REEVES US 285 (0139-05-043)

Items: 86

County: REEVES
Length: N/A
Highway: US 285
District: ODESSA
Control Number: 0139-05-043
DBE Goal: N/A
Project: STP 2019(387)
Guaranty: N/A
Time: 344 WORKING DAYS
Engineer's Estimate: $23,840,072.23
Date: 01/09/2019 (7 years ago)
Contract Number: N/A
Type: ROADWAY REHABILITATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$23,840,072.23
$18,885,090.96
Over/Under Est: -20.78% -$4,954,981.27
Over/Under Est: -9.5% -$2,264,627.16
Amt Left: 14.25% $2,690,354.11
Over/Under Est: 2.9% $690,994.29
Amt Left: 29.9% $5,645,975.56
Delta: -13.70% -$2,955,621.45
Over/Under Est: 9.58% $2,284,717.28
Amt Left: 38.34% $7,239,698.55
Delta: -6.50% -$1,593,722.99

Bid Items & Bid Tabulations

86 Total 0 of 86
REEVES  |  US 285  |  ODESSA  |  0139-05-043  |  01/09/2019  |  $23,840,072.23  |  STP 2019(387)  |  ROADWAY REHAB  |  344 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FNF CONSTRUCTION, INC.
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
KIEWIT INFRASTRUCTURE SOUTH CO.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
PREPARING ROW
STA 564.000 $602.710 $130.000 $200.000 $125.000 $451.290
REMOVING CONC (DRIVEWAYS)
SY 2,480.000 $23.500 $15.500 $15.000 $14.070 $17.500
REMOVING CONC (HEADWALL)
CY 48.000 $258.000 $300.000 $200.000 $100.000 $517.160
REMOV STAB BASE AND ASPH PAV (10"-18")
SY 5,382.000 $18.000 $8.000 $5.000 $10.230 $12.590
RMV STAB BASE & ASPH PV (17")
SY 3,114.000 $7.000 $9.500 $6.000 $11.830 $10.880
REMOVE TRT BASE AND ASPH (7.5")
SY 8,116.000 $5.310 $5.500 $4.000 $7.370 $4.910
EXCAVATION (CHANNEL)
CY 190.000 $12.000 $8.000 $40.000 $24.090 $35.310
SUBGRADE WIDENING (DENS CONT)
STA 564.000 $595.000 $690.000 $470.000 $339.700 $866.280
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 404.000 $25.000 $3.000 $16.000 $38.010 $19.840
BACKFILL (TY B)
STA 564.000 $144.000 $150.000 $72.000 $150.000 $198.400
BLADING
HR 50.000 $255.000 $216.000 $137.000 $300.000 $163.890
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 125,306.000 $0.140 $0.190 $0.130 $0.260 $0.160
PROOF ROLLING
HR 30.000 $180.000 $103.000 $72.500 $201.060 $80.720
FL BS (CMP IN PLACE)(TY A GR 4)(9")
SY 151,340.000 $14.000 $13.800 $13.000 $14.180 $16.560
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 259,898.000 $1.300 $1.500 $1.400 $0.820 $2.140
PRIME COAT (CSS-1H)
GAL 17,533.000 $4.950 $4.400 $2.900 $4.020 $3.860
PRIME COAT (MC-30)
GAL 69,284.000 $3.400 $5.000 $3.900 $4.100 $4.570
ASPH (AC-20XP)
GAL 41,234.000 $3.960 $3.500 $3.500 $4.030 $4.120
ASPH (AC-20-5TR)
GAL 155,225.000 $3.240 $3.500 $3.500 $4.030 $3.990
AGGR(TY-PB GR-4 SAC-B)
CY 3,397.000 $125.000 $98.000 $120.000 $120.250 $140.600
SUPERPAVE MIXTURES SP-B PG70-22
TON 116,268.000 $94.960 $66.000 $88.000 $101.730 $109.450
SUPERPAVE MIXTURES SP-D SAC-A PG70-22
TON 28,875.000 $119.000 $80.000 $100.000 $121.300 $118.220
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 500.000 $36.950 $60.000 $42.000 $61.210 $90.290
PLANE ASPH CONC PAV (2 1/2")
SY 246,935.000 $1.900 $1.500 $1.200 $1.610 $1.570
CEM STABIL BKFL
CY 227.000 $277.000 $176.000 $150.000 $300.160 $185.890
RIPRAP (MOW STRIP)(4 IN)
CY 44.000 $600.000 $888.000 $500.000 $840.230 $852.060
CMP (GAL STL 18 IN)
LF 614.000 $77.000 $106.000 $57.000 $103.620 $56.990
CMP (GAL STL 24 IN)
LF 111.000 $411.000 $120.000 $70.000 $89.460 $68.160
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 54.000 $1,290.000 $900.000 $669.000 $501.730 $520.960
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 54.000 $347.000 $850.000 $700.000 $845.760 $583.460
CONC BOX CULV (7 FT X 4 FT)(EXTEND)
LF 161.000 $413.000 $1,100.000 $750.000 $601.830 $730.810
RC PIPE (CL III)(18 IN)
LF 141.000 $87.300 $130.000 $60.000 $254.670 $90.080
RC PIPE (CL III)(24 IN)
LF 226.000 $261.800 $143.000 $80.000 $405.920 $96.230
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (C)
EA 2.000 $11,450.000 $5,000.000 $7,000.000 $2,312.570 $8,955.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
EA 6.000 $8,250.000 $4,000.000 $8,000.000 $4,269.160 $9,955.000
SET (TY I)(S= 7 FT)(HW= 5 FT)(6:1) (C)
EA 14.000 $7,500.000 $8,600.000 $12,500.000 $9,817.840 $10,830.000
SET (TY II) (18 IN) (CMP) (6: 1) (C)
EA 20.000 $1,705.000 $1,825.000 $2,200.000 $320.040 $1,065.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 10.000 $1,312.500 $1,800.000 $3,500.000 $2,892.980 $1,128.000
SET (TY II) (24 IN) (CMP) (6: 1) (C)
EA 4.000 $2,000.000 $2,100.000 $2,400.000 $1,640.370 $1,428.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 26.000 $1,564.500 $2,200.000 $4,400.000 $3,317.530 $1,252.000
REMOV STR (SET)
EA 82.000 $297.000 $570.000 $1,800.000 $173.190 $245.000
REMOV STR (PIPE)
LF 12.000 $112.000 $35.000 $90.000 $173.190 $40.690
MOBILIZATION
LS 1.000 $1,944,971.000 $1,881,000.000 $1,913,441.790 $2,219,800.000 $1,768,100.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $15,000.000 $5,000.000 $10,000.000 $19,221.240 $9,325.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 4,340.000 $8.750 $4.990 $4.000 $6.620 $6.620
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,340.000 $1.720 $1.000 $1.000 $2.060 $1.370
DRIVEWAYS (ACP)
SY 5,000.000 $72.900 $55.000 $39.000 $34.810 $58.000
DRIVEWAYS (CONC) (HES)
SY 2,480.000 $97.350 $82.000 $65.000 $95.890 $118.750
RUMBLE STRIPS (SHOULDER)
LF 220,403.000 $0.130 $0.130 $0.090 $0.090 $0.110
RUMBLE STRIPS (CENTERLINE)
LF 110,202.000 $0.160 $0.140 $0.090 $0.090 $0.120
MTL W-BEAM GD FEN (STEEL POST)
LF 350.000 $27.500 $37.000 $37.000 $34.520 $32.980
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,500.000 $3,000.000 $3,000.000 $2,871.280 $2,695.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,320.000 $1,600.000 $1,605.000 $1,625.250 $1,487.000
MTL BM GD FEN TRANS (NON - SYM)
EA 2.000 $880.000 $1,550.000 $1,544.000 $1,571.080 $1,435.000
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $4.100 $5.000 $5.000 $5.150 $4.550
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $249.620 $475.000 $500.000 $514.660 $455.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,700.000 $3,700.000 $3,681.000 $3,575.550 $3,325.000
ALUMINUM SIGNS (TY A)
SF 798.000 $25.750 $23.000 $21.000 $22.750 $31.670
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 24.000 $721.500 $900.000 $575.000 $623.010 $930.920
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 26.000 $804.000 $950.000 $645.000 $698.860 $1,007.200
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $1,082.000 $1,150.000 $760.000 $823.460 $1,132.180
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $1,112.000 $1,250.000 $920.000 $996.820 $1,295.000
REMOVE SM RD SN SUP&AM
EA 44.000 $110.000 $92.000 $125.000 $135.440 $131.330
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 16.000 $38.500 $26.000 $100.000 $41.990 $38.420
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 4.000 $71.500 $92.000 $90.000 $97.520 $171.430
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 224,252.000 $0.130 $0.150 $0.150 $0.160 $0.180
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 108.000 $0.290 $1.100 $1.090 $1.080 $1.610
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 224,252.000 $0.140 $0.150 $0.150 $0.160 $0.180
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 5,609.000 $1.870 $1.800 $0.850 $1.080 $1.300
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 1,055.000 $1.830 $1.250 $1.310 $1.300 $0.570
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,140.000 $0.740 $0.800 $0.820 $0.810 $0.920
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 146.000 $3.400 $13.250 $14.230 $14.090 $11.450
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 16.000 $198.000 $153.000 $164.230 $162.530 $148.670
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 16.000 $242.000 $224.000 $240.870 $238.370 $201.170
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 16.000 $14.760 $16.000 $16.420 $16.250 $30.020
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 250.000 $2.500 $2.600 $2.740 $2.710 $5.810
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 34,784.000 $0.310 $0.400 $0.370 $0.400 $0.460
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 113,857.000 $0.340 $0.400 $0.370 $0.380 $0.450
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 21,286.000 $0.350 $0.400 $0.370 $0.420 $0.470
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 77,107.000 $0.330 $0.400 $0.370 $0.380 $0.460
REFL PAV MRKR TY I-C
EA 197.000 $3.600 $5.100 $5.470 $5.420 $3.860
REFL PAV MRKR TY II-A-A
EA 1,172.000 $3.300 $3.100 $3.280 $3.250 $3.270
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 344.000 $75.000 $33.000 $150.000 $70.430 $79.700
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $8,900.000 $8,000.000 $6,500.000 $10,835.000 $13,850.000
TMA (STATIONARY)
EA 2.000 $5,000.000 $70,000.000 $8,700.000 $13,002.000 $19,310.000
TMA (MOBILE OPERATION)
HR 480.000 $50.000 $50.000 $77.000 $102.930 $97.300
Totals: $23,840,072.230 $18,885,090.960 $21,575,445.070 $24,531,066.520 $26,124,789.510