PREPARING ROW
|
STA
|
35.000
|
$4,025.000
|
$63,296.000
|
$111,000.000
|
|
|
REMOV CONC (MOWSTRIP)
|
LF
|
1,030.000
|
$9.000
|
$14.000
|
$10.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
4,611.190
|
$10.000
|
$35.000
|
$11.000
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
37,143.060
|
$16.000
|
$63.850
|
$7.300
|
|
|
ROAD GRADER WORK (DENS CONT)
|
SY
|
2,500.000
|
$5.000
|
$12.000
|
$4.200
|
|
|
HYDRO MULCH SEED (PERM_RURAL_CLAY)
|
SY
|
96,207.000
|
$0.850
|
$0.440
|
$0.500
|
|
|
HYDRO MULCH SEED (TEMP_WARM)
|
SY
|
48,104.000
|
$0.450
|
$0.410
|
$0.500
|
|
|
HYDRO MULCH SEED (TEMP_COOL)
|
SY
|
48,104.000
|
$0.450
|
$0.410
|
$0.500
|
|
|
FERTILIZER
|
AC
|
19.900
|
$360.000
|
$656.230
|
$773.000
|
|
|
VEGETATIVE WATERING
|
TGL
|
14,032.700
|
$25.000
|
$7.000
|
$22.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
10,018.000
|
$2.750
|
$1.640
|
$1.900
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
3,517.000
|
$100.000
|
$118.660
|
$300.000
|
|
|
CEMENT
|
TON
|
253.000
|
$225.000
|
$220.000
|
$350.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
14,068.000
|
$4.000
|
$4.800
|
$5.000
|
|
|
SALV, HAUL & STKPL RECLM ASPH PAV
|
CY
|
2,771.000
|
$10.000
|
$17.500
|
$27.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
3,517.000
|
$5.000
|
$9.100
|
$3.400
|
|
|
ASPH (RC-250)
|
GAL
|
3,517.000
|
$5.000
|
$7.900
|
$5.900
|
|
|
D-GR HMA TY-B SAC-B PG70-22
|
TON
|
3,660.000
|
$135.000
|
$147.700
|
$167.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
1,847.000
|
$115.000
|
$153.200
|
$195.000
|
|
|
TACK COAT
|
GAL
|
1,007.000
|
$4.500
|
$3.780
|
$4.900
|
|
|
CEM STABIL BKFL
|
CY
|
241.000
|
$150.000
|
$213.840
|
$182.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
26,629.000
|
$45.000
|
$58.590
|
$59.000
|
|
|
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
|
EA
|
1.000
|
$20,000.000
|
$38,267.900
|
$45,277.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,323.000
|
$220.000
|
$339.800
|
$422.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
1,950.000
|
$550.000
|
$493.540
|
$605.000
|
|
|
DRILL SHAFT (60 IN)
|
LF
|
1,320.000
|
$715.000
|
$704.800
|
$880.000
|
|
|
CL C CONC (ABUT)
|
CY
|
89.600
|
$2,000.000
|
$2,000.000
|
$1,740.000
|
|
|
CL C CONC (CAP)
|
CY
|
289.000
|
$1,900.000
|
$1,500.000
|
$2,133.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
246.200
|
$1,220.000
|
$1,500.000
|
$1,364.000
|
|
|
CL C CONC (MISC)
|
CY
|
199.600
|
$1,450.000
|
$2,000.000
|
$1,386.000
|
|
|
CL F CONC (CAP)
|
CY
|
62.000
|
$1,250.000
|
$1,800.000
|
$1,667.000
|
|
|
REINF CONC SLAB
|
SF
|
83,160.000
|
$25.000
|
$42.000
|
$36.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
37,558.000
|
$55.000
|
$76.000
|
$191.000
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
30,055.000
|
$30.000
|
$18.000
|
$18.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
4,380.400
|
$170.000
|
$190.000
|
$199.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
10.000
|
$1,200.000
|
$2,015.960
|
$1,200.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
107.200
|
$560.000
|
$1,079.980
|
$1,700.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
452.000
|
$230.000
|
$289.810
|
$350.000
|
|
|
ELASTOMERIC BEARING (E6)
|
EA
|
10.000
|
$4,000.000
|
$3,500.000
|
$5,085.000
|
|
|
ELASTOMERIC BEARING (F6)
|
EA
|
10.000
|
$4,000.000
|
$3,500.000
|
$5,084.000
|
|
|
SLIDING ELASTOMERIC BEARING (ES 5)
|
EA
|
20.000
|
$4,000.000
|
$3,500.000
|
$5,410.000
|
|
|
STR STEEL (PLATE GIRDER)
|
LB
|
2,058,000.000
|
$2.600
|
$2.860
|
$3.100
|
|
|
RAIL (TY SSTR)
|
LF
|
1,262.000
|
$120.000
|
$70.180
|
$85.000
|
|
|
RAIL (TY SSTR)(MOD)
|
LF
|
1,980.000
|
$83.000
|
$72.340
|
$73.000
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
|
LF
|
332.000
|
$200.000
|
$300.000
|
$332.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
146.000
|
$125.000
|
$332.560
|
$300.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,160.000
|
$7,917.720
|
$8,500.000
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$654.000
|
$1,374.510
|
$200.000
|
|
|
REMOV STR (PIPE)
|
LF
|
89.000
|
$2,136.000
|
$64.780
|
$75.000
|
|
|
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
|
EA
|
1.000
|
$550,000.000
|
$325,000.000
|
$519,846.000
|
|
|
REMOVE STR (BOLLARD)
|
EA
|
16.000
|
$194.340
|
$250.000
|
$150.000
|
|
|
REMOV STR (SMALL)
|
EA
|
1.000
|
$500.000
|
$3,909.960
|
$4,135.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,296,937.090
|
$2,978,461.770
|
$3,850,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
35.000
|
$7,300.000
|
$5,777.860
|
$15,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
473.000
|
$45.000
|
$54.630
|
$65.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
473.000
|
$33.000
|
$19.870
|
$24.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
340.000
|
$39.000
|
$44.770
|
$53.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
340.000
|
$12.000
|
$14.240
|
$17.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
24,812.000
|
$3.600
|
$3.450
|
$4.100
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
24,812.000
|
$1.200
|
$1.100
|
$1.300
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
246.000
|
$7.250
|
$14.260
|
$17.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
246.000
|
$1.400
|
$4.560
|
$5.400
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,794.000
|
$55.000
|
$89.600
|
$118.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
7,360.000
|
$44.000
|
$30.000
|
$60.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
3,002.000
|
$10.000
|
$12.000
|
$10.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
7,340.000
|
$22.000
|
$12.000
|
$25.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
1,290.000
|
$90.000
|
$99.340
|
$160.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
6,920.000
|
$0.200
|
$1.180
|
$0.600
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
1,536.000
|
$0.250
|
$1.410
|
$0.700
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
100.000
|
$25.000
|
$27.600
|
$33.000
|
|
|
TL-2 31" SHORT RADIUS (W/O DAT)
|
EA
|
1.000
|
$22,500.000
|
$37,500.000
|
$44,193.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
500.000
|
$3.000
|
$3.000
|
$3.600
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$275.000
|
$275.000
|
$323.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,400.000
|
$3,495.000
|
$4,118.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$320.000
|
$243.710
|
$1,767.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
13.000
|
$1,100.000
|
$1,100.000
|
$1,297.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
8.000
|
$1,000.000
|
$950.000
|
$1,120.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
4.000
|
$38,500.000
|
$29,395.000
|
$34,642.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
8.000
|
$28,000.000
|
$8,850.000
|
$10,430.000
|
|
|
GATE (REMOVE)
|
EA
|
1.000
|
$377.000
|
$781.990
|
$1,238.000
|
|
|
PIPE UNDERDRAINS (TY 6) (6")
|
LF
|
3,005.000
|
$28.000
|
$40.000
|
$25.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$670.000
|
$875.000
|
$1,032.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$890.000
|
$1,250.000
|
$1,473.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$1,000.000
|
$1,150.000
|
$1,355.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$2,200.000
|
$2,450.000
|
$2,888.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
8.000
|
$100.000
|
$125.000
|
$147.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BR)
|
EA
|
32.000
|
$15.000
|
$45.000
|
$53.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1 (BI)
|
EA
|
5.000
|
$60.000
|
$28.000
|
$33.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BR)
|
EA
|
12.000
|
$22.000
|
$45.000
|
$53.000
|
|
|
INSTL OM ASSM (OM-3L)(TWT)GND
|
EA
|
2.000
|
$250.000
|
$550.000
|
$648.000
|
|
|
INSTL OM ASSM (OM-3R)(TWT)GND
|
EA
|
2.000
|
$250.000
|
$550.000
|
$648.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
21,667.000
|
$0.600
|
$0.480
|
$0.600
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
20,924.000
|
$0.600
|
$0.480
|
$0.600
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
38.000
|
$1.500
|
$1.100
|
$1.300
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
887.000
|
$0.800
|
$0.880
|
$1.000
|
|
RE PROFILE PM TY I(W)6"(SLD)(090MIL)
|
LF
|
9,100.000
|
$1.200
|
$1.250
|
$1.500
|
|
RE PROFILE PM TY I(Y)6"(SLD)(090MIL)
|
LF
|
13,882.000
|
$0.750
|
$1.250
|
$1.500
|
|
RE PROFILE PM TY I(Y)6"(BRK)(090MIL)
|
LF
|
150.000
|
$0.750
|
$2.000
|
$2.400
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
3.000
|
$200.000
|
$200.000
|
$236.000
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
3.000
|
$285.000
|
$300.000
|
$353.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
22.000
|
$5.000
|
$7.500
|
$8.900
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
593.000
|
$5.000
|
$7.500
|
$8.900
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
14,766.000
|
$0.500
|
$0.400
|
$0.500
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
631.000
|
$3.400
|
$6.000
|
$7.100
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
24.000
|
$5,000.000
|
$8,839.970
|
$8,202.000
|
|
Totals: |
$24,425,867.540
|
$31,574,353.174
|
$39,078,124.628
|