|
|
0911-38-071
|
ANGELINA
|
LUFKIN
|
$207,605
|
VA
|
STP 2019(183)
|
11/07/2018
|
11/15/2023
|
LANDSCAPING_IN VARIOUS LOCATIONS
|
GREEN SOURCE ENVIRONMENTAL SOLUTIONS, INC.
($238,595)
|
|
|
0114-05-037
|
BASTROP
|
AUSTIN
|
$32,993,154
|
US 290
|
NH 2019(106)
|
11/07/2018
|
11/15/2023
|
GR, BASE, STRS, HMACP & PVMT MRKS
|
ANGEL BROTHERS HOLDINGS CORP.
($34,428,168)
|
|
|
0914-18-110
|
BASTROP
|
AUSTIN
|
$413,679
|
CR
|
BR 2018(884)
|
11/06/2018
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
TREVWAY, INC.
($399,604)
|
|
|
0836-02-025
|
BELL
|
WACO
|
$334,204
|
SH 195
|
STP 2019(143)HES
|
11/07/2018
|
11/15/2023
|
SAFETY LIGHTING
|
VACA UNDERGROUND UTILITIES INC
($281,766)
|
|
|
6338-73-001
|
BELL
|
WACO
|
$1,284,325
|
SH0317
|
RMC - 633873001
|
11/07/2018
|
11/15/2023
|
DISTRICT WIDE PAVMT MRK
|
BATTERSON, LLP
($1,169,617)
|
|
|
0915-00-207
|
BEXAR
|
SAN ANTONIO
|
$435,354
|
VA
|
STP 2019(169)
|
11/06/2018
|
11/15/2023
|
SIDEWALK, SIGNAL, SIGN, PAV'T MRKNG
|
E-Z BEL CONSTRUCTION, LLC
($533,808)
|
|
|
0046-05-050
|
BOWIE
|
ATLANTA
|
$470,867
|
US 82
|
STP 2019(202)
|
11/06/2018
|
11/15/2023
|
LEVEL UP, MICROSURF & PAV MRKS
|
MISSOURI PETROLEUM PRODUCTS COMPANY LLC
($494,828)
|
|
|
0218-01-096
|
BOWIE
|
ATLANTA
|
$4,788,910
|
US 59
|
NH 2019(201)
|
11/07/2018
|
11/15/2023
|
PLANING, ACP & PAV MRKS
|
RK HALL, LLC
($4,256,574)
|
|
|
0255-04-094
|
BROOKS
|
PHARR
|
$16,244,519
|
US 281
|
C 255-4-94
|
11/06/2018
|
11/15/2023
|
REHAB ROADWAY
|
FOREMOST PAVING, INC.
($17,284,414)
|
|
|
0508-03-104
|
CHAMBERS
|
BEAUMONT
|
$294,989
|
IH 10
|
STP 2019(188)HES
|
11/06/2018
|
11/15/2023
|
MILLED EDGELINE RUMBLE STRIPS, MILLE...
|
ISI CONTRACTING, INC.
($484,857)
|
|
|
0920-39-024
|
CHAMBERS
|
BEAUMONT
|
$1,061,385
|
VA
|
STP 2019(189)TAPS
|
11/06/2018
|
11/15/2023
|
INSTL ILLUM
|
THIRD COAST SERVICES LLC
($1,080,400)
|
|
|
0920-39-025
|
CHAMBERS
|
BEAUMONT
|
$1,178,761
|
VA
|
STP 2019(190)TAPS
|
11/06/2018
|
11/15/2023
|
CONSTRUCT SIDEWALKS
|
TREVWAY, INC.
($1,106,084)
|
|
|
0044-07-071
|
COOKE
|
WICHITA FALLS
|
$4,540,277
|
US 82
|
NH 2019(217)
|
11/07/2018
|
11/15/2023
|
PAVMT REPAIR AND OVERLAY
|
JAGOE-PUBLIC COMPANY
($4,475,655)
|
|
|
6332-65-001
|
DALLAS
|
DALLAS
|
$514,765
|
SL0012
|
RMC - 633265001
|
11/06/2018
|
11/15/2023
|
POTHOLE REPAIR
|
DBI SERVICES, LLC
($602,869)
|
|
|
6332-66-001
|
DALLAS
|
DALLAS
|
$663,575
|
SH0078
|
RMC - 633266001
|
11/07/2018
|
11/15/2023
|
POTHOLE REPAIR
|
DBI SERVICES, LLC
($796,100)
|
|
|
6338-26-001
|
DALLAS
|
DALLAS
|
$396,632
|
US0067
|
RMC - 633826001
|
11/06/2018
|
11/15/2023
|
STORM SEWER AND INLET CLEANING
|
DBI SERVICES, LLC
($1,042,591)
|
|
|
6338-27-001
|
DALLAS
|
DALLAS
|
$350,840
|
US0080
|
RMC - 633827001
|
11/07/2018
|
11/15/2023
|
STORM SEWER AND INLET CLEANING
|
DBI SERVICES, LLC
($871,029)
|
|
|
0143-09-070
|
DEWITT
|
YOAKUM
|
$106,497
|
US 87
|
NH 2018(834)
|
11/06/2018
|
11/15/2023
|
LANDSCAPE DEVELOPMENT
|
GREEN SOURCE ENVIRONMENTAL SOLUTIONS, INC.
($99,937)
|
|
|
0941-02-020
|
DEWITT
|
YOAKUM
|
$4,156,613
|
FM 2656
|
STP 2019(177)
|
11/06/2018
|
11/15/2023
|
REHAB EXIST ROADWAY
|
TIERRA LEASE SERVICE, LLC
($4,185,511)
|
|
|
6338-16-001
|
DEWITT
|
YOAKUM
|
$560,250
|
US0183
|
RMC - 633816001
|
11/07/2018
|
11/15/2023
|
ON CALL THERMOPLASTIC PAVMT MRK
|
BATTERSON, LLP
($470,003)
|
|
|
0007-03-092
|
EASTLAND
|
BROWNWOOD
|
$8,238,970
|
IH 20
|
NH 2019(184)
|
11/06/2018
|
11/15/2023
|
SEAL COAT_2019
|
BRANNAN PAVING CO., LTD.
($9,089,126)
|
|
|
0906-00-185
|
ECTOR
|
ODESSA
|
$1,263,074
|
VA
|
STP 2019(197)
|
11/06/2018
|
11/15/2023
|
CULVERT/STRUCT REPAIR
|
VIZCAINO, L.P.
($1,239,673)
|
|
|
0906-00-186
|
ECTOR
|
ODESSA
|
$2,680,848
|
VA
|
NH 2019(159)
|
11/06/2018
|
11/15/2023
|
OVER-HEIGHT BRIDGE DETECTION
|
AMERICAN LIGHTING AND SIGNALIZATION, LLC
($2,918,727)
|
|
|
2224-01-100
|
ECTOR
|
ODESSA
|
$1,603,725
|
SL 338
|
NH 2019(359)
|
11/07/2018
|
11/15/2023
|
RECON INTERS
|
FNH CONSTRUCTION, LLC
($3,012,163)
|
|
|
6310-43-001
|
ELLIS
|
DALLAS
|
$287,130
|
US0077
|
RMC - 631043001
|
11/06/2018
|
11/15/2023
|
TREE AND BRUSH RMVL AND TRIM
|
TERRY ENTERPRISES
($243,615)
|
|
|
6328-19-001
|
ELLIS
|
DALLAS
|
$545,223
|
IH0045
|
RMC - 632819001
|
11/06/2018
|
11/15/2023
|
ON-CALL TRAF CONTROL SERVICES
|
NIXON ENGINEERING
($534,600)
|
|
|
6333-29-001
|
ELLIS
|
DALLAS
|
$404,560
|
SH0034
|
RMC - 633329001
|
11/06/2018
|
11/15/2023
|
ROADSIDE MOW
|
CARCAM, LLC
($390,721)
|
|
|
0167-01-113
|
EL PASO
|
EL PASO
|
$97,716,680
|
US 54
|
NH 2019(166)
|
11/06/2018
|
11/15/2023
|
INTERCHANGE IMPRVS
|
SUNDT CONSTRUCTION, INC.
($96,506,598)
|
|
|
6336-22-001
|
ERATH
|
FORT WORTH
|
$854,275
|
US0377
|
RMC - 633622001
|
11/06/2018
|
11/15/2023
|
ROADSIDE MOW AND HERBICIDE
|
CROSS PLUS CONSTRUCTION, LLC
($1,037,541)
|
|
|
2139-03-021
|
FANNIN
|
PARIS
|
$3,488,104
|
SH 11
|
STP 2019(216)
|
11/06/2018
|
11/15/2023
|
OVERLAY
|
RK HALL, LLC
($3,667,040)
|
|
|
0145-11-011
|
FLOYD
|
LUBBOCK
|
$9,812,566
|
FM 97
|
STP 2019(158)
|
11/06/2018
|
11/15/2023
|
REHABILIATION
|
GILVIN-TERRILL, LTD.
($9,844,110)
|
|
|
2817-01-010
|
FORT BEND
|
HOUSTON
|
$5,457,736
|
FM 2759
|
STP 2019(192)
|
11/07/2018
|
11/15/2023
|
ADD 4' SHOULDER AND OVERLAY
|
DURWOOD GREENE CONSTRUCTION CO.
($4,321,825)
|
|
|
6335-51-001
|
GALVESTON
|
HOUSTON
|
$618,316
|
SH0146
|
RMC - 633551001
|
11/06/2018
|
11/15/2023
|
ASPH PAVMT REPAIR
|
MAIN LANE INDUSTRIES LTD.
($479,090)
|
|
|
6333-60-001
|
GILLESPIE
|
AUSTIN
|
$416,290
|
US0087
|
RMC - 633360001
|
11/06/2018
|
11/15/2023
|
DISTRICTWIDE ULTRA HP WATER CUTTING...
|
TOTAL HIGHWAY MAINTENANCE, LLC
($376,009)
|
|
|
0025-07-065
|
GONZALES
|
YOAKUM
|
$6,761,632
|
SH 97
|
STP 2019(173)
|
11/07/2018
|
11/15/2023
|
SEAL COAT
|
F. N. PLOCH CONSTRUCTION COMPANY, INC.
($7,309,913)
|
|
|
0715-01-014
|
GONZALES
|
YOAKUM
|
$2,209,230
|
FM 108
|
BR 2019(176)
|
11/07/2018
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
HILL COUNTRY BRIDGE, INC.
($1,963,663)
|
|
|
0309-01-043
|
GRAY
|
AMARILLO
|
$1,898,557
|
SH 70
|
STP 2019(236)HES
|
11/06/2018
|
11/15/2023
|
MILLED EDGELINE & MILLED CENTERLINE...
|
SURFACE PREPARATION TECHNOLOGIES, LLC
($1,357,600)
|
|
|
0025-10-092
|
GUADALUPE
|
SAN ANTONIO
|
$7,755,982
|
FM 78
|
STP 2019(171)
|
11/07/2018
|
11/15/2023
|
SURF & PAVMT MRK
|
HUNTER INDUSTRIES, LTD.
($7,321,503)
|
|
|
0067-04-054
|
HALE
|
LUBBOCK
|
$5,381,902
|
IH 27
|
STP 2019(193)
|
11/07/2018
|
11/15/2023
|
SEALCOAT
|
LIPHAM ASPHALT AND PAVING COMPANY, LLC
($5,509,388)
|
|
|
1053-01-016
|
HALL
|
CHILDRESS
|
$836,300
|
FM 658
|
STP 2019(144)
|
11/07/2018
|
11/15/2023
|
CULVERT EXTENSIONS & SAFETY END TREA...
|
CDM HOLDINGS, LLC
($774,680)
|
|
|
0120-05-025
|
HAMILTON
|
WACO
|
$500,929
|
FM 218
|
STP 2019(223)HES
|
11/07/2018
|
11/15/2023
|
INCREASE SUPERELEVATION
|
BIG CREEK CONSTRUCTION, LTD.
($571,907)
|
|
|
0389-05-124
|
HARRIS
|
HOUSTON
|
$2,150,827
|
SH 146
|
NH 2019(191)
|
11/06/2018
|
11/15/2023
|
REPL MEDIAN RAIL W/CTB,REPL ILLUM PO...
|
JAMES CONSTRUCTION GROUP, L.L.C.
($1,819,178)
|
|
|
2941-02-055
|
HARRIS
|
HOUSTON
|
$8,513,632
|
FM 2920
|
STP 2019(222)
|
11/07/2018
|
11/15/2023
|
BASE RPR, PLANING,1"TOM-F,1"TOM-C &...
|
ANGEL BROTHERS HOLDINGS CORP.
($6,097,569)
|
|
|
6329-88-001
|
HARRIS
|
HOUSTON
|
$1,337,009
|
IH0610
|
RMC - 632988001
|
11/07/2018
|
11/15/2023
|
COMM CBL REP AND/OR REPL
|
FLORIDA TRAFFIC CONTROL DEVICES, INC.
($983,827)
|
|
|
6335-59-001
|
HARRIS
|
HOUSTON
|
$894,100
|
IH0010
|
RMC - 633559001
|
11/07/2018
|
11/15/2023
|
FULL DEPTH CONC AND BRIDGE DECK REPA...
|
ISI CONTRACTING, INC.
($995,975)
|
|
|
6335-76-001
|
HARRIS
|
HOUSTON
|
$1,235,553
|
SL0008
|
RMC - 633576001
|
11/07/2018
|
11/15/2023
|
REFL PAVMT MRK (GRAPHICS)
|
PMI PAVEMENT MARKING, INC.
($1,106,689)
|
|
|
0030-05-067
|
HEMPHILL
|
AMARILLO
|
$8,488,627
|
US 83
|
STP 2019(210)
|
11/06/2018
|
11/15/2023
|
SEALCOAT
|
MISSOURI PETROLEUM PRODUCTS COMPANY LLC
($9,058,028)
|
|
|
0697-02-039
|
HENDERSON
|
TYLER
|
$40,593,999
|
SH 334
|
STP 2019(242)
|
11/06/2018
|
11/15/2023
|
RECON BRGS, GR, BS, SURF, PVT MRK
|
AUSTIN BRIDGE & ROAD SERVICES, LP
($43,069,729)
|
|
|
6329-58-001
|
HENDERSON
|
TYLER
|
$365,860
|
SH0031
|
RMC - 632958001
|
11/07/2018
|
11/15/2023
|
PAINT
|
STRIPING TECHNOLOGY, L.P.
($353,375)
|
|
|
6335-53-001
|
HIDALGO
|
PHARR
|
$1,281,341
|
IH0002
|
RMC - 633553001
|
11/07/2018
|
11/15/2023
|
PAVMT MRK
|
PAVEMENT MARKINGS INC.
($1,127,180)
|
|
|
6333-46-001
|
HILL
|
WACO
|
$397,915
|
SH0171
|
RMC - 633346001
|
11/07/2018
|
11/15/2023
|
DRIFTWOOD & DEBRIS RMVL
|
CROSS PLUS CONSTRUCTION, LLC
($410,990)
|
|
|
0635-03-025
|
HOUSTON
|
LUFKIN
|
$3,630,179
|
FM 228
|
C 635-3-25
|
11/06/2018
|
11/15/2023
|
RESURF WITH SEALCOAT
|
NEWMAN & KENG PAVING COMPANY, INC.
($2,929,223)
|
|
|
0002-07-049
|
HUDSPETH
|
EL PASO
|
$5,465,090
|
IH 10
|
BR 1802(572)
|
11/07/2018
|
11/15/2023
|
REPLACE BRIDGES AND APPROACHES
|
DAN WILLIAMS COMPANY
($5,693,877)
|
|
|
6312-48-001
|
JASPER
|
BEAUMONT
|
$509,843
|
FM1131
|
RMC - 631248001
|
11/06/2018
|
11/15/2023
|
REHAB EXIST ROADWAY/OVERLAY/STRIPING
|
OLDCASTLE MATERIALS TEXAS, INC.
($497,996)
|
|
|
6331-77-001
|
JASPER
|
BEAUMONT
|
$563,388
|
US0190
|
RMC - 633177001
|
11/06/2018
|
11/15/2023
|
FLEXIBLE PAVMT STRUCT REPAIR
|
OLDCASTLE MATERIALS TEXAS, INC.
($897,768)
|
|
|
6333-97-001
|
JEFFERSON
|
BEAUMONT
|
$322,339
|
US0069
|
RMC - 633397001
|
11/06/2018
|
11/15/2023
|
RUBBER ASPH CRACKSEALING
|
D & M CONTRACTORS, LLC
($296,452)
|
|
|
6333-98-001
|
JEFFERSON
|
BEAUMONT
|
$239,540
|
SS0136
|
RMC - 633398001
|
11/06/2018
|
11/15/2023
|
CLEAN AND SEAL EXIST RIGID CONC PAVM...
|
SLSS, LLC
($276,280)
|
|
|
0018-01-093
|
LA SALLE
|
LAREDO
|
$11,016,398
|
IH 35
|
NH 2019(164)
|
11/07/2018
|
11/15/2023
|
REHAB OF EXIST HWY
|
J. CARROLL WEAVER, INC.
($10,878,130)
|
|
|
0445-02-066
|
LAVACA
|
YOAKUM
|
$778,903
|
US 90A
|
STP 2019(174)
|
11/07/2018
|
11/15/2023
|
MILL AND INLAY
|
HUNTER INDUSTRIES, LTD.
($745,425)
|
|
|
0056-02-033
|
LIMESTONE
|
WACO
|
$9,120,814
|
US 84
|
STP 2019(224)
|
11/06/2018
|
11/15/2023
|
WDN SHLDRS & ADD PASS LNS
|
BIG CREEK CONSTRUCTION, LTD.
($9,187,964)
|
|
|
0053-03-021
|
LYNN
|
LUBBOCK
|
$6,876,878
|
US 84
|
NH 2019(154)
|
11/07/2018
|
11/15/2023
|
SEALCOAT
|
COX PAVING OF TEXAS, INC.
($9,099,683)
|
|
|
0068-02-048
|
LYNN
|
LUBBOCK
|
$5,863,298
|
US 87
|
STP 2019(157)
|
11/07/2018
|
11/15/2023
|
SEALCOAT
|
LIPHAM ASPHALT AND PAVING COMPANY, LLC
($6,100,851)
|
|
|
0150-01-028
|
MASON
|
AUSTIN
|
$697,516
|
SH 29
|
STP 2019(160)
|
11/06/2018
|
11/15/2023
|
FULL DEPTH REPAIR, SEAL & TOM OVERLA...
|
ANGEL BROTHERS HOLDINGS CORP.
($607,279)
|
|
|
0604-01-043
|
MATAGORDA
|
YOAKUM
|
$593,325
|
FM 2031
|
STP 2019(175)HES
|
11/07/2018
|
11/15/2023
|
WIDEN PAVED SURF
|
REXCO CONSTRUCTION SERVICES, INC.
($594,008)
|
|
|
6334-22-001
|
MCLENNAN
|
WACO
|
$1,836,770
|
FM2416
|
RMC - 633422001
|
11/07/2018
|
11/15/2023
|
SEAL COAT (DISTRICT WIDE)
|
BRANNAN PAVING CO., LTD.
($2,011,340)
|
|
|
0010-08-055
|
MORRIS
|
ATLANTA
|
$414,831
|
US 67
|
STP 2019(213)HES
|
11/06/2018
|
11/15/2023
|
SAFETY LIGHTING
|
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
($420,995)
|
|
|
0092-13-024
|
NAVARRO
|
DALLAS
|
$8,642,002
|
BI 45-F
|
BR 2019(207)
|
11/07/2018
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
PIERCE R & B LLC
($7,970,000)
|
|
|
6333-48-001
|
NAVARRO
|
DALLAS
|
$482,590
|
SH0022
|
RMC - 633348001
|
11/07/2018
|
11/15/2023
|
ON-CALL TRAF CONTROL SERVICE
|
ELITE CASTLE RESOURCES LLC
($500,300)
|
|
|
2263-02-098
|
NUECES
|
CORPUS CHRISTI
|
$3,659,317
|
SH 361
|
BR 2019(165)
|
11/06/2018
|
11/15/2023
|
BRIDGE REHAB (DALE MILLER BRIDGE)
|
SOUTHERN ROAD & BRIDGE, LLC
($4,671,605)
|
|
|
0490-03-028
|
OCHILTREE
|
AMARILLO
|
$13,097,047
|
SH 70
|
STP 2019(237)
|
11/06/2018
|
11/15/2023
|
BASE REPAIR AND OVERLAY
|
J. LEE MILLIGAN, INC.
($13,090,322)
|
|
|
6329-80-001
|
PARKER
|
FORT WORTH
|
$1,281,331
|
IH0020
|
RMC - 632980001
|
11/06/2018
|
11/15/2023
|
ROADSIDE MOW AND HERBICIDE
|
DBI SERVICES, LLC
($1,606,259)
|
|
|
6333-08-001
|
PARKER
|
FORT WORTH
|
$392,882
|
IH0020
|
RMC - 633308001
|
11/06/2018
|
11/15/2023
|
ROUTINE SWEEPING AND DEBRIS RMVL
|
SWEEPING SERVICES OF TEXAS - OPERATING, L.P.
($344,021)
|
|
|
6327-78-001
|
POLK
|
LUFKIN
|
$202,540
|
US0059
|
RMC - 632778001
|
11/12/2018
|
11/15/2023
|
FHWA_DISASTER RELIEF MAINT
|
CHAMPION INFRASTRUCTURE, LLC
($236,942)
|
|
|
0041-07-107
|
POTTER
|
AMARILLO
|
$8,587,278
|
US 87
|
NH 2019(212)
|
11/06/2018
|
11/15/2023
|
SEALCOAT
|
BRANNAN PAVING CO., LTD.
($12,390,506)
|
|
|
6335-65-001
|
RUNNELS
|
SAN ANGELO
|
$719,577
|
FM1770
|
RMC - 633565001
|
11/07/2018
|
11/15/2023
|
RETRACE PAVMT MRK AND MARKERS
|
VIZCAINO, L.P.
($762,761)
|
|
|
0059-05-045
|
SHELBY
|
LUFKIN
|
$10,852,736
|
SH 7
|
STP 2019(181)
|
11/06/2018
|
11/15/2023
|
RESURF WITH SEAL COAT
|
MISSOURI PETROLEUM PRODUCTS COMPANY LLC
($10,961,025)
|
|
|
0902-00-166
|
TARRANT
|
FORT WORTH
|
$5,006,200
|
VA
|
STP 2019(284)
|
11/06/2018
|
11/15/2023
|
TRAF SIG
|
DURABLE SPECIALTIES, INC.
($4,424,000)
|
|
|
6316-66-001
|
TARRANT
|
FORT WORTH
|
$3,242,875
|
IH0035W
|
RMC - 631666001
|
11/06/2018
|
11/15/2023
|
GUARDRAIL INSTL AND REPAIR
|
ELITE CASTLE RESOURCES LLC
($3,152,860)
|
|
|
6328-96-001
|
TARRANT
|
FORT WORTH
|
$1,174,767
|
IH0020
|
RMC - 632896001
|
11/06/2018
|
11/15/2023
|
SWEEPING AND DEBRIS RMVL
|
SWEEPING SERVICES OF TEXAS - OPERATING, L.P.
($1,020,089)
|
|
|
6329-99-001
|
TARRANT
|
FORT WORTH
|
$1,170,258
|
IH0020
|
RMC - 632999001
|
11/06/2018
|
11/15/2023
|
ROADSIDE MOW,HERBICIDE,LITTER RMVL A...
|
YELLOWSTONE LANDSCAPE - CENTRAL, INC.
($1,189,348)
|
|
|
6331-53-001
|
TITUS
|
ATLANTA
|
$654,890
|
US0067
|
BPM - 633153001
|
11/06/2018
|
11/15/2023
|
BRIDGE PREVENT MAINT
|
STATELINE CONSTRUCTION, LLC
($623,721)
|
|
|
0914-00-414
|
TRAVIS
|
AUSTIN
|
$1,988,359
|
VA
|
C 914-00-414
|
11/07/2018
|
11/15/2023
|
ROUTINE MAINT OF PAVMT MRK
|
TRP CONSTRUCTION GROUP, LLC
($1,954,799)
|
|
|
0914-00-415
|
TRAVIS
|
AUSTIN
|
$843,308
|
VA
|
C 914-00-415
|
11/06/2018
|
11/15/2023
|
ROUTINE MAINT OF PVMT MRK
|
TRP CONSTRUCTION GROUP, LLC
($727,670)
|
|
|
0914-00-418
|
TRAVIS
|
AUSTIN
|
$1,908,150
|
VA
|
C 914-00-418
|
11/06/2018
|
11/15/2023
|
ASPH PAVMT REPAIR
|
LONE STAR PAVING COMPANY
($2,145,700)
|
|
|
1378-01-038
|
TRAVIS
|
AUSTIN
|
$597,501
|
RM 1431
|
STP 2019(198)HES
|
11/06/2018
|
11/15/2023
|
INSTL CONTINUOUS LTL & SHOULDERS
|
DAN WILLIAMS COMPANY
($617,105)
|
|
|
6325-60-001
|
TRAVIS
|
AUSTIN
|
$46,617,578
|
IH0035
|
RMC - 632560001
|
11/06/2018
|
11/15/2023
|
ROADSIDE MAINT
|
ROY JORGENSEN ASSOCIATES, INC.
($39,712,405)
|
|
|
6327-14-001
|
TRAVIS
|
AUSTIN
|
$1,059,065
|
IH0035
|
RMC - 632714001
|
11/06/2018
|
11/15/2023
|
PREVENT MAINT OF TRAF SIG
|
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.
($909,080)
|
|
|
6333-59-001
|
TRAVIS
|
AUSTIN
|
$2,229,885
|
IH0035
|
BPM - 633359001
|
11/06/2018
|
11/15/2023
|
DISTRICTWIDE BRIDGE JOINT REPAIR
|
SCR CIVIL CONSTRUCTION, LLC
($2,690,761)
|
|
|
0037-01-042
|
UVALDE
|
SAN ANTONIO
|
$11,761,070
|
US 83
|
STP 2019(170)
|
11/07/2018
|
11/15/2023
|
REHAB EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($10,197,041)
|
|
|
6333-00-001
|
VAL VERDE
|
LAREDO
|
$299,459
|
US0277
|
RMC - 633300001
|
11/12/2018
|
11/15/2023
|
INSTL PAVE MRK AND MRKS
|
REPUBLIC TRAFFIC SAFETY, INC.
($281,755)
|
|
|
6336-57-001
|
VAN ZANDT
|
TYLER
|
$90,103
|
US0080
|
RMC - 633657001
|
11/12/2018
|
11/15/2023
|
GUARDRAIL
|
THOMAS 11 DEVELOPMENT LLC
($88,980)
|
|
|
6336-74-001
|
VICTORIA
|
YOAKUM
|
$858,035
|
US0059
|
RMC - 633674001
|
11/07/2018
|
11/15/2023
|
CALL OUT BRIDGE JOINTS
|
SCR CIVIL CONSTRUCTION, LLC
($634,690)
|
|
|
6336-75-001
|
VICTORIA
|
YOAKUM
|
$1,377,100
|
US0059
|
RMC - 633675001
|
11/07/2018
|
11/15/2023
|
CALL OUT CONC PUNCH OUTS
|
MAIN LANE INDUSTRIES LTD.
($997,550)
|
|
|
6335-75-001
|
WALLER
|
HOUSTON
|
$526,890
|
US0290
|
RMC - 633575001
|
11/07/2018
|
11/15/2023
|
CLEANING AND SWEEPING HWYS
|
EXPERT MAINTENANCE & CONSTRUCTION SERVICES LLC
($419,720)
|
|
|
0922-00-069
|
WEBB
|
LAREDO
|
$800,342
|
VA
|
STP 2019(346)
|
11/06/2018
|
11/15/2023
|
THERMOPLASTIC RE-STRIPING
|
VIZCAINO, L.P.
($638,114)
|
|
|
0044-11-002
|
WICHITA
|
WICHITA FALLS
|
$9,512,380
|
BU 287J
|
NH 2019(219)
|
11/07/2018
|
11/15/2023
|
SEAL COAT
|
LIPHAM ASPHALT AND PAVING COMPANY, LLC
($8,903,752)
|