VAL VERDE US 90 (0022-05-025)

Items: 103

County: VAL VERDE
Length: N/A
Highway: US 90
District: LAREDO
Control Number: 0022-05-025
DBE Goal: N/A
Project: F 2022(601)
Guaranty: N/A
Time: 445 WORKING DAYS
Engineer's Estimate: $12,119,654.56
Date: 06/02/2022 (4 years ago)
Contract Number: N/A
Type: PLANING, OVERLAYING, RAIL UPGRADE & PAV MRK
Mail/Deliver Bids To: N/A
ANTONIO REYNA1
ALBERTO CHAVEZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$12,119,654.56
$16,723,941.13
Over/Under Est: 37.99% $4,604,286.57
Subcontractor Percentage Amount
TERRA CONSTRUCTION LLC 8.56% $1,504,573.65
DEPENDABLE FENCE 4.25% $747,013.78
TEXAS GUARDRAIL CONTRACTORS LLC 3.49% $613,430.14
TRP CONSTRUCTION GROUP, LLC 1.38% $242,559.77
FLASHER EQUIPMENT COMPANY 0.68% $119,522.21
DELGADO'S CONTRACTORS, LLC 0.63% $110,733.81
A K FUQUAY CONSTRUCTION 0.60% $105,460.77
SURFACE PREPARATION TECHNOLOGIES, LLC 0.13% $22,849.83
CHEROKEE SERVICES 0.03% $5,273.04
Total: 19.75% $3,471,417.00

Bid Items & Bid Tabulations

103 Total 0 of 103
VAL VERDE  |  US 90  |  LAREDO  |  0022-05-025  |  06/02/2022  |  $12,119,654.56  |  F 2022(601)  |  PLANING, OVERLAYING, RAIL UPGRADE &...  |  445 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
PREPARING ROW
STA 76.000 $2,000.000 $759.240
PREPARING ROW (TREE) (36" TO 48" DIA)
EA 2.000 $3,300.000 $5,400.000
REMOVING CONC (PAV)
SY 41.000 $15.000 $37.620
REMOVING CONC (DRIVEWAYS)
SY 456.000 $14.000 $37.620
REMOVING CONC (CURB AND GUTTER)
LF 9,518.000 $8.000 $13.680
REMOVING CONC (SIDEWALK OR RAMP)
SY 5,469.000 $18.000 $27.360
REMOVING CONCRETE(MOW STRIP)
LF 300.000 $15.000 $13.680
REMOVING CONC (SAWCUT)
LF 348.000 $11.330 $27.360
EXCAVATION (ROADWAY)
CY 890.000 $10.000 $16.020
BACKFILL (TY A)
STA 512.070 $125.000 $180.900
FURNISH AND PLACE TOPSOIL (5")
SY 5,479.000 $3.000 $3.150
BLOCK SODDING
SY 5,479.000 $4.000 $6.990
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 5,479.000 $0.250 $0.510
VEGETATIVE WATERING
MG 206.000 $9.000 $20.520
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 8,912.000 $35.000 $40.250
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 4,802.000 $40.000 $49.020
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 35,515.000 $25.000 $25.040
PLANE ASPH CONC PAV(0" TO 2")
SY 1,467.000 $2.000 $2.080
PLANE ASPH CONC PAV (2")
SY 133,808.000 $1.500 $2.080
PLANE ASPH CONC PAV (2 1/2")
SY 20,768.000 $3.000 $2.510
CONC PVMT (CONT REINF-CRCP) (HES) (9")
SY 1,066.000 $108.320 $275.710
CONC PVMT(CRCP)(TRANSITION SLAB)
SY 160.000 $110.000 $281.600
FULL - DEPTH REPAIR CRCP (8")
SY 300.000 $270.000 $288.280
RIPRAP (MOW STRIP)(4 IN)
CY 865.000 $480.000 $732.800
CLEANING AND SEALING EXISTING JOINTS
LF 132.000 $30.000 $79.440
RAIL (HANDRAIL)(TY D)
LF 20.000 $150.000 $688.140
SET (TY I)(S=2 FT)(HW=3FT)(4:1)(C)
EA 1.000 $6,000.000 $3,752.210
SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1) (C)
EA 2.000 $11,500.000 $16,181.090
SET (TY I)(S= 8 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $11,525.000 $16,525.160
CLEAN EXIST CULVERTS
EA 4.000 $2,675.000 $1,512.840
REMOV STR (WINGWALL)
EA 4.000 $1,325.000 $2,953.420
MOBILIZATION
LS 1.000 $937,769.350 $1,400,864.220
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 23.000 $4,180.000 $2,560.870
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 64.000 $52.000 $144.130
ROCK FILTER DAMS (REMOVE)
LF 64.000 $16.000 $29.780
BACKHOE WORK (EROSION & SEDMT CONT)
HR 7.000 $72.000 $105.300
TEMP SEDMT CONT FENCE (INSTALL)
LF 258.000 $2.600 $4.900
TEMP SEDMT CONT FENCE (REMOVE)
LF 258.000 $1.050 $1.020
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 8,130.000 $4.500 $5.640
BIODEG EROSN CONT LOGS (REMOVE)
LF 8,130.000 $1.250 $1.020
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 676.000 $150.000 $105.300
ONE-WAY TRAF CONT (PILOT CAR)
HR 555.000 $68.000 $128.700
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
LF 120.000 $60.000 $61.300
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
LF 360.000 $5.000 $28.610
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
LF 120.000 $15.000 $50.140
CONC CURB & GUTTER (TY II)
LF 9,518.000 $25.000 $57.340
CONC CURB & GUTTER (VALLEY GUTTER)
LF 135.000 $31.000 $91.750
DRIVEWAYS (CONC) (FAST TRACK)
SY 1,201.000 $85.000 $183.500
CONC SIDEWALKS (4")
SY 5,469.000 $55.000 $96.340
CURB RAMPS (TY 1)
EA 17.000 $1,690.000 $2,867.260
CURB RAMPS (TY 2)
EA 2.000 $2,300.000 $3,211.330
CURB RAMPS (TY 3)
EA 1.000 $2,000.000 $3,440.710
CURB RAMPS (TY 5)
EA 3.000 $2,500.000 $3,784.780
CURB RAMPS (TY 7)
EA 3.000 $2,000.000 $3,096.640
CURB RAMPS (TY 10)
EA 31.000 $2,000.000 $2,637.880
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 99,613.000 $0.130 $0.200
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 49,807.000 $0.200 $0.200
MTL W-BEAM GD FEN (TIM POST)
LF 16,450.000 $26.000 $27.030
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,995.000 $2,147.100
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,280.000 $1,397.400
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 150.000 $90.000 $26.980
REMOVE METAL BEAM GUARD FENCE
LF 15,925.000 $2.400 $1.790
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $200.000 $178.500
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $260.000 $178.500
GUARDRAIL END TREATMENT (INSTALL)
EA 79.000 $2,910.000 $3,243.600
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $310.000 $178.500
CRASH CUSH ATTEN (MOVE & RESET)
EA 3.000 $1,300.000 $943.500
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $800.000 $943.500
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $8,140.000 $8,976.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 16.000 $226.000 $306.360
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 34.000 $731.760 $675.630
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $712.580 $783.940
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 2.000 $802.000 $907.720
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $900.000 $1,005.720
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $790.000 $1,010.870
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 2.000 $1,030.000 $1,134.650
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,007.000 $1,315.170
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 1.000 $1,000.000 $1,856.710
REMOVE SM RD SN SUP&AM
EA 41.000 $100.380 $113.470
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 220.000 $31.000 $24.760
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 3,635.000 $0.260 $3.370
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 8,907.000 $0.250 $3.370
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 5,118.000 $1.500 $1.430
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 8,088.000 $0.900 $1.430
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,445.000 $0.770 $1.020
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 2,312.000 $5.500 $8.160
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 33.000 $125.000 $178.500
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 32.000 $145.000 $204.000
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 132.000 $40.000 $66.300
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 7,980.000 $0.310 $0.660
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 124,550.000 $0.280 $0.480
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 15,778.000 $0.280 $0.660
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 126,774.000 $0.300 $0.480
REFL PAV MRKR TY I-C
EA 980.000 $2.900 $8.160
REFL PAV MRKR TY II-A-A
EA 1,906.000 $2.910 $8.160
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 8,691.000 $94.000 $129.420
SP MIXES SP-C SAC-A PG76-22
TON 51,688.000 $100.000 $140.220
BONDING COURSE
GAL 88,851.000 $2.300 $4.010
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $9,800.000 $10,313.260
LONG CHANNEL MOUNT CURB SYS (INSTALL)
LF 415.000 $60.000 $72.210
LONG CHANNEL MOUNT CURB SYS (REMOVE)
LF 415.000 $10.000 $7.220
TMA (STATIONARY)
DAY 398.000 $200.000 $226.890
TMA (MOBILE OPERATION)
HR 286.000 $50.000 $77.350
Totals: $12,119,654.560 $16,723,941.133