0140-03-052
|
PECOS
|
ODESSA
|
$18,879,654
|
IH 10
|
F 2025(312)
|
02/05/2026
|
12/01/2025
|
REHAB EXIST ROADWAY
|
FNF CONSTRUCTION, INC.
($14,714,263)
|
|
|
0042-12-096
|
CHILDRESS
|
CHILDRESS
|
$6,986,326
|
US 287
|
F 2026(073)
|
11/06/2025
|
09/01/2025
|
HWY IMPRV
|
RK HALL, LLC
($5,183,756)
|
|
|
0380-04-025
|
TERRY
|
LUBBOCK
|
$27,831,213
|
SH 137
|
C 380-4-25
|
10/09/2025
|
08/01/2025
|
SUPER 2
|
A. L. HELMCAMP, INC.
($22,303,962)
|
|
|
0355-05-046
|
HANSFORD
|
AMARILLO
|
$16,235,434
|
SH 207
|
F 2B25(129)
|
09/05/2025
|
07/01/2025
|
PREVENT MAINT
|
DUININCK, INC.
($12,484,683)
|
|
|
0425-01-021
|
HARTLEY
|
AMARILLO
|
$168,723,070
|
US 87
|
F 2B25(041)
|
09/04/2025
|
07/01/2025
|
CONSTRUCT NEW ROAD
|
FNF CONSTRUCTION, INC.
($99,678,127)
|
|
|
0292-04-063
|
WARD
|
ODESSA
|
$19,025,782
|
SH 18
|
F 2023(928)
|
07/02/2025
|
05/14/2025
|
HWY IMPRV
|
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
($17,279,720)
|
|
|
6484-76-001
|
PARKER
|
FORT WORTH
|
$723,300
|
IH0020
|
MMC - A00215570
|
07/02/2025
|
05/30/2025
|
HOT MIX
|
KIEWIT INFRASTRUCTURE SOUTH CO.
($598,000)
|
|
|
0005-04-083
|
MARTIN
|
ODESSA
|
$16,256,054
|
IH 20
|
F 2025(427)
|
06/05/2025
|
04/01/2025
|
ROADWAY REHAB
|
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
($11,318,569)
|
|
|
1158-05-002
|
CULBERSON
|
EL PASO
|
$105,998,212
|
FM 2185
|
F 2025(388)
|
06/04/2025
|
04/01/2025
|
WIDEN ROAD - ADD LANES AND SHOULDERS
|
A. L. HELMCAMP, INC.
($123,682,484)
|
|
|
0052-01-043
|
PARMER
|
LUBBOCK
|
$28,903,376
|
US 70
|
C 52-1-43
|
05/01/2025
|
03/01/2025
|
OVERLAY
|
A. L. HELMCAMP, INC.
($29,652,485)
|
|
|
0139-08-040
|
PECOS
|
ODESSA
|
$39,964,810
|
US 285
|
C 139-8-40
|
04/03/2025
|
02/02/2025
|
ROADWAY WIDENING TO A SUPER 2
|
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
($26,858,499)
|
|
|
0139-03-053
|
REEVES
|
ODESSA
|
$13,404,239
|
US 285
|
C 139-3-53
|
03/05/2025
|
01/05/2025
|
HWY IMPRV
|
FNF CONSTRUCTION, INC.
($10,373,162)
|
|
|
0397-02-041
|
WHEELER
|
CHILDRESS
|
$17,564,060
|
SH 152
|
C 397-2-41
|
03/05/2025
|
01/05/2025
|
SUPER 2
|
RK HALL, LLC
($14,172,579)
|
|
|
0053-05-050
|
GARZA
|
LUBBOCK
|
$15,389,416
|
US 84
|
C 53-5-50
|
03/04/2025
|
01/05/2025
|
REHAB OF EXIST ROADWAY
|
A. L. HELMCAMP, INC.
($13,312,185)
|
|
|
1337-01-026
|
LIPSCOMB
|
AMARILLO
|
$19,101,996
|
SH 23
|
BR 2025(551)
|
03/04/2025
|
01/05/2025
|
BRIDGE REPL
|
EARTH BUILDERS, L.P.
($18,726,656)
|
|
|
0140-13-020
|
CROCKETT
|
SAN ANGELO
|
$33,606,433
|
IH 10
|
C 140-13-20
|
02/06/2025
|
01/05/2025
|
ACP OVERLAY
|
KIEWIT INFRASTRUCTURE SOUTH CO.
($24,564,337)
|
|
|
0461-04-026
|
COCHRAN
|
LUBBOCK
|
$37,873,977
|
SH 214
|
C 461-4-26
|
01/08/2025
|
11/27/2024
|
SUPER 2
|
JAMES HAMILTON CONSTRUCTION CO.
($28,894,124)
|
|
|
0052-05-046
|
LAMB
|
LUBBOCK
|
$30,327,627
|
US 84
|
F 2025(306)
|
12/04/2024
|
11/10/2024
|
REMOVE/REPLACE BRIDGE RAIL
|
A. L. HELMCAMP, INC.
($25,868,924)
|
|
|
0003-06-103
|
REEVES
|
ODESSA
|
$37,995,862
|
IH 20
|
F 2024(536)
|
11/07/2024
|
09/26/2024
|
ROADWAY REHAB
|
FNF CONSTRUCTION, INC.
($31,497,131)
|
|
|
0003-06-101
|
REEVES
|
ODESSA
|
$41,098,807
|
IH 20
|
F 2024(535)
|
11/06/2024
|
09/25/2024
|
HWY IMPRV
|
FNF CONSTRUCTION, INC.
($27,943,635)
|
|
|
0042-03-047
|
ARMSTRONG
|
AMARILLO
|
$21,345,607
|
US 287
|
F 2025(201)
|
11/06/2024
|
09/25/2024
|
PREVENT MAINT
|
DUININCK, INC.
($19,891,474)
|
|
|
0068-08-070
|
HOWARD
|
ABILENE
|
$9,740,543
|
US 87
|
C 68-8-70
|
10/01/2024
|
08/20/2024
|
RESURF ROADWAY
|
RK HALL, LLC
($7,656,689)
|
|
|
0179-04-104
|
MATAGORDA
|
YOAKUM
|
$26,875,956
|
SH 35
|
BR 2B24(073)
|
09/06/2024
|
03/21/2024
|
BRIDGE REPL
|
RAGLE CONSTRUCTION, INC.
($30,981,397)
|
|
|
0355-03-034
|
OCHILTREE
|
AMARILLO
|
$30,107,140
|
SH 15
|
C 355-3-34
|
09/05/2024
|
07/25/2024
|
SURF/ROADWAY RESTOR
|
KIEWIT INFRASTRUCTURE SOUTH CO.
($28,843,111)
|
|
|
0077-05-031
|
IRION
|
SAN ANGELO
|
$57,311,002
|
US 67
|
F 2B24(013)
|
08/02/2024
|
06/21/2024
|
PREVENT MAINT
|
RK HALL, LLC
($52,231,941)
|
|
|
1103-04-039
|
STARR
|
PHARR
|
$30,872,296
|
FM 755
|
C 1103-4-39
|
07/10/2024
|
05/29/2024
|
RECON EXIST ROADWAY
|
FOREMOST PAVING, INC.
($24,639,662)
|
|
|
0033-05-089
|
JONES
|
ABILENE
|
$39,256,091
|
US 83
|
F 2B24(277)
|
07/09/2024
|
05/28/2024
|
WIDEN ROAD - ADD SHOULDERS
|
FNF CONSTRUCTION, INC.
($39,496,851)
|
|
|
0006-03-121
|
NOLAN
|
ABILENE
|
$52,231,957
|
IH 20
|
STP 2000(401)TP
|
06/06/2024
|
04/25/2024
|
CONSTRUCT REST AREA
|
WEBBER, LLC
($74,808,808)
|
|
|
0043-02-080
|
HARDEMAN
|
CHILDRESS
|
$25,479,723
|
US 287
|
BR 2024(922)
|
06/06/2024
|
04/25/2024
|
BRIDGE REPL
|
MORTMARA CONSTRUCTION, INC.
($28,987,860)
|
|
|
1155-01-017
|
MARTIN
|
ODESSA
|
$34,112,466
|
FM 846
|
C 1155-1-17
|
06/06/2024
|
04/25/2024
|
HWY IMPRV
|
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
($26,967,769)
|
|
|
0090-02-055
|
OLDHAM
|
AMARILLO
|
$16,724,606
|
IH 40
|
F 2B24(295)
|
06/05/2024
|
04/24/2024
|
HWY IMPRV
|
KIEWIT INFRASTRUCTURE SOUTH CO.
($15,078,258)
|
|
|
0137-03-085
|
WICHITA
|
WICHITA FALLS
|
$19,223,497
|
SH 25
|
F 2B24(122)
|
06/05/2024
|
04/24/2024
|
WIDEN ROAD - ADD SHOULDERS
|
A. L. HELMCAMP, INC.
($20,570,032)
|
|
|
6462-50-001
|
TARRANT
|
FORT WORTH
|
$779,205
|
IH0820
|
MMC - 646250001
|
05/03/2024
|
03/28/2024
|
HOT MIX
|
TEXAS MATERIALS GROUP, INC.
($1,033,100)
|
|
|
0455-03-038
|
GRAY
|
AMARILLO
|
$18,393,817
|
SH 152
|
F 2B24(078)
|
05/02/2024
|
03/21/2024
|
HWY IMPRV
|
RK HALL, LLC
($17,457,097)
|
|
|
0179-04-104
|
MATAGORDA
|
YOAKUM
|
$18,124,489
|
SH 35
|
BR 2B24(073)
|
05/02/2024
|
08/25/2024
|
BRIDGE REPL
|
MORTMARA CONSTRUCTION, INC.
($33,183,610)
|
|
|
0068-05-040
|
DAWSON
|
LUBBOCK
|
$12,007,910
|
US 87
|
C 68-5-40
|
04/04/2024
|
12/22/2023
|
WIDEN ROAD - ADD LANES AND SHOULDERS
|
A. L. HELMCAMP, INC.
($14,793,665)
|
|
|
0170-02-023
|
LIPSCOMB
|
AMARILLO
|
$19,830,078
|
US 60
|
C 170-2-23
|
04/04/2024
|
02/22/2024
|
PREVENT MAINT
|
DUININCK, INC.
($19,475,601)
|
|
|
6462-02-001
|
PARKER
|
FORT WORTH
|
$573,920
|
IH0020
|
MMC - 646202001
|
04/04/2024
|
02/29/2024
|
HOT MIX
|
AUSTIN ASPHALT, INC.
($600,500)
|
|
|
0003-08-065
|
REEVES
|
ODESSA
|
$18,101,641
|
BI 20-B
|
C 3-8-65
|
03/06/2024
|
01/24/2024
|
HWY IMPRV
|
A. L. HELMCAMP, INC.
($17,782,450)
|
|
|
0441-07-074
|
PECOS
|
ODESSA
|
$14,670,236
|
IH 10
|
C 441-7-74
|
03/05/2024
|
01/23/2024
|
ROADWAY REHAB
|
FNF CONSTRUCTION, INC.
($12,743,573)
|
|
|
1727-02-024
|
MOORE
|
AMARILLO
|
$39,780,978
|
FM 281
|
C 1727-2-24
|
02/02/2024
|
12/22/2023
|
REHAB EXIST ROADWAY
|
J. LEE MILLIGAN, INC.
($41,097,397)
|
|
|
0043-04-083
|
HARDEMAN
|
CHILDRESS
|
$9,300,051
|
US 287
|
F 2024(638)
|
01/05/2024
|
11/24/2023
|
HWY IMPRV
|
DUININCK, INC.
($8,059,391)
|
|
|
0228-01-062
|
TERRY
|
LUBBOCK
|
$11,660,774
|
US 62
|
F 2024(427)
|
12/06/2023
|
11/15/2023
|
REHAB EXIST ROADWAY
|
JAMES HAMILTON CONSTRUCTION CO.
($11,408,519)
|
|
|
0132-01-055
|
DICKENS
|
CHILDRESS
|
$9,731,074
|
US 82
|
C 132-1-55
|
12/05/2023
|
11/15/2023
|
OVERLAY
|
A. L. HELMCAMP, INC.
($11,319,018)
|
|
|
0184-01-070
|
CORYELL
|
WACO
|
$13,792,008
|
SH 36
|
F 2024(331)
|
11/01/2023
|
11/15/2023
|
SURF/ROADWAY RESTOR
|
BIG CREEK CONSTRUCTION, LTD.
($8,907,042)
|
|
|
0168-08-075
|
RANDALL
|
AMARILLO
|
$40,452,690
|
US 60
|
F 2024(033)
|
09/07/2023
|
11/15/2023
|
REHAB EXIST ROADWAY
|
DUININCK, INC.
($34,924,134)
|
|
|
0042-06-076
|
DONLEY
|
CHILDRESS
|
$6,658,833
|
US 287
|
F 2024(069)
|
09/06/2023
|
11/15/2023
|
HWY IMPRV
|
J. LEE MILLIGAN, INC.
($6,446,301)
|
|
|
0086-14-075
|
WEBB
|
LAREDO
|
$311,492,996
|
US 59
|
F 2022(745)
|
08/02/2023
|
11/15/2023
|
RECON EXIST ROADWAY
|
JAMES CONSTRUCTION GROUP, LLC
($344,030,535)
|
|
|
1639-01-016
|
REEVES
|
ODESSA
|
$56,173,945
|
FM 1450
|
F 2023(524)
|
03/07/2023
|
08/21/2024
|
ROADWAY REHAB
|
A. L. HELMCAMP, INC.
($81,336,502)
|
|
|
0003-05-055
|
REEVES
|
ODESSA
|
$60,513,367
|
IH 20
|
C 3-5-55
|
02/01/2023
|
11/15/2023
|
HWY IMPRV
|
FNF CONSTRUCTION, INC.
($56,142,249)
|
|
|
0168-07-050
|
DEAF SMITH
|
AMARILLO
|
$24,184,741
|
US 60
|
C 168-7-50
|
01/06/2023
|
11/15/2023
|
REHAB EXIST ROADWAY
|
RK HALL, LLC
($23,784,486)
|
|
|
0003-07-061
|
REEVES
|
ODESSA
|
$24,055,039
|
IH 20
|
C 3-7-61
|
01/05/2023
|
11/15/2023
|
HWY IMPRV
|
KIEWIT INFRASTRUCTURE SOUTH CO.
($18,857,194)
|
|
|
0557-02-019
|
HUTCHINSON
|
AMARILLO
|
$7,439,116
|
SH 152
|
F 2023(128)
|
10/06/2022
|
11/15/2023
|
SURF/ROADWAY RESTOR
|
DUININCK, INC.
($7,081,620)
|
|
|
1245-02-050
|
POTTER
|
AMARILLO
|
$7,835,330
|
RM 1061
|
F 2023(053)
|
09/08/2022
|
11/15/2023
|
PREVENT MAINT
|
RK HALL, LLC
($7,909,237)
|
|
|
0141-03-062
|
SUTTON
|
SAN ANGELO
|
$10,015,336
|
IH 10
|
C 141-3-62
|
06/01/2022
|
09/03/2024
|
ACP OVERLAY
|
DELHUR INDUSTRIES, INC.
($11,863,754)
|
|
|
0479-03-016
|
LOVING
|
ODESSA
|
$34,992,158
|
SH 302
|
F 2022(496)
|
05/05/2022
|
08/31/2024
|
ROADWAY WIDENING TO A SUPER 2
|
FNF CONSTRUCTION, INC.
($36,670,138)
|
|
|
1189-01-020
|
WINKLER
|
ODESSA
|
$14,859,514
|
FM 874
|
C 1189-1-20
|
03/04/2022
|
11/15/2023
|
HWY IMPRV
|
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
($14,858,747)
|
|
|
6389-83-001
|
REEVES
|
ODESSA
|
$270,000
|
IH0020
|
MMC - 638983001
|
02/08/2022
|
11/15/2023
|
DENSE GRADED HOT MIX
|
KIEWIT INFRASTRUCTURE SOUTH CO.
($296,475)
|
|
|
1245-02-049
|
POTTER
|
AMARILLO
|
$11,717,878
|
RM 1061
|
F 2022(374)
|
02/04/2022
|
11/15/2023
|
HWY IMPRV
|
KIEWIT INFRASTRUCTURE SOUTH CO.
($12,755,021)
|
|
|
1245-01-019
|
OLDHAM
|
AMARILLO
|
$16,783,145
|
RM 1061
|
F 2022(375)
|
02/03/2022
|
11/15/2023
|
HWY IMPRV
|
KIEWIT INFRASTRUCTURE SOUTH CO.
($18,084,714)
|
|
|
0379-01-046
|
HUTCHINSON
|
AMARILLO
|
$9,350,961
|
SH 136
|
F 2022(299)
|
01/07/2022
|
11/15/2023
|
REHAB EXIST ROADWAY
|
DUININCK, INC.
($9,504,385)
|
|
|
0070-02-091
|
TOM GREEN
|
SAN ANGELO
|
$10,297,869
|
US 87
|
F 2022(347)
|
01/06/2022
|
11/15/2023
|
PREVENT MAINT
|
REECE ALBERT, INC.
($9,737,926)
|
|
|
0133-01-049
|
KING
|
CHILDRESS
|
$6,063,882
|
US 82
|
F 2022(352)
|
01/06/2022
|
11/15/2023
|
REHAB
|
A. L. HELMCAMP, INC.
($5,768,976)
|
|
|
0133-04-042
|
BAYLOR
|
WICHITA FALLS
|
$17,221,162
|
US 82
|
F 2022(303)
|
12/01/2021
|
11/15/2023
|
UPGRADE TO SUPER 2
|
A. L. HELMCAMP, INC.
($15,938,381)
|
|
|
0168-05-041
|
DEAF SMITH
|
AMARILLO
|
$5,883,460
|
US 60
|
F 2022(056)
|
10/08/2021
|
11/15/2023
|
PREVENT MAINT
|
RK HALL, LLC
($5,275,867)
|
|
|
0052-02-036
|
BAILEY
|
LUBBOCK
|
$17,626,686
|
US 70
|
F 2022(025)
|
09/01/2021
|
11/15/2023
|
SURF/ROADWAY RESTOR
|
DUININCK, INC.
($18,113,896)
|
|
|
0169-07-053
|
GRAY
|
AMARILLO
|
$18,919,048
|
US 60
|
C 169-7-53
|
08/04/2021
|
11/15/2023
|
HWY IMPRV
|
RK HALL, LLC
($16,536,379)
|
|
|
0699-01-052
|
TAYLOR
|
ABILENE
|
$24,229,630
|
FM 89
|
F 2021(851)
|
08/04/2021
|
11/15/2023
|
WIDEN ROAD - ADD LANES
|
A. L. HELMCAMP, INC.
($28,944,555)
|
|
|
0139-06-021
|
REEVES
|
ODESSA
|
$65,370,022
|
US 285
|
C 139-6-21
|
07/01/2021
|
11/15/2023
|
WIDEN ROAD - ADD LANES
|
KIEWIT INFRASTRUCTURE SOUTH CO.
($58,528,501)
|
|
|
0075-02-026
|
PECOS
|
ODESSA
|
$37,570,691
|
US 67
|
C 75-2-26
|
06/04/2021
|
11/15/2023
|
WIDEN ROAD - ADD LANES AND SHOULDERS
|
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
($35,754,470)
|
|
|
0041-02-016
|
HARTLEY
|
AMARILLO
|
$8,784,107
|
US 385
|
F 2021(441)
|
04/08/2021
|
11/15/2023
|
REHAB EXIST ROADWAY
|
J. LEE MILLIGAN, INC.
($9,656,579)
|
|
|
0916-38-014
|
ARANSAS
|
CORPUS CHRISTI
|
$3,982,909
|
CS
|
BR 1902(249)
|
03/04/2021
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
LUCANIA CONSTRUCTION LLC
($4,582,972)
|
|
|
0160-02-025
|
SUTTON
|
SAN ANGELO
|
$23,985,882
|
US 277
|
NH 2020(946)
|
02/04/2021
|
11/15/2023
|
ADD PASSING LANES
|
ALLEN KELLER COMPANY
($19,351,497)
|
|
|
0902-39-035
|
PALO PINTO
|
FORT WORTH
|
$3,578,993
|
VA
|
C 902-39-35
|
12/03/2020
|
11/15/2023
|
STATE PARK IMPRVS
|
JAY MILLS CONTRACTING, INCORPORATED
($3,292,351)
|
|
|
0034-03-019
|
RUNNELS
|
SAN ANGELO
|
$27,205,295
|
US 83
|
NH 2020(944)
|
11/05/2020
|
11/15/2023
|
ADD PASSING LANES
|
J. H. STRAIN & SONS, INC.
($24,497,111)
|
|
|
0146-04-029
|
FOARD
|
CHILDRESS
|
$6,165,124
|
US 70
|
STP 2021(106)
|
11/05/2020
|
11/15/2023
|
ACP OVERLAY
|
DUININCK, INC.
($5,097,897)
|
|
|
0397-01-045
|
GRAY
|
AMARILLO
|
$16,937,610
|
SH 152
|
STP 2021(130)
|
11/04/2020
|
11/15/2023
|
HWY IMPRV
|
RK HALL, LLC
($15,464,360)
|
|
|
0294-02-023
|
GAINES
|
LUBBOCK
|
$56,190,977
|
US 180
|
C 294-2-23
|
10/02/2020
|
11/15/2023
|
SUPER 2 PASSING LANES
|
JAMES HAMILTON CONSTRUCTION CO.
($48,813,790)
|
|
|
0957-09-018
|
PRESIDIO
|
EL PASO
|
$9,263,331
|
FM 170
|
BR 2013(632)
|
09/04/2020
|
11/15/2023
|
REPLACE FOUR NARROW BRIDGES
|
RELMCO, INC.
($8,137,042)
|
|
|
0479-04-038
|
WINKLER
|
ODESSA
|
$48,731,544
|
SH 302
|
STP 2B20(250)
|
09/03/2020
|
11/15/2023
|
ROADWAY REHAB
|
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
($43,485,105)
|
|
|
0379-02-032
|
POTTER
|
AMARILLO
|
$8,577,015
|
SH 136
|
STP 2B20(144)HES
|
08/06/2020
|
11/15/2023
|
REHAB EXIST ROADWAY
|
KIEWIT INFRASTRUCTURE SOUTH CO.
($9,215,103)
|
|
|
0479-04-050
|
WINKLER
|
ODESSA
|
$48,971,163
|
SH 302
|
STP 2020(864)
|
08/06/2020
|
11/15/2023
|
CONSTRUCT GRADE SEPARATIONS
|
KIEWIT INFRASTRUCTURE SOUTH CO.
($54,467,579)
|
|
|
6363-67-001
|
HARRIS
|
HOUSTON
|
$14,645,721
|
IH0010
|
RMC - 636367001
|
08/06/2020
|
11/15/2023
|
FENDER SYSTEM CONSTRUCTION
|
BO-MAC CONTRACTORS, LTD.
($12,567,752)
|
|
|
0133-03-038
|
KNOX
|
CHILDRESS
|
$12,994,556
|
US 82
|
NH 2020(738)
|
07/08/2020
|
11/15/2023
|
SUPER 2
|
A. L. HELMCAMP, INC.
($12,684,228)
|
|
|
0139-03-047
|
REEVES
|
ODESSA
|
$6,489,899
|
US 285
|
NH 2B20(021)
|
06/05/2020
|
11/15/2023
|
ROADWAY REHAB
|
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
($5,198,387)
|
|
|
3559-02-007
|
TARRANT
|
FORT WORTH
|
$141,479,076
|
SH 170
|
NH 2020(493)
|
06/05/2020
|
11/15/2023
|
CONSTRUCT NEW ROADWAY LANES
|
ZACHRY CONSTRUCTION CORPORATION
($98,999,997)
|
|
|
0157-05-064
|
JONES
|
ABILENE
|
$21,588,660
|
US 277
|
C 157-5-64
|
05/08/2020
|
11/15/2023
|
SPOT REPAIR, OVERLAY
|
ZACK BURKETT CO.
($15,184,947)
|
|
|
0275-01-205
|
POTTER
|
AMARILLO
|
$14,312,032
|
IH 40
|
BR 2020(793)
|
05/08/2020
|
11/15/2023
|
BRIDGE MAINT AND REPAIR
|
GIBSON & ASSOCIATES, INC.
($15,820,659)
|
|
|
1183-01-014
|
REEVES
|
ODESSA
|
$63,857,120
|
FM 2119
|
STP 2020(751)
|
05/08/2020
|
11/15/2023
|
ROADWAY REHAB
|
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
($62,350,992)
|
|
|
0924-06-601
|
EL PASO
|
EL PASO
|
$2,896,650
|
VA
|
C 924-6-601
|
05/07/2020
|
11/15/2023
|
FY 2020 BRIDGE MAINT (EL PASO COUNTY...
|
J.D. ABRAMS, L.P.
($2,570,503)
|
|
|
0030-05-069
|
HEMPHILL
|
AMARILLO
|
$16,798,303
|
US 83
|
BR 2020(634)
|
03/05/2020
|
11/15/2023
|
REPLACE EXIST BRIDGES
|
WEBBER, LLC
($16,941,870)
|
|
|
0031-04-054
|
COLLINGSWORTH
|
CHILDRESS
|
$11,075,529
|
US 83
|
STP 2020(667)
|
03/04/2020
|
11/15/2023
|
SUPER 2 - SUBGRADE WIDENING, STRUCTS...
|
DUININCK, INC.
($11,250,761)
|
|
|
0076-08-027
|
REAGAN
|
SAN ANGELO
|
$25,494,789
|
US 67
|
STP 2020(652)
|
03/04/2020
|
11/15/2023
|
ADD PASSING LANES
|
REECE ALBERT, INC.
($23,698,271)
|
|
|
0463-06-028
|
WINKLER
|
ODESSA
|
$59,930,087
|
SH 302
|
STP 2020(573)
|
02/07/2020
|
11/15/2023
|
ROADWAY REHAB
|
FNF CONSTRUCTION, INC.
($63,338,505)
|
|
|
1727-01-016
|
HARTLEY
|
AMARILLO
|
$8,444,421
|
FM 281
|
STP 2020(512)
|
01/09/2020
|
09/26/2024
|
ACP OVERLAY AND PAVMT REPAIR
|
J. LEE MILLIGAN, INC.
($10,006,009)
|
|
|
0042-04-043
|
ARMSTRONG
|
AMARILLO
|
$8,316,513
|
US 287
|
NH 2020(352)
|
12/04/2019
|
11/15/2023
|
2" ACP OVERLAY, PAVMT REPAIR
|
KIEWIT INFRASTRUCTURE SOUTH CO.
($8,973,976)
|
|
|
0275-11-083
|
GRAY
|
AMARILLO
|
$9,813,112
|
IH 40
|
NH 2020(353)
|
12/03/2019
|
11/15/2023
|
CRCP REPAIR, OVERLAY AND BRIDGE RAIL...
|
GILVIN-TERRILL, LTD.
($10,924,180)
|
|
|
0380-09-092
|
MIDLAND
|
ODESSA
|
$36,173,390
|
SH 349
|
STP 2020(389)
|
12/03/2019
|
11/15/2023
|
MILL,INLAY,SUBGRADE WIDENING,SIGNS,&...
|
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
($27,958,084)
|
|
|
0066-01-021
|
DALLAM
|
AMARILLO
|
$10,000,117
|
US 287
|
NH 2020(203)
|
11/05/2019
|
11/15/2023
|
OVERLAY AND PAVMT REPAIR
|
RK HALL, LLC
($11,978,030)
|
|
|
0139-05-048
|
REEVES
|
ODESSA
|
$5,303,589
|
US 285
|
NH 2020(133)
|
10/02/2019
|
11/15/2023
|
ROADWAY REHAB
|
DAN WILLIAMS COMPANY
($6,540,325)
|
|
|
2635-01-038
|
POTTER
|
AMARILLO
|
$9,417,018
|
SL 335
|
NH 2020(079)
|
10/02/2019
|
11/15/2023
|
OVERLAY
|
RK HALL, LLC
($10,715,637)
|
|
|
0004-02-060
|
WARD
|
ODESSA
|
$23,238,929
|
IH 20
|
STP 1902(276)HES
|
08/07/2019
|
11/15/2023
|
INSTL MEDIAN BARRIERS
|
DAN WILLIAMS COMPANY
($28,675,420)
|
|
|
0003-05-054
|
REEVES
|
ODESSA
|
$24,210,116
|
IH 20
|
STP 1902(275)HES
|
08/06/2019
|
11/15/2023
|
INSTL MEDIAN BARRIERS
|
DAN WILLIAMS COMPANY
($27,958,749)
|
|
|
0238-03-064
|
DALLAM
|
AMARILLO
|
$13,993,637
|
US 54
|
NH 2020(034)
|
08/06/2019
|
11/15/2023
|
THICK OVERLAY AND PAVMT REPAIR
|
RK HALL, LLC
($14,364,734)
|
|
|
0558-09-035
|
REAGAN
|
SAN ANGELO
|
$16,879,598
|
SH 137
|
STP 2019(831)
|
07/10/2019
|
09/27/2024
|
RESTOR OF EXIST ROAD
|
RK HALL, LLC
($17,898,104)
|
|
|
1643-01-016
|
CROCKETT
|
SAN ANGELO
|
$14,208,778
|
SH 137
|
STP 1902(153)
|
07/10/2019
|
09/27/2024
|
RESTOR OF EXIST ROAD
|
REECE ALBERT, INC.
($16,675,320)
|
|
|
0461-05-011
|
YOAKUM
|
LUBBOCK
|
$21,661,892
|
SH 214
|
STP 2019(753)
|
06/05/2019
|
11/15/2023
|
SUPER 2 PASSING LANES
|
DUININCK, INC.
($24,052,608)
|
|
|
0006-07-080
|
CALLAHAN
|
ABILENE
|
$9,844,142
|
IH 20
|
NH 2019(920)
|
05/07/2019
|
11/15/2023
|
MILL & SMA OVRLAY
|
A. L. HELMCAMP, INC.
($10,684,705)
|
|
|
0133-02-025
|
KNOX
|
CHILDRESS
|
$10,556,028
|
US 82
|
NH 2019(590)
|
04/03/2019
|
11/15/2023
|
SUPER 2
|
A. L. HELMCAMP, INC.
($11,182,988)
|
|
|
0040-03-064
|
DALLAM
|
AMARILLO
|
$15,797,809
|
US 87
|
C 40-3-64
|
04/02/2019
|
11/15/2023
|
OVERLAY
|
RK HALL, LLC
($17,114,342)
|
|
|
0068-03-033
|
LYNN
|
LUBBOCK
|
$10,468,157
|
US 87
|
NH 2019(745)
|
04/02/2019
|
11/15/2023
|
THIN OVERLAY MIX
|
DUININCK, INC.
($13,819,501)
|
|
|
0490-04-045
|
ROBERTS
|
AMARILLO
|
$23,322,706
|
SH 70
|
STP 2019(727)
|
04/02/2019
|
11/15/2023
|
OVERLAY
|
J. LEE MILLIGAN, INC.
($23,349,234)
|
|
|
0030-02-052
|
OCHILTREE
|
AMARILLO
|
$14,148,590
|
US 83
|
STP 2019(603)
|
03/05/2019
|
11/15/2023
|
OVERLAY
|
J. LEE MILLIGAN, INC.
($13,814,377)
|
|
|
0158-01-082
|
RUNNELS
|
SAN ANGELO
|
$14,638,666
|
US 67
|
NH 2019(396)
|
02/06/2019
|
11/15/2023
|
ACP OVERLAY
|
KIEWIT INFRASTRUCTURE SOUTH CO.
($16,352,620)
|
|
|
0139-05-043
|
REEVES
|
ODESSA
|
$23,840,072
|
US 285
|
STP 2019(387)
|
01/09/2019
|
11/15/2023
|
ROADWAY REHAB
|
FNF CONSTRUCTION, INC.
($18,885,091)
|
|
|
0275-04-052
|
CARSON
|
AMARILLO
|
$7,990,543
|
IH 40
|
C 275-4-52
|
01/09/2019
|
11/15/2023
|
ACP OVERLAY,CRCP REPAIR, MBGF, AND S...
|
KIEWIT INFRASTRUCTURE SOUTH CO.
($8,012,745)
|
|
|
0238-02-038
|
HARTLEY
|
AMARILLO
|
$36,913,701
|
US 54
|
NH 2019(409)
|
01/08/2019
|
11/15/2023
|
CONVERT TO SUPER 2 HWY
|
J. LEE MILLIGAN, INC.
($35,223,787)
|
|
|
0490-03-028
|
OCHILTREE
|
AMARILLO
|
$13,097,047
|
SH 70
|
STP 2019(237)
|
11/06/2018
|
11/15/2023
|
BASE REPAIR AND OVERLAY
|
J. LEE MILLIGAN, INC.
($13,090,322)
|
|
|
0169-03-036
|
CARSON
|
AMARILLO
|
$17,852,193
|
US 60
|
NH 2019(080)
|
10/03/2018
|
11/15/2023
|
EBL - FULL DEPTH REPAIR, MILL AND FI...
|
RK HALL, LLC
($16,196,034)
|
|
|
0004-02-058
|
WARD
|
ODESSA
|
$25,388,366
|
IH 20
|
NH 2019(108)
|
10/02/2018
|
11/15/2023
|
RECON PAVMT
|
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
($24,141,875)
|
|
|
0275-05-044
|
GRAY
|
AMARILLO
|
$17,835,108
|
IH 40
|
NH 2019(079)
|
10/02/2018
|
11/15/2023
|
OVERLAY
|
KIEWIT INFRASTRUCTURE SOUTH CO.
($16,401,397)
|
|
|
0042-03-042
|
ARMSTRONG
|
AMARILLO
|
$7,412,912
|
US 287
|
NH 2019(052)
|
09/07/2018
|
11/15/2023
|
OVERLAY
|
KIEWIT INFRASTRUCTURE SOUTH CO.
($6,591,548)
|
|
|
0275-03-066
|
CARSON
|
AMARILLO
|
$16,161,505
|
IH 40
|
NH 2019(053)
|
09/07/2018
|
11/15/2023
|
EBL - MILL, REHAB AND OVERLAY
|
GILVIN-TERRILL, LTD.
($15,103,094)
|
|
|
0441-07-071
|
PECOS
|
ODESSA
|
$7,457,227
|
IH 10
|
NH 2019(031)
|
09/06/2018
|
11/15/2023
|
RECON PAVMT
|
FNF CONSTRUCTION, INC.
($6,847,259)
|
|
|
0493-02-015
|
LOVING
|
ODESSA
|
$17,560,799
|
RM 652
|
STP 2018(931)
|
08/07/2018
|
11/15/2023
|
ROADWAY RESTOR
|
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
($19,243,862)
|
|
|
0463-04-026
|
GLASSCOCK
|
SAN ANGELO
|
$19,682,228
|
SH 158
|
NH 1802(312)
|
07/11/2018
|
11/15/2023
|
ACP OVERLAY
|
RK HALL, LLC
($20,119,919)
|
|
|
0043-09-135
|
WICHITA
|
WICHITA FALLS
|
$8,924,359
|
IH 44
|
C 43-9-135
|
06/06/2018
|
11/15/2023
|
MILL & OVERLAY
|
ZACK BURKETT CO.
($8,831,585)
|
|
|
0124-05-029
|
BAYLOR
|
WICHITA FALLS
|
$6,037,764
|
US 183
|
C 124-5-29
|
06/06/2018
|
11/15/2023
|
ADD SHOULDERS
|
A. L. HELMCAMP, INC.
($6,427,096)
|
|
|
0169-08-024
|
ROBERTS
|
AMARILLO
|
$12,975,352
|
US 60
|
NH 2018(974)
|
06/06/2018
|
11/15/2023
|
THICK OVERLAY,JOINT REPAIR,MBGF,RUMB...
|
J. LEE MILLIGAN, INC.
($13,340,742)
|
|
|
0227-06-026
|
HOCKLEY
|
LUBBOCK
|
$24,906,986
|
US 385
|
STP 1802(433)
|
06/05/2018
|
11/15/2023
|
REHAB
|
A. L. HELMCAMP, INC.
($27,611,674)
|
|
|
0461-08-023
|
YOAKUM
|
LUBBOCK
|
$39,566,146
|
SH 214
|
C 461-8-23
|
06/05/2018
|
11/15/2023
|
REHAB
|
JAMES HAMILTON CONSTRUCTION CO.
($39,748,231)
|
|
|
0040-01-050
|
DALLAM
|
AMARILLO
|
$11,386,918
|
US 87
|
STP 1802(176)HES
|
05/02/2018
|
11/15/2023
|
OVERLAY,PVMT REPAIR,MBGF,RUMBLE STRI...
|
KIEWIT INFRASTRUCTURE SOUTH CO.
($10,092,336)
|
|
|
0229-03-035
|
CRANE
|
ODESSA
|
$25,971,706
|
US 385
|
NH 2018(881)
|
05/02/2018
|
11/15/2023
|
WIDENING TO AN ULTIMATE 4-LANE DIVID...
|
DELHUR INDUSTRIES, INC.
($20,285,449)
|
|
|
0626-01-007
|
REEVES
|
ODESSA
|
$438,565
|
PR 30B
|
C 626-1-7
|
05/02/2018
|
11/15/2023
|
REHAB PARK ROADS,PARKING LOTS AND CA...
|
FNH CONSTRUCTION, LLC
($560,740)
|
|
|
1639-01-014
|
REEVES
|
ODESSA
|
$8,014,513
|
FM 1450
|
STP 2018(879)
|
05/02/2018
|
11/15/2023
|
ROADWAY REHAB
|
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
($10,632,822)
|
|
|
0168-01-029
|
PARMER
|
LUBBOCK
|
$19,335,374
|
US 60
|
C 168-1-29
|
05/01/2018
|
11/15/2023
|
REHAB OF EXIST ROADWAY
|
J. LEE MILLIGAN, INC.
($17,450,676)
|
|
|
0066-05-066
|
MOORE
|
AMARILLO
|
$12,476,003
|
US 87
|
C 66-5-66
|
04/04/2018
|
11/15/2023
|
THICK OVERLAY,PAV REPAIR,SIGNS,BMGF,...
|
HIGHWAY CONTRACTORS, INC.
($11,242,986)
|
|
|
0226-06-032
|
CASTRO
|
LUBBOCK
|
$15,104,207
|
US 385
|
STP 2018(361)
|
04/04/2018
|
11/15/2023
|
REHAB
|
J. LEE MILLIGAN, INC.
($15,741,047)
|
|
|
0169-05-042
|
CARSON
|
AMARILLO
|
$12,655,032
|
US 60
|
NH 2013(614)
|
02/02/2018
|
11/15/2023
|
REHAB EXIST ROADWAY
|
RK HALL, LLC
($10,873,603)
|
|
|
0141-08-047
|
KIMBLE
|
SAN ANGELO
|
$7,992,651
|
IH 10
|
NH 2018(061)
|
11/02/2017
|
11/15/2023
|
HOT RECYCLE AND ACP OVERLAY
|
LONE STAR PAVING COMPANY
($6,324,554)
|
|
|
0169-04-036
|
CARSON
|
AMARILLO
|
$15,322,422
|
US 60
|
NH 2013(611)
|
10/04/2017
|
11/15/2023
|
FULL DEPTH RECLAMATION,PLANING,HOTMI...
|
RK HALL, LLC
($11,057,967)
|
|
|
0035-06-032
|
MENARD
|
SAN ANGELO
|
$8,659,020
|
US 83
|
STP 2018(059)
|
09/07/2017
|
11/15/2023
|
ADD PASSING LANES
|
ALLEN KELLER COMPANY
($5,814,759)
|
|
|
0104-10-006
|
PRESIDIO
|
EL PASO
|
$6,318,696
|
US 67
|
NH 1702(686)
|
08/09/2017
|
11/15/2023
|
NEW TWO-LANE TWIN BRIDGE STRUCT
|
EARTH BUILDERS, L.P.
($6,854,363)
|
|
|
0139-03-039
|
REEVES
|
ODESSA
|
$20,630,254
|
US 285
|
NH 1702(685)
|
08/08/2017
|
11/15/2023
|
ROADWAY WIDENING TO A MODIFIED SUPER...
|
FNF CONSTRUCTION, INC.
($15,005,109)
|
|
|
0327-10-057
|
WILLACY
|
PHARR
|
$21,166,609
|
US 77
|
NH 1702(492)
|
08/08/2017
|
11/15/2023
|
CONSTRUCT MAINLANES & OVERPASS
|
FOREMOST PAVING, INC.
($22,671,108)
|
|
|
0005-13-056
|
ECTOR
|
ODESSA
|
$3,632,750
|
IH 20
|
BR 1702(495)
|
07/12/2017
|
11/15/2023
|
UPGRADE BRIDGE AND APPROACH RAILING
|
SCR CIVIL CONSTRUCTION, LLC
($3,958,979)
|
|
|
0140-11-044
|
CROCKETT
|
SAN ANGELO
|
$5,474,290
|
IH 10
|
NH 1702(546)
|
07/12/2017
|
11/15/2023
|
PLANE, EMULSION TREAT, SURF TREATMEN...
|
REECE ALBERT, INC.
($4,567,929)
|
|
|
0266-08-011
|
COLORADO
|
YOAKUM
|
$9,384,798
|
BS 71-F
|
BR 1702(488)
|
07/12/2017
|
11/15/2023
|
CONSTRUCT NEW BRIDGE AND APPROACHES
|
ISI CONTRACTING, INC.
($10,459,589)
|
|
|
0605-01-060
|
MATAGORDA
|
YOAKUM
|
$39,234,368
|
FM 457
|
BR 2017(973)
|
07/12/2017
|
11/15/2023
|
REPLACE SWING BRIDGE
|
AUSTIN BRIDGE & ROAD SERVICES, LP
($41,231,131)
|
|
|
0043-17-030
|
WICHITA
|
WICHITA FALLS
|
$4,023,873
|
BU 287J
|
NH 2017(399)
|
12/01/2016
|
11/15/2023
|
OVERLAY
|
ZACK BURKETT CO.
($3,440,614)
|
|
|
2451-03-015
|
REEVES
|
ODESSA
|
$6,174,983
|
RM 652
|
BR 2017(327)
|
12/01/2016
|
11/15/2023
|
BRIDGE REPL
|
LESNA CONSTRUCTION, INC.
($3,793,865)
|
|
|
0004-04-087
|
WARD
|
ODESSA
|
$19,958,281
|
IH 20
|
NH 2017(276)
|
11/04/2016
|
11/15/2023
|
UPGRADES TO MEET FREEWAY STANDARDS
|
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
($13,195,417)
|