Show Job Controls
Bid Cobra

GOLIAD US 183 (0155-04-055)

Items: 157

County: GOLIAD
Length: N/A
Highway: US 183
District: CORPUS CHRISTI
Control Number: 0155-04-055
DBE Goal: N/A
Project: STP 1902(107)
Guaranty: N/A
Time: 461 WORKING DAYS
Engineer's Estimate: $29,312,415.54
Date: 07/09/2019 (6 years ago)
Contract Number: N/A
Type: REHABILITATE ROADWAY AND ADD PASSING LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$29,312,415.54
$31,126,365.06
Over/Under Est: 6.19% $1,813,949.52
Over/Under Est: 11% $3,223,567.23
Amt Left: 4.53% $1,409,617.71
$33,476,477.24
Over/Under Est: 14.21% $4,164,061.70
Amt Left: 7.55% $2,350,112.18
Delta: -2.89% -$940,494.47

Bid Items & Bid Tabulations

157 Total 0 of 157
GOLIAD  |  US 183  |  CORPUS CHRISTI  |  0155-04-055  |  07/09/2019  |  $29,312,415.54  |  STP 1902(107)  |  REHAB ROADWAY AND ADD PASSING LANES  |  461 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
ANGEL BROTHERS HOLDINGS CORP.
BAY LTD.
PREPARING ROW
STA 1,167.000 $500.000 $506.160 $490.000 $123.000
REMOVING CONCRETE(MOW STRIP)
LF 1,500.000 $15.000 $7.800 $11.000 $12.000
EXCAVATION (ROADWAY)
CY 33,583.000 $5.000 $11.220 $15.000 $11.750
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 14,972.000 $7.000 $11.220 $9.000 $9.100
BACKFILL (TY A OR B)
STA 616.000 $130.000 $117.450 $100.000 $250.000
FURNISHING AND PLACING TOPSOIL (4")
SY 48,308.700 $0.500 $1.000 $2.000 $1.100
BROADCAST SEED (TEMP) (WARM)
SY 24,154.850 $0.100 $0.080 $0.080 $0.180
BROADCAST SEED (TEMP) (COOL)
SY 24,154.850 $0.120 $0.080 $0.080 $0.180
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 48,308.700 $0.100 $0.140 $0.140 $0.170
VEGETATIVE WATERING
MG 882.880 $20.000 $23.310 $18.000 $32.000
PROOF ROLLING
HR 354.000 $75.000 $68.400 $65.000 $65.000
CEMENT
TON 1,243.000 $150.000 $152.250 $160.000 $230.000
CEMENT TREAT(EXIST MATL)(8")
SY 93,215.000 $1.750 $1.820 $1.700 $2.800
ASPH (MULTI OPTION)
GAL 77,341.000 $2.750 $2.970 $3.600 $2.900
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 2,544.000 $100.000 $91.280 $100.000 $100.000
D-GR HMA TY-D SAC-B PG70-22
TON 48,620.000 $80.000 $83.780 $90.000 $92.000
D-GR HMA TY B SAC-B PG (64-22)
TON 24,370.000 $70.000 $77.850 $83.000 $85.000
D-GR HMA TY-B SAC-B PG 70-22
TON 82,396.000 $80.000 $80.670 $83.000 $86.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 268,303.000 $30.000 $26.100 $30.000 $31.000
PLANE ASPH CONC PAV (3")
SY 462,851.000 $1.500 $2.440 $1.700 $2.400
CEM STABIL BKFL
CY 163.200 $80.000 $164.020 $200.000 $230.000
TRENCH EXCAVATION PROTECTION
LF 55.000 $2.000 $39.930 $50.000 $22.000
TEMPORARY SPL SHORING
SF 3,602.000 $12.000 $14.350 $29.000 $18.500
DRILL SHAFT (36 IN)
LF 1,940.000 $165.000 $350.000 $230.000 $240.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 96.000 $225.000 $165.000 $170.000 $250.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 30.000 $275.000 $185.000 $190.000 $450.000
CL C CONC (ABUT)
CY 95.600 $750.000 $1,200.000 $1,100.000 $860.000
CL C CONC (CAP)
CY 60.800 $925.000 $1,400.000 $1,300.000 $910.000
CL C CONC (COLUMN)
CY 22.200 $750.000 $1,400.000 $1,100.000 $980.000
CL C CONC (MISC)
CY 5.300 $600.000 $1,500.000 $1,500.000 $1,400.000
REINF CONC SLAB
SF 14,950.000 $16.000 $19.000 $21.000 $23.000
APPROACH SLAB
CY 141.200 $450.000 $600.000 $650.000 $630.000
PRESTR CONC GIRDER (TX28)
LF 1,935.000 $150.000 $130.000 $174.000 $150.000
RIPRAP (CONC)(5 IN)
CY 66.000 $375.000 $444.150 $550.000 $740.000
RIPRAP (STONE TYPE R)(DRY)(24")
CY 1,857.000 $185.000 $194.010 $180.000 $190.000
RIPRAP (MOW STRIP)(4 IN)
CY 140.500 $500.000 $437.850 $600.000 $590.000
RAIL (TY T223)
LF 714.000 $100.000 $100.000 $100.000 $120.000
RAIL (TY T631)
LF 80.000 $75.000 $100.000 $100.000 $110.000
ARMOR JOINT (SEALED)
LF 42.000 $100.000 $105.250 $110.000 $210.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 91.000 $90.000 $121.040 $90.000 $170.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 77.000 $360.000 $600.000 $1,000.000 $960.000
CONC BOX CULV (6 FT X 2 FT) (EXTEND)
LF 6.000 $270.000 $1,335.360 $1,800.000 $1,200.000
RC PIPE (CL III)(18 IN)
LF 269.000 $65.000 $106.790 $80.000 $66.000
RC PIPE (CL III)(21 IN)
LF 20.000 $70.000 $181.310 $147.000 $140.000
RC PIPE (CL III)(24 IN)
LF 20.000 $75.000 $178.730 $147.000 $140.000
RC PIPE (CL III)(30 IN)
LF 24.000 $80.000 $167.170 $170.000 $110.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $7,000.000 $4,480.930 $7,800.000 $6,000.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 1.000 $6,500.000 $3,623.900 $7,600.000 $7,100.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 21.000 $6,500.000 $3,413.890 $7,700.000 $6,400.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
EA 12.000 $8,000.000 $5,363.910 $8,000.000 $7,000.000
SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C)
EA 6.000 $7,200.000 $6,211.310 $13,000.000 $9,200.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $8,000.000 $5,082.700 $11,000.000 $8,100.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $7,200.000 $6,027.750 $11,000.000 $10,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 28.000 $750.000 $1,562.450 $1,300.000 $1,300.000
SET (TY II) (21 IN) (RCP) (6: 1) (P)
EA 2.000 $1,000.000 $2,123.900 $1,400.000 $1,500.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 2.000 $1,000.000 $2,230.100 $1,100.000 $1,500.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 6.000 $1,200.000 $2,599.880 $1,700.000 $1,600.000
CLEAN EXIST CULVERTS
EA 15.000 $2,000.000 $920.610 $2,000.000 $3,500.000
REMOV STR (SET)
EA 32.000 $500.000 $875.080 $600.000 $580.000
REMOV STR (PIPE)
LF 597.000 $20.000 $36.440 $30.000 $35.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 2.000 $50,000.000 $47,296.250 $40,000.000 $57,100.000
REMOV STR (SMALL FENCE)
LF 1,650.000 $1.500 $5.770 $1.000 $8.500
MOBILIZATION
LS 1.000 $1,500,000.000 $2,700,000.000 $2,400,000.000 $2,500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 28.000 $4,000.000 $5,000.000 $5,000.000 $8,200.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,092.000 $15.000 $15.000 $15.000 $57.000
CONSTRUCTION EXITS (REMOVE)
SY 1,092.000 $5.000 $2.000 $2.000 $7.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 29,265.000 $2.500 $1.780 $1.800 $2.800
TEMP SEDMT CONT FENCE (REMOVE)
LF 29,265.000 $1.000 $0.800 $0.800 $1.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,760.000 $5.000 $4.950 $5.000 $9.800
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,760.000 $1.000 $1.000 $1.000 $1.150
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 3,456.000 $100.000 $96.900 $90.000 $23.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 20.000 $3,500.000 $2,664.670 $4,400.000 $3,000.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 3,300.000 $25.000 $13.000 $40.000 $17.750
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 12,300.000 $10.000 $6.380 $10.000 $15.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 3,300.000 $10.000 $11.810 $22.000 $17.000
DRIVEWAYS AND TURNOUTS (SURF TREAT)
SY 6,049.000 $20.000 $32.850 $25.000 $25.000
DRIVEWAYS (BASE)
SY 1,361.000 $25.000 $17.520 $50.000 $47.000
RUMBLE STRIPS (SHOULDER)
LF 229,045.000 $0.150 $0.120 $0.110 $0.100
RUMBLE STRIPS (CENTERLINE)
LF 112,675.000 $0.150 $0.140 $0.130 $0.130
MTL W-BEAM GD FEN (TIM POST)
LF 1,500.000 $25.000 $19.000 $20.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,000.000 $1,750.000 $2,200.000 $1,900.000
REMOVE METAL BEAM GUARD FENCE
LF 1,175.000 $3.000 $1.600 $1.600 $1.850
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $175.000 $160.000 $170.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,000.000 $2,250.000 $2,400.000 $3,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $250.000 $180.000 $190.000 $380.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 58.000 $1,200.000 $995.000 $700.000 $1,700.000
CRASH CUSH ATTEN (REMOVE)
EA 10.000 $1,000.000 $850.000 $500.000 $860.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 10.000 $20,000.000 $8,600.000 $8,000.000 $10,100.000
WIRE FENCE (TY A)
LF 1,650.000 $10.000 $25.000 $10.000 $17.250
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 17.000 $250.000 $228.980 $230.000 $260.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $500.000 $559.720 $550.000 $630.000
REPLACE LUMINAIRE W/LED (250W EQ)
EA 10.000 $750.000 $650.000 $700.000 $660.000
IN RD IL (TY SA) 20T-8 (250W EQ) LED
EA 12.000 $1,000.000 $2,000.000 $4,700.000 $4,100.000
CONDT (PVC) (SCH 40) (2")
LF 1,905.000 $10.000 $14.400 $15.000 $11.250
CONDT (PVC) (SCH 40) (2") (BORE)
LF 295.000 $35.000 $15.850 $17.000 $29.000
ELEC CONDR (NO.12) INSULATED
LF 2,420.000 $1.500 $1.200 $1.300 $1.050
ELEC CONDR (NO.10) INSULATED
LF 13,920.000 $1.500 $1.250 $1.300 $1.200
ELEC CONDR (NO.8) BARE
LF 2,170.000 $1.500 $1.250 $1.300 $1.400
ELEC CONDR (NO.8) INSULATED
LF 4,340.000 $1.500 $1.300 $1.350 $1.450
GROUND BOX TY A (122311)W/APRON
EA 7.000 $1,000.000 $745.000 $7.700 $1,200.000
REMOVE GROUND BOX
EA 3.000 $250.000 $335.000 $350.000 $320.000
REMOVE ELECTRICAL SERVICES
EA 2.000 $300.000 $1,360.000 $1,500.000 $440.000
ELC SRV TY A 240/480 060(NS)SS(E)GC(O)
EA 1.000 $7,350.000 $8,465.000 $9,000.000 $8,200.000
ELC SRV TY D 120/240 060(NS)SS(E)GC(O)
EA 1.000 $6,750.000 $4,760.000 $5,000.000 $7,400.000
ALUMINUM SIGNS (TY A)
SF 1,380.000 $22.000 $18.830 $19.000 $21.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 48.000 $450.000 $320.570 $320.000 $360.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 9.000 $620.000 $371.450 $380.000 $420.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 23.000 $525.000 $361.280 $360.000 $410.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 20.000 $650.000 $422.340 $420.000 $480.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 3.000 $800.000 $457.950 $460.000 $520.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 4.000 $900.000 $519.020 $520.000 $590.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $760.000 $498.660 $500.000 $570.000
RELOCATE SM RD SN SUP&AM TY S80
EA 2.000 $590.000 $320.570 $325.000 $360.000
REMOVE SM RD SN SUP&AM
EA 83.000 $50.000 $71.240 $100.000 $81.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 40.000 $65.000 $71.240 $75.000 $81.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 11.000 $20.000 $15.270 $15.000 $17.250
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 12.000 $65.000 $71.240 $75.000 $81.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 15.000 $25.000 $20.350 $21.000 $23.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 13,220.000 $0.250 $0.330 $0.350 $0.380
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 312,552.000 $0.200 $0.310 $0.320 $0.360
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 3,070.000 $0.500 $0.650 $0.700 $0.750
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 313,452.000 $0.200 $0.310 $0.330 $0.360
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 151,382.000 $0.600 $0.450 $0.470 $0.500
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 112,532.000 $0.600 $0.450 $0.470 $0.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 9,472.000 $1.000 $1.780 $1.000 $1.100
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 9,472.000 $1.000 $1.780 $1.000 $1.100
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
LF 2,865.000 $0.350 $0.300 $0.310 $0.340
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,536.000 $0.500 $0.600 $0.620 $0.700
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 62.000 $5.000 $12.000 $13.000 $13.750
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 9,679.000 $0.250 $0.340 $0.350 $0.390
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 122,438.000 $0.200 $0.320 $0.330 $0.370
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 13,364.000 $0.200 $0.340 $0.350 $0.390
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 137,894.000 $0.200 $0.320 $0.330 $0.370
PREFAB PAV MRK TY C (W) (ARROW)
EA 8.000 $175.000 $175.000 $180.000 $200.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 8.000 $430.000 $525.000 $530.000 $610.000
PREFAB PAV MRK TY C (W) (WORD)
EA 8.000 $300.000 $275.000 $280.000 $320.000
PREFAB PAV MRK TY C (W)(BIKE DOT)
EA 10.000 $30.000 $225.000 $230.000 $260.000
PREFAB PAV MRK TY C (Y) (MED NOSE)
EA 2.000 $320.000 $250.000 $260.000 $290.000
REFL PAV MRKR TY II-A-A
EA 4,462.000 $3.000 $3.250 $3.400 $3.800
REFL PAV MRKR TY II-C-R
EA 485.000 $3.000 $3.750 $3.900 $4.300
ELIM EXT PAV MRK & MRKS (4")
LF 107,863.000 $0.750 $0.800 $0.800 $1.200
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $30,000.000 $10,715.000 $11,000.000 $4,800.000
VEH SIG SEC (12")LED(RED)
EA 8.000 $200.000 $215.000 $220.000 $420.000
BACK PLATE (12")(2 SEC)
EA 4.000 $50.000 $132.000 $135.000 $76.000
TRF SIG CBL (TY A)(14 AWG)(4 CONDR)
LF 350.000 $1.250 $1.750 $1.800 $5.700
INS TRF SIG PL AM (S)STR(TY D)
EA 2.000 $5,400.000 $5,900.000 $6,000.000 $8,400.000
TREE TRIMMING / BRUSH REMOVAL
MI 22.120 $3,500.000 $5,775.000 $9,500.000 $7,800.000
TREE REMOVAL (18" - 24" DIA)
EA 1.000 $750.000 $5,250.000 $2,500.000 $3,000.000
REMOVE SHOULDER TEXTURING
LF 97,900.000 $3.000 $3.050 $1.500 $3.200
REMOVE CENTERLINE TEXTURING
LF 13,130.000 $3.000 $3.220 $2.500 $4.400
BIRD EXCLUSION METHOD
SF 2,160.000 $1.500 $4.000 $2.000 $9.200
REMOVE CONDUCTOR
LF 7,160.000 $1.000 $1.000 $1.000 $0.950
REPLACE BREAKAWAY FUSE HOLDER
EA 10.000 $300.000 $120.000 $125.000 $300.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 7.000 $7,000.000 $7,613.380 $15,000.000 $10,400.000
CONDUIT (PREPARE)
LF 1,980.000 $4.000 $1.150 $1.200 $2.500
TMA (STATIONARY)
DAY 317.000 $150.000 $304.540 $300.000 $240.000
TMA (MOBILE OPERATION)
HR 584.000 $50.000 $101.510 $35.000 $24.000
Totals: $29,312,415.537 $31,126,365.096 $32,535,982.794 $33,476,477.255