PREPARING ROW (TREE) (0" TO 6" DIA)
|
EA
|
474.000
|
$400.000
|
$164.440
|
$100.000
|
$175.000
|
$218.500
|
|
|
PREPARING ROW (TREE) (6" TO 24" DIA)
|
EA
|
82.000
|
$600.000
|
$822.200
|
$500.000
|
$1,500.000
|
$661.250
|
|
|
PREPARING ROW(TREE)(24" TO 36" DIA.)
|
EA
|
2.000
|
$2,100.000
|
$1,644.400
|
$2,500.000
|
$2,800.000
|
$1,150.000
|
|
|
REMOVING STAB BASE & ASPH PAV(16")
|
SY
|
3,938.000
|
$15.000
|
$2.040
|
$10.000
|
$15.650
|
$12.650
|
|
|
REMOVING STAB BASE & ASPH PAV(14")
|
SY
|
9,585.000
|
$15.000
|
$2.420
|
$9.000
|
$15.550
|
$8.050
|
|
|
REMOVING STAB BASE & ASPH PAV (4" - 6")
|
SY
|
12,790.000
|
$10.000
|
$7.830
|
$5.000
|
$9.000
|
$5.750
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
30,560.000
|
$15.000
|
$8.790
|
$15.000
|
$20.250
|
$34.150
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
236.000
|
$40.000
|
$93.480
|
$100.000
|
$27.700
|
$68.670
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
35,843.000
|
$15.000
|
$9.440
|
$15.000
|
$20.300
|
$21.340
|
|
|
BACKFILL (TY A)
|
STA
|
135.870
|
$225.000
|
$100.000
|
$200.000
|
$295.000
|
$299.120
|
|
|
BLADING
|
HR
|
190.000
|
$170.000
|
$320.450
|
$150.000
|
$435.000
|
$386.960
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
47.290
|
$600.000
|
$487.230
|
$400.000
|
$530.000
|
$575.000
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
49.040
|
$500.000
|
$468.960
|
$400.000
|
$475.000
|
$517.500
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
8,503.000
|
$1.500
|
$2.130
|
$2.000
|
$2.150
|
$2.300
|
|
|
FL BS (CMP IN PLC)(TY A OR B GR4)(10")
|
SY
|
80,806.000
|
$20.000
|
$18.770
|
$21.000
|
$30.250
|
$41.870
|
|
|
CEMENT
|
TON
|
449.000
|
$210.000
|
$326.440
|
$225.000
|
$185.000
|
$238.820
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
40,735.000
|
$3.000
|
$2.000
|
$3.000
|
$2.950
|
$5.440
|
|
|
PRIME COAT (MC-30)
|
GAL
|
23,416.000
|
$5.000
|
$5.770
|
$4.350
|
$4.300
|
$5.360
|
|
|
EMULS ASPH (EROSN CONT)(MS-2)
|
GAL
|
10,932.000
|
$4.000
|
$6.400
|
$4.450
|
$4.100
|
$4.210
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
35,583.000
|
$3.700
|
$4.590
|
$4.000
|
$4.100
|
$4.400
|
|
|
AGGR(TY-A GR-4 SAC-B)
|
CY
|
878.000
|
$140.000
|
$177.700
|
$100.000
|
$130.000
|
$273.770
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
40,717.000
|
$27.000
|
$29.630
|
$25.000
|
$25.500
|
$27.180
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
3,952.000
|
$5.000
|
$2.710
|
$5.000
|
$5.300
|
$2.400
|
|
|
CUT AND RESTORE PAV (FLEX BASE)
|
SY
|
43.000
|
$100.000
|
$121.810
|
$100.000
|
$82.500
|
$202.170
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
72.000
|
$400.000
|
$487.230
|
$685.000
|
$425.000
|
$460.000
|
|
|
CL A CONC (FLUME)
|
CY
|
80.000
|
$750.000
|
$791.750
|
$650.000
|
$510.000
|
$554.510
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
586.000
|
$750.000
|
$669.940
|
$550.000
|
$615.000
|
$632.040
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
273.000
|
$750.000
|
$791.750
|
$650.000
|
$630.000
|
$687.700
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
244.000
|
$600.000
|
$1,035.360
|
$850.000
|
$685.000
|
$575.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
60.000
|
$700.000
|
$1,157.170
|
$950.000
|
$720.000
|
$632.500
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
136.000
|
$90.000
|
$70.650
|
$58.000
|
$91.000
|
$80.500
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
774.000
|
$125.000
|
$170.530
|
$140.000
|
$120.000
|
$97.750
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
16.000
|
$175.000
|
$274.070
|
$225.000
|
$255.000
|
$120.750
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
134.000
|
$250.000
|
$365.420
|
$300.000
|
$315.000
|
$149.500
|
|
|
HEADWALL (CH - FW - 0) (DIA= 24 IN)
|
EA
|
5.000
|
$6,500.000
|
$8,526.510
|
$7,000.000
|
$4,220.000
|
$3,450.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 30 IN)
|
EA
|
1.000
|
$7,000.000
|
$10,353.620
|
$8,500.000
|
$7,420.000
|
$5,750.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$9,000.000
|
$11,571.690
|
$9,500.000
|
$8,100.000
|
$8,625.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
15.000
|
$7,500.000
|
$9,135.550
|
$7,500.000
|
$8,700.000
|
$13,800.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
6.000
|
$9,000.000
|
$14,616.880
|
$12,000.000
|
$11,100.000
|
$18,400.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
6.000
|
$9,800.000
|
$12,789.770
|
$10,500.000
|
$9,300.000
|
$9,763.120
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,500.000
|
$1,218.070
|
$1,000.000
|
$3,400.000
|
$2,645.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
25.000
|
$3,000.000
|
$1,461.690
|
$1,200.000
|
$3,500.000
|
$3,162.500
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
8.000
|
$3,000.000
|
$1,827.110
|
$1,500.000
|
$3,850.000
|
$3,910.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$3,000.000
|
$1,827.110
|
$1,500.000
|
$3,850.000
|
$3,910.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$3,000.000
|
$3,045.180
|
$2,500.000
|
$5,200.000
|
$4,370.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
7.000
|
$3,000.000
|
$4,263.260
|
$3,500.000
|
$8,100.000
|
$5,175.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
3.000
|
$2,250.000
|
$3,045.180
|
$2,500.000
|
$5,000.000
|
$5,750.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
38.000
|
$1,000.000
|
$3,045.180
|
$2,500.000
|
$630.000
|
$2,875.000
|
|
|
REMOV STR (PIPE)
|
LF
|
606.000
|
$15.000
|
$48.720
|
$40.000
|
$50.000
|
$28.750
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
174.000
|
$75.000
|
$365.420
|
$300.000
|
$140.000
|
$57.500
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,400,000.000
|
$2,055,721.420
|
$1,840,000.000
|
$1,920,000.000
|
$1,557,625.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$21,000.000
|
$20,000.000
|
$30,000.000
|
$23,000.000
|
$15,931.290
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,025.000
|
$5.000
|
$6.090
|
$5.000
|
$9.800
|
$3.650
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,025.000
|
$2.000
|
$1.220
|
$1.000
|
$4.500
|
$1.150
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
4,459.000
|
$75.000
|
$147.920
|
$90.000
|
$91.300
|
$99.500
|
|
|
DRIVEWAYS (ACP)
|
SY
|
111.000
|
$45.000
|
$92.590
|
$10.000
|
$36.300
|
$99.820
|
|
|
DRIVEWAYS (BASE)
|
SY
|
724.000
|
$20.000
|
$36.210
|
$15.000
|
$27.000
|
$32.950
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
137,957.000
|
$0.150
|
$0.100
|
$0.200
|
$0.200
|
$0.160
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
63,993.000
|
$0.500
|
$0.150
|
$0.200
|
$0.200
|
$0.160
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
4,550.000
|
$37.000
|
$38.980
|
$32.000
|
$38.000
|
$36.800
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
19.000
|
$2,500.000
|
$2,588.410
|
$2,125.000
|
$2,900.000
|
$2,443.750
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
700.000
|
$4.000
|
$6.090
|
$5.000
|
$3.200
|
$5.750
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
31.000
|
$3,500.000
|
$3,928.290
|
$3,225.000
|
$3,700.000
|
$3,708.750
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
7.000
|
$400.000
|
$487.230
|
$400.000
|
$315.000
|
$460.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
1.000
|
$20,000.000
|
$66,384.980
|
$54,500.000
|
$66,000.000
|
$62,675.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
1.000
|
$1,000.000
|
$609.040
|
$541.000
|
$530.000
|
$575.000
|
|
|
IN RD IL (TY ST) 40T-8 (250W EQ) LED
|
EA
|
3.000
|
$6,500.000
|
$7,917.470
|
$4,432.000
|
$6,800.000
|
$7,475.000
|
|
|
IN RD IL (TY ST) 50T-8 (400W EQ) LED
|
EA
|
7.000
|
$7,500.000
|
$8,526.510
|
$5,356.000
|
$7,400.000
|
$8,050.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,960.000
|
$10.000
|
$14.620
|
$14.120
|
$12.650
|
$13.800
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
65.000
|
$45.000
|
$60.900
|
$25.680
|
$52.800
|
$57.500
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
2,135.000
|
$1.500
|
$2.440
|
$1.260
|
$2.100
|
$2.300
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
4,270.000
|
$1.650
|
$3.050
|
$1.510
|
$2.650
|
$2.880
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
2.000
|
$1,320.000
|
$2,009.820
|
$1,158.000
|
$1,740.000
|
$1,897.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
151.000
|
$750.000
|
$834.380
|
$700.000
|
$950.000
|
$805.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
65.000
|
$900.000
|
$964.710
|
$820.000
|
$1,100.000
|
$943.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
9.000
|
$1,000.000
|
$1,431.240
|
$1,080.000
|
$1,350.000
|
$1,242.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
35.000
|
$100.000
|
$182.710
|
$100.000
|
$105.500
|
$115.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
62.000
|
$25.000
|
$41.410
|
$34.000
|
$19.000
|
$39.100
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
199.000
|
$25.000
|
$48.720
|
$5.000
|
$10.550
|
$28.750
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
71.000
|
$35.000
|
$51.160
|
$42.000
|
$49.600
|
$48.300
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
226.000
|
$150.000
|
$151.040
|
$150.000
|
$160.000
|
$172.500
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
111.000
|
$150.000
|
$151.040
|
$150.000
|
$160.000
|
$172.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
4,384.000
|
$1.000
|
$0.550
|
$0.260
|
$0.270
|
$0.530
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
115,620.000
|
$1.000
|
$0.430
|
$0.260
|
$0.270
|
$0.400
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,942.000
|
$1.000
|
$2.440
|
$1.000
|
$1.250
|
$1.980
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
5,788.000
|
$1.000
|
$2.440
|
$1.000
|
$1.300
|
$1.980
|
|
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
|
LF
|
2,038.000
|
$0.600
|
$2.010
|
$0.550
|
$0.580
|
$1.930
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
12.000
|
$200.000
|
$200.980
|
$400.000
|
$422.140
|
$193.140
|
|
|
D-GR HMA TY-B PG64-28
|
TON
|
15,390.000
|
$108.000
|
$107.160
|
$135.000
|
$126.000
|
$137.050
|
|
|
SP MIXES SP-D SAC-A PG70-28
|
TON
|
40,575.000
|
$117.000
|
$128.320
|
$138.000
|
$125.500
|
$145.870
|
|
|
TACK COAT
|
GAL
|
11,466.000
|
$5.000
|
$4.570
|
$4.000
|
$3.800
|
$6.740
|
|
|
UNDERSEAL COURSE
|
GAL
|
72,653.000
|
$4.250
|
$3.000
|
$3.250
|
$3.000
|
$3.360
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$25,226.070
|
$15,500.000
|
$20,400.000
|
$30,525.710
|
|
|
HPPM W/RET REQ TY I(W)4"(BRK)(090MIL)
|
LF
|
8,323.000
|
$0.500
|
$0.710
|
$0.500
|
$0.550
|
$0.680
|
|
|
HPPM W/RET REQ TY I(W)4"(SLD)(090MIL)
|
LF
|
134,136.000
|
$0.500
|
$0.680
|
$0.480
|
$0.500
|
$0.640
|
|
|
HPPM W/RET REQ TY I(Y)4"(BRK)(090MIL)
|
LF
|
5,754.000
|
$0.500
|
$0.710
|
$0.500
|
$0.550
|
$0.680
|
|
|
HPPM W/RET REQ TY I(Y)4"(SLD)(090MIL)
|
LF
|
104,147.000
|
$0.500
|
$0.660
|
$0.480
|
$0.500
|
$0.620
|
|
|
TMA (STATIONARY)
|
DAY
|
332.000
|
$400.000
|
$306.580
|
$415.000
|
$525.000
|
$534.950
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
180.000
|
$80.000
|
$95.970
|
$95.000
|
$88.000
|
$96.190
|
|
|
REC REFL PAV MRKR TY I-C
|
EA
|
528.000
|
$3.000
|
$38.980
|
$55.000
|
$58.000
|
$37.460
|
|
|
REC REFL PAV MRKR TY II-A-A
|
EA
|
1,596.000
|
$3.000
|
$39.360
|
$55.000
|
$58.000
|
$37.460
|
|
Totals: |
$16,783,145.450
|
$18,084,714.165
|
$18,319,094.730
|
$19,280,386.900
|
$21,561,020.034
|