Show Job Controls
Bid Cobra

REFUGIO US 77 (0371-02-074)

Items: 62

County: REFUGIO
Length: N/A
Highway: US 77
District: CORPUS CHRISTI
Control Number: 0371-02-074
DBE Goal: N/A
Project: C 371-2-74
Guaranty: N/A
Time: 170 WORKING DAYS
Engineer's Estimate: $8,855,102.75
Date: 06/02/2022 (4 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
ROBERT ISASSI
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$8,855,102.75
$9,300,599.86
Over/Under Est: 5.03% $445,497.11
$9,863,292.22
Over/Under Est: 11.39% $1,008,189.47
Amt Left: 6.05% $562,692.36
Over/Under Est: 16.94% $1,500,403.65
Amt Left: 11.34% $1,054,906.54
Delta: -4.99% -$492,214.18
Subcontractor Percentage Amount
BEAVER BOYS SERVICES LLC 2.59% $241,036.60
HIGHWAY BARRICADES AND SERVICES, LLC 2.43% $226,146.31
WEST TEXAS ROCK RESOURCES, LLC 0.12% $11,167.72
LONE STAR EROSION CONTROL 0.04% $3,722.57
Total: 5.18% $482,073.20

Bid Items & Bid Tabulations

62 Total 0 of 62
REFUGIO  |  US 77  |  CORPUS CHRISTI  |  0371-02-074  |  06/02/2022  |  $8,855,102.75  |  C 371-2-74  |  SURF/ROADWAY RESTOR  |  170 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
BAY LTD.
HAAS-ANDERSON CONSTRUCTION, LTD.
REMOVING CONC (CURB OR CURB & GUTTER)
LF 785.000 $10.000 $9.180 $8.000 $14.000
REMOVING CONCRETE(MOW STRIP)
LF 1,200.000 $6.000 $9.180 $12.250 $13.000
BACKFILL (TY A OR B)
STA 577.000 $140.000 $135.900 $220.000 $278.000
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 2,369.000 $110.000 $119.410 $170.000 $202.000
ASPH (A-R TYPE II OR AC-20-5TR)
GAL 151,082.000 $3.750 $4.810 $4.800 $4.550
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 34,452.000 $35.000 $39.320 $45.000 $60.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 260,485.000 $1.750 $1.480 $1.700 $1.800
CL C CONC (RAIL FOUNDATION)
CY 22.000 $550.000 $1,000.000 $1,200.000 $1,080.000
CL C CONC (RAC-R)
CY 4.000 $1,500.000 $2,500.000 $2,800.000 $7,310.000
RIPRAP (CONC)(5 IN)
CY 7.500 $525.000 $800.000 $680.000 $1,170.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 28.000 $550.000 $700.000 $680.000 $854.000
RIPRAP (MOW STRIP)(4 IN)
CY 67.000 $500.000 $900.000 $570.000 $637.000
RAIL (TY T223)
LF 188.000 $200.000 $170.000 $240.000 $168.000
CLEAN EXIST CULVERTS
EA 7.000 $2,000.000 $3,000.000 $4,100.000 $3,690.000
MOBILIZATION
LS 1.000 $675,000.000 $757,058.210 $627,460.000 $263,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $4,000.000 $3,092.070 $7,900.000 $1,790.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 560.000 $4.000 $4.850 $7.700 $7.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 560.000 $1.000 $2.500 $3.800 $3.700
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 690.000 $30.000 $25.000 $16.500 $29.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 600.000 $15.000 $12.500 $15.000 $18.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 690.000 $30.000 $12.500 $15.750 $22.000
CONC CURB & GUTTER (TY II)
LF 785.000 $30.000 $30.000 $33.000 $54.000
DRIVEWAYS (ACP)
SY 374.000 $50.000 $36.000 $21.000 $48.000
RUMBLE STRIPS (SHOULDER)
LF 112,842.000 $0.150 $0.190 $0.150 $0.200
MTL W-BEAM GD FEN (TIM POST)
LF 550.000 $25.000 $32.500 $37.000 $36.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,250.000 $2,350.000 $2,100.000 $2,050.000
REMOVE METAL BEAM GUARD FENCE
LF 1,000.000 $2.000 $2.000 $2.300 $2.200
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $2,850.000 $3,200.000 $3,160.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1,500.000 $1,450.000 $1,600.000 $1,610.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $850.000 $750.000 $850.000 $832.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $25,000.000 $7,850.000 $8,900.000 $8,700.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 16.000 $40.000 $21.000 $57.000 $23.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 20.000 $22.000 $21.000 $57.000 $23.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 20.000 $8.000 $21.000 $57.000 $23.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 128.000 $70.000 $80.000 $140.000 $89.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 31,556.000 $0.500 $0.300 $0.340 $0.350
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 8,400.000 $0.500 $0.600 $0.700 $0.650
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 11,550.000 $5.000 $0.320 $0.370 $0.350
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 2,986.000 $4.000 $3.500 $4.000 $3.900
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 3,420.000 $1.000 $1.150 $1.300 $1.300
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 1,710.000 $1.000 $1.150 $1.300 $1.300
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 5,877.000 $1.000 $1.710 $2.300 $1.400
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,920.000 $1.000 $1.710 $2.300 $1.400
REFL PAV MRK TY II (W) 8" (DOT)
LF 5,850.000 $0.700 $0.450 $0.500 $0.500
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 19,434.000 $0.450 $0.450 $0.500 $0.500
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 81,009.000 $0.450 $0.380 $0.430 $0.400
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 1,023.000 $0.450 $0.450 $0.500 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 74,620.000 $0.450 $0.380 $0.430 $0.400
PREFAB PAV MRK TY C (W) (ARROW)
EA 70.000 $200.000 $165.000 $190.000 $183.000
PREFAB PAV MRK TY C (W) (WORD)
EA 68.000 $200.000 $185.000 $210.000 $205.000
REFL PAV MRKR TY I-C
EA 960.000 $3.000 $3.750 $4.300 $4.150
REFL PAV MRKR TY II-A-A
EA 560.000 $3.500 $3.750 $4.300 $4.150
REFL PAV MRKR TY II-C-R
EA 330.000 $3.000 $3.750 $4.300 $4.150
ELIM EXT PAV MRK & MRKS (4")
LF 5,130.000 $1.000 $0.550 $0.650 $0.600
ELIM EXT PAV MRK & MRKS (24")
LF 360.000 $4.000 $3.000 $3.400 $3.350
TREE TRIMMING / BRUSH REMOVAL
MI 12.000 $7,000.000 $6,264.000 $7,700.000 $7,520.000
TREE AND BRUSH REMOVAL
AC 0.100 $20,000.000 $16,200.000 $20,462.100 $20,000.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 31,258.000 $150.000 $151.560 $160.000 $173.000
TACK COAT
GAL 20,840.000 $4.000 $4.010 $3.800 $4.050
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 600.000 $75.000 $150.000 $55.000 $54.000
TMA (STATIONARY)
DAY 34.000 $100.000 $350.000 $330.000 $10.000
TMA (MOBILE OPERATION)
DAY 340.000 $250.000 $500.000 $400.000 $10.000
Totals: $8,855,102.750 $9,300,599.860 $9,863,292.220 $10,355,506.400