MCMULLEN SH 72 (0483-02-021)

Items: 122

County: MCMULLEN
Length: N/A
Highway: SH 72
District: SAN ANTONIO
Control Number: 0483-02-021
DBE Goal: N/A
Project: STP 2018(077)
Guaranty: N/A
Time: 354 WORKING DAYS
Engineer's Estimate: $29,289,401.85
Date: 09/06/2018 (7 years ago)
Contract Number: N/A
Type: GRADE, BASE, SURF, PAVEMENT MARKINGS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$29,289,401.85
$30,553,964.74
Over/Under Est: 4.32% $1,264,562.89
Over/Under Est: 4.99% $1,462,637.22
Amt Left: 0.65% $198,074.33
Over/Under Est: 19% $5,564,598.15
Amt Left: 14.07% $4,300,035.26
Delta: -13.34% -$4,101,960.93
Over/Under Est: 23.42% $6,859,035.90
Amt Left: 18.31% $5,594,473.01
Delta: -3.71% -$1,294,437.75
$36,512,072.15
Over/Under Est: 24.66% $7,222,670.30
Amt Left: 19.5% $5,958,107.41
Delta: -1.01% -$363,634.40
Over/Under Est: 39.1% $11,451,883.29
Amt Left: 33.34% $10,187,320.40
Delta: -11.58% -$4,229,212.99

Bid Items & Bid Tabulations

122 Total 0 of 122
MCMULLEN  |  SH 72  |  SAN ANTONIO  |  0483-02-021  |  09/06/2018  |  $29,289,401.85  |  STP 2018(077)  |  GRADE, BASE, SURF, PAVMT MRK  |  354 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
ANGEL BROTHERS HOLDINGS CORP.
JORDAN FOSTER CONSTRUCTION, LLC
ANDERSON COLUMBIA CO., INC.
DEAN WORD COMPANY, LTD.
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
PREPARING ROW
STA 823.000 $250.000 $255.000 $230.000 $300.000 $114.000 $97.382 $1,000.000
EXCAVATION (ROADWAY)
CY 18,822.000 $10.000 $7.800 $7.500 $11.000 $12.000 $10.459 $6.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 11,264.000 $8.000 $7.800 $5.500 $6.000 $4.000 $7.020 $9.500
COMPOST MANUF TOPSOIL (4")
SY 93,072.000 $1.000 $0.770 $0.800 $0.800 $2.000 $0.804 $1.750
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 93,072.000 $0.150 $0.100 $0.120 $0.120 $0.100 $0.104 $0.120
DRILL SEEDING (TEMP) (COOL)
SY 93,072.000 $0.150 $0.080 $0.100 $0.100 $0.080 $0.083 $0.100
FERTILIZER
AC 39.200 $200.000 $153.720 $280.000 $280.000 $420.000 $291.200 $280.000
VEGETATIVE WATERING
MG 2,905.000 $25.000 $14.190 $10.000 $8.000 $30.000 $23.653 $25.000
FL BS (CMP IN PLC)(TYA GR1-2) (6")
SY 54,821.000 $10.000 $8.990 $10.000 $12.500 $12.000 $12.047 $13.500
PRIME COAT(MC-30 OR AE-P)
GAL 87,217.000 $3.000 $3.130 $3.300 $3.250 $3.800 $3.646 $3.000
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
GAL 128,057.000 $3.000 $3.190 $3.100 $3.000 $3.400 $3.379 $5.000
AGGR (TY-PB GR-4)
CY 4,270.000 $70.000 $64.030 $45.000 $75.000 $70.000 $73.878 $85.000
D-GR HMA TY-B PG70-22
TON 237,305.000 $60.000 $68.100 $63.000 $68.000 $70.000 $69.774 $80.000
SUPERPAVE MIXTURES SP-C SAC-B PG76-22
TON 46,466.000 $75.000 $80.880 $84.000 $88.000 $89.000 $91.518 $90.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 2,042.000 $2.000 $2.030 $3.500 $2.250 $8.000 $4.933 $3.000
PLAN & TEXT ASPH CONC PAV (8"-12")
SY 363,715.000 $3.250 $2.390 $3.100 $4.650 $5.000 $4.492 $4.000
CEM STABIL BKFL
CY 1,287.000 $110.000 $182.400 $100.000 $135.000 $80.000 $162.750 $100.000
CUT & RESTORING PAV
SY 9,883.000 $65.000 $78.230 $40.000 $50.000 $72.000 $108.500 $80.000
FLOWABLE BACKFILL
CY 1,195.000 $118.000 $102.330 $150.000 $135.000 $220.000 $162.750 $155.000
TRENCH EXCAVATION PROTECTION
LF 1,791.000 $4.500 $3.590 $10.000 $3.000 $5.000 $4.940 $8.000
TEMPORARY SPL SHORING
SF 5,860.000 $15.000 $1.150 $5.000 $15.000 $21.000 $21.497 $18.000
CL A CONC (MISC)
CY 3.400 $600.000 $701.380 $1,200.000 $450.000 $1,000.000 $1,013.477 $500.000
RIPRAP (CONC)(4 IN)
CY 300.000 $300.000 $479.080 $450.000 $505.000 $480.000 $492.041 $425.000
RIPRAP (MOW STRIP)(4 IN)
CY 95.000 $450.000 $491.200 $470.000 $535.000 $480.000 $487.579 $425.000
CLEANING AND SEALING JOINTS
LF 560.000 $50.000 $9.950 $10.000 $28.000 $10.000 $8.480 $10.000
HEADER TYPE EXPANSION JOINT
LF 560.000 $90.000 $98.750 $100.000 $90.000 $96.000 $129.320 $100.000
CMP (GAL STL 12 IN)
LF 284.000 $60.000 $43.120 $40.000 $55.000 $38.000 $38.838 $32.000
CMP (GAL STL 18 IN)
LF 493.000 $60.000 $48.680 $45.000 $65.000 $45.000 $45.336 $36.000
CMP AR (GAL STL DES 2)
LF 319.000 $70.000 $60.220 $53.000 $68.000 $46.000 $46.873 $45.000
CONC BOX CULV (4 FT X 2 FT)
LF 1,298.000 $225.000 $191.900 $250.000 $225.000 $195.000 $198.358 $210.000
CONC BOX CULV (6 FT X 3 FT)
LF 1,019.000 $325.000 $365.800 $350.000 $295.000 $323.000 $329.957 $312.000
CONC BOX CULV (8 FT X 4 FT)
LF 390.000 $500.000 $567.640 $460.000 $450.000 $440.000 $444.691 $534.000
RC PIPE (CL III)(18 IN)
LF 202.000 $60.000 $97.540 $70.000 $75.000 $63.000 $63.452 $45.500
RC PIPE (CL III)(36 IN)
LF 56.000 $55.000 $134.660 $118.000 $150.000 $90.000 $91.065 $84.250
RC PIPE (CL IV)(24 IN)
LF 2,446.000 $60.000 $96.270 $85.000 $95.000 $78.000 $79.023 $53.000
HEADWALL (CH - FW - 0) (DIA= 24 IN)
EA 1.000 $3,500.000 $3,044.900 $5,000.000 $3,800.000 $12,900.000 $13,126.701 $4,400.000
HEADWALL (CH - FW - 0) (DIA= 36 IN)
EA 1.000 $5,050.000 $3,383.770 $6,500.000 $4,800.000 $13,000.000 $13,219.652 $4,700.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 9.000 $6,000.000 $5,035.310 $7,000.000 $4,300.000 $13,500.000 $13,713.718 $4,900.000
WINGWALL (PW - 2) (HW=3 FT)
EA 16.000 $4,400.000 $4,535.600 $5,000.000 $7,500.000 $13,300.000 $13,532.416 $4,900.000
WINGWALL (PW - 2) (HW=4 FT)
EA 6.000 $6,500.000 $7,312.710 $9,300.000 $9,000.000 $14,000.000 $14,287.867 $6,900.000
WINGWALL (PW - 2) (HW=5 FT)
EA 4.000 $8,400.000 $9,419.690 $8,400.000 $12,000.000 $15,200.000 $15,530.579 $8,100.000
SET (TY II) (12 IN) (CMP) (6: 1) (P)
EA 8.000 $780.000 $1,055.230 $1,100.000 $1,400.000 $840.000 $852.229 $790.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 14.000 $800.000 $1,449.710 $1,300.000 $1,500.000 $900.000 $912.618 $990.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 6.000 $1,000.000 $1,602.130 $1,500.000 $1,600.000 $1,050.000 $1,068.915 $1,000.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 44.000 $1,600.000 $1,802.140 $1,500.000 $1,800.000 $1,240.000 $1,270.219 $1,250.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 1.000 $2,000.000 $3,876.320 $3,500.000 $3,200.000 $1,780.000 $1,817.200 $3,000.000
SET (TY II) (DES 2) (CMP) (6: 1) (P)
EA 12.000 $1,100.000 $1,535.630 $1,300.000 $1,600.000 $1,110.000 $1,138.504 $1,000.000
REMOV STR (PIPE)
EA 41.000 $500.000 $1,069.160 $800.000 $1,250.000 $1,380.000 $1,410.341 $490.000
MOBILIZATION
LS 1.000 $1,395,000.000 $2,107,146.800 $1,500,000.000 $2,869,914.280 $2,500,000.000 $2,999,352.702 $4,000,020.360
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 22.000 $5,000.000 $1,810.640 $3,400.000 $7,500.000 $9,100.000 $5,014.970 $13,250.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 4,200.000 $22.000 $22.550 $25.000 $29.000 $23.000 $22.000 $28.000
ROCK FILTER DAMS (REMOVE)
LF 4,200.000 $7.000 $7.170 $5.000 $8.000 $7.000 $7.280 $6.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,800.000 $15.000 $12.300 $20.000 $15.500 $13.000 $12.480 $26.000
CONSTRUCTION EXITS (REMOVE)
SY 1,800.000 $7.000 $2.050 $5.000 $6.000 $2.100 $2.080 $6.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 143,626.000 $2.000 $1.760 $2.500 $2.000 $1.800 $1.789 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 143,626.000 $0.400 $0.510 $0.300 $0.350 $0.500 $0.520 $1.000
CONSTRUCTING DETOURS
SY 46,289.000 $35.000 $9.540 $40.000 $50.000 $50.000 $50.084 $50.000
ONE-WAY TRAF CONT (PILOT CAR)
HR 2,064.000 $70.000 $34.200 $90.000 $100.000 $104.000 $92.149 $220.000
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
LF 2,910.000 $15.000 $12.940 $25.000 $15.000 $32.000 $16.275 $45.000
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
LF 15,750.000 $5.000 $5.500 $8.000 $5.000 $8.000 $8.680 $10.000
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
LF 2,910.000 $10.000 $12.070 $14.000 $12.000 $14.000 $16.275 $13.000
DRIVEWAYS (CONC)
SY 1,882.000 $70.000 $80.300 $76.000 $75.000 $100.000 $78.090 $71.370
DRIVEWAYS (ACP)
SY 13,158.000 $35.000 $37.320 $55.000 $40.000 $55.000 $43.812 $45.000
RUMBLE STRIPS (SHOULDER)
LF 163,751.000 $0.300 $0.150 $0.110 $0.120 $0.210 $0.083 $0.100
RUMBLE STRIPS (CENTERLINE)
LF 81,875.000 $0.300 $0.160 $0.110 $0.120 $0.220 $0.094 $0.100
MTL W-BEAM GD FEN (TIM POST)
LF 1,600.000 $20.000 $22.450 $23.000 $23.000 $22.000 $22.870 $21.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $1,500.000 $2,111.130 $2,300.000 $1,720.000 $2,400.000 $2,220.720 $1,820.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $900.000 $867.730 $870.000 $850.000 $1,110.000 $884.000 $1,070.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 100.000 $22.000 $23.920 $24.000 $24.000 $22.000 $24.367 $21.000
REMOVE METAL BEAM GUARD FENCE
LF 2,148.000 $1.000 $1.020 $1.000 $1.000 $1.300 $1.040 $1.250
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,200.000 $2,840.020 $2,900.000 $2,800.000 $2,800.000 $2,893.280 $2,730.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $200.000 $101.060 $100.000 $99.000 $210.000 $102.960 $200.000
CRASH CUSH ATTEN (INSTL)
EA 8.000 $8,000.000 $6,624.320 $6,800.000 $7,000.000 $7,100.000 $6,748.560 $6,850.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 58.000 $800.000 $751.350 $750.000 $750.000 $1,300.000 $765.440 $1,250.000
CRASH CUSH ATTEN (REMOVE)
EA 8.000 $200.000 $366.490 $370.000 $359.000 $520.000 $373.360 $500.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 5.000 $200.000 $185.000 $190.000 $150.000 $150.000 $192.400 $150.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 1.000 $250.000 $255.000 $270.000 $150.000 $220.000 $265.200 $215.000
MAILBOX INSTALL-M (TWG-POST) TY 2
EA 1.000 $400.000 $310.000 $330.000 $150.000 $390.000 $322.400 $375.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 19.000 $450.000 $340.000 $360.000 $360.000 $480.000 $353.600 $470.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 39.000 $520.000 $440.000 $460.000 $400.000 $540.000 $457.600 $520.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 6.000 $500.000 $570.000 $600.000 $525.000 $680.000 $592.800 $655.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $700.000 $670.000 $700.000 $525.000 $800.000 $696.800 $760.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $650.000 $695.000 $720.000 $600.000 $900.000 $722.800 $865.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 4.000 $900.000 $750.000 $780.000 $700.000 $840.000 $780.000 $810.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 1.000 $950.000 $560.000 $580.000 $500.000 $500.000 $582.400 $480.000
REMOVE SM RD SN SUP&AM
EA 72.000 $80.000 $45.000 $48.000 $40.000 $68.000 $46.800 $65.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 18.000 $20.000 $26.000 $11.000 $10.000 $11.000 $27.040 $10.500
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 50.000 $25.000 $28.000 $11.000 $10.000 $11.000 $29.120 $10.500
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 114.000 $70.000 $52.000 $41.000 $40.000 $42.000 $54.080 $40.350
REMOVE DELIN & OBJECT MARKER ASSMS
EA 108.000 $15.000 $5.000 $3.200 $10.000 $15.000 $5.200 $15.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 125,400.000 $0.250 $0.280 $0.290 $0.280 $0.300 $0.291 $0.240
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 125,400.000 $0.250 $0.280 $0.290 $0.280 $0.300 $0.291 $0.240
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 3,879.000 $2.500 $3.000 $3.050 $3.000 $3.100 $3.120 $2.400
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 184,680.000 $0.500 $0.540 $0.550 $0.550 $0.560 $0.562 $0.500
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 184,680.000 $0.500 $0.540 $0.550 $0.550 $0.550 $0.562 $0.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 16,464.000 $0.500 $1.060 $1.000 $1.000 $1.400 $1.269 $0.710
REFL PAV MRK TY II (W) 8" (SLD)
LF 1,030.000 $0.350 $0.440 $0.450 $0.450 $0.500 $0.458 $0.500
REFL PAV MRK TY II (W) 24" (SLD)
LF 148.000 $2.750 $3.000 $3.050 $3.000 $3.200 $3.120 $4.000
REFL PAV MRK TY II (W) (ARROW)
EA 4.000 $50.000 $63.000 $65.000 $63.000 $65.000 $65.520 $67.000
REFL PAV MRK TY II (W) (WORD)
EA 4.000 $60.000 $63.000 $65.000 $63.000 $65.000 $65.520 $67.000
REFL PAV MRK TY II (Y) 24" (SLD)
LF 12.000 $1.250 $3.000 $3.050 $3.000 $3.200 $3.120 $5.000
REFL PAV MRK TY II (Y) (MED NOSE)
EA 1.000 $200.000 $188.000 $190.000 $188.000 $195.000 $195.520 $177.000
PAVEMENT SEALER 4"
LF 305,876.000 $0.150 $0.130 $0.130 $0.130 $0.150 $0.135 $0.150
PAVEMENT SEALER 8"
LF 1,030.000 $0.350 $0.400 $0.400 $0.400 $0.400 $0.416 $0.400
PAVEMENT SEALER 24"
LF 160.000 $2.000 $3.000 $3.050 $3.000 $3.000 $3.120 $2.400
PAVEMENT SEALER (ARROW)
EA 4.000 $28.000 $63.000 $65.000 $63.000 $65.000 $65.520 $63.000
PAVEMENT SEALER (WORD)
EA 4.000 $34.000 $63.000 $65.000 $63.000 $65.000 $65.520 $63.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 8,370.000 $0.350 $0.360 $0.370 $0.400 $0.370 $0.374 $0.340
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 163,782.000 $0.350 $0.340 $0.350 $0.350 $0.350 $0.354 $0.320
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 6,430.000 $0.350 $0.360 $0.370 $0.400 $0.370 $0.374 $0.340
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 127,294.000 $0.350 $0.340 $0.350 $0.350 $0.350 $0.354 $0.320
REFL PAV MRKR TY I-C
EA 470.000 $3.000 $3.000 $3.050 $3.000 $3.200 $3.120 $3.000
REFL PAV MRKR TY II-A-A
EA 2,230.000 $3.000 $3.000 $3.050 $3.000 $3.200 $3.120 $3.000
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 288.000 $1.000 $5.000 $5.000 $6.000 $5.200 $5.200 $3.000
PAV SURF PREP FOR MRK (4")
LF 305,876.000 $0.050 $0.080 $0.090 $0.080 $0.080 $0.083 $0.090
PAV SURF PREP FOR MRK (8")
LF 1,030.000 $0.150 $0.500 $0.510 $0.500 $0.500 $0.520 $0.100
PAV SURF PREP FOR MRK (24")
LF 160.000 $1.200 $2.000 $2.000 $2.000 $2.000 $2.080 $1.000
PAV SURF PREP FOR MRK (ARROW)
EA 4.000 $20.000 $50.000 $51.000 $50.000 $52.000 $52.000 $20.000
PAV SURF PREP FOR MRK (WORD)
EA 4.000 $23.000 $50.000 $51.000 $50.000 $52.000 $52.000 $20.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 2,736.000 $60.000 $7.580 $50.000 $40.000 $70.000 $103.075 $90.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 288.000 $20.000 $14.000 $14.000 $16.000 $15.000 $14.560 $0.250
TMA (STATIONARY)
DAY 502.000 $250.000 $126.380 $160.000 $160.000 $220.000 $217.000 $450.000
Totals: $29,289,401.850 $30,553,964.746 $30,752,039.070 $34,854,000.000 $36,148,437.750 $36,512,072.353 $40,741,285.140