REAGAN SH 137 (0558-09-035)

Items: 92

County: REAGAN
Length: N/A
Highway: SH 137
District: SAN ANGELO
Control Number: 0558-09-035
DBE Goal: N/A
Project: STP 2019(831)
Guaranty: N/A
Time: 213 WORKING DAYS
Engineer's Estimate: $16,879,597.71
Date: 07/10/2019 (6 years ago)
Contract Number: N/A
Type: RESTORATION OF EXISTING ROAD
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$16,879,597.71
1
$17,898,104.15
Over/Under Est: 6.03% $1,018,506.44
$18,448,993.01
Over/Under Est: 9.3% $1,569,395.30
Amt Left: 3.08% $550,888.86
Over/Under Est: 23.05% $3,891,468.71
Amt Left: 16.05% $2,872,962.27
Delta: -12.59% -$2,322,073.41

Bid Items & Bid Tabulations

92 Total 0 of 92
REAGAN  |  SH 137  |  SAN ANGELO  |  0558-09-035  |  07/10/2019  |  $16,879,597.71  |  STP 2019(831)  |  RESTOR OF EXIST ROAD  |  213 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
REECE ALBERT, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
REMOVING STAB BASE & ASPH PAV (0-6")
SY 3,669.000 $4.500 $10.790 $1.890 $6.730
EXCAVATION (ROADWAY)
CY 932.000 $10.000 $23.800 $34.040 $17.950
EMBANKMENT (VEHICLE)(ORD COMP)(TY A)
CY 668.000 $35.000 $85.180 $31.760 $65.880
BACKFILL (TY A OR B)
STA 580.000 $160.000 $273.390 $232.140 $431.900
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 15.900 $980.000 $982.230 $1,012.630 $1,210.060
DRILL SEEDING (TEMP) (WARM)
AC 4.000 $513.000 $853.510 $879.930 $921.650
DRILL SEEDING (TEMP) (COOL)
AC 5.300 $423.000 $853.510 $879.930 $921.650
PRIME COAT (MC-30)
GAL 12,887.000 $5.000 $4.360 $4.660 $3.910
FOG SEAL (CSS-1H)
GAL 30,315.000 $3.220 $4.870 $4.160 $3.530
ASPH (AC-20-5TR)
GAL 122,310.000 $4.250 $3.470 $3.890 $3.840
AGGR(TY-PB GR-4 SAC-B)
CY 3,178.000 $100.000 $151.270 $100.720 $156.630
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
TON 39,490.000 $100.000 $99.230 $103.300 $108.320
SUPERPAVE MIXTURES SP-B SAC-B PG64-22
TON 64,888.000 $100.000 $94.060 $95.630 $114.470
PLANE ASPH CONC PAV (2")
SY 64,435.000 $1.610 $1.310 $2.170 $1.810
CONC PVMT (CONT REINF-CRCP) (HES)(12")
SY 2,096.000 $125.000 $245.030 $252.610 $286.170
CL A CONC (COLLAR)
EA 4.000 $1,250.000 $1,650.000 $567.020 $1,187.810
CL C CONC (RAC-R)
CY 46.000 $1,487.500 $1,320.000 $2,398.030 $1,781.720
RIPRAP (CONC)(CL B)(5 IN)
CY 43.200 $470.000 $715.000 $737.130 $772.080
RIPRAP (MOW STRIP)(4 IN)
CY 11.120 $700.000 $880.000 $737.130 $950.250
RETROFIT RAIL (TY SSTR)
LF 326.500 $185.000 $165.000 $180.670 $510.760
CMP (GAL STL 36 IN)
LF 6.000 $126.000 $550.000 $567.020 $593.910
CMP AR (GAL STL DES 3)
LF 8.000 $105.000 $550.000 $567.020 $593.910
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
EA 4.000 $6,352.500 $8,250.000 $8,505.340 $8,908.590
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
EA 10.000 $6,352.500 $9,900.000 $10,206.410 $10,690.300
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
EA 2.000 $7,250.000 $12,100.000 $12,474.500 $13,065.930
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
EA 4.000 $7,500.000 $13,750.000 $14,175.570 $14,847.640
SET (TY I)(S= 7 FT)(HW= 4 FT)(3:1) (C)
EA 2.000 $6,250.000 $15,950.000 $16,443.660 $17,223.270
SET (TY I)(S= 8 FT)(HW= 6 FT)(3:1) (C)
EA 6.000 $9,850.000 $17,600.000 $18,144.720 $19,004.980
SET (TY II) (36 IN) (CMP) (3: 1) (C)
EA 2.000 $2,350.000 $4,950.000 $5,103.210 $5,345.150
SET (TY II) (DES 3) (CMP) (4: 1) (C)
EA 2.000 $1,850.000 $3,300.000 $3,402.140 $3,563.430
CLEAN EXIST CULVERTS
EA 18.000 $2,600.000 $3,300.000 $3,402.140 $3,563.430
MOBILIZATION
LS 1.000 $987,000.000 $707,304.520 $1,384,168.680 $1,984,922.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $25,000.000 $30,873.310 $8,216.580 $40,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 223.000 $25.000 $25.710 $65.020 $60.930
CONSTRUCTION EXITS (REMOVE)
SY 223.000 $10.000 $19.740 $19.480 $15.260
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 504.000 $10.000 $7.440 $5.000 $5.240
BIODEG EROSN CONT LOGS (REMOVE)
LF 504.000 $3.000 $1.810 $0.700 $0.740
CONSTRUCTING DETOURS
SY 3,255.000 $14.000 $19.170 $25.990 $37.640
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 2.000 $5,000.000 $7,215.950 $9,869.940 $11,224.870
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
LF 100.000 $200.000 $116.600 $120.210 $125.910
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 400.000 $25.000 $19.250 $19.850 $20.790
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 100.000 $12.500 $27.500 $28.350 $29.700
DRIVEWAYS (CONC)
SY 177.000 $85.000 $181.500 $187.120 $213.870
DRIVEWAYS (SURF TREAT)
SY 4,831.000 $40.000 $43.040 $33.270 $15.010
RUMBLE STRIPS (SHOULDER)
LF 116,098.000 $0.160 $0.150 $0.180 $0.210
RUMBLE STRIPS (CENTERLINE)
LF 58,049.000 $0.220 $0.220 $0.260 $0.360
MTL W-BEAM GD FEN (STEEL POST)
LF 7,200.000 $24.000 $31.350 $32.320 $34.270
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 16.000 $2,000.000 $2,398.000 $2,472.220 $2,589.430
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 6.000 $1,150.000 $1,402.500 $1,445.910 $1,514.460
GUARDRAIL END TREATMENT (INSTALL)
EA 38.000 $3,575.000 $3,300.000 $3,402.140 $3,563.430
CRASH CUSH ATTEN (MOVE & RESET)
EA 14.000 $1,750.000 $2,750.000 $2,835.110 $2,969.530
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $1,100.000 $1,134.050 $1,187.810
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $10,000.000 $11,000.000 $11,340.450 $13,362.880
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 19.000 $645.000 $643.500 $663.420 $757.380
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 21.000 $695.000 $797.500 $822.180 $974.290
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $825.000 $803.000 $827.850 $867.100
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $825.000 $1,017.500 $1,048.990 $1,098.730
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $1,050.000 $1,061.500 $1,094.350 $1,146.240
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $600.000 $654.500 $674.760 $706.750
RELOCATE SM RD SN SUP&AM TY S80
EA 2.000 $700.000 $761.200 $784.760 $821.970
REMOVE SM RD SN SUP&AM
EA 46.000 $120.000 $55.000 $73.130 $148.510
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 81.000 $96.000 $60.500 $62.370 $80.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 24.000 $25.000 $22.000 $22.680 $23.760
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 19.000 $105.000 $62.700 $64.640 $67.710
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 136.000 $50.000 $38.500 $39.690 $41.570
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 258,440.000 $0.250 $0.240 $0.250 $0.260
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 27,760.000 $0.250 $0.240 $0.250 $0.260
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 90,460.000 $0.250 $0.240 $0.250 $0.260
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 408.000 $3.850 $4.510 $4.650 $4.870
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 1,725.000 $1.000 $0.940 $0.960 $1.010
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 48.000 $8.750 $13.750 $14.180 $14.850
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 16,879.000 $1.000 $0.940 $0.960 $1.010
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 25,704.000 $1.500 $2.260 $1.860 $2.380
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 108.000 $11.000 $24.230 $24.980 $26.170
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 129,220.000 $0.310 $0.440 $0.450 $0.480
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 13,880.000 $0.340 $0.440 $0.450 $0.480
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 45,230.000 $0.350 $0.440 $0.450 $0.480
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $275.000 $385.000 $396.920 $415.730
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 1.000 $385.000 $715.000 $737.130 $772.080
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $310.000 $550.000 $567.030 $593.910
PREFAB PAV MRK TY C (W) (RR XING)
EA 2.000 $750.000 $1,045.000 $1,077.350 $1,128.420
REFL PAV MRKR TY I-C
EA 17.000 $5.000 $3.300 $3.400 $3.560
REFL PAV MRKR TY II-A-A
EA 1,353.000 $5.000 $3.300 $3.400 $3.560
ELIM EXT PAV MRK & MRKS (4")
LF 2,770.000 $0.950 $1.010 $1.040 $1.090
FULL - WIDTH MOWING
CYC 2.000 $7,000.000 $11,489.430 $7,620.790 $16,101.470
LITTER REMOVAL
CYC 2.000 $5,400.000 $17,623.770 $6,651.180 $12,130.360
CEMENT
TON 946.000 $152.500 $241.670 $220.070 $174.980
ASPHALT BINDER (PG64-22)
TON 2,267.000 $425.000 $631.440 $656.190 $652.360
FOAMED ASPHALT TREAT (7") (DC)
SY 285,015.000 $3.000 $3.830 $3.910 $2.160
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 792.000 $125.000 $94.040 $59.780 $29.460
TMA (STATIONARY)
DAY 374.000 $250.000 $374.990 $220.250 $243.670
TMA (MOBILE OPERATION)
DAY 20.000 $200.000 $484.710 $806.820 $75.200
Totals: $16,879,597.710 $17,898,104.160 $18,448,993.043 $20,771,066.435