Show Job Controls
Bid Cobra

GOLIAD US 59 (0088-02-062)

Items: 105

County: GOLIAD
Length: 0.2440 MILES
Highway: US 59
District: CORPUS CHRISTI
Control Number: 0088-02-062
DBE Goal: 6.5%
Project: BR 2025(159)
Guaranty: $100,000.00
Time: 579 WORKING DAYS
Engineer's Estimate: $24,425,867.53
Date: 10/01/2024 (1 year ago)
Contract Number: 10243008
Type: BRIDGE REPLACEMENT
Project ID: A00072145
Project Description: REPLACE BRIDGE AND APPROACHES (FUTURE I-69 CORRIDOR)
Mail/Deliver Bids To: N/A
NICK NOVOSAD
ROBERTO A JIMENEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$24,425,867.53
$31,574,353.16
Over/Under Est: 29.27% $7,148,485.63
Over/Under Est: 59.99% $14,652,257.09
Amt Left: 23.77% $7,503,771.46
Subcontractor Percentage Amount
A. H. BECK FOUNDATION CO., INC. 6.10% $1,962,474.18
CHOCTAW ERECTORS, INC. 3.73% $1,200,004.70
FARR FOUNDATION, INC. 2.22% $714,211.91
JB PINNACLE GROUP, LLC 1.04% $334,585.76
LINDAMOOD, INC. 0.97% $312,065.57
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 0.88% $283,111.03
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 0.85% $273,459.52
JADAN ENTERPRISES, LLC 0.43% $138,338.34
BIRD SOLUTIONS INTERNATIONAL LLC 0.35% $112,600.98
TORO BRAVO CONSTRUCTION, LLC 0.34% $109,383.81
HIGHWAY BARRICADES AND SERVICES, LLC 0.30% $96,515.12
4E TREE WORX LLC 0.17% $54,691.90
CND CONTRACTING, LLC 0.08% $25,737.37
SK CONCRETE SERVICES LLC 0.05% $16,085.85
A.Z. REBAR CONSTRUCTION, INC. 0.00% $0.00
Total: 17.51% $5,633,266.04

Bid Items & Bid Tabulations

105 Total 0 of 105
GOLIAD  |  US 59  |  CORPUS CHRISTI  |  0088-02-062  |  10/01/2024  |  $24,425,867.53  |  BR 2025(159)  |  BRIDGE REPL  |  579 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
ZACHRY CONSTRUCTION CORPORATION
PREPARING ROW
STA 35.000 $4,025.000 $63,296.000 $111,000.000
REMOV CONC (MOWSTRIP)
LF 1,030.000 $9.000 $14.000 $10.000
EXCAV (ROADWAY)
CY 4,611.190 $10.000 $35.000 $11.000
EMBANK (FNL)(DC)(TY C)
CY 37,143.060 $16.000 $63.850 $7.300
ROAD GRADER WORK (DENS CONT)
SY 2,500.000 $5.000 $12.000 $4.200
HYDRO MULCH SEED (PERM_RURAL_CLAY)
SY 96,207.000 $0.850 $0.440 $0.500
HYDRO MULCH SEED (TEMP_WARM)
SY 48,104.000 $0.450 $0.410 $0.500
HYDRO MULCH SEED (TEMP_COOL)
SY 48,104.000 $0.450 $0.410 $0.500
FERTILIZER
AC 19.900 $360.000 $656.230 $773.000
VEGETATIVE WATERING
TGL 14,032.700 $25.000 $7.000 $22.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 10,018.000 $2.750 $1.640 $1.900
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 3,517.000 $100.000 $118.660 $300.000
CEMENT
TON 253.000 $225.000 $220.000 $350.000
CEMENT TREAT (SUBGRADE) (8")
SY 14,068.000 $4.000 $4.800 $5.000
SALV, HAUL & STKPL RECLM ASPH PAV
CY 2,771.000 $10.000 $17.500 $27.000
PRIME COAT (MC-30)
GAL 3,517.000 $5.000 $9.100 $3.400
ASPH (RC-250)
GAL 3,517.000 $5.000 $7.900 $5.900
D-GR HMA TY-B SAC-B PG70-22
TON 3,660.000 $135.000 $147.700 $167.000
D-GR HMA TY-D SAC-B PG70-22
TON 1,847.000 $115.000 $153.200 $195.000
TACK COAT
GAL 1,007.000 $4.500 $3.780 $4.900
CEM STABIL BKFL
CY 241.000 $150.000 $213.840 $182.000
TEMPORARY SPL SHORING
SF 26,629.000 $45.000 $58.590 $59.000
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
EA 1.000 $20,000.000 $38,267.900 $45,277.000
DRILL SHAFT (36 IN)
LF 1,323.000 $220.000 $339.800 $422.000
DRILL SHAFT (48 IN)
LF 1,950.000 $550.000 $493.540 $605.000
DRILL SHAFT (60 IN)
LF 1,320.000 $715.000 $704.800 $880.000
CL C CONC (ABUT)
CY 89.600 $2,000.000 $2,000.000 $1,740.000
CL C CONC (CAP)
CY 289.000 $1,900.000 $1,500.000 $2,133.000
CL C CONC (COLUMN)
CY 246.200 $1,220.000 $1,500.000 $1,364.000
CL C CONC (MISC)
CY 199.600 $1,450.000 $2,000.000 $1,386.000
CL F CONC (CAP)
CY 62.000 $1,250.000 $1,800.000 $1,667.000
REINF CONC SLAB
SF 83,160.000 $25.000 $42.000 $36.000
RETAINING WALL (MSE)
SF 37,558.000 $55.000 $76.000 $191.000
RETAINING WALL (TEMP WALL)
SF 30,055.000 $30.000 $18.000 $18.000
PRESTR CONC GIRDER (TX54)
LF 4,380.400 $170.000 $190.000 $199.000
RIPRAP (CONC)(4 IN)
CY 10.000 $1,200.000 $2,015.960 $1,200.000
RIPRAP (MOW STRIP)(4 IN)
CY 107.200 $560.000 $1,079.980 $1,700.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 452.000 $230.000 $289.810 $350.000
ELASTOMERIC BEARING (E6)
EA 10.000 $4,000.000 $3,500.000 $5,085.000
ELASTOMERIC BEARING (F6)
EA 10.000 $4,000.000 $3,500.000 $5,084.000
SLIDING ELASTOMERIC BEARING (ES 5)
EA 20.000 $4,000.000 $3,500.000 $5,410.000
STR STEEL (PLATE GIRDER)
LB 2,058,000.000 $2.600 $2.860 $3.100
RAIL (TY SSTR)
LF 1,262.000 $120.000 $70.180 $85.000
RAIL (TY SSTR)(MOD)
LF 1,980.000 $83.000 $72.340 $73.000
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
LF 332.000 $200.000 $300.000 $332.000
RC PIPE (CL III)(24 IN)
LF 146.000 $125.000 $332.560 $300.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $2,160.000 $7,917.720 $8,500.000
REMOV STR (SET)
EA 4.000 $654.000 $1,374.510 $200.000
REMOV STR (PIPE)
LF 89.000 $2,136.000 $64.780 $75.000
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
EA 1.000 $550,000.000 $325,000.000 $519,846.000
REMOVE STR (BOLLARD)
EA 16.000 $194.340 $250.000 $150.000
REMOV STR (SMALL)
EA 1.000 $500.000 $3,909.960 $4,135.000
MOBILIZATION
LS 1.000 $2,296,937.090 $2,978,461.770 $3,850,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 35.000 $7,300.000 $5,777.860 $15,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 473.000 $45.000 $54.630 $65.000
ROCK FILTER DAMS (REMOVE)
LF 473.000 $33.000 $19.870 $24.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 340.000 $39.000 $44.770 $53.000
CONSTRUCTION EXITS (REMOVE)
SY 340.000 $12.000 $14.240 $17.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 24,812.000 $3.600 $3.450 $4.100
TEMP SEDMT CONT FENCE (REMOVE)
LF 24,812.000 $1.200 $1.100 $1.300
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 246.000 $7.250 $14.260 $17.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 246.000 $1.400 $4.560 $5.400
CONSTRUCTING DETOURS
SY 3,794.000 $55.000 $89.600 $118.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 7,360.000 $44.000 $30.000 $60.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 3,002.000 $10.000 $12.000 $10.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 7,340.000 $22.000 $12.000 $25.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 1,290.000 $90.000 $99.340 $160.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 6,920.000 $0.200 $1.180 $0.600
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 1,536.000 $0.250 $1.410 $0.700
MTL W-BEAM GD FEN (TIM POST)
LF 100.000 $25.000 $27.600 $33.000
TL-2 31" SHORT RADIUS (W/O DAT)
EA 1.000 $22,500.000 $37,500.000 $44,193.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $3.000 $3.000 $3.600
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $275.000 $275.000 $323.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,400.000 $3,495.000 $4,118.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $320.000 $243.710 $1,767.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 13.000 $1,100.000 $1,100.000 $1,297.000
CRASH CUSH ATTEN (REMOVE)
EA 8.000 $1,000.000 $950.000 $1,120.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 4.000 $38,500.000 $29,395.000 $34,642.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 8.000 $28,000.000 $8,850.000 $10,430.000
GATE (REMOVE)
EA 1.000 $377.000 $781.990 $1,238.000
PIPE UNDERDRAINS (TY 6) (6")
LF 3,005.000 $28.000 $40.000 $25.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $670.000 $875.000 $1,032.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $890.000 $1,250.000 $1,473.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $1,000.000 $1,150.000 $1,355.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $2,200.000 $2,450.000 $2,888.000
REMOVE SM RD SN SUP&AM
EA 8.000 $100.000 $125.000 $147.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BR)
EA 32.000 $15.000 $45.000 $53.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1 (BI)
EA 5.000 $60.000 $28.000 $33.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BR)
EA 12.000 $22.000 $45.000 $53.000
INSTL OM ASSM (OM-3L)(TWT)GND
EA 2.000 $250.000 $550.000 $648.000
INSTL OM ASSM (OM-3R)(TWT)GND
EA 2.000 $250.000 $550.000 $648.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 21,667.000 $0.600 $0.480 $0.600
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 20,924.000 $0.600 $0.480 $0.600
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 38.000 $1.500 $1.100 $1.300
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 887.000 $0.800 $0.880 $1.000
RE PROFILE PM TY I(W)6"(SLD)(090MIL)
LF 9,100.000 $1.200 $1.250 $1.500
RE PROFILE PM TY I(Y)6"(SLD)(090MIL)
LF 13,882.000 $0.750 $1.250 $1.500
RE PROFILE PM TY I(Y)6"(BRK)(090MIL)
LF 150.000 $0.750 $2.000 $2.400
PREFAB PM TY C (W)(ARROW)
EA 3.000 $200.000 $200.000 $236.000
PREFAB PM TY C (W)(WORD)
EA 3.000 $285.000 $300.000 $353.000
REFL PAV MRKR TY I-C
EA 22.000 $5.000 $7.500 $8.900
REFL PAV MRKR TY II-A-A
EA 593.000 $5.000 $7.500 $8.900
ELIM EXT PM & MRKS (4")
LF 14,766.000 $0.500 $0.400 $0.500
ELIM EXT PM & MRKS (24")
LF 631.000 $3.400 $6.000 $7.100
TIP TESTING(DRILL SHAFT)
EA 24.000 $5,000.000 $8,839.970 $8,202.000
Totals: $24,425,867.540 $31,574,353.174 $39,078,124.628