REMOVING CONC (SIDEWALKS)
|
SY
|
100.000
|
$15.000
|
$18.000
|
$11.000
|
$19.000
|
$2,315.980
|
|
|
REMOVING CONC (CURB)
|
LF
|
100.000
|
$10.000
|
$1.000
|
$3.000
|
$10.000
|
$35.510
|
|
|
REMOVING CONC (WHEELCHAIR RAMP)
|
SY
|
4.000
|
$10.000
|
$30.000
|
$58.000
|
$48.000
|
$17.500
|
|
|
BLADING
|
STA
|
800.000
|
$95.000
|
$100.000
|
$107.000
|
$125.000
|
$168.330
|
|
|
BLADING
|
LF
|
5,000.000
|
$2.000
|
$5.000
|
$1.070
|
$5.000
|
$5.980
|
|
|
CEM TRT(PLNT MX) (CL L)(TY C)(GR 1-2)
|
TON
|
2.000
|
$70.000
|
$70.000
|
$88.000
|
$145.000
|
$729.080
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
|
SY
|
500.000
|
$50.000
|
$45.000
|
$40.000
|
$100.000
|
$161.850
|
|
|
FULL - DEPTH REPAIR CRCP (15")
|
SY
|
500.000
|
$367.000
|
$350.000
|
$450.000
|
$350.000
|
$174.980
|
|
|
FULL - DEPTH REPAIR CRCP (8"-14")
|
SY
|
1,000.000
|
$314.000
|
$310.000
|
$440.000
|
$325.000
|
$145.820
|
|
|
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
|
SF
|
100.000
|
$300.000
|
$125.000
|
$95.000
|
$250.000
|
$213.160
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
50.000
|
$2,699.400
|
$150.000
|
$110.000
|
$150.000
|
$291.630
|
|
|
CONC STR REPR(RAPID VERT AND OVERHEAD)
|
SF
|
100.000
|
$100.000
|
$75.000
|
$130.000
|
$175.000
|
$449.090
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
100.000
|
$100.000
|
$70.000
|
$87.000
|
$150.000
|
$125.040
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
10.000
|
$100.000
|
$450.000
|
$190.000
|
$500.000
|
$735.100
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
75.000
|
$400.000
|
$500.000
|
$190.000
|
$400.000
|
$666.010
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
225.000
|
$20.000
|
$25.000
|
$16.500
|
$24.000
|
$21.290
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
225.000
|
$15.000
|
$5.000
|
$10.000
|
$19.000
|
$15.890
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
150.000
|
$150.000
|
$300.000
|
$90.000
|
$195.000
|
$123.220
|
|
|
INLET (COMPL)(TY AZ)
|
EA
|
2.000
|
$500.000
|
$2,500.000
|
$2,700.000
|
$4,000.000
|
$7,874.020
|
|
|
INLET (COMPL)(EXT TY C)
|
EA
|
4.000
|
$1,000.000
|
$1,000.000
|
$800.000
|
$1,400.000
|
$8,748.910
|
|
|
INLET (STG II)(TY C)
|
EA
|
4.000
|
$1,200.000
|
$1,100.000
|
$1,800.000
|
$1,400.000
|
$8,748.910
|
|
|
MANH (STG II)(TY A)
|
EA
|
4.000
|
$1,071.000
|
$1,100.000
|
$1,200.000
|
$1,400.000
|
$1,458.150
|
|
|
REMOV STR (INLET)
|
EA
|
4.000
|
$400.000
|
$300.000
|
$290.000
|
$350.000
|
$1,282.510
|
|
|
REMOV STR (MANHOLE)
|
EA
|
4.000
|
$300.000
|
$200.000
|
$290.000
|
$190.000
|
$656.170
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
48.000
|
$1,000.000
|
$100.000
|
$2,100.000
|
$750.000
|
$291.630
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
18.000
|
$2,500.000
|
$200.000
|
$2,700.000
|
$1,500.000
|
$1,458.150
|
|
|
PORT CTB (DES SOURCE)(SAFETY SH)
|
LF
|
150.000
|
$12.000
|
$5.000
|
$17.000
|
$14.000
|
$145.820
|
|
|
PORT CTB (MOVE)(SAFETY SH)
|
LF
|
1,200.000
|
$7.000
|
$7.000
|
$7.000
|
$10.000
|
$145.820
|
|
|
PORT CTB (STKPL)(SAFETY SH)
|
LF
|
150.000
|
$12.000
|
$5.000
|
$20.000
|
$15.000
|
$14.580
|
|
|
LANDSCAPE PAVERS
|
SY
|
150.000
|
$20.000
|
$88.000
|
$60.000
|
$60.000
|
$75.030
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
200.000
|
$7.000
|
$55.000
|
$46.000
|
$50.000
|
$58.330
|
|
|
CONC CURB (MONO) (TY I)
|
LF
|
300.000
|
$3.600
|
$3.000
|
$13.000
|
$15.000
|
$14.580
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
300.000
|
$15.000
|
$3.000
|
$13.000
|
$20.000
|
$39.100
|
|
|
CONC CURB (U-TURN)
|
LF
|
1,000.000
|
$23.600
|
$40.000
|
$13.000
|
$40.000
|
$34.890
|
|
|
CONC CURB (DOWEL)
|
LF
|
300.000
|
$40.000
|
$12.000
|
$21.000
|
$15.000
|
$72.910
|
|
|
CONC SIDEWALKS (4")
|
SY
|
250.000
|
$45.000
|
$65.000
|
$40.000
|
$60.000
|
$85.980
|
|
|
CURB RAMPS (TY 1)
|
EA
|
2.000
|
$1,300.000
|
$2,200.000
|
$1,300.000
|
$1,500.000
|
$2,826.920
|
|
|
CURB RAMPS (TY 7)
|
EA
|
2.000
|
$750.000
|
$2,200.000
|
$1,300.000
|
$1,500.000
|
$1,639.650
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
10.000
|
$2,000.000
|
$2,200.000
|
$1,300.000
|
$1,700.000
|
$2,145.750
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
5.000
|
$2,000.000
|
$1,075.000
|
$1,100.000
|
$2,000.000
|
$2,058.640
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
50.000
|
$2.000
|
$2.000
|
$2.000
|
$10.000
|
$5.470
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$60.300
|
$1.000
|
$145.000
|
$250.000
|
$191.020
|
|
|
GUARDRAIL END TREATMENT (MOVE & RESET)
|
EA
|
5.000
|
$550.000
|
$450.000
|
$1,200.000
|
$500.000
|
$5,842.330
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
150.000
|
$25.000
|
$25.000
|
$30.000
|
$20.000
|
$34.160
|
|
|
CHAIN LINK FENCE (REPAIR) (6')
|
LF
|
450.000
|
$15.000
|
$20.000
|
$41.000
|
$22.000
|
$28.160
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
500.000
|
$5.000
|
$1.000
|
$5.000
|
$2.000
|
$5.830
|
|
|
GATE (INSTALL) (DOUBLE) (6' X 14')
|
EA
|
1.000
|
$1,100.000
|
$800.000
|
$2,100.000
|
$1,000.000
|
$2,189.170
|
|
|
GATE (REPAIR) (DOUBLE) (6' X 14')
|
EA
|
1.000
|
$1,100.000
|
$900.000
|
$2,900.000
|
$1,000.000
|
$291.630
|
|
|
GATE (REMOVE)
|
EA
|
1.000
|
$200.000
|
$200.000
|
$500.000
|
$500.000
|
$291.630
|
|
|
GATE (INSTALL)(SINGLE)(6' X 24')
|
EA
|
1.000
|
$1,100.000
|
$1,100.000
|
$2,100.000
|
$1,500.000
|
$2,187.230
|
|
|
GATE (INSTALL)(DOUBLE)(6' X 16')
|
EA
|
1.000
|
$1,600.000
|
$1,500.000
|
$2,000.000
|
$1,500.000
|
$2,041.410
|
|
|
GATE (REPAIR)(SINGLE)(6' X 24')
|
EA
|
1.000
|
$700.000
|
$700.000
|
$2,900.000
|
$1,000.000
|
$437.450
|
|
|
GATE (REPAIR)(DOUBLE)(6' X 16')
|
EA
|
1.000
|
$700.000
|
$800.000
|
$2,800.000
|
$1,000.000
|
$364.540
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
750.000
|
$25.000
|
$18.000
|
$29.000
|
$35.000
|
$37.760
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
300.000
|
$28.680
|
$18.000
|
$32.000
|
$60.000
|
$36.360
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
500.000
|
$28.270
|
$20.000
|
$30.000
|
$50.000
|
$39.840
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)SRF
|
EA
|
20.000
|
$20.000
|
$45.000
|
$44.000
|
$150.000
|
$58.330
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
1,000.000
|
$20.000
|
$7.000
|
$32.000
|
$25.000
|
$20.120
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
1,000.000
|
$20.000
|
$12.000
|
$37.000
|
$50.000
|
$21.870
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
1,000.000
|
$20.000
|
$7.000
|
$32.000
|
$25.000
|
$20.120
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
1,000.000
|
$20.000
|
$12.000
|
$36.000
|
$30.000
|
$29.160
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
2,500.000
|
$0.310
|
$0.550
|
$1.370
|
$1.200
|
$2.120
|
|
REFL PAV MRK TY I (W)8"(BRK)(100MIL)
|
LF
|
2,500.000
|
$0.500
|
$0.820
|
$1.810
|
$1.200
|
$1.140
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
25,000.000
|
$0.900
|
$0.820
|
$1.100
|
$1.000
|
$3.370
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
20,000.000
|
$2.630
|
$2.150
|
$2.720
|
$1.800
|
$3.450
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
20,000.000
|
$2.150
|
$2.100
|
$3.020
|
$2.800
|
$4.010
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
10,000.000
|
$3.000
|
$3.300
|
$6.050
|
$5.900
|
$9.170
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
300.000
|
$100.000
|
$112.000
|
$97.000
|
$95.000
|
$225.540
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
100.000
|
$125.000
|
$122.000
|
$121.000
|
$120.000
|
$219.850
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
105.000
|
$107.000
|
$112.000
|
$121.000
|
$120.000
|
$217.980
|
|
REFL PAV MRK TY I(W)(U-LT ARW)(100 MIL)
|
EA
|
50.000
|
$100.000
|
$112.000
|
$121.000
|
$120.000
|
$229.660
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
2.000
|
$200.000
|
$112.000
|
$110.000
|
$120.000
|
$217.270
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
300.000
|
$125.000
|
$112.000
|
$97.000
|
$95.000
|
$249.910
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
18.000
|
$600.000
|
$408.000
|
$550.000
|
$600.000
|
$609.380
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
18.000
|
$600.000
|
$408.000
|
$550.000
|
$600.000
|
$600.190
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
20.000
|
$389.000
|
$433.000
|
$440.000
|
$475.000
|
$738.410
|
|
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
|
EA
|
4.000
|
$100.000
|
$112.000
|
$99.000
|
$106.668
|
$317.720
|
|
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
|
EA
|
4.000
|
$150.000
|
$76.000
|
$82.000
|
$88.890
|
$397.350
|
|
RFL PAV MRK TY I(W)BIKE RR XING(100MIL)
|
EA
|
4.000
|
$150.000
|
$76.000
|
$83.000
|
$88.890
|
$479.370
|
|
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
|
EA
|
4.000
|
$100.000
|
$76.000
|
$83.000
|
$88.890
|
$397.350
|
|
REFL PAV MRK TY I(W)(BIKE WORD)(100MIL)
|
EA
|
4.000
|
$95.000
|
$76.000
|
$83.000
|
$88.890
|
$437.450
|
|
REFL PAV MRK TY I (W)(BIKE DOT)(100MIL)
|
EA
|
4.000
|
$50.000
|
$76.000
|
$83.000
|
$88.890
|
$437.450
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
4,500.000
|
$1.000
|
$0.680
|
$0.880
|
$0.950
|
$1.370
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
5,000.000
|
$1.950
|
$1.650
|
$2.200
|
$2.400
|
$3.270
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
6,500.000
|
$3.100
|
$3.200
|
$4.400
|
$4.750
|
$5.090
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
5,000.000
|
$0.500
|
$0.820
|
$0.580
|
$0.650
|
$1.020
|
|
REFL PAV MRK TY II (W) 18" (YLD TRI)
|
EA
|
100.000
|
$30.000
|
$21.000
|
$46.000
|
$35.000
|
$43.740
|
|
REFL PAV MRK TY II (W) 36" (YLD TRI)
|
EA
|
100.000
|
$35.000
|
$36.000
|
$46.000
|
$35.000
|
$69.990
|
|
|
PAVEMENT SEALER 6"
|
LF
|
22,500.000
|
$0.070
|
$0.040
|
$0.210
|
$0.200
|
$0.090
|
|
|
PAVEMENT SEALER 8"
|
LF
|
22,500.000
|
$0.080
|
$0.080
|
$0.270
|
$0.300
|
$0.200
|
|
|
PAVEMENT SEALER 12"
|
LF
|
25,000.000
|
$0.150
|
$0.160
|
$0.700
|
$0.700
|
$1.310
|
|
|
PAVEMENT SEALER 24"
|
LF
|
12,500.000
|
$0.240
|
$0.280
|
$1.410
|
$1.400
|
$1.390
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
300.000
|
$6.500
|
$5.600
|
$36.000
|
$36.000
|
$25.900
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
300.000
|
$7.500
|
$7.850
|
$36.000
|
$36.000
|
$32.040
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
100.000
|
$7.500
|
$7.850
|
$48.000
|
$50.000
|
$23.390
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
100.000
|
$6.500
|
$5.600
|
$48.000
|
$50.000
|
$21.920
|
|
|
PAVEMENT SEALER (LNDP ARROW)
|
EA
|
2.000
|
$10.000
|
$5.600
|
$88.000
|
$94.816
|
$29.170
|
|
|
PAVEMENT SEALER (U-L ARROW)
|
EA
|
500.000
|
$6.500
|
$40.000
|
$110.000
|
$115.000
|
$8.660
|
|
|
PAVEMENT SEALER (ENTR GORE)
|
EA
|
18.000
|
$30.000
|
$40.000
|
$220.000
|
$237.040
|
$75.710
|
|
|
PAVEMENT SEALER (EXIT GORE)
|
EA
|
18.000
|
$57.000
|
$5.600
|
$220.000
|
$237.040
|
$95.550
|
|
|
PAVEMENT SEALER (SYMBOL)
|
EA
|
4.000
|
$7.000
|
$40.000
|
$55.000
|
$59.260
|
$35.840
|
|
|
PAVEMENT SEALER (RR XING)
|
EA
|
20.000
|
$27.000
|
$5.600
|
$110.000
|
$118.520
|
$62.240
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
100.000
|
$24.000
|
$5.600
|
$27.000
|
$29.630
|
$1.800
|
|
|
PAVEMENT SEALER (BIKE ARROW)
|
EA
|
4.000
|
$5.400
|
$5.600
|
$56.000
|
$60.042
|
$1.860
|
|
|
PAVEMENT SEALER (BIKE SYMBOL)
|
EA
|
4.000
|
$5.400
|
$5.600
|
$44.000
|
$47.408
|
$1.860
|
|
|
PAVEMENT SEALER (BIKE WORD)
|
EA
|
4.000
|
$5.400
|
$5.600
|
$44.000
|
$47.408
|
$1.860
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
5,000.000
|
$0.540
|
$0.560
|
$1.330
|
$0.650
|
$0.800
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
10,000.000
|
$0.540
|
$0.560
|
$1.330
|
$0.650
|
$0.710
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
5,000.000
|
$0.540
|
$0.560
|
$0.820
|
$0.650
|
$0.840
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
10,000.000
|
$0.540
|
$0.560
|
$1.330
|
$0.650
|
$0.710
|
|
|
PAVEMENT SEALER (BIKE RRX)
|
EA
|
4.000
|
$5.400
|
$5.600
|
$44.000
|
$47.408
|
$174.980
|
|
PREFAB PAV MRK TY C (MULTI) (SHIELD)
|
EA
|
4.000
|
$1,800.000
|
$3,160.000
|
$2,200.000
|
$2,370.397
|
$218.720
|
|
REFL PAV MRKR TY I-C
|
EA
|
1,250.000
|
$3.900
|
$4.000
|
$6.000
|
$4.480
|
$6.060
|
|
REFL PAV MRKR TY I-R
|
EA
|
500.000
|
$3.900
|
$4.000
|
$6.000
|
$4.500
|
$6.650
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,750.000
|
$3.800
|
$4.000
|
$6.000
|
$4.500
|
$5.600
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,550.000
|
$4.000
|
$4.000
|
$6.000
|
$4.500
|
$5.730
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
22,500.000
|
$0.240
|
$0.180
|
$0.340
|
$0.300
|
$2.510
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
22,500.000
|
$0.220
|
$0.240
|
$0.410
|
$0.350
|
$2.680
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
25,000.000
|
$0.380
|
$0.300
|
$0.680
|
$0.600
|
$0.980
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
12,500.000
|
$0.530
|
$0.500
|
$1.370
|
$1.200
|
$1.010
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
300.000
|
$16.000
|
$12.200
|
$68.000
|
$60.000
|
$26.240
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
100.000
|
$15.000
|
$18.200
|
$55.000
|
$50.000
|
$36.960
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
300.000
|
$20.000
|
$12.200
|
$68.000
|
$60.000
|
$29.140
|
|
|
ELIM EXT PAV MRK & MRKS (ENTR GORE)
|
EA
|
18.000
|
$150.000
|
$117.000
|
$220.000
|
$237.040
|
$103.550
|
|
|
ELIM EXT PAV MRK & MRKS (EXIT GORE)
|
EA
|
18.000
|
$150.000
|
$117.000
|
$220.000
|
$237.040
|
$109.490
|
|
|
ELIM EXT PAV MRK & MRKS (RR XING)
|
EA
|
20.000
|
$140.000
|
$117.000
|
$220.000
|
$237.040
|
$130.770
|
|
|
ELIM EXT PAV MRK & MRKS (SYMBOL)
|
EA
|
4.000
|
$55.000
|
$23.000
|
$55.000
|
$59.260
|
$78.140
|
|
|
ELIM EXT PAV MRK & MRKS (SHEILD)
|
EA
|
4.000
|
$100.000
|
$33.000
|
$55.000
|
$118.520
|
$81.290
|
|
|
ELIM EXT PAV MRK & MARKS (BIKE ARROW)
|
EA
|
4.000
|
$10.000
|
$5.600
|
$55.000
|
$59.260
|
$81.290
|
|
|
ELIM EXT PAV MRK & MARKS (BIKE RR XING)
|
EA
|
4.000
|
$10.000
|
$5.600
|
$55.000
|
$59.260
|
$72.910
|
|
|
ELIM EXT PAV MRK & MARKS (BIKE SYMBOL)
|
EA
|
4.000
|
$10.000
|
$5.600
|
$55.000
|
$59.260
|
$72.910
|
|
|
ELIM EXT PAV MRK & MARKS (BIKE WORD)
|
EA
|
4.000
|
$5.000
|
$5.600
|
$55.000
|
$59.260
|
$23.330
|
|
|
ELIM EXT PAV MRK & MARKS (BIKE DOT)
|
EA
|
4.000
|
$15.000
|
$5.600
|
$55.000
|
$59.260
|
$23.330
|
|
|
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
|
EA
|
105.000
|
$20.000
|
$12.200
|
$77.000
|
$60.000
|
$23.330
|
|
|
ELIM EXT PAV MRK & MRKS (UTRN/LT ARR)
|
EA
|
50.000
|
$10.000
|
$12.200
|
$77.000
|
$60.000
|
$23.330
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
3,375.000
|
$0.010
|
$0.040
|
$0.110
|
$0.050
|
$11.700
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
3,375.000
|
$0.090
|
$0.080
|
$0.190
|
$0.070
|
$11.720
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
3,750.000
|
$0.150
|
$0.100
|
$0.380
|
$0.130
|
$11.750
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,875.000
|
$0.180
|
$0.100
|
$0.770
|
$0.250
|
$0.280
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
45.000
|
$10.000
|
$5.600
|
$20.000
|
$6.000
|
$4.330
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
15.000
|
$10.000
|
$5.600
|
$20.000
|
$6.000
|
$6.410
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
100.000
|
$10.500
|
$5.600
|
$20.000
|
$6.000
|
$5.910
|
|
|
PAV SURF PREP FOR MRK (U/LT ARROW)
|
EA
|
500.000
|
$10.000
|
$5.600
|
$8.000
|
$6.000
|
$13.120
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
45.000
|
$10.000
|
$5.600
|
$19.000
|
$6.000
|
$12.210
|
|
|
PAV SURF PREP FOR MRK (ENTR GORE)
|
EA
|
3.000
|
$56.000
|
$31.000
|
$77.000
|
$60.000
|
$86.670
|
|
|
PAV SURF PREP FOR MRK (EXIT GORE)
|
EA
|
3.000
|
$50.000
|
$31.000
|
$77.000
|
$60.000
|
$119.480
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
4.000
|
$18.000
|
$31.000
|
$77.000
|
$60.000
|
$112.190
|
|
|
PAV SURF PREP FOR MRK (18")(YLD TRI)
|
EA
|
100.000
|
$6.000
|
$5.600
|
$8.000
|
$6.000
|
$91.860
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
100.000
|
$12.000
|
$5.600
|
$8.000
|
$6.000
|
$65.620
|
|
|
PAV SURF PREP FOR MRKS (SHIELD)
|
EA
|
4.000
|
$30.000
|
$5.600
|
$6.000
|
$5.926
|
$123.940
|
|
|
PAV SURF PREP FOR MRK (BIKE ARROW)
|
EA
|
4.000
|
$5.000
|
$5.600
|
$6.000
|
$5.926
|
$83.120
|
|
|
PAV SURF PREP FOR MRK (BIKE RR XING)
|
EA
|
4.000
|
$5.000
|
$5.600
|
$6.000
|
$5.926
|
$78.740
|
|
|
PAV SURF PREP FOR MRK (BIKE SYMBOL)
|
EA
|
4.000
|
$5.000
|
$5.600
|
$6.000
|
$5.926
|
$86.030
|
|
|
PAV SURF PREP FOR MRK (BIKE WORD)
|
EA
|
4.000
|
$3.000
|
$5.600
|
$5.000
|
$5.120
|
$99.160
|
|
|
PAV SURF PREP FOR MRK (BIKE DOT)
|
EA
|
4.000
|
$2.000
|
$5.600
|
$6.000
|
$5.926
|
$123.940
|
|
|
PAV SURF PREP FOR MRK (BLAST CLN)(6")
|
LF
|
19,125.000
|
$0.460
|
$0.310
|
$0.110
|
$0.150
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (BLAST CLN)(8")
|
LF
|
19,125.000
|
$0.520
|
$0.360
|
$0.160
|
$0.200
|
$0.220
|
|
|
PAV SURF PREP FOR MRK (BLAST CLN)(12")
|
LF
|
21,250.000
|
$0.800
|
$0.250
|
$0.220
|
$0.250
|
$0.290
|
|
|
PAV SURF PREP FOR MRK (BLAST CLN)(24")
|
LF
|
10,625.000
|
$1.200
|
$0.450
|
$0.550
|
$0.600
|
$0.730
|
|
|
PV SURF PREP FOR MRK (BLST CLN)(ARRWS)
|
EA
|
255.000
|
$3.000
|
$16.000
|
$11.000
|
$11.852
|
$78.740
|
|
|
PV SURF PREP MRKS (BLST CLN)(DBL ARW)
|
EA
|
85.000
|
$4.000
|
$26.000
|
$11.000
|
$11.852
|
$74.370
|
|
|
PV SRF PRP FOR MRK (BLT CLN)(ENT GORE)
|
EA
|
15.000
|
$5.000
|
$127.000
|
$55.000
|
$59.260
|
$51.040
|
|
|
PV SRF PRP FOR MRK (BLT CLN)(EXT GORE)
|
EA
|
15.000
|
$5.000
|
$127.000
|
$55.000
|
$59.260
|
$56.870
|
|
|
PAV SURF PREP MRK (BLST CLN)(RR XING)
|
EA
|
16.000
|
$5.000
|
$76.000
|
$55.000
|
$59.260
|
$56.870
|
|
|
PV SURF PRP FOR MRK (BLST CLN)(WORDS)
|
EA
|
255.000
|
$5.000
|
$56.000
|
$11.000
|
$11.852
|
$29.160
|
|
|
POTHOLE REPAIR (SAW - CUT)
|
TON
|
200.000
|
$220.000
|
$200.000
|
$86.000
|
$115.000
|
$1,165.940
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
40,000.000
|
$2.760
|
$2.400
|
$3.600
|
$2.600
|
$3.740
|
|
|
SPOT MOWING
|
AC
|
50.000
|
$72.000
|
$75.000
|
$76.000
|
$80.000
|
$103.530
|
|
|
FULL - WIDTH MOWING - TRACT (1)
|
AC
|
385.000
|
$72.000
|
$75.000
|
$58.000
|
$80.000
|
$103.530
|
|
|
FULL - WIDTH MOWING - TRACT (2)
|
AC
|
248.000
|
$72.000
|
$75.000
|
$58.000
|
$80.000
|
$103.530
|
|
|
FULL - WIDTH MOWING - TRACT (3)
|
AC
|
60.000
|
$72.000
|
$75.000
|
$58.000
|
$80.000
|
$103.530
|
|
|
FULL - WIDTH MOWING - TRACT (4)
|
AC
|
60.000
|
$72.000
|
$75.000
|
$58.000
|
$80.000
|
$103.530
|
|
|
FULL - WIDTH MOWING - TRACT (5)
|
AC
|
120.000
|
$72.000
|
$75.000
|
$58.000
|
$80.000
|
$103.530
|
|
|
FULL - WIDTH MOWING - TRACT (6)
|
AC
|
1,152.000
|
$72.000
|
$75.000
|
$58.000
|
$80.000
|
$103.530
|
|
|
FULL - WIDTH MOWING - TRACT (7)
|
AC
|
32.000
|
$72.000
|
$75.000
|
$58.000
|
$80.000
|
$103.530
|
|
|
FULL - WIDTH MOWING - TRACT (8)
|
AC
|
528.000
|
$72.000
|
$75.000
|
$58.000
|
$80.000
|
$103.530
|
|
|
FULL - WIDTH MOWING - TRACT (12)
|
AC
|
1,928.000
|
$72.000
|
$75.000
|
$58.000
|
$80.000
|
$103.530
|
|
|
PAVEMENT EDGES, STRUCTURES & FIXTURES
|
MI
|
250.000
|
$150.000
|
$280.000
|
$300.000
|
$200.000
|
$103.530
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
50.000
|
$30.000
|
$30.000
|
$75.000
|
$30.000
|
$21.320
|
|
|
LITTER REMOVAL - TRACT (1)
|
CYC
|
52.000
|
$2,800.000
|
$2,300.000
|
$2,300.000
|
$2,800.000
|
$3,264.640
|
|
|
LITTER REMOVAL - TRACT (2)
|
CYC
|
52.000
|
$300.000
|
$550.000
|
$330.000
|
$1,800.000
|
$466.380
|
|
|
LITTER REMOVAL - TRACT (3)
|
CYC
|
52.000
|
$250.000
|
$500.000
|
$2,600.000
|
$1,000.000
|
$3,731.020
|
|
|
LITTER REMOVAL - TRACT (4)
|
CYC
|
52.000
|
$250.000
|
$500.000
|
$180.000
|
$1,000.000
|
$233.190
|
|
|
LITTER REMOVAL - TRACT (5)
|
CYC
|
52.000
|
$250.000
|
$475.000
|
$360.000
|
$1,000.000
|
$466.380
|
|
|
LITTER REMOVAL - TRACT (6)
|
CYC
|
52.000
|
$2,600.000
|
$3,000.000
|
$2,000.000
|
$8,500.000
|
$2,798.260
|
|
|
LITTER REMOVAL - TRACT (7)
|
CYC
|
52.000
|
$250.000
|
$475.000
|
$90.000
|
$1,100.000
|
$126.620
|
|
|
LITTER REMOVAL - TRACT (8)
|
CYC
|
52.000
|
$2,600.000
|
$2,000.000
|
$1,820.000
|
$4,000.000
|
$2,565.070
|
|
|
LITTER REMOVAL - TRACT (11)
|
CYC
|
4.000
|
$250.000
|
$550.000
|
$180.000
|
$1,100.000
|
$233.190
|
|
|
LITTER REMOVAL - TRACT (12)
|
CYC
|
52.000
|
$3,000.000
|
$9,000.000
|
$6,300.000
|
$14,000.000
|
$8,861.170
|
|
|
DEBRIS REMOVAL (SPOT DEBRIS)
|
MI
|
500.000
|
$36.000
|
$60.000
|
$200.000
|
$150.000
|
$69.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (1)
|
CYC
|
24.000
|
$1,500.000
|
$930.000
|
$1,500.000
|
$2,130.000
|
$932.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (2)
|
CYC
|
24.000
|
$300.000
|
$230.000
|
$200.000
|
$180.000
|
$133.410
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (3)
|
CYC
|
24.000
|
$300.000
|
$200.000
|
$200.000
|
$1,280.000
|
$1,065.410
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (4)
|
CYC
|
24.000
|
$300.000
|
$230.000
|
$200.000
|
$100.000
|
$66.700
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (5)
|
CYC
|
24.000
|
$300.000
|
$200.000
|
$200.000
|
$180.000
|
$133.410
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (6)
|
CYC
|
24.000
|
$1,500.000
|
$830.000
|
$1,500.000
|
$960.000
|
$799.060
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (7)
|
CYC
|
24.000
|
$300.480
|
$160.000
|
$200.000
|
$60.000
|
$36.340
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (8)
|
CYC
|
24.000
|
$1,500.000
|
$830.000
|
$1,500.000
|
$880.000
|
$732.350
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (12)
|
CYC
|
24.000
|
$5,000.000
|
$3,900.000
|
$5,000.000
|
$3,000.000
|
$2,530.120
|
|
|
DEBRIS - FRONTAGE ROADS - AREA (1)
|
CYC
|
24.000
|
$1,500.480
|
$470.000
|
$1,500.000
|
$570.000
|
$932.000
|
|
|
DEBRIS - FRONTAGE ROADS - AREA (2)
|
CYC
|
24.000
|
$200.000
|
$230.000
|
$200.000
|
$100.000
|
$133.410
|
|
|
DEBRIS - FRONTAGE ROADS - AREA (3)
|
CYC
|
24.000
|
$200.000
|
$135.000
|
$200.000
|
$650.000
|
$1,065.410
|
|
|
DEBRIS - FRONTAGE ROADS - AREA (4)
|
CYC
|
24.000
|
$200.000
|
$215.000
|
$200.000
|
$60.000
|
$66.700
|
|
|
DEBRIS - FRONTAGE ROADS - AREA (6)
|
CYC
|
24.000
|
$1,500.000
|
$530.000
|
$1,500.000
|
$100.000
|
$799.060
|
|
|
DEBRIS - FRONTAGE ROADS - AREA (7)
|
CYC
|
24.000
|
$200.000
|
$200.000
|
$200.000
|
$490.000
|
$36.340
|
|
|
DEBRIS - FRONTAGE ROADS - AREA (8)
|
CYC
|
24.000
|
$1,500.000
|
$530.000
|
$1,500.000
|
$40.000
|
$732.350
|
|
|
DEBRIS - FRONTAGE ROADS - AREA (12)
|
CYC
|
24.000
|
$5,000.000
|
$1,500.000
|
$5,000.000
|
$450.000
|
$2,530.120
|
|
|
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (1)
|
CYC
|
24.000
|
$1,500.000
|
$530.000
|
$1,500.000
|
$300.000
|
$932.000
|
|
|
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (2)
|
CYC
|
24.000
|
$200.000
|
$230.000
|
$200.000
|
$60.000
|
$133.410
|
|
|
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (3)
|
CYC
|
24.000
|
$200.000
|
$160.000
|
$150.000
|
$330.000
|
$1,065.410
|
|
|
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (4)
|
CYC
|
24.000
|
$200.000
|
$210.000
|
$250.000
|
$40.000
|
$66.700
|
|
|
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (5)
|
CYC
|
24.000
|
$200.000
|
$230.000
|
$250.000
|
$60.000
|
$133.410
|
|
|
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (6)
|
CYC
|
24.000
|
$1,500.000
|
$530.000
|
$1,500.000
|
$260.000
|
$799.060
|
|
|
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (7)
|
CYC
|
24.000
|
$200.000
|
$200.000
|
$250.000
|
$30.000
|
$36.340
|
|
|
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (8)
|
CYC
|
24.000
|
$1,500.000
|
$530.000
|
$1,500.000
|
$240.000
|
$732.350
|
|
|
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (12)
|
CYC
|
24.000
|
$3,000.000
|
$1,700.000
|
$3,500.000
|
$770.000
|
$2,530.120
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (1)
|
CYC
|
24.000
|
$1,000.000
|
$530.000
|
$1,000.000
|
$300.000
|
$932.000
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (2)
|
CYC
|
24.000
|
$200.000
|
$230.000
|
$300.000
|
$60.000
|
$133.410
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (3)
|
CYC
|
24.000
|
$200.000
|
$230.000
|
$400.000
|
$330.000
|
$1,065.410
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (4)
|
CYC
|
24.000
|
$200.000
|
$150.000
|
$200.000
|
$40.000
|
$66.700
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (5)
|
CYC
|
24.000
|
$200.000
|
$140.000
|
$200.000
|
$60.000
|
$133.410
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (6)
|
CYC
|
24.000
|
$400.000
|
$440.000
|
$370.000
|
$260.000
|
$799.060
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (7)
|
CYC
|
24.000
|
$200.120
|
$200.000
|
$300.000
|
$30.000
|
$36.340
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (12)
|
CYC
|
24.000
|
$3,000.000
|
$1,750.000
|
$3,000.000
|
$240.000
|
$2,530.120
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
25.000
|
$250.000
|
$175.000
|
$220.000
|
$52.368
|
$163.610
|
|
|
CLEANING / SWEEPING (HANDWORK)
|
SY
|
750,000.000
|
$0.510
|
$0.420
|
$0.430
|
$0.950
|
$0.360
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(1)
|
CYC
|
24.000
|
$2,500.000
|
$2,765.000
|
$4,280.000
|
$3,300.000
|
$2,070.910
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(2)
|
CYC
|
24.000
|
$375.000
|
$395.000
|
$610.000
|
$475.000
|
$295.950
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(3)
|
CYC
|
24.000
|
$375.000
|
$3,160.000
|
$4,900.000
|
$3,700.000
|
$2,366.860
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(4)
|
CYC
|
24.000
|
$375.000
|
$200.000
|
$310.000
|
$250.000
|
$148.340
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(5)
|
CYC
|
24.000
|
$375.000
|
$395.000
|
$610.000
|
$475.000
|
$295.950
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(6)
|
CYC
|
24.000
|
$2,200.000
|
$2,370.000
|
$3,700.000
|
$3,000.000
|
$1,775.690
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(7)
|
CYC
|
24.000
|
$200.000
|
$107.000
|
$160.000
|
$125.000
|
$80.710
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(8)
|
CYC
|
24.000
|
$2,200.000
|
$2,170.000
|
$3,360.000
|
$2,500.000
|
$1,627.350
|
|
|
CLEAN / SWEEP - CENTER MEDIAN-AREA (12)
|
CYC
|
24.000
|
$8,000.000
|
$7,500.000
|
$11,620.000
|
$9,100.000
|
$5,620.840
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(1)
|
CYC
|
24.000
|
$2,500.000
|
$2,765.000
|
$4,280.000
|
$3,300.000
|
$2,070.910
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(2)
|
CYC
|
24.000
|
$350.000
|
$395.000
|
$610.000
|
$500.000
|
$295.950
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(3)
|
CYC
|
24.000
|
$350.000
|
$3,160.000
|
$4,900.000
|
$4,000.000
|
$2,366.860
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(4)
|
CYC
|
24.000
|
$350.000
|
$197.000
|
$310.000
|
$230.000
|
$148.340
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(5)
|
CYC
|
24.000
|
$350.000
|
$395.000
|
$610.000
|
$475.000
|
$295.950
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(6)
|
CYC
|
24.000
|
$2,300.000
|
$2,370.000
|
$3,700.000
|
$2,900.000
|
$1,775.690
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(7)
|
CYC
|
24.000
|
$250.000
|
$110.000
|
$170.000
|
$125.000
|
$80.710
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(8)
|
CYC
|
24.000
|
$2,300.000
|
$2,170.000
|
$3,360.000
|
$2,500.000
|
$1,627.350
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(9)
|
CYC
|
24.000
|
$3,000.000
|
$1,975.000
|
$3,100.000
|
$2,500.000
|
$1,479.740
|
|
|
CLEAN /SWEEP-OUTSIDE MAIN LANE-AREA(12)
|
CYC
|
24.000
|
$7,500.000
|
$7,500.000
|
$11,620.000
|
$9,100.000
|
$5,620.840
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(1)
|
CYC
|
24.000
|
$3,000.000
|
$2,765.000
|
$4,280.000
|
$3,300.000
|
$2,070.910
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(2)
|
CYC
|
24.000
|
$450.000
|
$395.000
|
$610.000
|
$475.000
|
$295.950
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(3)
|
CYC
|
24.000
|
$450.000
|
$3,160.000
|
$4,890.000
|
$3,750.000
|
$2,366.860
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(4)
|
CYC
|
24.000
|
$450.000
|
$200.000
|
$310.000
|
$235.000
|
$148.340
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(6)
|
CYC
|
24.000
|
$2,750.000
|
$2,370.000
|
$3,700.000
|
$2,800.000
|
$1,775.690
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(7)
|
CYC
|
24.000
|
$230.000
|
$110.000
|
$170.000
|
$130.000
|
$80.710
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(8)
|
CYC
|
24.000
|
$2,750.000
|
$2,170.000
|
$3,360.000
|
$2,500.000
|
$1,627.350
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD -AREA(12)
|
CYC
|
24.000
|
$2,750.000
|
$7,500.000
|
$11,620.000
|
$9,100.000
|
$5,620.840
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 1)
|
CYC
|
24.000
|
$2,450.000
|
$2,765.000
|
$4,280.000
|
$3,300.000
|
$2,070.910
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 2)
|
CYC
|
24.000
|
$375.000
|
$395.000
|
$620.000
|
$475.000
|
$295.950
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 3)
|
CYC
|
24.000
|
$375.000
|
$3,160.000
|
$4,890.000
|
$3,700.000
|
$2,366.860
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 4)
|
CYC
|
24.000
|
$375.000
|
$197.000
|
$75.000
|
$240.000
|
$148.340
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 5)
|
CYC
|
24.000
|
$375.000
|
$395.000
|
$150.000
|
$475.000
|
$295.950
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 6)
|
CYC
|
24.000
|
$2,300.000
|
$2,370.000
|
$920.000
|
$2,900.000
|
$1,775.690
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 7)
|
CYC
|
24.000
|
$190.000
|
$107.000
|
$40.000
|
$125.000
|
$80.710
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 8)
|
CYC
|
24.000
|
$2,300.000
|
$2,170.000
|
$840.000
|
$2,600.000
|
$1,627.350
|
|
|
CLEAN / SWEEP - (ENTR/EXT RMP)(AREA 12)
|
CYC
|
24.000
|
$7,500.000
|
$7,500.000
|
$2,900.000
|
$9,000.000
|
$5,620.840
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(1)
|
CYC
|
24.000
|
$2,400.000
|
$2,765.000
|
$1,290.000
|
$3,300.000
|
$2,070.910
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(2)
|
CYC
|
24.000
|
$375.000
|
$395.000
|
$180.000
|
$475.000
|
$295.950
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(4)
|
CYC
|
24.000
|
$375.000
|
$197.000
|
$90.000
|
$240.000
|
$148.340
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(5)
|
CYC
|
24.000
|
$375.000
|
$395.000
|
$180.000
|
$475.000
|
$295.950
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(6)
|
CYC
|
24.000
|
$2,300.000
|
$2,370.000
|
$1,100.000
|
$2,800.000
|
$1,775.690
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(7)
|
CYC
|
24.000
|
$180.000
|
$107.000
|
$50.000
|
$125.000
|
$80.710
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(8)
|
CYC
|
24.000
|
$2,300.000
|
$2,170.000
|
$1,010.000
|
$2,500.000
|
$1,627.350
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(15
|
CYC
|
24.000
|
$7,500.000
|
$7,500.000
|
$3,490.000
|
$9,100.000
|
$5,620.840
|
|
|
GRAFFITI REMOVAL (BLAST CLEANING)
|
SF
|
20,000.000
|
$1.200
|
$1.000
|
$1.800
|
$1.000
|
$2.080
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
60,000.000
|
$1.200
|
$1.100
|
$5.400
|
$2.000
|
$2.400
|
|
|
GRAFFITI REMOVAL (CHEMICAL CLEANING)
|
SF
|
500.000
|
$3.000
|
$0.750
|
$3.500
|
$5.000
|
$2.770
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
10.000
|
$2,000.000
|
$1,500.000
|
$3,230.000
|
$1,500.000
|
$2,799.320
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
10.000
|
$200.000
|
$180.000
|
$330.000
|
$200.000
|
$171.430
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
10.000
|
$200.000
|
$290.000
|
$400.000
|
$350.000
|
$281.530
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
10.000
|
$200.000
|
$290.000
|
$500.000
|
$500.000
|
$330.410
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
10.000
|
$200.000
|
$440.000
|
$660.000
|
$650.000
|
$458.950
|
|
|
TREE REMOVAL (30" - 36" DIA)
|
EA
|
10.000
|
$200.000
|
$440.000
|
$1,000.000
|
$850.000
|
$682.270
|
|
|
TREE REMOVAL (36" - 42" DIA)
|
EA
|
5.000
|
$200.000
|
$400.000
|
$1,320.000
|
$1,000.000
|
$961.190
|
|
|
TREE REMOVAL (42" - 48" DIA)
|
EA
|
2.000
|
$200.000
|
$400.000
|
$1,200.000
|
$2,000.000
|
$1,234.210
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
500.000
|
$10.000
|
$8.000
|
$13.000
|
$8.000
|
$72.910
|
|
|
DRAIN INLET CLEANING
|
EA
|
200.000
|
$85.000
|
$75.000
|
$80.000
|
$75.000
|
$122.120
|
|
|
PUMP STATION WELL CLEANING
|
EA
|
36.000
|
$1,900.000
|
$1,950.000
|
$2,500.000
|
$2,300.000
|
$291.630
|
|
|
BASKET AND INLET PIPE CLEANING
|
EA
|
64.000
|
$500.000
|
$330.000
|
$450.000
|
$435.000
|
$291.630
|
|
|
SUMP CLEANING
|
EA
|
52.000
|
$300.000
|
$330.000
|
$460.000
|
$435.000
|
$291.630
|
|
|
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
|
LF
|
5,000.000
|
$5.600
|
$6.500
|
$6.200
|
$4.750
|
$6.120
|
|
|
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
|
LF
|
5,000.000
|
$5.600
|
$6.500
|
$7.000
|
$5.750
|
$7.510
|
|
|
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
|
LF
|
5,000.000
|
$58.600
|
$6.000
|
$8.800
|
$6.500
|
$8.280
|
|
|
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
|
LF
|
5,000.000
|
$6.800
|
$6.500
|
$9.900
|
$7.500
|
$9.880
|
|
|
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
|
LF
|
5,000.000
|
$7.800
|
$5.000
|
$10.000
|
$9.000
|
$10.610
|
|
|
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
|
LF
|
5,000.000
|
$8.800
|
$5.000
|
$13.000
|
$12.000
|
$16.000
|
|
|
STORM SEWER CLEAN (BOX CULV) (6-<12 SF)
|
LF
|
100.000
|
$20.000
|
$11.000
|
$14.300
|
$13.000
|
$22.710
|
|
|
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
|
LF
|
100.000
|
$20.000
|
$12.000
|
$16.400
|
$15.000
|
$25.990
|
|
|
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
|
LF
|
100.000
|
$20.000
|
$15.000
|
$20.750
|
$19.000
|
$34.340
|
|
|
SLOTTED DRAIN CLEANING
|
LF
|
750.000
|
$8.000
|
$5.000
|
$5.000
|
$4.750
|
$13.670
|
|
|
STORM SEWER CLEAN X LRG PUMP STAT WELL
|
EA
|
20.000
|
$6,080.000
|
$7,960.000
|
$10,725.000
|
$10,000.000
|
$291.630
|
|
|
PUMP STATION WELL CLEANING (LARGE)
|
EA
|
32.000
|
$3,275.000
|
$4,800.000
|
$6,435.000
|
$6,000.000
|
$729.080
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
2,625.000
|
$15.000
|
$14.500
|
$25.000
|
$15.000
|
$25.000
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
375.000
|
$125.000
|
$5.000
|
$30.000
|
$25.000
|
$82.360
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
375.000
|
$125.000
|
$5.000
|
$28.000
|
$30.000
|
$87.380
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
250.000
|
$75.000
|
$31.000
|
$87.000
|
$75.000
|
$103.070
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
220.000
|
$100.000
|
$40.000
|
$87.000
|
$70.000
|
$118.710
|
|
|
REALIGN POSTS
|
EA
|
300.000
|
$40.000
|
$6.000
|
$8.000
|
$30.000
|
$35.600
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
1,500.000
|
$25.000
|
$22.000
|
$16.800
|
$19.000
|
$61.220
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
250.000
|
$55.000
|
$45.000
|
$87.000
|
$45.000
|
$88.220
|
|
|
REPAIR OF TERMINAL ANCHORS POSTS
|
EA
|
4.000
|
$6.000
|
$5.000
|
$60.000
|
$250.000
|
$73.390
|
|
|
REPLACE TERMINAL ANCHOR POSTS
|
EA
|
4.000
|
$14.000
|
$5.000
|
$130.000
|
$350.000
|
$73.390
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
5.000
|
$2,500.000
|
$2,800.000
|
$2,700.000
|
$2,500.000
|
$5,531.260
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
10.000
|
$1,100.000
|
$1,100.000
|
$1,190.000
|
$950.000
|
$3,208.940
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
24.000
|
$100.000
|
$100.000
|
$800.000
|
$100.000
|
$876.140
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
15.000
|
$75.000
|
$109.000
|
$260.000
|
$200.000
|
$205.950
|
|
|
REPLACE SGT CABLE ANCHOR
|
EA
|
15.000
|
$70.000
|
$88.000
|
$250.000
|
$200.000
|
$253.550
|
|
|
REPLACE SGT STRUT
|
EA
|
16.000
|
$50.000
|
$62.000
|
$230.000
|
$125.000
|
$262.450
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
75.000
|
$25.000
|
$20.000
|
$47.000
|
$50.000
|
$197.270
|
|
|
REMOVE AND REPLACE (NARROW REACT 350)
|
EA
|
1.000
|
$19,825.000
|
$21,000.000
|
$22,000.000
|
$19,000.000
|
$28,183.350
|
|
|
REMOVE AND REPLACE (WIDE REACT 350)
|
EA
|
1.000
|
$26,333.330
|
$46,000.000
|
$35,500.000
|
$29,000.000
|
$50,336.660
|
|
|
REPAIR REACT (N) (MISC HARDWARE)
|
EA
|
10.000
|
$1,010.000
|
$1,400.000
|
$10,960.000
|
$800.000
|
$1,682.340
|
|
|
REPAIR REACT (N) (REAR SEC "S")
|
EA
|
4.000
|
$125.000
|
$50.000
|
$580.000
|
$500.000
|
$622.340
|
|
|
REPAIR REACT (N) (REAR SEC "B")
|
EA
|
4.000
|
$225.000
|
$50.000
|
$580.000
|
$500.000
|
$548.630
|
|
|
REPAIR REACT (N) (FRONT SECTION)
|
EA
|
4.000
|
$325.000
|
$250.000
|
$1,075.000
|
$1,000.000
|
$990.090
|
|
|
REPAIR REACT (N) (CYLINDERS)
|
EA
|
10.000
|
$2,484.000
|
$2,900.000
|
$4,500.000
|
$3,000.000
|
$3,483.600
|
|
|
REPAIR (QUAD) (N) (BAY)
|
EA
|
1.000
|
$1,083.000
|
$1,500.000
|
$1,420.000
|
$1,500.000
|
$2,916.300
|
|
|
REPAIR REACT (W) (MISC) (HARDWARE)
|
EA
|
10.000
|
$1,033.000
|
$1,200.000
|
$10,960.000
|
$700.000
|
$1,917.320
|
|
|
REPAIR REACT (W) (CYLINDERS)
|
EA
|
10.000
|
$2,600.000
|
$2,900.000
|
$4,060.000
|
$2,500.000
|
$3,783.540
|
|
|
REMOVE AND REPLACE (HEART)
|
EA
|
2.000
|
$15,000.000
|
$1,000.000
|
$28,100.000
|
$10,000.000
|
$30,621.200
|
|
|
REPAIR HEART (MISC HARDWARE)
|
EA
|
2.000
|
$2,000.000
|
$3,500.000
|
$3,700.000
|
$500.000
|
$3,062.120
|
|
|
REMOVE AND REPLACE (TAU II) (N)
|
EA
|
3.000
|
$2,500.000
|
$19,500.000
|
$24,700.000
|
$20,000.000
|
$36,453.810
|
|
|
REPAIR TAU II (N)
|
LF
|
250.000
|
$250.000
|
$335.000
|
$280.000
|
$200.000
|
$477.950
|
|
|
REPAIR TAU II (W)
|
LF
|
250.000
|
$250.000
|
$50.000
|
$280.000
|
$200.000
|
$625.180
|
|
|
REMOVE AND REPLACE TAU II (W)
|
EA
|
3.000
|
$250.000
|
$25,000.000
|
$3,400.000
|
$25,000.000
|
$4,374.460
|
|
|
REMOVE & REPLACE REACT 350(TXDOT FRNSH)
|
EA
|
5.000
|
$4,000.000
|
$2,500.000
|
$1,900.000
|
$2,500.000
|
$5,257.190
|
|
|
RAISING AND UNDERSEALING CONCRETE SLAB
|
LB
|
5,000.000
|
$15.000
|
$8.000
|
$8.000
|
$8.500
|
$9.770
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
113.000
|
$34.210
|
$90.000
|
$520.000
|
$125.000
|
$364.540
|
|
|
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
200.000
|
$500.000
|
$900.000
|
$1,260.000
|
$900.000
|
$583.260
|
|
|
RELOC LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
100.000
|
$100.000
|
$400.000
|
$790.000
|
$1,000.000
|
$437.450
|
|
|
REMV LARGE RDSD SIGN SUPP & ASSEM
|
EA
|
6.000
|
$500.000
|
$400.000
|
$685.000
|
$300.000
|
$426.510
|
|
|
REPAIR SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
200.000
|
$500.000
|
$280.000
|
$410.000
|
$500.000
|
$478.270
|
|
|
RELOC SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
100.000
|
$100.000
|
$250.000
|
$245.000
|
$250.000
|
$291.630
|
|
|
REMV SMALL RDSD SIGN SUPP & ASSEM
|
EA
|
6.000
|
$300.000
|
$70.000
|
$110.000
|
$300.000
|
$193.860
|
|
|
TMA (STATIONARY)
|
EA
|
50.000
|
$2,500.000
|
$50.000
|
$520.000
|
$1,000.000
|
$1,119.950
|
|
|
TMA (STATIONARY)
|
DAY
|
365.000
|
$1,500.000
|
$190.000
|
$360.000
|
$400.000
|
$282.540
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
24.000
|
$1,500.000
|
$60.000
|
$140.000
|
$100.000
|
$140.280
|
|
|
STORM SEWER (TELEVISION INSPECTION)
|
LF
|
300.000
|
$2.000
|
$6.000
|
$5.000
|
$10.000
|
$7.800
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 5)
|
HR
|
24.000
|
$1,500.000
|
$330.000
|
$250.000
|
$375.000
|
$121.030
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 6)
|
HR
|
24.000
|
$1,500.000
|
$370.000
|
$300.000
|
$450.000
|
$122.120
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 7)
|
HR
|
24.000
|
$1,500.000
|
$423.000
|
$340.000
|
$500.000
|
$120.300
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 9)
|
HR
|
24.000
|
$1,500.000
|
$350.000
|
$260.000
|
$350.000
|
$121.030
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 11)
|
HR
|
24.000
|
$1,500.000
|
$563.000
|
$500.000
|
$1,000.000
|
$122.480
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 12)
|
HR
|
24.000
|
$1,500.000
|
$334.000
|
$175.000
|
$300.000
|
$121.030
|
|
|
SNOW AND ICE CONTROL (TRUCK)
|
HR
|
1,000.000
|
$48.000
|
$5.000
|
$120.000
|
$95.000
|
$39.760
|
|
|
SNOW AND ICE CONTROL (SHADOW VEHICLE)
|
HR
|
1,000.000
|
$45.000
|
$5.000
|
$100.000
|
$50.000
|
$39.760
|
|
|
SNOW AND ICE CONTROL (LOADER)
|
HR
|
50.000
|
$55.000
|
$35.000
|
$150.000
|
$175.000
|
$39.760
|
|
|
SNOW AND ICE CONTROL (SEASON)
|
MO
|
4.000
|
$20,000.000
|
$4,000.000
|
$20,000.000
|
$125,000.000
|
$770,558.100
|
|
|
SNOW AND ICE CONTROL (SPRAY RIG)
|
HR
|
200.000
|
$38.000
|
$55.000
|
$200.000
|
$95.000
|
$39.760
|
|
Totals: |
$9,031,198.580
|
$7,890,502.500
|
$10,767,028.250
|
$11,169,187.296
|
$12,959,443.280
|