UVALDE US 83 (0037-01-042)

Items: 101

County: UVALDE
Length: N/A
Highway: US 83
District: SAN ANTONIO
Control Number: 0037-01-042
DBE Goal: N/A
Project: STP 2019(170)
Guaranty: N/A
Time: 287 WORKING DAYS
Engineer's Estimate: $11,761,069.79
Date: 11/07/2018 (7 years ago)
Contract Number: N/A
Type: REHAB EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$11,761,069.79
$10,197,040.68
Over/Under Est: -13.3% -$1,564,029.11
Over/Under Est: -1.58% -$185,251.29
Amt Left: 13.52% $1,378,777.82
Over/Under Est: 1.52% $178,362.99
Amt Left: 17.09% $1,742,392.10
Delta: -3.14% -$363,614.28
Over/Under Est: 3.72% $437,763.25
Amt Left: 19.63% $2,001,792.36
Delta: -2.17% -$259,400.26
$12,307,257.07
Over/Under Est: 4.64% $546,187.28
Amt Left: 20.69% $2,110,216.39
Delta: -0.89% -$108,424.03

Bid Items & Bid Tabulations

101 Total 0 of 101
UVALDE  |  US 83  |  SAN ANTONIO  |  0037-01-042  |  11/07/2018  |  $11,761,069.79  |  STP 2019(170)  |  REHAB EXIST ROADWAY  |  287 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
LONE STAR PAVING COMPANY
ANGEL BROTHERS HOLDINGS CORP.
SPAWGLASS CIVIL CONSTRUCTION, INC.
J. CARROLL WEAVER, INC.
REMOVING CONC (RIPRAP)
SY 28.000 $15.000 $30.060 $50.000 $26.500 $44.580 $13.320
REMOVING CONC (DRIVEWAYS)
SY 16.000 $12.000 $30.060 $75.000 $35.500 $75.370 $111.000
REMOVING CONCRETE(MOW STRIP)
LF 1,030.000 $15.000 $7.890 $20.000 $9.500 $7.160 $8.880
EXCAVATION (ROADWAY)
CY 67,039.000 $4.500 $15.420 $13.000 $14.750 $10.190 $10.070
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 2,165.000 $12.000 $9.990 $5.000 $3.750 $13.280 $6.020
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
SY 75,130.000 $0.220 $0.450 $0.450 $0.210 $0.220 $0.500
STRAW/HAY MLCH SEED(PERM)(URBAN)(CLAY)
SY 16,059.000 $0.500 $0.450 $0.450 $0.210 $0.220 $0.500
STRAW/HAY MLCH SEED(TEMP)(WARM)
SY 91,188.000 $0.220 $0.350 $0.350 $0.210 $0.220 $0.390
STRAW/HAY MLCH SEED(TEMP)(COOL)
SY 91,188.000 $0.210 $0.350 $0.350 $0.210 $0.220 $0.390
VEGETATIVE WATERING
MG 1,698.000 $20.000 $19.980 $25.000 $17.500 $27.350 $19.980
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 4,982.000 $1.000 $1.750 $1.750 $2.750 $1.380 $1.940
PROOF ROLLING
HR 21.800 $45.000 $85.500 $44.520 $60.000 $86.590 $38.850
FL BS (CMP IN PLC)(TY D GR 1-2 OR 5)6"
SY 213,169.000 $15.000 $5.600 $7.500 $6.150 $6.400 $4.900
LIME TRT (EXST MATL) (6")
SY 217,604.000 $2.800 $1.940 $4.000 $2.000 $2.910 $1.970
LIME (HYD, COM, OR QK(SLURRY))
TON 2,062.000 $150.000 $162.750 $190.000 $180.000 $183.590 $184.470
PRIME COAT(MC-30 OR AE-P)
GAL 41,754.000 $3.500 $3.890 $3.000 $3.750 $4.420 $3.610
AGGR(TY-PB GR-4 SAC-B)
CY 1,892.000 $16.440 $67.880 $75.000 $100.000 $77.360 $71.810
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
GAL 62,437.000 $0.920 $3.310 $3.000 $3.250 $3.200 $3.120
D-GR HMA TY-B PG64-22
TON 45,431.000 $60.000 $60.700 $67.000 $67.000 $77.360 $83.410
SUPERPAVE MIXTURES SP-D SAC-B PG70-22
TON 17,240.000 $90.000 $70.650 $74.000 $81.000 $82.880 $96.820
PLANE CONC PAV(0" TO 2")
SY 173.000 $7.500 $14.790 $1.880 $4.000 $3.140 $8.880
PLANE ASPH CONC PAV (2")
SY 4,458.000 $2.560 $2.440 $1.650 $4.000 $3.280 $4.440
PLANE ASPH CONC PAV (3")
SY 1,120.000 $2.500 $6.120 $2.680 $4.000 $3.280 $8.880
CL C CONC (MISC)
CY 8.000 $800.000 $600.000 $800.000 $1,275.000 $740.410 $1,165.500
CL C CONC (RAC-R)
CY 18.000 $1,100.000 $825.000 $750.000 $1,600.000 $884.070 $1,129.980
RIPRAP (CONC)(4 IN)
CY 35.000 $330.000 $415.000 $525.000 $550.000 $591.220 $515.040
RIPRAP (MOW STRIP)(4 IN)
CY 64.000 $440.000 $430.000 $500.000 $500.000 $569.120 $538.350
CLEANING AND SEALING EXISTING JOINTS
LF 448.000 $10.000 $18.000 $25.000 $27.000 $19.480 $22.200
RAIL (TY T223)
LF 40.000 $180.000 $175.000 $165.000 $190.000 $276.270 $192.030
RETROFIT RAIL (TY T221)
LF 448.000 $165.000 $180.000 $175.000 $155.000 $209.970 $210.900
RETROFIT RAIL (TY T223)
LF 176.000 $175.000 $190.000 $185.000 $375.000 $193.390 $216.450
HEADER TYPE EXPANSION JOINT
CF 111.000 $350.000 $343.000 $395.000 $425.000 $421.090 $505.050
CMP (GAL STL 18 IN)
LF 52.000 $80.000 $60.000 $100.000 $50.000 $48.320 $79.920
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 2.000 $740.000 $1,100.000 $2,500.000 $825.000 $1,875.970 $1,165.500
MOBILIZATION
LS 1.000 $884,789.230 $903,026.160 $913,000.000 $1,000,000.000 $1,224,073.000 $875,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $8,000.000 $4,695.400 $5,500.000 $500.000 $4,649.910 $2,220.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 800.000 $20.000 $23.500 $23.500 $30.000 $29.840 $26.090
ROCK FILTER DAMS (REMOVE)
LF 800.000 $8.000 $7.500 $7.500 $10.000 $9.950 $8.330
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,404.000 $10.000 $9.850 $9.850 $13.000 $13.260 $10.930
CONSTRUCTION EXITS (REMOVE)
SY 1,404.000 $5.000 $6.500 $6.500 $7.750 $7.740 $7.220
TEMP SEDMT CONT FENCE (INSTALL)
LF 19,218.000 $1.700 $2.100 $2.100 $2.750 $2.760 $2.330
TEMP SEDMT CONT FENCE (REMOVE)
LF 19,218.000 $0.470 $0.500 $0.500 $0.500 $0.550 $0.560
CONSTRUCTING DETOURS
SY 1,563.000 $30.000 $30.660 $45.000 $45.000 $25.300 $72.150
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 2.000 $2,500.000 $2,435.620 $3,500.000 $10,000.000 $4,144.090 $3,885.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 10,740.000 $19.000 $15.000 $40.000 $75.000 $53.380 $74.180
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 480.000 $34.000 $20.000 $46.000 $70.000 $53.390 $74.180
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 72,880.000 $4.500 $5.000 $5.000 $9.250 $5.670 $2.730
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 2,480.000 $5.000 $6.750 $5.000 $9.250 $6.470 $1.510
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 10,740.000 $6.500 $7.000 $15.000 $11.000 $11.470 $3.940
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 480.000 $8.710 $7.000 $16.000 $11.000 $10.340 $1.510
DRIVEWAYS (CONC)
SY 16.000 $60.000 $80.000 $120.000 $66.500 $93.270 $138.750
DRIVEWAYS (SURF TREAT)
SY 936.000 $30.000 $12.090 $25.000 $6.500 $1.490 $19.980
RUMBLE STRIPS (SHOULDER)
LF 57,571.000 $0.200 $0.140 $0.100 $0.180 $0.150 $0.110
RUMBLE STRIPS (CENTERLINE)
LF 33,718.000 $0.250 $0.160 $0.120 $0.200 $0.150 $11.100
MTL W-BEAM GD FEN (TIM POST)
LF 776.000 $18.000 $21.990 $23.100 $24.000 $25.530 $27.750
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 6.000 $1,350.000 $1,962.000 $1,598.000 $1,550.000 $1,765.930 $1,998.000
SHORT RADIUS
LF 1.000 $32.000 $85.900 $32.900 $90.000 $36.360 $888.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 1.000 $600.000 $867.000 $595.000 $950.000 $657.530 $2,775.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $880.000 $1,063.000 $895.000 $1,150.000 $989.060 $1,998.000
MTL BM GD FEN TRANS (NON - SYM)
EA 6.000 $500.000 $595.000 $695.000 $650.000 $768.040 $1,332.000
MTL BEAM GD FEN TRANS(THRIE BEAM)28"
EA 1.000 $1,600.000 $1,942.000 $1,598.000 $1,550.000 $1,765.930 $1,998.000
REMOVE METAL BEAM GUARD FENCE
LF 630.000 $2.000 $1.550 $1.500 $1.500 $1.660 $3.330
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000 $2,100.000 $2,832.000 $2,730.000 $3,000.000 $3,016.890 $2,553.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $225.000 $75.000 $250.000 $80.000 $276.270 $555.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $500.000 $457.000 $583.000 $625.000 $505.030 $507.270
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $500.000 $618.000 $830.000 $900.000 $682.950 $685.980
REMOVE SM RD SN SUP&AM
EA 4.000 $85.000 $85.000 $150.000 $175.000 $93.930 $94.350
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 14.000 $30.000 $18.000 $15.000 $16.000 $19.890 $19.980
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 14.000 $30.000 $18.000 $15.000 $16.000 $19.890 $19.980
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 7.000 $50.000 $68.000 $46.150 $50.000 $75.150 $75.480
INSTL OM ASSM (OM-2Z)(FLX)SRF
EA 5.000 $90.000 $68.000 $85.000 $92.500 $75.150 $75.480
REMOVE DELIN & OBJECT MARKER ASSMS
EA 18.000 $26.000 $25.000 $15.000 $15.000 $23.650 $49.950
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 6.000 $15.000 $18.000 $18.500 $20.000 $20.450 $19.980
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 3,860.000 $0.240 $0.440 $0.440 $0.350 $0.490 $0.490
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 85,954.000 $0.210 $0.420 $0.420 $0.350 $0.460 $0.470
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,193.000 $0.620 $0.900 $0.900 $0.850 $0.990 $1.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 22.000 $80.000 $65.000 $65.000 $165.000 $71.830 $72.150
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 8.000 $8.000 $85.000 $85.000 $165.000 $93.930 $94.350
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 9,412.000 $0.210 $0.420 $0.420 $0.350 $0.460 $0.470
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 54,876.000 $0.210 $0.400 $0.400 $0.350 $0.440 $0.440
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 179,808.000 $0.450 $0.450 $0.450 $0.750 $0.500 $0.500
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 216.000 $10.000 $4.000 $4.000 $11.000 $4.420 $4.440
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 6,231.000 $0.600 $0.450 $0.450 $0.750 $0.500 $0.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,193.000 $0.800 $1.000 $1.000 $0.800 $1.110 $1.110
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 81.000 $6.000 $3.000 $3.000 $8.000 $3.320 $3.330
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 22.000 $96.000 $65.000 $65.000 $165.000 $71.830 $72.150
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 4.000 $350.000 $475.000 $475.000 $500.000 $524.920 $527.250
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 8.000 $120.000 $85.000 $85.000 $165.000 $93.930 $94.350
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 4.000 $370.000 $45.000 $45.000 $350.000 $49.730 $49.950
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 4,540.000 $0.350 $0.320 $0.320 $0.450 $0.350 $0.360
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 57,571.000 $0.350 $0.300 $0.300 $0.450 $0.330 $0.330
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 8,920.000 $0.380 $0.320 $0.320 $0.450 $0.350 $0.360
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 50,414.000 $0.300 $0.300 $0.300 $0.450 $0.330 $0.330
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 24,525.000 $0.300 $0.800 $0.800 $0.800 $0.880 $0.890
REFL PAV MRKR TY I-C
EA 340.000 $3.500 $3.500 $3.500 $4.500 $3.870 $3.890
REFL PAV MRKR TY II-A-A
EA 1,573.000 $3.500 $3.500 $3.500 $4.500 $3.870 $3.890
ELIM EXT PAV MRK & MRKS (4")
LF 48,688.000 $0.300 $0.450 $0.350 $1.000 $0.390 $0.390
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 56.000 $90.000 $99.590 $120.000 $350.000 $94.930 $102.120
TMA (STATIONARY)
DAY 76.000 $160.000 $308.510 $350.000 $125.000 $186.270 $225.330
TMA (MOBILE OPERATION)
HR 352.000 $29.000 $81.190 $100.000 $40.000 $23.540 $105.450
DRIVEWAY ASSISTANCE DEVICE SYSTEM
MO 17.000 $18,111.110 $8,013.750 $1,000.000 $2,000.000 $11,239.860 $16,650.000
Totals: $11,761,060.330 $10,197,040.680 $11,575,818.506 $11,939,432.780 $12,198,833.042 $12,307,257.070