BAILEY US 70 (0052-02-036)

Items: 98

County: BAILEY
Length: N/A
Highway: US 70
District: LUBBOCK
Control Number: 0052-02-036
DBE Goal: N/A
Project: F 2022(025)
Guaranty: N/A
Time: 222 WORKING DAYS
Engineer's Estimate: $17,626,686.22
Date: 09/01/2021 (4 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$17,626,686.22
$18,113,895.52
Over/Under Est: 2.76% $487,209.30
$19,241,383.51
Over/Under Est: 9.16% $1,614,697.29
Amt Left: 6.22% $1,127,487.99
Over/Under Est: 21.32% $3,758,262.97
Amt Left: 18.06% $3,271,053.67
Delta: -11.14% -$2,143,565.68
$23,677,545.73
Over/Under Est: 34.33% $6,050,859.51
Amt Left: 30.71% $5,563,650.21
Delta: -10.72% -$2,292,596.54

Bid Items & Bid Tabulations

98 Total 0 of 98
BAILEY  |  US 70  |  LUBBOCK  |  0052-02-036  |  09/01/2021  |  $17,626,686.22  |  F 2022(025)  |  SURF/ROADWAY RESTOR  |  222 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DUININCK, INC.
RK HALL, LLC
KIEWIT INFRASTRUCTURE SOUTH CO.
J. LEE MILLIGAN, INC.
REMOVING CONC (RIPRAP)
SY 79.500 $25.000 $51.500 $45.000 $68.450 $35.000
REMOVING CONC (FOUNDATIONS)
CY 35.140 $500.000 $840.000 $700.000 $997.280 $110.000
REMOVING CONC (DRIVEWAYS)
SY 73.000 $25.000 $30.500 $50.000 $102.210 $35.000
REMOVE CONC (RAIL)
LF 150.000 $40.000 $49.500 $110.000 $126.730 $35.000
RMV TRT & UNTRT BASE & ASPH PV(10"-15")
SY 13,128.000 $8.000 $4.000 $7.470 $11.660 $12.000
OBLITERATING ABANDONED ROAD
STA 7.000 $2,000.000 $3,400.000 $2,120.000 $4,930.810 $1,600.000
SUBGRADE WIDENING (DENS CONT)
STA 223.750 $745.000 $425.000 $790.000 $850.800 $1,400.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 4,556.400 $15.000 $28.000 $33.000 $35.930 $22.000
BACKFILL (TY B)
STA 987.030 $180.000 $125.000 $160.000 $73.420 $135.000
BLADING
STA 987.030 $100.000 $40.500 $160.000 $170.580 $145.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 67.250 $500.000 $460.000 $452.190 $521.410 $540.000
PRIME COAT (MC-30)
GAL 4,232.000 $6.000 $4.000 $6.000 $6.260 $5.250
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 42,311.000 $4.000 $3.600 $3.700 $3.760 $4.000
FOG SEAL (CSS-1H)
GAL 9,563.000 $4.000 $3.700 $4.000 $3.510 $4.200
ASPH (AC-20-5TR)
GAL 16,978.000 $4.000 $3.500 $3.500 $3.850 $4.000
AGGR(TY-PB GR-4 SAC-B)
CY 385.000 $100.000 $185.000 $285.000 $209.210 $145.000
STONE-MTRX-ASPH SMA-D SAC-A PG70-28
TON 40,472.800 $125.000 $135.500 $148.030 $130.000 $165.000
TACK COAT
GAL 3,400.000 $3.500 $2.700 $8.610 $3.180 $3.700
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 33,800.000 $40.000 $32.000 $33.000 $39.910 $47.000
PLANE ASPH CONC PAV(0" TO 2")
SY 422,436.890 $1.700 $1.300 $1.170 $1.080 $1.600
CEM STABIL BKFL
CY 2.400 $500.000 $1,000.000 $1,106.830 $1,179.650 $1,220.000
CL C CONC (RAIL FOUNDATION)
CY 16.100 $2,000.000 $1,500.000 $2,767.060 $2,949.130 $3,050.000
CL C CONC (RAC-R)
CY 20.900 $2,500.000 $1,400.000 $2,213.650 $2,359.310 $2,450.000
CL C CONC (CULV)(EXTEND)
CY 63.050 $1,200.000 $2,600.000 $2,767.060 $2,949.130 $3,050.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 100.000 $150.000 $260.000 $267.320 $364.510 $225.000
RIPRAP (CONC) (CL A )
CY 38.700 $700.000 $780.000 $830.120 $884.740 $915.000
RAIL (TY T223)
LF 150.500 $175.000 $235.000 $387.390 $412.880 $430.000
CMP (GAL STL 24 IN)
LF 112.900 $200.000 $130.000 $138.350 $147.460 $155.000
RC PIPE (CL IV)(24 IN)
LF 252.000 $200.000 $145.000 $152.740 $162.790 $170.000
INLET (COMPL) (DROP) (SPL)
EA 2.000 $8,000.000 $11,000.000 $11,621.660 $12,386.350 $12,800.000
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
EA 1.000 $7,000.000 $8,800.000 $9,408.010 $10,027.050 $10,400.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 1.000 $8,500.000 $11,000.000 $11,843.020 $12,622.280 $13,000.000
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
EA 1.000 $10,000.000 $8,300.000 $8,854.590 $9,437.220 $9,750.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 10.000 $1,500.000 $2,100.000 $2,213.650 $2,359.310 $2,450.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 5.000 $1,500.000 $2,300.000 $2,435.010 $2,595.240 $2,700.000
CLEAN EXIST CULVERTS
EA 25.000 $2,000.000 $2,600.000 $1,748.370 $1,288.930 $210.000
MOBILIZATION
LS 1.000 $1,600,000.000 $1,230,000.000 $1,000,000.000 $3,101,283.490 $2,360,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $8,000.000 $15,000.000 $10,000.000 $40,000.000 $40,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 111.110 $40.000 $31.000 $25.920 $35.390 $60.000
CONSTRUCTION EXITS (REMOVE)
SY 111.110 $10.000 $8.300 $8.640 $11.800 $15.000
SANDBAGS FOR EROSION CONTROL
EA 1,980.000 $10.000 $10.500 $9.790 $11.800 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 800.000 $5.000 $3.650 $3.630 $4.130 $6.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 400.000 $2.000 $1.050 $0.860 $1.180 $3.450
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 3,450.000 $8.000 $4.800 $6.620 $5.460 $8.000
DRIVEWAYS (CONC)
SY 73.000 $100.000 $175.000 $188.160 $200.540 $100.000
DRIVEWAYS (ACP)
SY 4,591.000 $40.000 $71.500 $25.000 $48.370 $50.000
RUMBLE STRIPS (SHOULDER)
LF 136,313.000 $0.200 $0.080 $0.190 $0.140 $0.200
MTL W-BEAM GD FEN (STEEL POST)
LF 300.000 $30.000 $39.500 $42.600 $45.120 $46.650
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,500.000 $2,900.000 $3,301.500 $3,332.520 $3,450.000
REMOVE METAL BEAM GUARD FENCE
LF 275.000 $5.000 $1.600 $10.650 $1.830 $1.900
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $500.000 $200.000 $532.500 $230.030 $240.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,500.000 $3,900.000 $3,993.750 $4,394.210 $4,540.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $500.000 $215.000 $532.500 $241.830 $250.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 16.000 $200.000 $190.000 $197.030 $218.240 $200.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 70.000 $500.000 $545.000 $559.130 $619.320 $455.000
RELOCATE SM RD SN SUP&AM TY S80
EA 138.000 $530.000 $625.000 $639.000 $707.790 $545.000
REMOVE SM RD SN SUP&AM
EA 24.000 $100.000 $105.000 $106.500 $117.970 $140.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 127.000 $20.000 $31.000 $31.950 $35.390 $82.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 8.000 $35.000 $13.000 $41.540 $31.560 $32.500
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF
EA 6.000 $155.000 $105.000 $106.500 $117.970 $120.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 48.000 $155.000 $105.000 $106.500 $117.970 $83.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 67.000 $70.000 $105.000 $106.500 $117.970 $83.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 26,310.000 $0.250 $0.120 $0.130 $0.140 $0.150
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 218,096.000 $0.250 $0.110 $0.120 $0.130 $0.130
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 16,340.000 $0.600 $0.250 $0.260 $0.280 $0.300
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 530.000 $0.250 $0.120 $0.130 $0.140 $0.150
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 222,066.000 $0.250 $0.110 $0.120 $0.130 $0.130
WK ZN PAV MRK REMOV (REFL) TY I-A
EA 5,606.000 $4.000 $3.650 $3.730 $4.130 $4.300
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 5,606.000 $4.000 $3.650 $3.730 $4.130 $4.300
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 16,818.000 $3.000 $2.600 $2.660 $2.950 $3.050
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 16,818.000 $3.000 $2.600 $2.660 $2.950 $3.050
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 482.000 $1.500 $1.050 $2.000 $2.360 $1.250
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 340.000 $1.500 $1.050 $2.000 $2.360 $1.300
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 16,221.000 $1.000 $0.850 $0.870 $0.970 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 100,328.000 $0.500 $0.450 $0.460 $0.510 $0.550
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 26,400.000 $0.700 $0.670 $0.690 $0.770 $0.800
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 1,160.000 $0.500 $1.050 $1.070 $1.180 $1.250
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 105,920.000 $0.500 $0.450 $0.460 $0.510 $0.550
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 760.000 $15.000 $16.500 $17.040 $18.870 $19.490
PREFAB PAV MRK TY C (W) (ARROW)
EA 106.000 $250.000 $260.000 $266.250 $294.910 $305.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 396.000 $35.000 $36.500 $37.280 $41.290 $43.000
REFL PAV MRKR TY I-C
EA 68.000 $3.500 $4.150 $4.260 $4.720 $5.000
REFL PAV MRKR TY II-A-A
EA 172.000 $3.500 $4.150 $4.260 $4.720 $5.000
REFL PAV MRKR TY II-C-R
EA 2,120.000 $3.500 $3.200 $3.300 $3.660 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 162,868.000 $0.500 $0.780 $0.800 $1.180 $0.550
ELIM EXT PAV MRK & MRKS (8")
LF 1,280.000 $1.000 $1.050 $1.070 $1.180 $1.250
FULL - WIDTH MOWING
AC 351.660 $150.000 $41.500 $104.280 $57.250 $75.230
LITTER REMOVAL
AC 351.660 $100.000 $41.500 $44.330 $59.450 $110.000
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
SY 342,989.910 $6.000 $6.000 $6.150 $6.850 $7.100
ASPH FOR REINF FAB (AC-20-5TR)
GAL 68,598.000 $3.000 $3.000 $3.880 $4.540 $4.000
D-GR HMA TY-B PG70-28
TON 7,301.940 $90.000 $145.000 $131.810 $125.000 $145.000
D-GR HMA TY-C SAC-A PG70-28
TON 10,996.760 $95.000 $110.000 $124.280 $110.000 $146.000
D-GR HMA TY-D PG70-28
TON 19,934.200 $95.000 $110.000 $122.100 $120.000 $147.000
TACK COAT
GAL 73,539.000 $3.500 $2.700 $4.000 $3.180 $4.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 240.000 $125.000 $105.000 $185.000 $211.220 $100.000
TMA (STATIONARY)
DAY 444.000 $200.000 $235.000 $450.000 $297.400 $450.000
TMA (MOBILE OPERATION)
DAY 30.000 $200.000 $105.000 $615.000 $873.470 $850.000
TEMP SPEED MONITOR SYS
EA 1.000 $12,000.000 $11,000.000 $25,000.000 $11,659.330 $12,500.000
Totals: $17,626,686.223 $18,113,895.535 $19,241,383.578 $21,384,949.277 $23,677,545.737