Show Job Controls
Bid Cobra

DALLAM US 87 (0040-03-064)

Items: 65

County: DALLAM
Length: N/A
Highway: US 87
District: AMARILLO
Control Number: 0040-03-064
DBE Goal: N/A
Project: C 40-3-64
Guaranty: N/A
Time: 150 WORKING DAYS
Engineer's Estimate: $15,797,808.79
Date: 04/02/2019 (7 years ago)
Contract Number: N/A
Type: OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$15,797,808.79
1
$17,114,341.94
Over/Under Est: 8.33% $1,316,533.15
Over/Under Est: 10.95% $1,729,170.44
Amt Left: 2.41% $412,637.29
$17,751,121.78
Over/Under Est: 12.36% $1,953,312.99
Amt Left: 3.72% $636,779.84
Delta: -1.28% -$224,142.55
Over/Under Est: 30.68% $4,846,742.79
Amt Left: 20.63% $3,530,209.64
Delta: -16.30% -$2,893,429.80

Bid Items & Bid Tabulations

65 Total 0 of 65
DALLAM  |  US 87  |  AMARILLO  |  0040-03-064  |  04/02/2019  |  $15,797,808.79  |  C 40-3-64  |  OVERLAY  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
KIEWIT INFRASTRUCTURE SOUTH CO.
J. LEE MILLIGAN, INC.
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
PREPARING ROW
AC 47.410 $200.000 $175.020 $197.060 $185.000 $1,600.000
PREPARING ROW (TREE) (0" TO 6" DIA)
EA 2.000 $1,000.000 $323.480 $583.910 $220.000 $440.000
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 12.000 $1,200.000 $291.630 $1,167.810 $1,750.000 $370.000
PREPARING ROW(TREE)(24" TO 36" DIA.)
EA 1.000 $1,500.000 $760.400 $2,919.530 $3,500.000 $445.000
BACKFILL (TY A)
STA 1,690.830 $155.000 $179.840 $145.930 $210.000 $125.000
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 47.410 $450.000 $349.920 $362.020 $340.000 $360.000
PRIME COAT (MC-30)
GAL 16,824.000 $3.650 $3.840 $3.650 $3.750 $5.000
EMULS ASPH (EROSN CONT)(MULTI)
GAL 14,342.000 $3.500 $3.610 $4.060 $3.650 $4.000
ASPH (MULTI OPTION)
GAL 25,573.000 $3.500 $3.700 $3.580 $2.800 $4.000
AGGR(TY-B GR-4 SAC-B)
CY 612.000 $105.000 $135.360 $150.970 $92.500 $90.000
D-GR HMA TY-B PG64-28
TON 14,805.000 $70.000 $102.960 $92.720 $103.900 $105.000
SUPERPAVE MIXTURES SP-D SAC-A PG76-28
TON 100,302.000 $93.000 $107.090 $106.530 $105.650 $120.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 45,711.000 $20.000 $16.140 $19.170 $19.150 $13.460
PLANE ASPH CONC PAV(0" TO 2")
SY 7,013.000 $2.800 $4.320 $2.980 $3.200 $2.750
PLANE ASPH CONC PAV (0" TO 3 1/2")
SY 3,034.000 $6.000 $4.590 $3.310 $4.000 $3.700
PLANE ASPH CONC PAV (4")
SY 67,297.000 $2.500 $2.050 $1.990 $3.200 $3.400
CLEANING EXISTING JOINTS
LF 160.000 $33.000 $29.500 $58.390 $25.000 $50.000
MOBILIZATION
LS 1.000 $1,100,000.000 $770,059.040 $1,486,121.260 $1,520,000.000 $2,039,071.250
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $18,000.000 $17,164.400 $20,000.000 $27,100.000 $32,000.000
RUMBLE STRIPS (SHOULDER)
LF 258,680.000 $0.150 $0.130 $0.230 $0.100 $0.130
MTL W-BEAM GD FEN (STEEL POST)
LF 800.000 $27.000 $31.590 $28.030 $31.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,700.000 $2,349.000 $1,751.720 $2,290.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 800.000 $3.000 $3.240 $2.340 $3.150 $2.500
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $300.000 $324.000 $216.050 $315.000 $240.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,800.000 $3,240.000 $2,569.190 $3,200.000 $2,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $275.000 $324.000 $233.560 $315.000 $250.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 4.000 $260.000 $297.000 $408.730 $290.000 $425.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 30.000 $1,265.000 $1,366.200 $700.690 $1,335.000 $700.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 35.000 $1,000.000 $1,058.400 $759.080 $1,035.000 $750.000
REMOVE SM RD SN SUP&AM
EA 56.000 $105.000 $108.000 $87.590 $105.000 $100.000
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
EA 31.000 $145.000 $145.800 $58.390 $142.000 $60.000
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
EA 171.000 $145.000 $145.800 $58.390 $142.000 $60.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 61.000 $135.000 $145.800 $64.230 $142.000 $65.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 263.000 $15.000 $16.200 $11.680 $15.800 $12.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 6.000 $26.000 $21.600 $11.680 $21.100 $13.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
EA 6.000 $26.000 $21.600 $11.680 $21.100 $13.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
EA 8.000 $26.000 $21.600 $11.680 $21.100 $13.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR)
EA 8.000 $26.000 $21.600 $11.680 $21.100 $13.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 6,475.000 $0.300 $0.270 $0.290 $0.260 $0.300
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 25,750.000 $0.300 $0.270 $0.290 $0.260 $0.300
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,500.000 $0.600 $0.540 $0.580 $0.530 $0.600
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 25,620.000 $0.300 $0.270 $0.290 $0.260 $0.300
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 14,800.000 $1.000 $0.920 $2.340 $1.150 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 2,000.000 $1.000 $0.920 $2.340 $1.200 $1.000
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
LF 2,770.000 $0.600 $0.440 $0.480 $0.430 $0.500
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 16,325.000 $0.700 $0.860 $0.930 $0.840 $0.900
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 438.000 $7.500 $12.420 $13.430 $12.120 $12.000
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 74.000 $140.000 $199.800 $216.050 $195.000 $200.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 74.000 $160.000 $243.000 $262.760 $237.000 $250.000
REFL PAV MRK TY I (W)(RR XING)(090MIL)
EA 3.000 $525.000 $432.000 $467.120 $421.500 $450.000
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 521.000 $20.500 $17.280 $18.680 $16.850 $18.000
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 43,960.000 $0.360 $0.440 $0.480 $0.430 $0.500
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 170,875.000 $0.360 $0.440 $0.480 $0.430 $0.500
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 720.000 $0.360 $0.440 $0.480 $0.430 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 169,239.000 $0.360 $0.440 $0.480 $0.430 $0.500
REFL PAV MRKR TY I-C
EA 42.000 $3.250 $5.400 $5.840 $5.250 $6.000
REFL PAV MRKR TY II-C-R
EA 2,972.000 $3.250 $3.240 $3.500 $3.150 $3.800
TRAFFIC BUTTON TY II-A-A
EA 72.000 $3.250 $5.400 $5.840 $5.250 $5.500
EMULSION
GAL 374,169.000 $3.000 $2.300 $2.410 $2.100 $4.300
CEMENT
TON 394.000 $195.000 $191.970 $184.510 $160.400 $145.000
EMUL TRTMNT(MX EXST MTRL & NEW BASE)12"
SY 67,297.000 $5.000 $3.000 $1.960 $2.050 $2.150
UNDERSEAL COURSE
GAL 107,557.000 $3.400 $5.490 $3.690 $3.300 $7.740
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $20,000.000 $4,886.500 $24,024.380 $21,500.000 $22,008.070
TMA (STATIONARY)
DAY 300.000 $250.000 $381.730 $252.230 $650.000 $109.600
TMA (MOBILE OPERATION)
HR 700.000 $45.000 $65.570 $75.430 $65.000 $126.560
Totals: $15,797,808.790 $17,114,341.963 $17,526,979.245 $17,751,121.780 $20,644,551.580