Show Job Controls
Bid Cobra

GONZALES SH 80 (0287-03-034)

Items: 172

County: GONZALES
Length: N/A
Highway: SH 80
District: YOAKUM
Control Number: 0287-03-034
DBE Goal: 0.0%
Project: C 287-3-34
Guaranty: N/A
Time: 449 WORKING DAYS
Engineer's Estimate: $47,110,387.28
Date: 01/04/2024 (2 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD LANES
Mail/Deliver Bids To: N/A
COVEY MORROW
CHASE HERMES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$47,110,387.28
$39,193,544.65
Over/Under Est: -16.8% -$7,916,842.63
$43,822,763.05
Over/Under Est: -6.98% -$3,287,624.23
Amt Left: 11.81% $4,629,218.40
Over/Under Est: -6.06% -$2,854,357.40
Amt Left: 12.92% $5,062,485.23
Delta: -0.99% -$433,266.83
Over/Under Est: -0.1% -$45,436.15
Amt Left: 20.08% $7,871,406.48
Delta: -6.35% -$2,808,921.25
Subcontractor Percentage Amount
INTERSTATE CONCRETE & STEEL SERVICES INCORPORATED 6.00% $2,401,315.69
TRP CONSTRUCTION GROUP, LLC 3.34% $1,336,732.40
HAZMAT INTERNATIONAL, INC. 0.97% $388,212.70
HAZ MAT SPECIAL SERVICES LLC 0.97% $388,212.70
AARON CONCRETE CONTRACTORS, LLC 0.76% $304,166.65
J. H. ODEN CONTRACTING COMPANY 0.34% $136,074.56
GREGORY PILE DRIVING, INC. 0.22% $88,048.24
DECO CONTRACTORS, INC. 0.22% $88,048.24
EGGEMEYER LAND CLEARING, LLC 0.10% $40,021.93
PROFESSIONAL TRAFFIC CONTROL LLC 0.08% $32,017.54
SK CONCRETE SERVICES LLC 0.08% $32,017.54
4E TREE WORX LLC 0.04% $16,008.77
TRANSTAR TRAFFIC SYSTEMS LLC 0.02% $8,004.39
Total: 13.14% $5,258,881.35

Bid Items & Bid Tabulations

172 Total 0 of 172
GONZALES  |  SH 80  |  YOAKUM  |  0287-03-034  |  01/04/2024  |  $47,110,387.28  |  C 287-3-34  |  WIDEN ROAD - ADD LANES  |  449 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
CK NEWBERRY, LLC
TEXAS MATERIALS GROUP, INC.
JORDAN FOSTER CONSTRUCTION, LLC
PREPARING ROW(TREE)(24" TO 36" DIA.)
EA 16.000 $3,000.000 $5,150.000 $2,500.000 $2,500.000 $2,400.000
REMOVING CONC (RIPRAP)
SY 194.000 $45.000 $14.000 $50.000 $35.500 $41.000
REMOVING CONC (DRIVEWAYS)
SY 1,136.000 $25.000 $28.000 $50.000 $46.000 $69.000
OBLITERATING ABANDONED ROAD
SY 4,439.000 $9.000 $8.300 $10.000 $10.850 $11.500
EXCAVATION (ROADWAY)
CY 64,690.000 $15.000 $14.200 $22.000 $18.500 $35.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 58,855.000 $22.000 $14.200 $16.000 $19.400 $22.000
BLADING
HR 60.000 $160.000 $180.000 $150.000 $170.000 $220.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 8,888.000 $1.000 $0.350 $0.300 $0.220 $0.350
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 290,074.000 $0.200 $0.320 $0.300 $0.220 $0.320
DRILL SEEDING (TEMP) (WARM)
SY 72,521.000 $0.220 $0.220 $0.200 $0.200 $0.220
DRILL SEEDING (TEMP) (COOL)
SY 72,521.000 $0.220 $0.220 $0.200 $0.200 $0.220
VEGETATIVE WATERING
MG 2,441.800 $51.000 $17.500 $15.000 $28.000 $43.000
FL BS (CMP IN PLC)(TY E GR 5)(FNL POS)
CY 78,530.000 $95.000 $71.440 $90.000 $104.750 $84.000
FL BS (RDWY DEL)(TY E GR 5)(FNAL POS)
CY 135.000 $102.000 $96.000 $125.000 $116.000 $520.000
LIME TRT (EXST MATL) (6")
SY 183,086.000 $5.250 $3.000 $2.800 $3.590 $2.100
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 2,166.000 $330.000 $308.000 $350.000 $335.000 $307.000
CEMENT
TON 1,422.000 $260.000 $220.000 $205.000 $274.000 $211.000
CEMENT TREAT (EXIST MATL) (6")
SY 183,086.000 $2.200 $3.000 $1.750 $1.970 $1.500
CEMENT TREAT (NEW BASE)(12")
SY 3,593.000 $4.000 $4.800 $2.750 $3.630 $9.550
PRIME COAT (MC-30)
GAL 68,571.000 $6.000 $4.900 $5.250 $4.900 $4.100
AGGR(TY-PE GR-4 SAC-B)
CY 4,605.000 $145.000 $147.990 $150.000 $168.000 $144.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 203,219.000 $6.750 $4.470 $4.500 $4.400 $4.100
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 1,000.000 $105.000 $80.470 $115.000 $101.000 $136.000
PLANE ASPH CONC PAV(0" TO 1")
SY 20,004.000 $7.750 $1.800 $7.000 $3.200 $1.850
PLANE ASPH CONC PAV (1.5")
SY 12,571.000 $7.750 $1.910 $6.000 $4.950 $2.350
PLANE ASPH CONC PAV (2 1/2")
SY 4,694.000 $8.000 $3.780 $15.000 $6.700 $4.000
FULL - DEPTH REPAIR CPJR (10")
SY 500.000 $375.000 $574.820 $175.000 $188.000 $210.000
CEM STABIL BKFL
CY 1,041.600 $185.000 $200.680 $225.000 $187.000 $400.000
CUT & RESTORING PAV
SY 308.000 $95.000 $183.470 $300.000 $95.000 $179.000
CUT AND RESTORE PAV (FLEX BASE)
SY 313.000 $85.000 $123.110 $200.000 $50.000 $198.000
FLOWABLE BACKFILL
CY 2.000 $650.000 $510.230 $1,600.000 $1,312.000 $1,750.000
TRENCH EXCAVATION PROTECTION
LF 144.000 $17.000 $27.000 $30.000 $25.000 $9.750
TEMPORARY SPL SHORING
SF 571.000 $65.000 $59.400 $65.000 $55.000 $1.800
DRILL SHAFT (30 IN)
LF 308.000 $310.000 $376.220 $500.000 $525.000 $540.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 20.000 $325.000 $295.000 $150.000 $295.000 $500.000
CL A CONC (FLUME)
CY 3.000 $750.000 $650.000 $1,400.000 $1,525.000 $4,000.000
CL C CONC (ABUT)(EXTEND)
CY 10.600 $2,000.000 $3,500.000 $5,000.000 $3,990.000 $5,200.000
CL C CONC (CAP)(EXTEND)
CY 16.000 $3,500.000 $3,500.000 $5,100.000 $4,305.000 $6,800.000
CL C CONC (COLUMN)
CY 11.800 $2,000.000 $3,500.000 $4,900.000 $2,940.000 $4,300.000
SHEAR KEY
CY 9.300 $300.000 $2,000.000 $4,000.000 $294.000 $1,720.000
REINF CONC SLAB (BOX BEAM)(EXT SLAB)
SF 2,150.000 $30.000 $80.000 $65.000 $63.000 $100.000
PRESTR CONC BOX BEAM (4B20)
LF 237.000 $315.000 $325.000 $325.000 $350.000 $490.000
PRESTR CONC BOX BEAM (5B20)
LF 237.000 $295.000 $325.000 $325.000 $350.000 $430.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 7.000 $260.000 $1,000.000 $525.000 $295.000 $1,060.000
RIPRAP (CONC)(5 IN)
CY 54.000 $575.000 $626.380 $700.000 $580.000 $2,700.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 76.100 $575.000 $739.690 $900.000 $840.000 $980.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 84.000 $235.000 $225.000 $400.000 $400.000 $230.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 108.000 $265.000 $250.000 $400.000 $240.000 $590.000
CLEANING AND SEALING EXISTING JOINTS
LF 1,306.000 $35.000 $19.000 $100.000 $33.800 $50.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 256.000 $165.000 $190.000 $275.000 $195.000 $300.000
RETROFIT RAIL (TY SSTR)
LF 1,637.000 $230.000 $290.000 $325.000 $231.000 $340.000
CONC BOX CULV (4 FT X 2 FT)
LF 158.000 $325.000 $636.100 $700.000 $589.000 $590.000
CONC BOX CULV (4 FT X 3 FT)
LF 237.000 $540.000 $731.140 $800.000 $677.000 $680.000
CONC BOX CULV (5 FT X 5 FT)
LF 77.000 $760.000 $815.380 $900.000 $755.000 $970.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 160.000 $820.000 $457.910 $500.000 $424.000 $1,700.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 92.000 $800.000 $524.870 $600.000 $486.000 $1,800.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 86.000 $940.000 $593.980 $650.000 $550.000 $2,000.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 113.000 $960.000 $653.380 $725.000 $605.000 $2,100.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 23.000 $1,100.000 $696.580 $775.000 $645.000 $2,500.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 145.000 $1,300.000 $782.980 $850.000 $725.000 $2,600.000
CONC BOX CULV (5 FT X 2.5 FT) (EXTEND)
LF 20.000 $990.000 $892.050 $975.000 $826.000 $2,200.000
RC PIPE (CL III)(15 IN)
LF 40.000 $90.000 $81.000 $100.000 $75.000 $230.000
RC PIPE (CL III)(18 IN)
LF 2,334.000 $95.000 $99.360 $115.000 $92.000 $240.000
RC PIPE (CL III)(24 IN)
LF 356.000 $130.000 $113.400 $130.000 $105.000 $260.000
MANHOLE (COMPL)(SPECIAL)
EA 1.000 $20,000.000 $39,958.860 $45,000.000 $37,000.000 $65,000.000
WINGWALL (FW - 0) (HW=4 FT)
EA 1.000 $18,000.000 $5,615.840 $7,000.000 $5,200.000 $35,000.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $28,000.000 $11,426.070 $13,000.000 $10,580.000 $40,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $32,000.000 $16,269.740 $18,000.000 $15,065.000 $54,000.000
SET (TY I)(S=3 FT)(HW=2FT)(4:1)(C)
EA 4.000 $5,000.000 $4,103.880 $4,500.000 $3,800.000 $16,900.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 8.000 $8,000.000 $6,155.820 $7,000.000 $5,700.000 $31,000.000
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
EA 1.000 $8,250.000 $6,479.820 $7,500.000 $6,000.000 $37,000.000
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
EA 2.000 $8,500.000 $5,480.840 $6,000.000 $5,075.000 $29,000.000
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 2.000 $8,600.000 $7,559.780 $8,500.000 $7,000.000 $29,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 7.000 $8,900.000 $4,697.870 $5,500.000 $4,350.000 $36,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
EA 8.000 $9,500.000 $5,723.840 $6,500.000 $5,300.000 $25,000.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
EA 4.000 $9,600.000 $6,263.820 $7,000.000 $5,800.000 $24,000.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 3.000 $10,000.000 $7,019.800 $8,000.000 $6,500.000 $29,000.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (C)
EA 4.000 $10,300.000 $7,235.790 $8,000.000 $6,700.000 $24,000.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)
EA 2.000 $10,250.000 $6,587.810 $7,500.000 $6,100.000 $30,000.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 2.000 $9,200.000 $5,507.840 $6,000.000 $5,100.000 $31,000.000
SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (C)
EA 22.000 $12,500.000 $7,019.800 $8,000.000 $6,500.000 $14,200.000
SET (TY II) (15 IN) (RCP) (6: 1) (P)
EA 2.000 $2,100.000 $1,187.970 $1,400.000 $1,100.000 $6,400.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 118.000 $2,500.000 $1,295.960 $1,500.000 $1,200.000 $3,900.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $2,600.000 $1,814.350 $2,000.000 $1,690.000 $6,600.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 14.000 $2,650.000 $2,051.940 $2,500.000 $1,900.000 $6,900.000
REMOV STR (SMALL)
EA 34.000 $1,200.000 $1,295.960 $1,500.000 $1,200.000 $2,700.000
MOBILIZATION
LS 1.000 $4,300,000.000 $3,707,500.030 $4,250,000.000 $4,425,000.000 $4,706,495.110
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 30.000 $6,500.000 $8,000.000 $20,000.000 $9,500.000 $29,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,616.000 $5.000 $4.350 $4.500 $4.250 $4.350
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,616.000 $1.750 $0.650 $0.800 $0.750 $0.650
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 2,160.000 $75.000 $75.000 $80.000 $34.000 $44.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 3,930.000 $12.000 $15.000 $35.000 $17.000 $25.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 2,160.000 $16.000 $25.000 $30.000 $19.000 $19.000
CONC CURB & GUTTER (TY II)
LF 382.000 $55.000 $59.400 $58.000 $57.000 $81.000
INTERSECTIONS (ACP)
SY 4,072.000 $65.000 $55.200 $75.000 $125.000 $92.000
DRIVEWAYS (SURF TREAT)
SY 6,226.000 $45.000 $41.400 $35.000 $41.350 $34.000
DRIVEWAYS (CONC)(TYPE 1)
SY 335.000 $120.000 $117.660 $115.000 $100.000 $380.000
DRIVEWAYS (CONC)(TYPE 2)
SY 441.000 $130.000 $148.580 $140.000 $137.000 $440.000
CONC SIDEWALKS (5")
SY 1,426.000 $105.000 $59.400 $65.000 $86.000 $124.000
CURB RAMPS (TY 1)
SY 10.000 $153.000 $1,295.960 $1,400.000 $250.000 $380.000
CURB RAMPS (TY 2)
SY 20.000 $190.000 $1,511.960 $1,600.000 $255.000 $380.000
CURB RAMPS (TY 10)
SY 53.000 $145.000 $1,295.960 $1,400.000 $255.000 $290.000
CONC SIDEWALKS (SPECIAL) (TYPE A)
SY 19.000 $750.000 $1,025.970 $1,200.000 $800.000 $1,380.000
RUMBLE STRIPS (SHOULDER)
LF 176,748.000 $0.450 $0.100 $0.200 $0.210 $0.160
RUMBLE STRIPS (CENTERLINE)
LF 90,494.000 $0.200 $0.100 $0.250 $0.320 $0.160
MTL W-BEAM GD FEN (TIM POST)
LF 1,925.000 $31.000 $24.980 $30.000 $24.750 $22.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 21.000 $2,400.000 $2,439.820 $2,300.000 $2,800.000 $1,800.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 100.000 $95.000 $105.920 $100.000 $105.000 $94.000
REMOVE METAL BEAM GUARD FENCE
LF 1,825.000 $5.000 $6.060 $3.000 $6.000 $0.540
GUARDRAIL END TREATMENT (INSTALL)
EA 25.000 $3,600.000 $3,373.900 $3,500.000 $3,341.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 20.000 $360.000 $419.640 $500.000 $416.000 $260.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 16.000 $2,100.000 $1,079.760 $1,200.000 $915.000 $1,070.000
CRASH CUSH ATTEN (REMOVE)
EA 8.000 $1,450.000 $951.150 $1,200.000 $640.000 $640.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 8.000 $9,800.000 $9,825.360 $8,000.000 $9,400.000 $16,400.000
REMOVE AND INSTALL EXISTING GATE
EA 1.000 $1,400.000 $2,952.990 $6,000.000 $1,500.000 $9,000.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 3.000 $600.000 $425.000 $500.000 $425.000 $480.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 62.000 $265.000 $115.000 $200.000 $115.000 $180.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 7.000 $320.000 $150.000 $250.000 $150.000 $200.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 2.000 $4,700.000 $2,495.000 $1,500.000 $2,495.000 $3,200.000
CONDT (PVC) (SCH 40) (2")
LF 1,420.000 $20.000 $14.000 $16.000 $14.000 $23.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 179.000 $35.000 $35.000 $25.000 $35.000 $62.000
ELEC CONDR (NO.8) BARE
LF 1,649.000 $2.200 $2.200 $1.750 $2.200 $2.250
ELEC CONDR (NO.8) INSULATED
LF 3,298.000 $2.150 $2.250 $2.000 $2.250 $2.250
GROUND BOX TY D (162922)W/APRON
EA 9.000 $1,700.000 $1,295.000 $1,500.000 $1,295.000 $2,800.000
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
EA 2.000 $6,800.000 $6,200.000 $8,000.000 $6,200.000 $11,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 15.000 $875.000 $575.000 $675.000 $575.000 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 24.000 $970.000 $700.000 $800.000 $700.000 $640.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 13.000 $1,060.000 $750.000 $850.000 $750.000 $700.000
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 3.000 $1,250.000 $950.000 $1,100.000 $950.000 $1,050.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 145.000 $675.000 $375.000 $450.000 $375.000 $320.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 6.000 $575.000 $500.000 $600.000 $500.000 $410.000
RELOCATE SM RD SN SUP&AM(HIST MRKR)
EA 1.000 $1,700.000 $500.000 $600.000 $500.000 $400.000
REMOVE SM RD SN SUP&AM
EA 204.000 $95.000 $50.000 $100.000 $50.000 $50.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 38.000 $35.000 $25.000 $30.000 $25.000 $22.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 47.000 $95.000 $60.000 $75.000 $60.000 $55.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 77.000 $37.000 $28.000 $30.000 $26.000 $35.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 367,982.000 $0.330 $0.450 $0.550 $0.450 $0.400
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 370,471.000 $0.330 $0.450 $0.550 $0.450 $0.410
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 8,804.000 $1.200 $1.250 $1.500 $1.250 $0.400
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 3,854.000 $2.000 $1.250 $1.500 $1.250 $0.380
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,454.000 $1.850 $1.770 $3.000 $1.370 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 10,089.000 $2.000 $1.770 $3.000 $1.370 $2.000
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
LF 4,424.000 $2.100 $1.000 $1.100 $1.000 $1.350
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 12,694.000 $1.350 $0.950 $1.000 $0.950 $1.350
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 581.000 $4.500 $4.000 $4.500 $4.000 $9.500
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 13,375.000 $0.850 $0.750 $0.800 $0.750 $0.810
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 2,518.000 $1.000 $0.750 $0.800 $0.750 $0.810
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 191,053.000 $0.850 $1.150 $1.200 $1.150 $0.810
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 205,034.000 $0.850 $1.150 $1.200 $1.150 $0.810
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 444.000 $18.250 $10.000 $12.000 $10.000 $19.500
PREFAB PAV MRK TY C (W) (ARROW)
EA 50.000 $270.000 $200.000 $250.000 $200.000 $250.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 24.000 $490.000 $400.000 $500.000 $400.000 $670.000
PREFAB PAV MRK TY C (W) (WORD)
EA 38.000 $325.000 $250.000 $400.000 $250.000 $370.000
REFL PAV MRKR TY I-C
EA 319.000 $6.500 $5.000 $6.000 $5.000 $4.950
REFL PAV MRKR TY II-A-A
EA 4,652.000 $5.750 $5.000 $6.000 $5.000 $4.950
ELIM EXT PAV MRK & MRKS (4")
LF 366,968.000 $0.550 $0.250 $0.300 $0.590 $0.300
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 3.000 $4,500.000 $4,500.000 $8,000.000 $4,500.000 $7,900.000
RELOCATE RDSD FLASH BEACON ASSEMBLY
EA 1.000 $3,550.000 $1,995.000 $2,000.000 $1,995.000 $5,000.000
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 3.000 $750.000 $500.000 $500.000 $500.000 $780.000
FULL - WIDTH MOWING
CYC 7.000 $11,500.000 $24,225.000 $8,000.000 $9,000.000 $8,100.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 9.000 $85.000 $162.000 $600.000 $750.000 $930.000
D-GR HMA TY-B PG64-22
TON 55,365.000 $125.000 $99.000 $100.000 $103.000 $90.000
D-GR HMA TY-D SAC-B PG70-22
TON 91,924.000 $135.000 $112.200 $120.000 $121.700 $114.000
TACK COAT
GAL 91,549.000 $5.250 $3.870 $5.000 $3.650 $3.050
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $12,300.000 $10,500.000 $40,000.000 $18,000.000 $36,000.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $9,500.000 $10,500.000 $20,000.000 $13,500.000 $33,000.000
TMA (STATIONARY)
DAY 443.000 $320.000 $290.000 $325.000 $290.000 $620.000
TMA (MOBILE OPERATION)
DAY 259.000 $400.000 $690.000 $105.000 $800.000 $1,110.000
HPPM-RIB W/RET REQ TYI(W)6"(BRK)100MIL
LF 6,517.000 $0.900 $0.750 $0.800 $0.750 $0.750
HPPM-RIB W/RET REQ TYI(W)6"(SLD)100MIL
LF 116,029.000 $0.900 $0.700 $0.750 $0.700 $0.750
HPPM-RIB W/RET REQ TYI(Y)6"(BRK)100MIL
LF 84,400.000 $0.900 $0.750 $0.800 $0.750 $0.800
HPPM-RIB W/RET REQ TYI(Y)6"(SLD)100MIL
LF 205,034.000 $0.900 $0.700 $0.750 $0.700 $0.800
Totals: $47,110,387.280 $39,193,544.667 $43,822,763.050 $44,256,029.880 $47,064,951.130