Show Job Controls
Bid Cobra

GARZA US 84 (0053-05-050)

Items: 65

County: GARZA
Length: 0.0000 MILES
Highway: US 84
District: LUBBOCK
Control Number: 0053-05-050
DBE Goal: 0.0%
Project: C 53-5-50
Guaranty: $100,000.00
Time: 208 WORKING DAYS
Engineer's Estimate: $15,389,416.20
Date: 03/04/2025 (1 year ago)
Contract Number: 3253004
Type: REHABILITATION OF EXISTING ROADWAY
Project ID: A00120208
Project Description: REHABILITATION OF EXISTING ROADWAY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEVE SISNEROS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$15,389,416.20
$13,312,185.39
Over/Under Est: -13.5% -$2,077,230.81
$16,158,744.30
Over/Under Est: 5% $769,328.10
Amt Left: 21.38% $2,846,558.91
$16,251,642.24
Over/Under Est: 5.6% $862,226.04
Amt Left: 22.08% $2,939,456.85
Delta: -0.57% -$92,897.94
Over/Under Est: 12.51% $1,925,092.94
Amt Left: 30.07% $4,002,323.75
Delta: -6.54% -$1,062,866.90
Over/Under Est: 19.36% $2,978,700.83
Amt Left: 37.98% $5,055,931.64
Delta: -6.09% -$1,053,607.89
Subcontractor Percentage Amount
DOUBLE A CONTRACTING, L.P. 2.06% $274,290.76
DUSTIN ALLEN, INC. 1.72% $229,019.47
J. H. ODEN CONTRACTING COMPANY 1.46% $194,400.25
A BROTHERS MILLING, LLC 1.24% $165,107.06
INDUSTRIAL FABRICS, INC. 0.96% $127,824.82
BARRICADES UNLIMITED 0.24% $31,956.20
MARCOMS CONSTRUCTION LLC 0.22% $29,293.19
Total: 7.90% $1,051,891.75

Bid Items & Bid Tabulations

65 Total 0 of 65
GARZA  |  US 84  |  LUBBOCK  |  0053-05-050  |  03/04/2025  |  $15,389,416.20  |  C 53-5-50  |  REHAB OF EXIST ROADWAY  |  208 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
DUININCK, INC.
RK HALL, LLC
JAMES HAMILTON CONSTRUCTION CO.
KIEWIT INFRASTRUCTURE SOUTH CO.
REMOV CONC (MOWSTRIP)
LF 2,300.000 $30.000 $15.000 $14.500 $14.580 $15.000 $22.890
EXCAV (ROADWAY)
CY 5,725.000 $30.000 $21.000 $20.000 $20.350 $20.000 $18.210
BACKFILL (TY B)
STA 1,120.000 $250.000 $95.000 $95.500 $195.200 $400.000 $83.640
BLADING
STA 1,120.000 $200.000 $70.000 $40.500 $132.520 $300.000 $337.040
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 25,903.000 $3.500 $5.000 $4.000 $4.670 $4.300 $2.650
FOG SEAL (CSS-1H)
GAL 7,100.000 $6.000 $5.000 $4.000 $4.770 $5.000 $3.810
SP MIXES SP-C SAC-B PG70-28
TON 22,014.000 $180.000 $150.000 $191.500 $174.500 $203.000 $202.060
TACK COAT
GAL 19,890.000 $4.500 $4.500 $3.500 $7.450 $5.500 $5.930
TOM-C PG76-28 SAC-A
TON 22,956.000 $160.000 $178.000 $210.000 $187.220 $217.000 $226.680
TACK COAT
GAL 55,891.000 $4.500 $4.500 $3.500 $4.440 $5.500 $5.930
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 18,866.000 $40.000 $37.000 $35.000 $44.850 $32.000 $46.630
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 19,865.000 $100.000 $93.000 $90.000 $97.180 $94.000 $106.530
PLANE ASPH CONC PAV(0" TO 2")
SY 52,224.000 $4.000 $1.700 $3.000 $7.170 $2.900 $1.990
PLANE ASPH CONC PAV(0" TO 4")
SY 80,546.000 $4.000 $3.500 $5.000 $8.480 $4.300 $2.640
CEM STABIL BKFL
CY 47.000 $400.000 $270.000 $380.000 $357.500 $340.000 $459.960
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 28.000 $400.000 $220.000 $540.000 $385.000 $450.000 $657.090
RIPRAP (MOW STRIP)(5 IN)
CY 107.000 $900.000 $725.000 $645.000 $660.000 $660.000 $788.510
RC PIPE (CL III)(24 IN)
LF 204.000 $300.000 $120.000 $195.000 $165.000 $155.000 $243.680
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 1.000 $6,000.000 $4,400.000 $3,800.000 $2,200.000 $3,500.000 $4,599.650
MOBILIZATION
LS 1.000 $1,399,000.000 $814,000.000 $1,600,000.000 $1,499,777.910 $1,421,000.000 $1,525,758.240
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $20,000.000 $9,000.000 $24,500.000 $11,472.300 $35,000.000 $45,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 780.000 $150.000 $50.000 $81.000 $78.320 $50.000 $64.030
TMA (STATIONARY)
DAY 416.000 $300.000 $150.000 $270.000 $281.270 $300.000 $563.490
TMA (MOBILE OPERATION)
DAY 51.000 $1,000.000 $150.000 $970.000 $415.220 $900.000 $1,111.030
ROCK FILTER DAMS (REMOVE)
LF 50.000 $25.000 $40.000 $54.000 $73.600 $40.000 $72.280
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 666.000 $50.000 $15.000 $64.500 $52.820 $35.000 $78.850
CONSTRUCTION EXITS (REMOVE)
SY 333.000 $25.000 $4.000 $27.000 $34.340 $8.000 $32.850
SANDBAGS FOR EROSION CONTROL
EA 1,352.000 $20.000 $10.000 $31.500 $26.970 $22.500 $38.110
TEMP SEDMT CONT FENCE (INSTALL)
LF 480.000 $5.000 $8.500 $8.650 $23.380 $9.000 $10.510
TEMP SEDMT CONT FENCE (REMOVE)
LF 240.000 $2.000 $2.000 $5.400 $22.230 $4.500 $6.570
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 8,685.000 $5.000 $9.000 $9.700 $7.830 $7.500 $11.830
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,343.000 $3.000 $1.000 $2.150 $1.830 $4.000 $2.630
ROCK FILTER DAMS (INSTALL) (TY 1) 6:1
LF 100.000 $50.000 $125.000 $135.000 $124.080 $75.000 $164.270
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 176,600.000 $0.300 $0.230 $0.090 $0.220 $0.200 $0.140
MTL W-BEAM GD FEN (STEEL POST)
LF 4,525.000 $30.000 $31.000 $32.000 $34.650 $34.000 $41.400
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 12.000 $1,200.000 $1,800.000 $1,800.000 $1,925.000 $2,000.000 $2,299.820
MTL THRIE-BEAM GD FEN (STEEL POST)
EA 4.000 $1,600.000 $2,500.000 $2,500.000 $3,547.500 $3,500.000 $4,238.250
REMOVE METAL BEAM GUARD FENCE
LF 4,382.000 $6.000 $3.200 $3.250 $3.300 $3.300 $3.940
REMOVE TERMINAL ANCHOR SECTION
EA 14.000 $500.000 $320.000 $325.000 $330.000 $330.000 $394.260
CABLE BARRIER SYSTEM (RELOCATE)(TL-4)
LF 2,300.000 $30.000 $17.000 $27.000 $27.500 $28.000 $32.850
GUARDRAIL END TREATMENT (INSTALL)
EA 14.000 $5,000.000 $3,400.000 $3,500.000 $3,822.500 $3,750.000 $4,566.790
GUARDRAIL END TREATMENT (REMOVE)
EA 14.000 $800.000 $320.000 $325.000 $330.000 $330.000 $394.260
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 40.000 $700.000 $850.000 $1,000.000 $1,045.000 $1,050.000 $1,248.480
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2
EA 39.000 $60.000 $68.000 $54.000 $55.000 $55.000 $65.710
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GF2
EA 26.000 $60.000 $68.000 $54.000 $55.000 $55.000 $65.710
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 1.000 $60.000 $110.000 $220.000 $225.500 $230.000 $269.410
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 16,620.000 $0.300 $0.260 $0.300 $0.310 $0.330 $0.390
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 66,452.000 $0.300 $0.260 $0.300 $0.310 $0.310 $0.370
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 3,600.000 $0.800 $0.500 $0.300 $0.310 $0.440 $0.530
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 66,452.000 $0.300 $0.260 $0.300 $0.310 $0.310 $0.370
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 15,596.000 $2.000 $1.200 $1.600 $2.480 $1.400 $2.630
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 1,300.000 $1.000 $1.260 $1.200 $1.210 $1.370 $1.640
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,855.000 $1.000 $1.050 $1.100 $1.100 $1.200 $1.450
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
LF 25,950.000 $0.500 $0.750 $0.670 $0.680 $0.900 $1.050
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 97,000.000 $0.500 $0.750 $0.670 $0.680 $0.730 $0.880
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 103,800.000 $0.500 $0.750 $0.670 $0.680 $0.730 $0.880
PREFAB PM TY C (W)(24")(SLD)
LF 900.000 $20.000 $15.000 $21.500 $22.000 $19.000 $23.000
PREFAB PM TY C (W)(ARROW)
EA 40.000 $500.000 $320.000 $325.000 $330.000 $275.000 $328.550
PREFAB PM TY C (W)(36")(YLD TRI)
EA 200.000 $100.000 $26.000 $26.000 $26.400 $66.000 $78.850
REFL PAV MRKR TY II-C-R
EA 1,922.000 $3.000 $4.500 $4.900 $5.010 $5.500 $6.570
FULL - WIDTH MOWING
CYC 2.000 $20,000.000 $7,500.000 $6,500.000 $8,847.050 $4,200.000 $8,330.290
LITTER REMOVAL
CYC 2.000 $5,000.000 $5,000.000 $5,200.000 $12,836.700 $2,100.000 $5,264.680
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
SY 19,865.000 $7.000 $7.000 $7.550 $7.800 $7.200 $13.660
ASPH FOR REINF FAB (PG70-28)
GAL 2,980.000 $6.000 $6.500 $3.150 $22.600 $6.500 $14.130
TEMP SPEED MONITOR SYS
EA 2.000 $15,000.000 $12,000.000 $8,100.000 $11,479.600 $16,500.000 $8,673.620
Totals: $15,389,416.200 $13,312,185.390 $16,158,744.300 $16,251,642.240 $17,314,509.140 $18,368,117.030
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (NON-PART) $9,600.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $8,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $77,000.00
Total: $94,600.00