VAL VERDE US 90 (0022-07-031)

Items: 44

County: VAL VERDE
Length: N/A
Highway: US 90
District: LAREDO
Control Number: 0022-07-031
DBE Goal: N/A
Project: C 22-7-31
Guaranty: N/A
Time: 200 WORKING DAYS
Engineer's Estimate: $9,284,311.97
Date: 02/04/2021 (5 years ago)
Contract Number: N/A
Type: SPOT BASE REPAIR, OVERLAY, RAIL UPGRADE & PVM MRKS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$9,284,311.97
$7,511,303.55
Over/Under Est: -19.1% -$1,773,008.42
Over/Under Est: -11.07% -$1,028,170.90
Amt Left: 9.92% $744,837.52
Over/Under Est: -6.65% -$617,861.25
Amt Left: 15.38% $1,155,147.17
Delta: -4.97% -$410,309.65
Over/Under Est: 25.9% $2,405,045.03
Amt Left: 55.62% $4,178,053.45
Delta: -34.88% -$3,022,906.28

Bid Items & Bid Tabulations

44 Total 0 of 44
VAL VERDE  |  US 90  |  LAREDO  |  0022-07-031  |  02/04/2021  |  $9,284,311.97  |  C 22-7-31  |  SPOT BASE REPAIR, OVERLAY, RAIL UPGR...  |  200 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
ANDERSON COLUMBIA CO., INC.
ANGEL BROTHERS HOLDINGS CORP.
H. L. ZUMWALT CONSTRUCTION, INC.
BACKFILL (TY A)
STA 473.000 $140.000 $77.100 $100.000 $75.000 $300.000
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
TON 4,973.000 $85.000 $78.450 $95.000 $86.000 $100.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 19,216.000 $28.000 $23.500 $29.000 $31.000 $55.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 61,643.000 $19.000 $13.230 $16.200 $14.500 $45.000
PLANE ASPH CONC PAV(0" TO 2")
SY 2,934.000 $3.500 $3.960 $1.800 $2.600 $3.000
PLANE ASPH CONC PAV (2")
SY 256,350.000 $1.500 $1.130 $1.100 $1.550 $2.000
RIPRAP (MOW STRIP)(4 IN)
CY 576.000 $460.000 $500.000 $450.000 $450.000 $450.000
CLEANING AND SEALING EXISTING JOINTS
LF 262.000 $25.000 $40.000 $40.000 $40.000 $50.000
MOBILIZATION
LS 1.000 $844,028.390 $591,209.710 $474,000.000 $600,000.000 $800,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $3,500.000 $4,270.100 $3,000.000 $3,500.000 $15,000.000
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 400.000 $95.000 $91.200 $120.000 $65.000 $80.000
ONE-WAY TRAF CONT (PILOT CAR)
HR 1,020.000 $125.000 $91.200 $135.000 $100.000 $100.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 174,854.000 $0.300 $0.160 $0.200 $0.160 $0.250
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 87,427.000 $0.300 $0.130 $0.300 $0.220 $0.300
MTL W-BEAM GD FEN (TIM POST)
LF 10,400.000 $19.000 $19.250 $21.000 $21.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,000.000 $1,625.000 $2,300.000 $2,200.000 $2,500.000
REMOVE METAL BEAM GUARD FENCE
LF 10,400.000 $1.700 $1.500 $1.600 $1.500 $3.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $220.000 $200.000 $215.000 $200.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 42.000 $2,600.000 $2,425.000 $2,620.000 $2,500.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 42.000 $225.000 $200.000 $215.000 $200.000 $300.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 18.000 $17.000 $35.000 $35.000 $35.000 $35.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 12.000 $55.000 $75.000 $80.000 $75.000 $80.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 12.000 $20.000 $15.000 $16.000 $15.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 142.000 $15.000 $35.000 $54.000 $35.000 $35.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,216.000 $1.250 $1.410 $1.400 $0.850 $1.250
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 12,595.000 $1.250 $1.410 $1.400 $0.850 $1.250
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 678.000 $0.800 $0.700 $2.000 $0.700 $2.000
REFL PAV MRK TY I (W)18"(SLD)(100MIL)
LF 88.000 $4.200 $5.000 $7.000 $5.000 $5.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 114.000 $6.500 $7.000 $12.000 $7.000 $7.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 3.000 $140.000 $150.000 $150.000 $150.000 $200.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 3.000 $150.000 $150.000 $150.000 $150.000 $150.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 16.000 $35.000 $55.000 $41.000 $55.000 $50.000
PAVEMENT SEALER 4"
LF 108,483.000 $0.250 $0.150 $0.090 $0.160 $0.200
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 2,020.000 $0.380 $0.400 $0.400 $0.400 $0.450
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 174,855.000 $0.300 $0.350 $0.300 $0.370 $0.400
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 13,331.000 $0.280 $0.380 $0.400 $0.400 $0.350
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 95,152.000 $0.300 $0.360 $0.300 $0.380 $0.350
REFL PAV MRKR TY I-C
EA 140.000 $3.360 $4.000 $4.000 $4.000 $6.000
REFL PAV MRKR TY II-A-A
EA 1,860.000 $3.100 $3.470 $3.000 $3.500 $7.000
SP MIXES SP-C SAC-A PG76-22
TON 48,245.000 $96.000 $77.050 $86.000 $94.000 $90.000
BONDING COURSE
GAL 41,951.000 $3.000 $2.750 $3.000 $3.000 $4.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $7,676.050 $20,800.000 $10,000.000 $15,000.000
TMA (STATIONARY)
DAY 160.000 $100.000 $307.040 $170.000 $110.000 $250.000
TMA (MOBILE OPERATION)
HR 300.000 $30.000 $76.760 $60.000 $35.000 $50.000
Totals: $9,284,311.970 $7,511,303.550 $8,256,141.070 $8,666,450.720 $11,689,357.000