|
|
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
|
SY
|
1,000.000
|
$0.290
|
$0.870
|
$3.460
|
$16.300
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
1,000.000
|
$0.330
|
$0.870
|
$3.460
|
$16.300
|
|
|
VEGETATIVE WATERING
|
MG
|
300.000
|
$16.000
|
$16.730
|
$10.860
|
$227.150
|
|
|
RIPRAP (CONC) (CL A )
|
CY
|
6.000
|
$495.480
|
$1,194.370
|
$676.250
|
$2,990.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$199,158.400
|
$690,966.020
|
$282,193.960
|
$405,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
24.000
|
$8,000.000
|
$2,284.720
|
$10,995.000
|
$25,015.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
250.000
|
$2.600
|
$4.370
|
$4.780
|
$27.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
250.000
|
$1.000
|
$1.160
|
$4.260
|
$13.150
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
250.000
|
$5.900
|
$6.060
|
$5.010
|
$17.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
250.000
|
$1.770
|
$3.860
|
$2.130
|
$10.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
50.000
|
$8.400
|
$12.540
|
$54.850
|
$12.850
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
50.000
|
$24.730
|
$27.200
|
$68.050
|
$30.350
|
|
|
CONDT (PVC) (SCH 40) (2") (CONC ENCSE)
|
LF
|
50.000
|
$11.050
|
$24.690
|
$59.220
|
$22.000
|
|
|
CONDT (PVC) (SCH 40) (2") (STL ENCSE)
|
LF
|
25.000
|
$45.890
|
$47.640
|
$64.440
|
$82.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
1,000.000
|
$13.920
|
$13.460
|
$57.060
|
$11.150
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
50.000
|
$40.360
|
$30.260
|
$73.740
|
$31.150
|
|
|
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
|
LF
|
50.000
|
$16.000
|
$37.530
|
$58.690
|
$15.850
|
|
|
CONDT (PVC) (SCH 40) (3") (STL ENCSE)
|
LF
|
25.000
|
$100.420
|
$71.240
|
$69.370
|
$66.850
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
50.000
|
$20.140
|
$17.180
|
$58.860
|
$11.800
|
|
|
CONDT (PVC) (SCH 40) (4") (BORE)
|
LF
|
50.000
|
$24.980
|
$33.660
|
$77.580
|
$31.850
|
|
|
CONDT (PVC) (SCH 40) (4") (CONC ENCSE)
|
LF
|
50.000
|
$27.000
|
$42.150
|
$58.820
|
$32.250
|
|
|
CONDT (PVC) (SCH 40) (4") (STL ENCSE)
|
LF
|
25.000
|
$70.140
|
$106.180
|
$76.190
|
$155.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
50.000
|
$7.650
|
$13.960
|
$54.450
|
$10.800
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
50.000
|
$20.430
|
$28.000
|
$67.650
|
$30.850
|
|
|
CONDT (PVC) (SCH 80) (2") (CONC ENCSE)
|
LF
|
50.000
|
$13.650
|
$26.380
|
$57.850
|
$22.550
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
50.000
|
$14.610
|
$15.100
|
$56.700
|
$181.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
100.000
|
$34.990
|
$31.080
|
$71.690
|
$32.050
|
|
|
CONDT (PVC) (SCH 80) (3") (CONC ENCSE)
|
LF
|
50.000
|
$15.290
|
$38.670
|
$61.000
|
$16.650
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
50.000
|
$17.810
|
$18.320
|
$62.430
|
$13.350
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
50.000
|
$31.720
|
$34.800
|
$84.430
|
$33.400
|
|
|
CONDT (RM) (2")
|
LF
|
50.000
|
$31.250
|
$31.750
|
$114.640
|
$59.250
|
|
|
CONDT (RM) (2") (BORE)
|
LF
|
50.000
|
$33.930
|
$37.440
|
$126.400
|
$44.200
|
|
|
CONDT (RM) (3")
|
LF
|
50.000
|
$40.690
|
$53.550
|
$122.980
|
$121.000
|
|
|
CONDT (RM) (3") (BORE)
|
LF
|
50.000
|
$32.650
|
$51.440
|
$136.650
|
$54.650
|
|
|
CONDT (RM) (4")
|
LF
|
25.000
|
$96.500
|
$71.110
|
$154.320
|
$213.000
|
|
|
CONDT (RM) (4") (BORE)
|
LF
|
50.000
|
$50.000
|
$57.810
|
$148.720
|
$62.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
250,000.000
|
$1.220
|
$0.920
|
$0.850
|
$1.320
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
10.000
|
$1,025.890
|
$1,358.190
|
$949.500
|
$1,485.000
|
|
|
REMOVE GROUND BOX
|
EA
|
10.000
|
$295.780
|
$303.100
|
$532.500
|
$476.000
|
|
|
ZINC-COAT STL WIRE STRAND (3/8")
|
LF
|
1,500.000
|
$4.410
|
$5.180
|
$2.280
|
$4.600
|
|
|
TIMBER POLE (CL 2) 40 FT
|
EA
|
10.000
|
$1,441.740
|
$1,364.840
|
$2,672.750
|
$1,510.000
|
|
|
TIMBER POLE (CL 2) 50 FT
|
EA
|
5.000
|
$1,792.930
|
$1,592.840
|
$2,776.250
|
$1,980.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
100.000
|
$188.980
|
$280.620
|
$135.750
|
$161.000
|
|
|
FO CBL (6 SMF)
|
LF
|
50.000
|
$2.300
|
$9.760
|
$3.670
|
$51.000
|
|
|
FO CBL (6 SMF)(AERIAL)
|
LF
|
50.000
|
$5.950
|
$11.900
|
$5.210
|
$72.000
|
|
|
FO CBL (6 SMF)(PIGTAIL)
|
LF
|
50.000
|
$13.610
|
$14.210
|
$8.010
|
$29.000
|
|
|
FO CBL (12 SMF)
|
LF
|
50.000
|
$6.000
|
$20.120
|
$4.000
|
$63.000
|
|
|
FO CBL (12 SMF)(AERIAL)
|
LF
|
50.000
|
$4.950
|
$23.300
|
$5.590
|
$84.000
|
|
|
FO CBL (12 SMF)(PIGTAIL)
|
LF
|
4,000.000
|
$12.510
|
$4.510
|
$8.850
|
$4.000
|
|
|
FO CBL (24 SMF)
|
LF
|
200.000
|
$2.780
|
$14.130
|
$4.990
|
$21.150
|
|
|
FO CBL (24 SMF)(AERIAL)
|
LF
|
100.000
|
$4.950
|
$17.600
|
$6.530
|
$52.850
|
|
|
FO CBL (36 SMF)
|
LF
|
35,000.000
|
$2.440
|
$3.170
|
$3.430
|
$2.450
|
|
|
FO CBL (36 SMF)(AERIAL)
|
LF
|
1,000.000
|
$4.950
|
$5.860
|
$6.810
|
$14.900
|
|
|
FO CBL (48 SMF)(AERIAL)
|
LF
|
100.000
|
$5.950
|
$7.790
|
$7.460
|
$70.700
|
|
|
FO CBL (72 SMF)
|
LF
|
500,000.000
|
$2.940
|
$3.400
|
$3.280
|
$2.100
|
|
|
FO CBL (72 SMF)(AERIAL)
|
LF
|
2,000.000
|
$5.130
|
$7.580
|
$7.630
|
$14.550
|
|
|
FO CBL (96 SMF)
|
LF
|
50.000
|
$7.000
|
$19.830
|
$6.690
|
$236.000
|
|
|
FO CBL (96 SMF)(AERIAL)
|
LF
|
50.000
|
$10.500
|
$23.300
|
$8.510
|
$331.000
|
|
|
FO CBL (144 SMF)
|
LF
|
100.000
|
$7.000
|
$21.000
|
$8.850
|
$95.250
|
|
|
FO CBL (144 SMF)(AERIAL)
|
LF
|
100.000
|
$10.300
|
$23.300
|
$10.430
|
$130.000
|
|
|
FO SPLICE ENCLOSURE (TYPE 1)
|
EA
|
25.000
|
$2,123.060
|
$1,402.340
|
$1,690.500
|
$2,370.000
|
|
|
FO SPLICE ENCLOSURE (TYPE 1)(AERIAL)
|
EA
|
3.000
|
$2,984.920
|
$2,116.680
|
$1,690.500
|
$3,210.000
|
|
|
FO SPLICE ENCLOSURE (TYPE 2)
|
EA
|
3.000
|
$1,747.530
|
$1,572.160
|
$1,690.500
|
$3,195.000
|
|
|
FO SPLICE ENCLOSURE (TYPE 2)(AERIAL)
|
EA
|
3.000
|
$2,400.000
|
$2,173.680
|
$1,690.500
|
$3,990.000
|
|
|
FO SPLICE ENCLOSURE (TYPE 3)
|
EA
|
3.000
|
$2,654.150
|
$1,651.960
|
$1,690.500
|
$3,365.000
|
|
|
FO SPLICE ENCLOSURE (TYPE 3)(AERIAL)
|
EA
|
3.000
|
$2,700.000
|
$2,253.480
|
$1,690.500
|
$4,135.000
|
|
|
RACK MOUNTED FO SPLICE ENCLOSURE
|
EA
|
8.000
|
$2,500.000
|
$1,038.640
|
$1,866.500
|
$5,035.000
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
5,000.000
|
$57.630
|
$49.420
|
$28.570
|
$45.350
|
|
|
FIBER OPTIC PATCH PANEL (6 POSITION)
|
EA
|
3.000
|
$1,310.000
|
$810.640
|
$1,426.500
|
$884.000
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
20.000
|
$450.000
|
$810.640
|
$1,866.500
|
$1,015.000
|
|
|
FIBER OPTIC PATCH PANEL (24 POSITION)
|
EA
|
20.000
|
$455.000
|
$1,237.000
|
$3,566.250
|
$1,525.000
|
|
|
FIBER OPTIC PATCH PANEL (36 POSITION)
|
EA
|
3.000
|
$807.000
|
$1,305.400
|
$5,546.250
|
$1,896.000
|
|
|
FIBER OPTIC PATCH PANEL (48 POSITION)
|
EA
|
2.000
|
$1,007.000
|
$1,701.080
|
$7,306.250
|
$2,550.000
|
|
|
FIBER OPTIC PATCH PANEL (72 POSITION)
|
EA
|
10.000
|
$600.000
|
$2,059.040
|
$10,826.250
|
$7,095.000
|
|
|
FIBER OPTIC PATCH PANEL (96 POSITION)
|
EA
|
2.000
|
$750.000
|
$2,754.440
|
$15,145.000
|
$8,910.000
|
|
|
RELOCATE FIBER OPTIC CABLE
|
LF
|
2,000.000
|
$2.660
|
$4.230
|
$4.930
|
$15.700
|
|
|
REMOVE FIBER OPTIC CABLE
|
LF
|
250,000.000
|
$1.250
|
$0.660
|
$0.600
|
$2.090
|
|
|
FO CBL (24 SMF)(PIGTAIL)
|
LF
|
4,000.000
|
$14.610
|
$4.710
|
$10.210
|
$7.550
|
|
|
PRETERM FIBER PATCH PANEL (6 POSITION)
|
EA
|
5.000
|
$707.000
|
$532.480
|
$1,153.250
|
$1,270.000
|
|
|
PRETERM FIBER PATCH PANEL (12 POSITION)
|
EA
|
30.000
|
$1,019.200
|
$532.480
|
$1,373.250
|
$1,310.000
|
|
|
PRETERM FIBER PATCH PANEL (24 POSITION)
|
EA
|
40.000
|
$1,890.000
|
$847.380
|
$2,086.500
|
$1,505.000
|
|
|
FIBER OPTIC PATCH PANEL UNIT
|
EA
|
10.000
|
$2,589.230
|
$1,041.700
|
$3,406.500
|
$7,095.000
|
|
|
ITS GRND MNT CAB (TY 6) (CONF 2) (REM)
|
EA
|
10.000
|
$2,500.000
|
$898.800
|
$2,130.000
|
$1,165.000
|
|
|
ITS MULTI-DUCT CND (PVC-40)
|
LF
|
2,000.000
|
$19.680
|
$17.220
|
$29.760
|
$23.650
|
|
|
ITS MULTI-DUCT CND (PVC-40)(BORE)
|
LF
|
200.000
|
$27.530
|
$38.850
|
$80.760
|
$42.700
|
|
|
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
|
LF
|
100.000
|
$13.030
|
$35.720
|
$60.480
|
$26.750
|
|
|
ITS MULTI-DUCT CND (PVC-40)(STL ENCSE)
|
LF
|
50.000
|
$86.000
|
$68.770
|
$89.180
|
$76.850
|
|
|
ITS MULTI-DUCT CND (PVC-80)
|
LF
|
100.000
|
$14.380
|
$26.880
|
$64.510
|
$26.500
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
100.000
|
$32.680
|
$36.590
|
$86.510
|
$74.500
|
|
|
ITS MULTI-DUCT CND (PVC-80)(CONC ENCSE)
|
LF
|
100.000
|
$38.690
|
$40.160
|
$32.630
|
$29.500
|
|
|
ITS MULTI-DUCT CND (RMC)
|
LF
|
100.000
|
$65.940
|
$96.110
|
$89.180
|
$166.000
|
|
|
FIBER OPTIC CABLE ROAD MARKER
|
EA
|
70.000
|
$191.410
|
$154.670
|
$162.790
|
$81.000
|
|
|
CABLE RACK ASSEMBLY (INSTALL)
|
EA
|
20.000
|
$149.720
|
$623.680
|
$930.750
|
$960.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
225,000.000
|
$1.760
|
$0.940
|
$0.890
|
$5.900
|
|
|
JUNCTION BOX (INSTALL)
|
EA
|
6.000
|
$1,348.030
|
$1,842.180
|
$1,478.500
|
$2,185.000
|
|
|
GROUND BOX (PREPARE)
|
EA
|
300.000
|
$307.870
|
$274.480
|
$319.500
|
$541.250
|
|
|
RELOCATE ITS RADIO
|
EA
|
5.000
|
$1,809.180
|
$1,633.440
|
$2,245.000
|
$3,290.000
|
|
|
REMOVE ITS RADIO
|
EA
|
15.000
|
$845.000
|
$466.060
|
$532.500
|
$1,270.000
|
|
|
REMOVE EXISTING CABLES (POWER)
|
LF
|
100.000
|
$0.460
|
$3.080
|
$5.330
|
$1.050
|
|
|
REMOVE EXISTING CABLES (COMMUNICATION)
|
LF
|
100.000
|
$2.470
|
$3.080
|
$5.330
|
$12.900
|
|
|
TMA (STATIONARY)
|
DAY
|
100.000
|
$247.860
|
$839.680
|
$254.910
|
$310.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
20.000
|
$3,024.840
|
$4,455.030
|
$3,809.020
|
$3,045.000
|
|
|
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
|
EA
|
15.000
|
$5,065.610
|
$6,299.230
|
$4,904.070
|
$4,090.000
|
|
|
REMOVE ITS GROUND BOX
|
EA
|
15.000
|
$422.900
|
$1,051.230
|
$1,278.000
|
$495.000
|
|
Totals: |
$4,183,001.010
|
$4,346,466.810
|
$4,384,482.960
|
$6,008,851.250
|