.000
|
$110.000
|
$98.000
|
$125.000
|
$149.430
|
$109.000
|
$124.600
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
68.800
|
$450.000
|
$600.000
|
$460.000
|
$600.000
|
$505.690
|
$466.000
|
$480.400
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
766.000
|
$10.000
|
$15.000
|
$11.500
|
$20.000
|
$16.360
|
$13.000
|
$14.400
|
|
|
RAIL (TY C223)
|
LF
|
827.000
|
$135.000
|
$125.000
|
$130.000
|
$150.000
|
$190.000
|
$138.000
|
$132.800
|
|
|
RAIL (TY C223)(MOD)
|
LF
|
312.000
|
$140.000
|
$170.000
|
$150.000
|
$155.000
|
$190.000
|
$144.000
|
$132.800
|
|
|
RETROFIT RAIL (TY C223)
|
LF
|
157.000
|
$300.000
|
$300.000
|
$145.000
|
$175.000
|
$219.500
|
$153.000
|
$207.800
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
387.000
|
$130.000
|
$100.000
|
$58.000
|
$60.000
|
$55.260
|
$66.000
|
$87.400
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
150.000
|
$50.000
|
$60.000
|
$50.000
|
$100.000
|
$51.220
|
$52.000
|
$58.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
84.000
|
$150.000
|
$472.000
|
$300.000
|
$300.000
|
$320.430
|
$326.000
|
$342.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
946.000
|
$45.000
|
$92.000
|
$48.000
|
$60.000
|
$52.480
|
$68.000
|
$59.900
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
532.000
|
$75.000
|
$119.000
|
$68.000
|
$70.000
|
$63.510
|
$81.000
|
$73.300
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
162.000
|
$80.000
|
$242.000
|
$96.000
|
$80.000
|
$116.380
|
$108.000
|
$106.200
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
132.000
|
$110.000
|
$196.000
|
$112.000
|
$110.000
|
$169.970
|
$145.000
|
$126.200
|
|
|
RC PIPE (CL III)(60 IN)
|
LF
|
116.000
|
$500.000
|
$326.000
|
$292.000
|
$250.000
|
$225.350
|
$244.000
|
$362.700
|
|
|
RC PIPE (CL IV)(48 IN)
|
LF
|
180.000
|
$150.000
|
$308.000
|
$252.000
|
$225.000
|
$224.130
|
$249.000
|
$359.700
|
|
|
INLET (COMPL)(PCO)(5FT)(BOTH)
|
EA
|
2.000
|
$6,500.000
|
$6,250.000
|
$6,400.000
|
$6,000.000
|
$5,562.430
|
$6,600.000
|
$6,183.700
|
|
|
SET (TY I)(S= 5 FT)(HW= 2 FT)(3:1) (C)
|
EA
|
2.000
|
$1,000.000
|
$4,600.000
|
$8,800.000
|
$7,500.000
|
$7,184.980
|
$5,600.000
|
$4,773.500
|
|
|
SET (TY II) (18 IN) (CMP) (3: 1) (C)
|
EA
|
4.000
|
$500.000
|
$800.000
|
$295.000
|
$675.000
|
$988.370
|
$1,003.000
|
$1,033.200
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
52.000
|
$900.000
|
$1,750.000
|
$590.000
|
$775.000
|
$1,255.870
|
$1,109.000
|
$847.700
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,000.000
|
$2,500.000
|
$625.000
|
$875.000
|
$1,271.390
|
$1,214.000
|
$1,074.700
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
24.000
|
$1,200.000
|
$2,150.000
|
$730.000
|
$975.000
|
$1,376.360
|
$1,400.000
|
$1,295.800
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$950.000
|
$3,500.000
|
$750.000
|
$1,275.000
|
$1,378.460
|
$1,400.000
|
$2,264.100
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,300.000
|
$4,500.000
|
$1,200.000
|
$1,875.000
|
$1,848.860
|
$2,000.000
|
$2,311.100
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$3,000.000
|
$4,150.000
|
$1,300.000
|
$1,875.000
|
$1,838.360
|
$2,400.000
|
$2,337.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$3,900.000
|
$6,150.000
|
$2,220.000
|
$3,075.000
|
$2,825.360
|
$5,000.000
|
$4,241.700
|
|
|
SET (TY II) (48 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$3,500.000
|
$9,100.000
|
$4,000.000
|
$6,075.000
|
$5,687.330
|
$3,500.000
|
$3,403.000
|
|
|
SET (TY II) (60 IN) (RCP) (4: 1) (P)
|
EA
|
4.000
|
$8,000.000
|
$14,000.000
|
$7,500.000
|
$11,875.000
|
$6,900.080
|
$12,400.000
|
$12,398.700
|
|
|
REMOV STR (PIPE)
|
LF
|
1,583.000
|
$13.000
|
$15.000
|
$15.000
|
$33.000
|
$15.000
|
$18.000
|
$13.700
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
2.000
|
$10,000.000
|
$25,000.000
|
$90,000.000
|
$20,000.000
|
$45,000.000
|
$34,000.000
|
$77,122.800
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$665,839.460
|
$1,300,000.000
|
$1,375,000.000
|
$1,300,000.000
|
$1,579,000.000
|
$1,500,000.000
|
$1,660,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
24.000
|
$2,500.000
|
$6,000.000
|
$7,000.000
|
$15,750.000
|
$10,000.000
|
$7,400.000
|
$7,665.600
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
240.000
|
$23.000
|
$27.000
|
$28.000
|
$34.130
|
$27.000
|
$27.000
|
$32.200
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
240.000
|
$7.000
|
$1.000
|
$8.000
|
$16.800
|
$8.000
|
$8.000
|
$8.600
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
281.000
|
$25.000
|
$43.000
|
$18.500
|
$19.950
|
$18.000
|
$18.000
|
$26.900
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
281.000
|
$8.000
|
$1.000
|
$8.000
|
$8.400
|
$8.000
|
$8.000
|
$10.700
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,192.000
|
$2.500
|
$1.450
|
$1.500
|
$1.520
|
$1.450
|
$1.450
|
$2.900
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,192.000
|
$1.000
|
$0.100
|
$0.400
|
$0.260
|
$0.420
|
$0.420
|
$0.900
|
|
|
ONE-WAY TRAFFIC CONTROL (PORT TRAF SIG)
|
DAY
|
5.000
|
$500.000
|
$300.000
|
$1,260.000
|
$519.000
|
$974.250
|
$1,500.000
|
$532.100
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 2)
|
LF
|
1,500.000
|
$25.000
|
$15.000
|
$12.000
|
$21.000
|
$20.000
|
$12.000
|
$5.400
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 2)
|
LF
|
1,500.000
|
$25.000
|
$5.000
|
$7.000
|
$10.500
|
$15.000
|
$8.000
|
$5.400
|
|
|
COLORED TEXTURED CONC (5")
|
SY
|
807.000
|
$100.000
|
$115.000
|
$65.000
|
$105.000
|
$74.560
|
$108.000
|
$73.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
21,962.000
|
$3.500
|
$2.000
|
$2.300
|
$3.000
|
$2.000
|
$2.000
|
$8.400
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
285.000
|
$8.000
|
$25.000
|
$25.000
|
$50.000
|
$50.000
|
$40.000
|
$29.800
|
|
|
INTERSECTIONS (CONC)
|
SY
|
357.000
|
$40.000
|
$80.000
|
$80.000
|
$88.000
|
$67.040
|
$106.000
|
$100.300
|
|
|
DRIVEWAYS (CONC)
|
SY
|
4,765.000
|
$85.000
|
$60.000
|
$53.000
|
$66.000
|
$65.280
|
$78.000
|
$73.600
|
|
|
TURNOUTS (ACP)
|
SY
|
58.000
|
$60.000
|
$200.000
|
$210.000
|
$201.000
|
$132.930
|
$69.000
|
$74.100
|
|
|
RIGHT OF WAY MARKERS
|
EA
|
49.000
|
$375.000
|
$120.000
|
$470.000
|
$300.000
|
$500.000
|
$250.000
|
$473.700
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
525.000
|
$23.000
|
$22.000
|
$22.200
|
$23.100
|
$22.500
|
$22.000
|
$24.200
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
9.000
|
$1,200.000
|
$1,550.000
|
$1,600.000
|
$2,044.810
|
$1,675.000
|
$1,550.000
|
$1,799.900
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,825.000
|
$2.250
|
$2.000
|
$2.100
|
$2.100
|
$2.500
|
$2.000
|
$2.700
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
12.000
|
$175.000
|
$125.000
|
$127.000
|
$131.250
|
$200.000
|
$125.000
|
$214.900
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$250.000
|
$125.000
|
$127.000
|
$131.250
|
$150.000
|
$125.000
|
$161.200
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,500.000
|
$2,575.000
|
$2,600.000
|
$2,703.750
|
$2,550.000
|
$2,575.000
|
$2,740.100
|
|
|
GUARDRAIL END TREATMENT (MOVE & RESET)
|
EA
|
1.000
|
$1,000.000
|
$1,100.000
|
$1,200.000
|
$1,155.000
|
$1,000.000
|
$1,100.000
|
$1,074.600
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
8.000
|
$1,000.000
|
$800.000
|
$1,400.000
|
$750.000
|
$1,000.000
|
$750.000
|
$1,074.600
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
8.000
|
$12,000.000
|
$12,000.000
|
$12,000.000
|
$12,600.000
|
$13,500.000
|
$14,300.000
|
$14,506.400
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
2.000
|
$330.000
|
$390.000
|
$400.000
|
$404.250
|
$385.000
|
$400.000
|
$459.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
18.000
|
$175.000
|
$150.000
|
$150.000
|
$147.000
|
$140.000
|
$175.000
|
$192.800
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
1.000
|
$200.000
|
$200.000
|
$200.000
|
$199.500
|
$190.000
|
$250.000
|
$247.400
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
21.000
|
$500.000
|
$442.000
|
$460.000
|
$464.100
|
$442.000
|
$500.000
|
$507.100
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
16.000
|
$600.000
|
$534.000
|
$550.000
|
$560.700
|
$534.000
|
$600.000
|
$614.900
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
1.000
|
$800.000
|
$717.000
|
$740.000
|
$752.850
|
$717.000
|
$900.000
|
$776.500
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$1,000.000
|
$929.000
|
$970.000
|
$975.450
|
$929.000
|
$800.000
|
$846.900
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
48.000
|
$70.000
|
$65.000
|
$68.000
|
$68.250
|
$65.000
|
$100.000
|
$85.500
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
18.000
|
$35.000
|
$55.000
|
$58.000
|
$57.750
|
$55.000
|
$60.000
|
$48.400
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
24.000
|
$30.000
|
$30.000
|
$18.500
|
$31.500
|
$25.000
|
$32.000
|
$26.900
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
24,268.000
|
$0.500
|
$0.150
|
$0.160
|
$0.160
|
$0.150
|
$0.150
|
$0.200
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
24,268.000
|
$0.180
|
$0.150
|
$0.160
|
$0.160
|
$0.150
|
$0.150
|
$0.200
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
3,678.000
|
$2.000
|
$2.700
|
$2.800
|
$2.840
|
$2.700
|
$2.700
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
3,678.000
|
$2.000
|
$2.700
|
$2.800
|
$2.840
|
$2.700
|
$2.700
|
$3.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
1,472.000
|
$1.000
|
$0.860
|
$0.900
|
$0.900
|
$0.860
|
$0.860
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
101.000
|
$5.250
|
$5.500
|
$5.800
|
$5.780
|
$5.500
|
$5.500
|
$6.100
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
10.000
|
$135.000
|
$140.000
|
$146.000
|
$147.000
|
$140.000
|
$140.000
|
$155.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
6.000
|
$200.000
|
$150.000
|
$156.000
|
$157.500
|
$150.000
|
$150.000
|
$166.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
|
EA
|
5.000
|
$28.000
|
$80.000
|
$83.000
|
$84.000
|
$80.000
|
$80.000
|
$88.500
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
5,270.000
|
$0.150
|
$0.150
|
$0.160
|
$0.160
|
$0.150
|
$0.150
|
$0.200
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
22,762.000
|
$0.120
|
$0.150
|
$0.160
|
$0.160
|
$0.150
|
$0.150
|
$0.200
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
1,212.000
|
$0.350
|
$0.300
|
$0.330
|
$0.320
|
$0.300
|
$0.300
|
$0.300
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
102.000
|
$3.000
|
$2.000
|
$2.050
|
$2.100
|
$2.000
|
$2.000
|
$2.200
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
9.000
|
$70.000
|
$50.000
|
$53.000
|
$52.500
|
$50.000
|
$50.000
|
$55.300
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
5.000
|
$85.000
|
$60.000
|
$63.000
|
$63.000
|
$60.000
|
$60.000
|
$66.400
|
|
REFL PAV MRK TY II (W) 36" (YLD TRI)
|
EA
|
5.000
|
$50.000
|
$40.000
|
$42.000
|
$42.000
|
$40.000
|
$40.000
|
$44.300
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
5,300.000
|
$0.150
|
$0.150
|
$0.160
|
$0.160
|
$0.150
|
$0.150
|
$0.200
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
22,728.000
|
$0.120
|
$0.150
|
$0.160
|
$0.160
|
$0.150
|
$0.150
|
$0.200
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
|
LF
|
24,662.000
|
$0.400
|
$1.000
|
$1.050
|
$1.050
|
$1.000
|
$1.000
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
5,270.000
|
$0.400
|
$0.500
|
$0.530
|
$0.530
|
$0.500
|
$0.500
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
5,300.000
|
$0.400
|
$0.500
|
$0.530
|
$0.530
|
$0.500
|
$0.500
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
25,994.000
|
$0.400
|
$0.500
|
$0.530
|
$0.530
|
$0.500
|
$0.500
|
$0.600
|
|
REFL PAV MRKR TY I-C
|
EA
|
4,002.000
|
$3.750
|
$3.300
|
$3.400
|
$3.470
|
$3.300
|
$3.300
|
$3.700
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
4,270.000
|
$3.500
|
$3.300
|
$3.400
|
$3.470
|
$3.300
|
$3.300
|
$3.700
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
4,268.000
|
$0.500
|
$0.400
|
$0.420
|
$0.420
|
$0.400
|
$0.400
|
$0.400
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
56,062.000
|
$0.100
|
$0.040
|
$0.050
|
$0.040
|
$0.040
|
$0.040
|
$0.400
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,212.000
|
$0.150
|
$0.080
|
$0.090
|
$0.080
|
$0.080
|
$0.080
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
116.000
|
$2.000
|
$1.000
|
$1.050
|
$1.050
|
$1.000
|
$1.000
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
11.000
|
$20.000
|
$20.000
|
$21.000
|
$21.000
|
$20.000
|
$20.000
|
$22.100
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
6.000
|
$20.000
|
$30.000
|
$32.000
|
$31.500
|
$30.000
|
$30.000
|
$33.200
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
5.000
|
$10.000
|
$20.000
|
$21.000
|
$21.000
|
$20.000
|
$20.000
|
$22.100
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$2,500.000
|
$200.000
|
$1,250.000
|
$3,150.000
|
$1,500.000
|
$7,100.000
|
$9,839.600
|
|
|
FLOATING SILT BARRIER (TURBID CURTAIN)
|
LF
|
25.000
|
$10.000
|
$35.000
|
$65.000
|
$210.000
|
$50.000
|
$50.000
|
$16.300
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$8,500.000
|
$17,000.000
|
$17,850.000
|
$19,485.000
|
$12,000.000
|
$11,462.600
|
|
|
TMA (STATIONARY)
|
DAY
|
10.000
|
$250.000
|
$450.000
|
$200.000
|
$735.000
|
$1,000.000
|
$150.000
|
$221.100
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
100.000
|
$50.000
|
$70.000
|
$68.000
|
$52.500
|
$100.000
|
$48.000
|
$67.600
|
|
Totals: |
$11,922,008.600
|
$13,617,111.870
|
$13,796,438.980
|
$14,899,918.800
|
$15,792,312.790
|
$16,184,495.950
|
$16,567,332.771
|