GOLIAD US 59 (0088-03-048)

Items: 50

County: GOLIAD
Length: N/A
Highway: US 59
District: CORPUS CHRISTI
Control Number: 0088-03-048
DBE Goal: N/A
Project: F 2023(931)
Guaranty: N/A
Time: 76 WORKING DAYS
Engineer's Estimate: $11,511,610.13
Date: 06/02/2023 (3 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
NICK NOVOSAD
ROBERTO A JIMENEZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$11,511,610.13
$10,014,542.27
Over/Under Est: -13% -$1,497,067.86
$10,923,995.25
Over/Under Est: -5.1% -$587,614.88
Amt Left: 9.08% $909,452.98
Over/Under Est: 2.6% $299,244.22
Amt Left: 17.94% $1,796,312.08
Delta: -8.12% -$886,859.10
Subcontractor Percentage Amount
TEXAS GUARDRAIL CONTRACTORS LLC 6.09% $628,431.74
HIGHWAY BARRICADES AND SERVICES, LLC 2.80% $288,934.13
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. 0.45% $46,435.84
PRIMATE CONSTRUCTION, LP 0.28% $28,893.41
FLASHER EQUIPMENT COMPANY 0.11% $11,350.98
MURRAY CONSTRUCTION 0.10% $10,319.08
Total: 9.83% $1,014,365.18

Bid Items & Bid Tabulations

50 Total 0 of 50
GOLIAD  |  US 59  |  CORPUS CHRISTI  |  0088-03-048  |  06/02/2023  |  $11,511,610.13  |  F 2023(931)  |  RESURF ROADWAY  |  76 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
CK NEWBERRY, LLC
LONE STAR PAVING COMPANY
BACKFILL (TY A OR B)
STA 1,143.000 $150.000 $185.000 $200.000 $140.000
ASPH (AC-20-5TR)
GAL 44,152.000 $4.000 $4.690 $5.000 $7.000
AGGR(TY-PB GR-3 SAC-B)
CY 1,147.000 $125.000 $144.640 $160.000 $170.000
PLANE ASPH CONC PAV(0" TO 2")
SY 35,970.000 $2.000 $2.110 $1.750 $1.700
PLANE ASPH CONC PAV (2")
SY 54,018.000 $2.000 $2.110 $2.000 $2.400
RIPRAP (MOW STRIP)(4 IN)
CY 460.000 $750.000 $635.830 $650.000 $505.000
MOBILIZATION
LS 1.000 $751,460.480 $915,036.170 $1,000,000.000 $178,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $5,000.000 $9,592.780 $25,000.000 $1,200.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 130.000 $5.000 $4.320 $10.000 $5.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 7,630.000 $5.000 $5.400 $12.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 7,760.000 $2.000 $1.080 $5.000 $2.000
INTERSECTIONS (ACP)
SY 3,650.000 $65.000 $50.600 $30.000 $35.000
DRIVEWAYS (ACP)
SY 8,667.000 $55.000 $41.400 $35.000 $40.000
RUMBLE STRIPS (SHOULDER)
LF 239,875.000 $0.150 $0.150 $0.200 $0.110
MTL W-BEAM GD FEN (TIM POST)
LF 7,625.000 $30.000 $26.380 $30.000 $22.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 23.000 $2,350.000 $3,210.700 $3,000.000 $2,400.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 11.000 $1,400.000 $1,805.480 $2,000.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 7,400.000 $5.000 $1.620 $2.000 $1.500
REMOVE TERMINAL ANCHOR SECTION
EA 11.000 $250.000 $293.280 $300.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 20.000 $3,375.000 $3,727.710 $4,000.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 20.000 $350.000 $288.640 $300.000 $200.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 8.000 $22.000 $19.440 $25.000 $15.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 8.000 $35.000 $21.600 $30.000 $22.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 198.000 $25.000 $19.440 $25.000 $15.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 55.000 $25.000 $21.600 $25.000 $21.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 8.000 $25.000 $21.600 $25.000 $20.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 145.000 $30.000 $12.960 $20.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 80.000 $50.000 $30.240 $40.000 $35.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 40.000 $50.000 $30.240 $40.000 $35.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 4,850.000 $0.400 $1.190 $1.250 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 11,244.000 $1.200 $1.620 $1.000 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 208.000 $1.200 $1.620 $1.000 $1.500
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 438.000 $1.000 $0.860 $1.000 $1.800
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 29,690.000 $1.000 $0.860 $1.000 $1.100
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 37,480.000 $0.600 $0.600 $0.750 $0.700
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 134,957.000 $0.600 $0.600 $0.750 $0.600
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 440.000 $0.600 $0.620 $0.750 $0.700
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 134,938.000 $0.600 $0.620 $0.750 $0.600
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 781.000 $10.000 $6.480 $7.000 $6.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 515.000 $15.000 $12.960 $14.000 $12.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 82.000 $230.000 $162.010 $200.000 $200.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 4.000 $420.000 $432.020 $500.000 $400.000
PREFAB PAV MRK TY C (W) (WORD)
EA 82.000 $300.000 $270.010 $300.000 $265.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 238.000 $50.000 $19.440 $21.000 $70.000
REFL PAV MRKR TY II-A-A
EA 46.000 $5.000 $4.160 $5.000 $5.000
REFL PAV MRKR TY II-C-R
EA 3,339.000 $5.000 $4.160 $5.000 $5.000
D-GR HMA TY-D SAC-B PG70-22
TON 64,972.000 $125.000 $101.300 $111.500 $142.000
TACK COAT
GAL 4,431.000 $4.000 $3.860 $5.000 $7.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 170.000 $100.000 $116.920 $50.000 $200.000
TMA (STATIONARY)
DAY 85.000 $100.000 $350.750 $400.000 $300.000
Totals: $11,511,610.130 $10,014,542.270 $10,923,995.250 $11,810,854.350