Show Job Controls
Bid Cobra

VICTORIA SH 185 (0432-02-097)

Items: 120

County: VICTORIA
Length: N/A
Highway: SH 185
District: YOAKUM
Control Number: 0432-02-097
DBE Goal: 200.0%
Project: F 2024(438)
Guaranty: N/A
Time: 270 WORKING DAYS
Engineer's Estimate: $18,073,712.59
Date: 12/05/2023 (2 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
CLAYTON HARRIS
JAMES JANAK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$18,073,712.59
$17,374,126.11
Over/Under Est: -3.87% -$699,586.48
Subcontractor Percentage Amount
HIGHWAY BARRICADES AND SERVICES, LLC 3.50% $608,094.42
HAZMAT INTERNATIONAL, INC. 0.90% $156,367.14
J. H. ODEN CONTRACTING COMPANY 0.35% $60,809.44
PROFESSIONAL TRAFFIC CONTROL LLC 0.14% $24,323.78
CHEROKEE SERVICES 0.05% $8,687.06
Total: 4.94% $858,281.84

Bid Items & Bid Tabulations

120 Total 0 of 120
VICTORIA  |  SH 185  |  YOAKUM  |  0432-02-097  |  12/05/2023  |  $18,073,712.59  |  F 2024(438)  |  SURF/ROADWAY RESTOR  |  270 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
REMOVING CONC (PAV)
SY 33.300 $15.000 $42.000
REMOVING CONC (MEDIANS)
SY 167.000 $16.500 $38.500
REMOVING CONCRETE(MOW STRIP)
LF 3,332.000 $5.500 $10.500
EXCAVATION (ROADWAY)
CY 193.000 $8.000 $64.900
SUBGRADE WIDENING (ORD COMP)
STA 365.510 $550.000 $718.500
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 50.000 $75.000 $89.100
BACKFILL (TY B)
STA 560.570 $175.000 $135.500
BLADING
HR 30.000 $125.000 $120.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 127,155.000 $0.400 $0.220
BROADCAST SEED (TEMP) (WARM)
SY 31,789.000 $0.400 $0.200
BROADCAST SEED (TEMP) (COOL)
SY 31,789.000 $0.400 $0.200
VEGETATIVE WATERING
MG 1,070.320 $27.000 $24.500
FL BS (CMP IN PLC)(TY E GR 5)(FNL POS)
CY 126.900 $125.000 $137.630
LIME TRT (EXST MATL) (6")
SY 3,158.000 $4.000 $7.200
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 38.000 $275.000 $385.000
CEMENT
TON 2,145.000 $300.000 $247.500
CEMENT TREAT(EXIST MATL)(8")
SY 176,532.000 $4.000 $3.000
PRIME COAT (MC-30)
GAL 35,306.000 $6.100 $5.120
AGGR(TY-PE GR-4 SAC-B)
CY 4,064.000 $120.000 $148.130
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 179,588.000 $4.500 $4.410
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,000.000 $75.000 $91.580
PLANE ASPH CONC PAV(0" TO 2")
SY 8,365.000 $2.250 $2.440
PLANE ASPH CONC PAV (8")
SY 11,725.000 $12.000 $8.490
PLANE ASPH CONC PAV (2")
SY 89,527.000 $2.500 $2.440
PLANE ASPH CONC PAV (2 1/2")
SY 130,559.000 $2.500 $2.990
PLANE ASPH CONC PAV (2.5" TO 4.5")
SY 30,257.000 $3.750 $2.990
CEM STABIL BKFL
CY 73.300 $220.000 $282.500
CUT & RESTORE ASPH PAVING
SY 68.000 $100.000 $193.910
RIPRAP (CONC)(6 IN)
CY 1.800 $550.000 $791.240
RIPRAP (MOW STRIP)(4 IN)
CY 3.000 $495.000 $984.610
RIPRAP (MOW STRIP)(6 IN)
CY 9.300 $550.000 $777.190
CLEANING AND SEALING EXISTING JOINTS
LF 192.000 $45.000 $66.020
RETROFIT RAIL (TY SSTR)
LF 170.000 $300.000 $344.310
RC PIPE (CL III)(18 IN)
LF 60.000 $96.000 $170.990
RC PIPE (CL III)(30 IN)
LF 198.000 $125.000 $251.120
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 2.000 $1,820.000 $2,486.880
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 3.000 $2,500.000 $2,620.850
REMOV STR (SMALL)
EA 2.000 $800.000 $6,046.350
MOBILIZATION
LS 1.000 $1,700,000.000 $1,588,983.940
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $3,000.000 $5,928.060
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 50.000 $45.000 $60.000
ROCK FILTER DAMS (REMOVE)
LF 50.000 $10.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,435.000 $5.000 $4.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,435.000 $1.000 $1.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 330.000 $50.000 $51.630
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 330.000 $10.000 $27.660
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 330.000 $10.000 $23.750
DRIVEWAYS (CONC)
SY 33.000 $110.000 $161.600
DRIVEWAYS (ACP)
SY 737.000 $75.000 $55.200
DRIVEWAYS (SURF TREAT)
SY 1,874.000 $45.000 $50.600
RUMBLE STRIPS (SHOULDER)
LF 200,559.000 $0.350 $0.050
RUMBLE STRIPS (CENTERLINE)
LF 9,284.000 $0.350 $0.280
MTL W-BEAM GD FEN (TIM POST)
LF 828.500 $28.000 $21.730
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,750.000 $2,279.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,550.000 $1,272.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 50.000 $35.000 $29.680
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 84.000 $90.000 $81.620
REMOVE METAL BEAM GUARD FENCE
LF 975.000 $3.000 $0.640
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $250.000 $212.000
RM MTL BM GD FEN TRANS (T101)
EA 4.000 $250.000 $424.000
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 1.000 $3,400.000 $4,240.000
REMOVE CABLE BARRIER
LF 1,052.000 $4.250 $2.120
REMOVE CABLE BARRIER TERMINAL SECTION
EA 1.000 $500.000 $636.000
GUARDRAIL END TREATMENT (INSTALL)
EA 11.000 $3,300.000 $2,968.000
GUARDRAIL END TREATMENT (REMOVE)
EA 11.000 $300.000 $265.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,500.000 $1,272.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $750.000 $636.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $9,000.000 $8,639.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 28.000 $250.000 $212.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 1.000 $450.000 $318.000
REMOVE SM RD SN SUP&AM
EA 1.000 $100.000 $106.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 28.000 $25.000 $21.200
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $80.000 $68.900
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 24.000 $50.000 $31.800
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $31.000 $31.800
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 31,908.000 $0.480 $0.380
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 195,012.000 $0.480 $0.380
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 440.000 $0.750 $0.520
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 15,130.000 $0.900 $0.520
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 900.000 $15.000 $12.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 3,960.000 $0.500 $0.380
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 127,422.000 $0.400 $0.380
WK ZN PAV MRK NON-REMOV (Y)12"(SLD)
LF 100.000 $0.750 $8.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 300.000 $1.000 $0.440
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 122,854.000 $0.450 $0.440
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 6,530.000 $1.150 $0.580
WK ZN PAV MRK REMOV (W)(ARROW)
EA 3.000 $125.000 $150.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 3.000 $150.000 $200.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 129,096.000 $0.400 $0.440
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 11,495.000 $1.350 $1.630
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 6,530.000 $1.350 $1.630
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
LF 1,171.000 $1.750 $0.660
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 213.000 $1.900 $0.880
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 9,450.000 $1.750 $0.880
REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL)
LF 30.000 $1.500 $50.000
PREFAB PAV MRK TY C (W) (18") (SLD)
LF 94.000 $12.000 $12.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 1,493.000 $17.000 $16.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 10.000 $250.000 $175.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 8.000 $500.000 $475.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 4.000 $800.000 $550.000
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 310.000 $15.000 $15.000
PREFAB PAV MRK TY C (Y) (12") (SLD)
LF 850.000 $7.420 $8.000
REFL PAV MRKR TY I-C
EA 24.000 $6.500 $5.000
REFL PAV MRKR TY II-A-A
EA 721.000 $6.000 $5.000
REFL PAV MRKR TY II-C-R
EA 1,770.000 $4.500 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 75,213.000 $0.350 $0.450
ELIM EXT PAV MRK & MRKS (8")
LF 100.000 $1.250 $0.700
D-GR HMA TY-B SAC-B PG64-22
TON 30,314.000 $115.000 $108.550
D-GR HMA TY-D SAC-B PG70-22
TON 58,512.000 $125.000 $120.650
TACK COAT
GAL 1,827.000 $4.500 $3.320
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $9,000.000 $17,475.000
LONG CHANNEL MOUNT CURB SYS (INSTALL)
LF 736.000 $60.000 $55.120
LONG CHANNEL MOUNT CURB SYS (REMOVE)
LF 736.000 $5.000 $2.120
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $11,000.000 $16,237.500
TMA (STATIONARY)
DAY 20.000 $250.000 $291.250
TMA (MOBILE OPERATION)
DAY 20.000 $325.000 $378.630
HPPM-RIB W/RET REQ TYI(W)6"(BRK)100MIL
LF 23,270.000 $0.800 $0.640
HPPM-RIB W/RET REQ TYI(W)6"(SLD)100MIL
LF 125,108.000 $0.750 $0.640
HPPM-RIB W/RET REQ TYI(Y)6"(BRK)100MIL
LF 3,624.000 $0.750 $0.640
HPPM-RIB W/RET REQ TYI(Y)6"(SLD)100MIL
LF 113,586.000 $0.750 $0.640
Totals: $18,073,712.590 $17,374,126.141