JACKSON SH 35 (0179-09-034)

Items: 120

County: JACKSON
Length: N/A
Highway: SH 35
District: YOAKUM
Control Number: 0179-09-034
DBE Goal: 0.0%
Project: C 179-9-34
Guaranty: N/A
Time: 300 WORKING DAYS
Engineer's Estimate: $16,160,768.61
Date: 03/06/2024 (2 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
CLAYTON HARRIS
JAMES JANAK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$16,160,768.61
$17,748,210.05
Over/Under Est: 9.82% $1,587,441.44
Over/Under Est: 19.92% $3,218,790.97
Amt Left: 9.19% $1,631,349.53
Subcontractor Percentage Amount
HARDY HOLE DRILLING 1.69% $299,536.58
CREACOM, INC. 1.45% $256,998.84
HIGHWAY BARRICADES AND SERVICES, LLC 0.80% $141,792.46
HAZMAT INTERNATIONAL, INC. 0.61% $108,116.75
J. H. ODEN CONTRACTING COMPANY 0.33% $58,489.39
AARON CONCRETE CONTRACTORS, LLC 0.25% $44,310.14
TORO BRAVO CONSTRUCTION, LLC 0.21% $37,220.52
PRIMATE CONSTRUCTION, LP 0.03% $5,317.22
ROYAL REBAR INC 0.00% $0.00
TRP CONSTRUCTION GROUP, LLC 0.00% $0.00
Total: 5.37% $951,781.90

Bid Items & Bid Tabulations

120 Total 0 of 120
JACKSON  |  SH 35  |  YOAKUM  |  0179-09-034  |  03/06/2024  |  $16,160,768.61  |  C 179-9-34  |  HAZARD ELIM & SAFETY  |  300 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
JAMES CONSTRUCTION GROUP, LLC
PREPARING ROW
STA 72.700 $10,000.000 $2,999.200 $24,900.000
OBLITERATING ABANDONED ROAD
SY 8,166.000 $3.500 $10.500 $6.320
EXCAVATION (ROADWAY)
CY 21,252.000 $15.000 $17.500 $11.640
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 269,874.000 $15.000 $24.660 $20.370
FURNISHING AND PLACING TOPSOIL (4")
SY 52,110.000 $4.000 $1.840 $1.550
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 143,150.000 $1.000 $0.180 $0.170
BROADCAST SEED (TEMP) (WARM)
SY 35,791.000 $1.000 $0.160 $0.120
BROADCAST SEED (TEMP) (COOL)
SY 35,791.000 $1.000 $0.160 $0.110
VEGETATIVE WATERING
MG 402.000 $50.000 $21.000 $38.930
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 9,726.000 $2.000 $0.990 $0.850
FL BS (CMP IN PLC)(TY E GR 5)(FNL POS)
CY 14,709.000 $95.000 $110.860 $119.460
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 712.000 $330.000 $357.500 $360.580
LIME TRT (EXST MATL)(8")
SY 44,300.000 $5.000 $3.000 $6.590
CEMENT
TON 237.000 $300.000 $242.000 $246.220
CEMENT TREAT(EXIST MATL)(8")
SY 23,859.000 $4.900 $3.000 $4.220
PRIME COAT (MC-30)
GAL 12,843.000 $6.250 $5.460 $4.840
AGGR(TY-PE GR-4 SAC-B)
CY 658.000 $200.000 $177.410 $336.190
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 32,242.000 $10.000 $4.810 $4.200
PLANE ASPH CONC PAV(0" TO 2")
SY 1,304.000 $3.500 $3.540 $11.410
CEM STABIL BKFL
CY 569.700 $225.000 $200.000 $213.380
CUT & RESTORING PAV
SY 68.000 $150.000 $250.000 $144.420
TRENCH EXCAVATION PROTECTION
LF 89.000 $12.000 $50.000 $1.090
DRILL SHAFT (18 IN)
LF 260.000 $230.000 $233.230 $88.540
DRILL SHAFT (36 IN)
LF 1,170.000 $345.000 $266.490 $290.580
DRILL SHAFT (SIGN MTS) (24 IN)
LF 46.000 $320.000 $186.370 $187.360
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 160.000 $300.000 $177.780 $171.710
CL C CONC (ABUT)
CY 69.200 $1,300.000 $1,800.000 $1,016.850
CL C CONC (CAP)
CY 47.000 $1,550.000 $1,600.000 $1,414.840
CL C CONC (COLUMN)
CY 47.100 $1,650.000 $1,250.000 $841.680
REINF CONC SLAB
SF 11,500.000 $26.000 $36.000 $20.750
APPROACH SLAB
CY 115.300 $600.000 $725.000 $579.900
PRESTR CONC GIRDER (TX46)
LF 1,490.520 $225.000 $200.000 $206.210
RIPRAP (CONC)(4 IN)
CY 5.600 $660.000 $800.000 $813.540
RIPRAP (CONC)(5 IN)
CY 6.800 $750.000 $750.000 $701.340
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 316.000 $600.000 $650.000 $423.680
RIPRAP (MOW STRIP)(4 IN)
CY 6.800 $512.590 $700.000 $703.030
RAIL (TY SSTR)
LF 120.000 $85.000 $150.000 $138.500
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 436.000 $135.000 $160.000 $135.180
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 102.000 $200.000 $275.000 $226.570
CONC BOX CULV (3 FT X 2 FT)
LF 74.000 $275.000 $500.000 $448.070
CONC BOX CULV (5 FT X 2 FT)
LF 94.000 $475.000 $650.000 $430.120
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 122.000 $700.000 $410.000 $355.520
RC PIPE (CL III)(18 IN)
LF 248.000 $175.000 $150.000 $103.510
RC PIPE (CL III)(24 IN)
LF 428.000 $215.000 $120.000 $124.790
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 1.000 $8,000.000 $7,300.000 $15,113.280
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 2.000 $10,000.000 $8,200.000 $6,339.740
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1) (C)
EA 2.000 $13,000.000 $9,000.000 $10,496.780
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 4.000 $1,550.000 $2,800.000 $1,689.530
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $2,200.000 $3,750.000 $1,755.040
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000 $2,400.000 $3,300.000 $1,447.840
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 9.000 $2,500.000 $3,800.000 $1,957.170
REMOV STR (PIPE)
LF 454.000 $25.000 $25.000 $29.120
MOBILIZATION
LS 1.000 $1,465,000.000 $1,709,280.150 $1,894,472.050
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $4,000.000 $4,210.390 $17,994.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 66.000 $40.000 $65.000 $68.340
ROCK FILTER DAMS (REMOVE)
LF 66.000 $12.000 $15.000 $14.090
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,104.000 $4.500 $5.000 $3.710
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,104.000 $1.500 $1.000 $2.350
CONSTRUCTING DETOURS
SY 1,631.000 $110.000 $109.060 $179.690
DRIVEWAYS (SURF TREAT)
SY 476.000 $55.000 $50.600 $111.850
RUMBLE STRIPS (SHOULDER)
LF 9,042.000 $0.400 $0.540 $0.440
RUMBLE STRIPS (CENTERLINE)
LF 9,176.000 $0.500 $0.540 $0.320
MTL W-BEAM GD FEN (TIM POST)
LF 300.000 $29.000 $23.260 $23.700
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,400.000 $2,531.910 $2,041.450
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,500.000 $3,092.200 $3,151.040
REMOVE RD IL ASM (TRANS-BASE)
EA 4.000 $1,000.000 $1,344.550 $1,298.620
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 16.000 $5,950.000 $6,641.820 $6,414.950
CONDT (PVC) (SCH 40) (2")
LF 7,365.000 $23.000 $7.200 $6.950
CONDT (PVC) (SCH 80) (2") (BORE)
LF 670.000 $21.000 $13.490 $13.030
ELEC CONDR (NO.6) BARE
LF 8,750.000 $2.200 $1.290 $1.250
ELEC CONDR (NO.6) INSULATED
LF 17,500.000 $2.500 $1.420 $1.370
GROUND BOX TY A (122311)W/APRON
EA 12.000 $1,000.000 $1,321.770 $1,276.620
REMOVE ELECTRICAL SERVICES
EA 1.000 $1,000.000 $724.790 $700.030
ELC SRV TY A 240/480 060(NS)AL(E)TP(O)
EA 1.000 $8,500.000 $9,895.470 $9,557.460
ALUMINUM SIGNS (TY G)
SF 512.000 $35.000 $26.920 $27.060
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 4.000 $1,100.000 $794.990 $875.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,200.000 $824.590 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,175.000 $848.900 $900.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 5.000 $1,150.000 $989.500 $950.000
IN SM RD SN SUP&AM TYS80(1)SB(U-EXAL)
EA 2.000 $1,450.000 $1,374.310 $1,300.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 32.000 $450.000 $370.010 $465.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 7.000 $550.000 $428.150 $575.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $3,000.000 $2,795.620 $2,602.180
INSTALL LRSS (STRUCT STEEL)
LB 3,852.000 $7.500 $6.010 $6.040
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $35.000 $21.140 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $40.000 $31.710 $30.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 16.000 $80.000 $68.720 $60.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 15,137.000 $1.000 $0.420 $1.250
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 645.000 $1.750 $0.680 $2.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 241.000 $12.000 $14.000 $12.500
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
EA 70.000 $55.000 $25.000 $60.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 22,585.000 $1.000 $0.420 $1.250
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 419.000 $2.500 $1.630 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 717.000 $2.500 $1.630 $1.950
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 717.000 $1.500 $0.660 $1.750
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,994.000 $1.750 $0.880 $1.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 668.000 $5.000 $1.200 $5.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 171.000 $5.000 $1.200 $5.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 136.000 $15.000 $16.000 $12.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 8.000 $235.000 $150.000 $250.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 1.000 $375.000 $325.000 $350.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 1.000 $300.000 $500.000 $450.000
PREFAB PAV MRK TY C (W) (WORD)
EA 7.000 $300.000 $250.000 $295.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 17.000 $65.000 $25.000 $60.000
REFL PAV MRKR TY I-C
EA 66.000 $4.500 $5.000 $5.500
REFL PAV MRKR TY II-A-A
EA 732.000 $4.500 $5.000 $5.500
REFL PAV MRKR TY II-C-R
EA 256.000 $4.500 $5.000 $5.500
ELIM EXT PAV MRK & MRKS (4")
LF 20,978.000 $0.700 $0.550 $1.000
ELIM EXT PAV MRK & MRKS (24")
LF 24.000 $8.000 $10.000 $5.000
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 1.000 $1,100.000 $672.460 $649.490
D-GR HMA TY-B PG70-22
TON 10,484.000 $115.000 $118.700 $151.290
D-GR HMA TY-D SAC-B PG70-22
TON 12,690.000 $145.000 $124.200 $157.140
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 565.000 $150.000 $137.200 $171.700
TACK COAT
GAL 13,755.000 $4.500 $3.780 $2.420
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $12,000.000 $10,500.000 $10,926.550
TMA (STATIONARY)
DAY 50.000 $300.000 $350.000 $304.630
TMA (MOBILE OPERATION)
DAY 30.000 $390.000 $950.000 $106.790
HPPM-RIB W/RET REQ TYI(W)6"(SLD)100MIL
LF 32,213.000 $1.300 $0.660 $0.800
HPPM-RIB W/RET REQ TYI(Y)6"(BRK)100MIL
LF 1,120.000 $1.350 $0.660 $0.900
HPPM-RIB W/RET REQ TYI(Y)6"(SLD)100MIL
LF 34,206.000 $1.350 $0.660 $0.800
Totals: $16,160,768.612 $17,748,210.050 $19,379,559.613