PREPARING ROW
|
STA
|
513.000
|
$800.000
|
$340.000
|
$662.880
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
183.000
|
$20.000
|
$14.500
|
$11.220
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
837.000
|
$15.000
|
$12.000
|
$11.220
|
|
|
REMOVING CONC (CURB)
|
LF
|
6,239.000
|
$2.250
|
$4.000
|
$4.470
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
5,560.000
|
$9.000
|
$11.000
|
$7.800
|
|
|
REMOVING STAB BASE & ASPH PAV (9")
|
SY
|
308,444.000
|
$3.000
|
$3.250
|
$5.860
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
6,628.000
|
$15.000
|
$13.000
|
$11.130
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
254.000
|
$15.000
|
$16.700
|
$16.650
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
5,973.000
|
$7.500
|
$9.250
|
$11.130
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
69,200.000
|
$1.100
|
$0.740
|
$0.700
|
|
|
DRILL SEEDING (PERM)(WARM OR COOL)
|
SY
|
69,200.000
|
$0.200
|
$0.140
|
$0.130
|
|
|
VEGETATIVE WATERING
|
MG
|
1,080.000
|
$20.000
|
$16.000
|
$23.310
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
2,068.000
|
$2.000
|
$1.050
|
$1.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
31,133.000
|
$2.800
|
$3.550
|
$3.830
|
|
|
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
|
GAL
|
100,082.000
|
$2.800
|
$3.400
|
$3.610
|
|
|
AGGR (TY-PB GR-4)
|
CY
|
2,780.000
|
$85.000
|
$50.000
|
$75.460
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
128,954.000
|
$58.000
|
$64.750
|
$60.500
|
|
|
D-GR HMA TY-B PG64-22(LEVEL-UP)
|
TON
|
6,500.000
|
$58.000
|
$74.700
|
$65.490
|
|
|
SUPERPAVE MIXTURES SP-D SAC-B PG70-22
|
TON
|
37,878.000
|
$65.000
|
$79.400
|
$71.700
|
|
|
PLANE ASPH CONC PAV(0" TO 1")
|
SY
|
2,543.000
|
$3.000
|
$2.700
|
$4.660
|
|
|
PLANE ASPH CONC PAV(0" TO 4")
|
SY
|
1,986.000
|
$4.000
|
$3.300
|
$4.660
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
434.000
|
$8.000
|
$6.000
|
$4.660
|
|
|
PLANE ASPH CONC PAV (0"- 2 1/2")
|
SY
|
3,607.000
|
$2.000
|
$3.500
|
$3.610
|
|
|
CEM STABIL BKFL
|
CY
|
39.000
|
$125.000
|
$131.000
|
$125.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
109.000
|
$100.000
|
$86.000
|
$110.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
39.000
|
$150.000
|
$152.000
|
$145.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
76.000
|
$10.000
|
$26.000
|
$25.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
729.000
|
$25.000
|
$65.000
|
$65.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
32.000
|
$200.000
|
$268.000
|
$160.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
104.000
|
$225.000
|
$300.000
|
$190.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
182.400
|
$260.000
|
$326.000
|
$300.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
177.000
|
$500.000
|
$436.000
|
$415.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
5.000
|
$600.000
|
$420.000
|
$400.000
|
|
|
RIPRAP (STONE PROTECTION)(15 IN)
|
CY
|
109.000
|
$230.000
|
$190.000
|
$150.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
378.000
|
$425.000
|
$470.000
|
$450.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
598.000
|
$20.000
|
$3.400
|
$13.000
|
|
|
RAIL (TY T631)
|
LF
|
145.000
|
$75.000
|
$73.500
|
$72.450
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
86.000
|
$500.000
|
$315.000
|
$525.000
|
|
|
JOINT SEALANT
|
LF
|
598.000
|
$15.000
|
$31.000
|
$11.000
|
|
|
GABION MATTRESSES (GALV)(18 IN)
|
SY
|
146.000
|
$200.000
|
$114.000
|
$105.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
34.500
|
$300.000
|
$363.000
|
$345.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
49.500
|
$500.000
|
$484.000
|
$461.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)
|
LF
|
3.000
|
$500.000
|
$630.000
|
$600.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
373.000
|
$100.000
|
$89.000
|
$85.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
52.000
|
$125.000
|
$103.000
|
$98.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
8.000
|
$6,000.000
|
$6,800.000
|
$6,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
6.000
|
$7,500.000
|
$7,400.000
|
$7,100.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
1.000
|
$8,500.000
|
$8,300.000
|
$7,900.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$1,700.000
|
$1,680.000
|
$1,600.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,000.000
|
$2,200.000
|
$2,200.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$3,000.000
|
$2,400.000
|
$2,400.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
24.000
|
$1,500.000
|
$1,580.000
|
$1,575.000
|
|
|
REMOV STR (INLET)
|
EA
|
2.000
|
$10,000.000
|
$2,350.000
|
$2,415.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
15.000
|
$975.000
|
$1,575.000
|
$1,575.000
|
|
|
REMOV STR (PIPE)
|
LF
|
236.000
|
$20.000
|
$30.500
|
$30.450
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
23.000
|
$80.000
|
$184.000
|
$183.750
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$353,750.000
|
$1,354,725.000
|
$1,738,797.530
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$5,000.000
|
$8,700.000
|
$5,902.880
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
295.000
|
$30.000
|
$30.000
|
$23.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
295.000
|
$10.000
|
$7.500
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
103,047.000
|
$1.900
|
$1.800
|
$1.650
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
103,047.000
|
$0.500
|
$0.250
|
$0.500
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
1,632.000
|
$65.000
|
$67.000
|
$96.900
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
1,496.000
|
$80.000
|
$94.000
|
$114.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
300.000
|
$25.000
|
$26.000
|
$16.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
4,840.000
|
$22.000
|
$32.000
|
$15.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
360.000
|
$30.000
|
$32.000
|
$19.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
780.000
|
$6.000
|
$11.000
|
$8.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
14,340.000
|
$6.000
|
$8.500
|
$7.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
1,020.000
|
$6.000
|
$8.500
|
$7.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
300.000
|
$8.000
|
$13.000
|
$10.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
4,840.000
|
$8.000
|
$13.000
|
$9.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
360.000
|
$8.000
|
$13.000
|
$9.000
|
|
|
CONC CURB (TY I)
|
LF
|
6,154.000
|
$9.000
|
$12.600
|
$10.200
|
|
|
DRIVEWAYS (CONC)
|
SY
|
837.000
|
$75.000
|
$79.000
|
$75.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
10,215.000
|
$30.000
|
$34.250
|
$30.660
|
|
|
CONC MEDIAN
|
SY
|
183.000
|
$65.000
|
$51.500
|
$50.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
9,375.000
|
$25.000
|
$22.000
|
$21.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$2,000.000
|
$1,945.000
|
$2,000.000
|
|
|
SHORT RADIUS
|
LF
|
300.000
|
$25.000
|
$37.000
|
$36.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
8.000
|
$1,200.000
|
$925.000
|
$890.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
4,440.000
|
$1.300
|
$1.000
|
$1.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
6.000
|
$150.000
|
$120.000
|
$120.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
13.000
|
$2,500.000
|
$2,360.000
|
$2,250.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
11.000
|
$180.000
|
$150.000
|
$150.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
7.000
|
$1,500.000
|
$575.000
|
$550.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,000.000
|
$575.000
|
$550.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
2.000
|
$12,000.000
|
$12,900.000
|
$12,250.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
30.000
|
$210.000
|
$189.000
|
$180.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
4.000
|
$250.000
|
$220.000
|
$210.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
2.000
|
$520.000
|
$465.000
|
$445.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
13.000
|
$3,200.000
|
$3,200.000
|
$3,500.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
2,495.000
|
$9.000
|
$12.500
|
$9.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
483.000
|
$35.000
|
$67.000
|
$40.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
378.000
|
$15.000
|
$22.000
|
$13.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
50.000
|
$50.000
|
$86.000
|
$50.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
2,764.000
|
$1.250
|
$1.650
|
$1.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
5,528.000
|
$1.500
|
$1.650
|
$1.150
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
642.000
|
$2.000
|
$2.200
|
$1.300
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
1,490.000
|
$2.250
|
$2.800
|
$2.500
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
7.000
|
$1,000.000
|
$1,000.000
|
$825.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
7.000
|
$1,000.000
|
$1,250.000
|
$950.000
|
|
|
ZINC-COAT STL WIRE STRAND (3/16")
|
LF
|
1,420.000
|
$4.000
|
$4.300
|
$7.000
|
|
|
ZINC-COAT STL WIRE STRAND (5/16")
|
LF
|
1,420.000
|
$4.000
|
$4.300
|
$7.000
|
|
|
ELC SRV TY A 240/480 100(NS)SS(E)TP(O)
|
EA
|
1.000
|
$6,200.000
|
$7,200.000
|
$4,500.000
|
|
|
ELC SRV TY D 120/240 070(NS)AL(E)TP(O)
|
EA
|
3.000
|
$4,000.000
|
$6,100.000
|
$3,100.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
364.000
|
$30.000
|
$28.000
|
$22.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
140.000
|
$380.000
|
$375.000
|
$360.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
1.000
|
$1,000.000
|
$390.000
|
$375.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
94.000
|
$450.000
|
$440.000
|
$425.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
5.000
|
$600.000
|
$550.000
|
$525.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
5.000
|
$625.000
|
$620.000
|
$590.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
9.000
|
$700.000
|
$670.000
|
$645.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
4.000
|
$800.000
|
$730.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
22.000
|
$800.000
|
$850.000
|
$810.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
5.000
|
$270.000
|
$330.000
|
$315.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
247.000
|
$60.000
|
$42.000
|
$40.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
1,812.000
|
$4.500
|
$3.250
|
$6.000
|
|
|
REMOVE LRSA
|
EA
|
2.000
|
$800.000
|
$700.000
|
$500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
364.000
|
$50.000
|
$52.000
|
$50.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
4,537.000
|
$3.800
|
$2.600
|
$2.500
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
4,234.000
|
$2.700
|
$2.600
|
$2.500
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
17,775.000
|
$2.750
|
$2.200
|
$2.100
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
16,845.000
|
$2.750
|
$2.200
|
$2.100
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
240.000
|
$4.000
|
$2.600
|
$2.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
5,945.000
|
$0.800
|
$1.000
|
$0.950
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,915.000
|
$5.250
|
$6.800
|
$6.500
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
9.000
|
$110.000
|
$100.000
|
$95.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
4.000
|
$400.000
|
$180.000
|
$175.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
11.000
|
$140.000
|
$155.000
|
$150.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
184.000
|
$40.000
|
$26.000
|
$25.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
870.000
|
$5.200
|
$6.750
|
$6.500
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
1.000
|
$150.000
|
$420.000
|
$400.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
82,740.000
|
$0.120
|
$0.160
|
$0.150
|
|
|
PAVEMENT SEALER 6"
|
LF
|
123,165.000
|
$0.140
|
$0.190
|
$0.180
|
|
|
PAVEMENT SEALER 8"
|
LF
|
5,945.000
|
$0.300
|
$0.320
|
$0.300
|
|
|
PAVEMENT SEALER 24"
|
LF
|
2,785.000
|
$2.380
|
$2.600
|
$2.500
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
9.000
|
$50.000
|
$57.000
|
$55.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
11.000
|
$50.000
|
$68.000
|
$65.000
|
|
|
PAVEMENT SEALER (MED NOSE)
|
EA
|
1.000
|
$180.000
|
$230.000
|
$220.000
|
|
|
PAVEMENT SEALER (LNDP ARROW)
|
EA
|
4.000
|
$160.000
|
$89.000
|
$85.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
184.000
|
$16.250
|
$21.000
|
$20.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
7,850.000
|
$0.450
|
$0.370
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
4,570.000
|
$0.500
|
$0.370
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
68,180.000
|
$0.350
|
$0.370
|
$0.350
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
107,605.000
|
$0.850
|
$0.680
|
$0.650
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
1,900.000
|
$0.600
|
$0.680
|
$0.650
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
15,560.000
|
$1.200
|
$0.680
|
$0.650
|
|
REFL PAV MRKR TY I-C
|
EA
|
294.000
|
$3.300
|
$5.150
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,183.000
|
$3.100
|
$5.150
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
369.000
|
$4.000
|
$5.150
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
72,746.000
|
$0.300
|
$0.800
|
$0.650
|
|
|
INSTALL HWY TRF SIG (FLASH BEACON)
|
EA
|
3.000
|
$4,500.000
|
$4,400.000
|
$7,000.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
24.000
|
$225.000
|
$365.000
|
$250.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
16.000
|
$250.000
|
$365.000
|
$250.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
2,750.000
|
$2.000
|
$2.300
|
$2.500
|
|
|
REMOVE RDSD FLASH BEACON ASSEMBLY
|
EA
|
1.000
|
$1,000.000
|
$420.000
|
$515.000
|
|
|
INS TRF SIG PL AM (S)STR(TY D)
|
EA
|
6.000
|
$4,500.000
|
$6,400.000
|
$6,100.000
|
|
|
INS TRF SIG PL AM (S)STR(TY D)LUM
|
EA
|
6.000
|
$5,000.000
|
$6,900.000
|
$7,100.000
|
|
|
REMOVAL OF GROUND BOXES
|
EA
|
3.000
|
$300.000
|
$105.000
|
$200.000
|
|
|
REMOVAL OF TIMBER POLES
|
EA
|
1.000
|
$1,000.000
|
$710.000
|
$400.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
18.000
|
$200.000
|
$350.000
|
$81.190
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$9,500.000
|
$10,500.000
|
$7,036.250
|
|
|
TMA (STATIONARY)
|
DAY
|
514.000
|
$160.000
|
$300.000
|
$135.310
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
18.000
|
$600.000
|
$350.000
|
$270.630
|
|
Totals: |
$16,296,952.450
|
$18,988,547.950
|
$19,177,435.060
|