PREPARING ROW
|
STA
|
76.000
|
$2,000.000
|
$759.240
|
|
|
PREPARING ROW (TREE) (36" TO 48" DIA)
|
EA
|
2.000
|
$3,300.000
|
$5,400.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
41.000
|
$15.000
|
$37.620
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
456.000
|
$14.000
|
$37.620
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
9,518.000
|
$8.000
|
$13.680
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
5,469.000
|
$18.000
|
$27.360
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
300.000
|
$15.000
|
$13.680
|
|
|
REMOVING CONC (SAWCUT)
|
LF
|
348.000
|
$11.330
|
$27.360
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
890.000
|
$10.000
|
$16.020
|
|
|
BACKFILL (TY A)
|
STA
|
512.070
|
$125.000
|
$180.900
|
|
|
FURNISH AND PLACE TOPSOIL (5")
|
SY
|
5,479.000
|
$3.000
|
$3.150
|
|
|
BLOCK SODDING
|
SY
|
5,479.000
|
$4.000
|
$6.990
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
5,479.000
|
$0.250
|
$0.510
|
|
|
VEGETATIVE WATERING
|
MG
|
206.000
|
$9.000
|
$20.520
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
|
SY
|
8,912.000
|
$35.000
|
$40.250
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
4,802.000
|
$40.000
|
$49.020
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
35,515.000
|
$25.000
|
$25.040
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,467.000
|
$2.000
|
$2.080
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
133,808.000
|
$1.500
|
$2.080
|
|
|
PLANE ASPH CONC PAV (2 1/2")
|
SY
|
20,768.000
|
$3.000
|
$2.510
|
|
|
CONC PVMT (CONT REINF-CRCP) (HES) (9")
|
SY
|
1,066.000
|
$108.320
|
$275.710
|
|
|
CONC PVMT(CRCP)(TRANSITION SLAB)
|
SY
|
160.000
|
$110.000
|
$281.600
|
|
|
FULL - DEPTH REPAIR CRCP (8")
|
SY
|
300.000
|
$270.000
|
$288.280
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
865.000
|
$480.000
|
$732.800
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
132.000
|
$30.000
|
$79.440
|
|
|
RAIL (HANDRAIL)(TY D)
|
LF
|
20.000
|
$150.000
|
$688.140
|
|
|
SET (TY I)(S=2 FT)(HW=3FT)(4:1)(C)
|
EA
|
1.000
|
$6,000.000
|
$3,752.210
|
|
|
SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
2.000
|
$11,500.000
|
$16,181.090
|
|
|
SET (TY I)(S= 8 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
2.000
|
$11,525.000
|
$16,525.160
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
4.000
|
$2,675.000
|
$1,512.840
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,325.000
|
$2,953.420
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$937,769.350
|
$1,400,864.220
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
23.000
|
$4,180.000
|
$2,560.870
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
64.000
|
$52.000
|
$144.130
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
64.000
|
$16.000
|
$29.780
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
7.000
|
$72.000
|
$105.300
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
258.000
|
$2.600
|
$4.900
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
258.000
|
$1.050
|
$1.020
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
8,130.000
|
$4.500
|
$5.640
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
8,130.000
|
$1.250
|
$1.020
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
676.000
|
$150.000
|
$105.300
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
555.000
|
$68.000
|
$128.700
|
|
|
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
120.000
|
$60.000
|
$61.300
|
|
|
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
360.000
|
$5.000
|
$28.610
|
|
|
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
120.000
|
$15.000
|
$50.140
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
9,518.000
|
$25.000
|
$57.340
|
|
|
CONC CURB & GUTTER (VALLEY GUTTER)
|
LF
|
135.000
|
$31.000
|
$91.750
|
|
|
DRIVEWAYS (CONC) (FAST TRACK)
|
SY
|
1,201.000
|
$85.000
|
$183.500
|
|
|
CONC SIDEWALKS (4")
|
SY
|
5,469.000
|
$55.000
|
$96.340
|
|
|
CURB RAMPS (TY 1)
|
EA
|
17.000
|
$1,690.000
|
$2,867.260
|
|
|
CURB RAMPS (TY 2)
|
EA
|
2.000
|
$2,300.000
|
$3,211.330
|
|
|
CURB RAMPS (TY 3)
|
EA
|
1.000
|
$2,000.000
|
$3,440.710
|
|
|
CURB RAMPS (TY 5)
|
EA
|
3.000
|
$2,500.000
|
$3,784.780
|
|
|
CURB RAMPS (TY 7)
|
EA
|
3.000
|
$2,000.000
|
$3,096.640
|
|
|
CURB RAMPS (TY 10)
|
EA
|
31.000
|
$2,000.000
|
$2,637.880
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
99,613.000
|
$0.130
|
$0.200
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
49,807.000
|
$0.200
|
$0.200
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
16,450.000
|
$26.000
|
$27.030
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,995.000
|
$2,147.100
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$1,280.000
|
$1,397.400
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
150.000
|
$90.000
|
$26.980
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
15,925.000
|
$2.400
|
$1.790
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$200.000
|
$178.500
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$260.000
|
$178.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
79.000
|
$2,910.000
|
$3,243.600
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$310.000
|
$178.500
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
3.000
|
$1,300.000
|
$943.500
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$800.000
|
$943.500
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
1.000
|
$8,140.000
|
$8,976.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
16.000
|
$226.000
|
$306.360
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
34.000
|
$731.760
|
$675.630
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$712.580
|
$783.940
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
2.000
|
$802.000
|
$907.720
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$900.000
|
$1,005.720
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$790.000
|
$1,010.870
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
2.000
|
$1,030.000
|
$1,134.650
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,007.000
|
$1,315.170
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
1.000
|
$1,000.000
|
$1,856.710
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
41.000
|
$100.380
|
$113.470
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
220.000
|
$31.000
|
$24.760
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
3,635.000
|
$0.260
|
$3.370
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
8,907.000
|
$0.250
|
$3.370
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
5,118.000
|
$1.500
|
$1.430
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
8,088.000
|
$0.900
|
$1.430
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,445.000
|
$0.770
|
$1.020
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,312.000
|
$5.500
|
$8.160
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
33.000
|
$125.000
|
$178.500
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
32.000
|
$145.000
|
$204.000
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
132.000
|
$40.000
|
$66.300
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
7,980.000
|
$0.310
|
$0.660
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
124,550.000
|
$0.280
|
$0.480
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
15,778.000
|
$0.280
|
$0.660
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
126,774.000
|
$0.300
|
$0.480
|
|
REFL PAV MRKR TY I-C
|
EA
|
980.000
|
$2.900
|
$8.160
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,906.000
|
$2.910
|
$8.160
|
|
|
D-GR HMA TY-D PG70-22 (LEVEL-UP)
|
TON
|
8,691.000
|
$94.000
|
$129.420
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
51,688.000
|
$100.000
|
$140.220
|
|
|
BONDING COURSE
|
GAL
|
88,851.000
|
$2.300
|
$4.010
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$9,800.000
|
$10,313.260
|
|
|
LONG CHANNEL MOUNT CURB SYS (INSTALL)
|
LF
|
415.000
|
$60.000
|
$72.210
|
|
|
LONG CHANNEL MOUNT CURB SYS (REMOVE)
|
LF
|
415.000
|
$10.000
|
$7.220
|
|
|
TMA (STATIONARY)
|
DAY
|
398.000
|
$200.000
|
$226.890
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
286.000
|
$50.000
|
$77.350
|
|
Totals: |
$12,119,654.560
|
$16,723,941.133
|