Show Job Controls
Bid Cobra

VAL VERDE US 90 (0022-09-055)

Items: 52

County: VAL VERDE
Length: N/A
Highway: US 90
District: LAREDO
Control Number: 0022-09-055
DBE Goal: N/A
Project: C 22-9-55
Guaranty: N/A
Time: 238 WORKING DAYS
Engineer's Estimate: $16,243,352.88
Date: 05/04/2023 (3 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
LUIS URBINA
ANGEL MARTINEZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$16,243,352.88
$17,895,331.20
Over/Under Est: 10.17% $1,651,978.32
Subcontractor Percentage Amount
ANDERSON COLUMBIA CO., INC. 0.00% $0.00
DELGADO'S CONTRACTORS, LLC 0.00% $0.00
DEPENDABLE FENCE 0.00% $0.00
INTERSTATE BARRICADES & MARKINGS, INC. 0.00% $0.00
K. L. DURHAM CONSTRUCTION, L.L.C. 0.00% $0.00
PAVEMENT MARKINGS INC. 0.00% $0.00
RPV CONSTRUCTION, LLC 0.00% $0.00
RVP CONSTRUCTION, INC. 0.00% $0.00
SURFACE PREPARATION TECHNOLOGIES, LLC 0.00% $0.00
TEXAS ICON CONSTRUCTION, LLC 0.00% $0.00
Total: 0.00% $0.00

Bid Items & Bid Tabulations

52 Total 0 of 52
VAL VERDE  |  US 90  |  LAREDO  |  0022-09-055  |  05/04/2023  |  $16,243,352.88  |  C 22-9-55  |  RESURF ROADWAY  |  238 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
BACKFILL (TY A)
STA 730.000 $170.000 $237.400
BLADING
HR 80.000 $160.000 $178.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 90,670.000 $28.000 $41.760
PLANE ASPH CONC PAV(0" TO 2")
SY 4,313.000 $2.150 $4.580
PLANE ASPH CONC PAV (2")
SY 59,547.000 $2.160 $2.460
CL C CONC (RAC-R)
CY 18.000 $3,000.000 $2,100.000
RIPRAP (MOW STRIP)(4 IN)
CY 402.000 $550.000 $828.950
RETROFIT RAIL (TY T221)
LF 114.000 $150.000 $260.000
MOBILIZATION
LS 1.000 $1,000,000.000 $1,789,521.900
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $5,000.000 $5,373.760
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 350.000 $90.000 $135.430
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
LF 90.000 $47.000 $128.450
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
LF 270.000 $10.000 $65.040
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
LF 90.000 $10.000 $65.040
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 145,803.000 $0.150 $0.130
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 34,695.000 $0.250 $0.100
MTL W-BEAM GD FEN (TIM POST)
LF 7,600.000 $24.000 $27.970
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,200.000 $3,109.880
SHORT RADIUS
LF 275.000 $150.000 $34.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 36.000 $1,390.000 $1,541.900
MTL BM GD FEN TRANS (NON - SYM)
EA 8.000 $1,220.000 $909.290
REMOVE METAL BEAM GUARD FENCE
LF 7,140.000 $2.000 $3.370
REMOVE TERMINAL ANCHOR SECTION
EA 36.000 $182.000 $225.890
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $205.000 $215.220
GUARDRAIL END TREATMENT (INSTALL)
EA 36.000 $3,210.000 $3,557.710
GUARDRAIL END TREATMENT (REMOVE)
EA 36.000 $265.000 $196.750
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $1,000.000 $1,076.080
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $833.960
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $10,000.000 $9,335.020
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $20.000 $43.040
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 152.000 $60.000 $40.220
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 10,938.000 $1.500 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 13,010.000 $0.770 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 971.000 $0.930 $3.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 160.000 $4.000 $14.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 9.000 $150.000 $150.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 8.000 $172.000 $150.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 700.000 $0.850 $3.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 36,952.000 $0.570 $1.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 147,803.000 $0.540 $1.000
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 19,053.000 $0.680 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 147,803.000 $0.530 $1.000
REFL PAV MRKR TY I-C
EA 1,865.000 $4.070 $5.000
REFL PAV MRKR TY II-A-A
EA 2,779.000 $3.760 $4.000
D-GR HMA TY-C SAC-A PG76-22
TON 70,065.000 $150.000 $134.370
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 2,236.000 $129.000 $143.960
BONDING COURSE
GAL 121,959.000 $3.000 $4.710
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $11,000.000 $11,245.500
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 96.000 $15.000 $29.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $10,000.000 $9,200.000
TMA (STATIONARY)
DAY 233.000 $210.000 $295.940
TMA (MOBILE OPERATION)
DAY 11.000 $175.000 $730.370
Totals: $16,243,352.880 $17,895,331.200