DALLAM US 87 (0040-01-050)

Items: 36

County: DALLAM
Length: N/A
Highway: US 87
District: AMARILLO
Control Number: 0040-01-050
DBE Goal: N/A
Project: STP 1802(176)HES
Guaranty: N/A
Time: 120 WORKING DAYS
Engineer's Estimate: $11,386,917.70
Date: 05/02/2018 (8 years ago)
Contract Number: N/A
Type: OVERLAY,PVMT REPAIR,MBGF,RUMBLE STRIPS,STRIPING
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$11,386,917.70
$10,092,335.71
Over/Under Est: -11.37% -$1,294,581.99
$10,649,914.62
Over/Under Est: -6.47% -$737,003.08
Amt Left: 5.52% $557,578.91
$10,709,663.64
Over/Under Est: -5.95% -$677,254.06
Amt Left: 6.12% $617,327.93
Delta: -0.56% -$59,749.02
$10,859,704.47
Over/Under Est: -4.63% -$527,213.23
Amt Left: 7.6% $767,368.76
Delta: -1.40% -$150,040.83
Over/Under Est: 9.31% $1,060,068.45
Amt Left: 23.33% $2,354,650.44
Delta: -14.62% -$1,587,281.68
$12,619,180.93
Over/Under Est: 10.82% $1,232,263.23
Amt Left: 25.04% $2,526,845.22
Delta: -1.38% -$172,194.78

Bid Items & Bid Tabulations

36 Total 0 of 36
DALLAM  |  US 87  |  AMARILLO  |  0040-01-050  |  05/02/2018  |  $11,386,917.70  |  STP 1802(176)HES  |  OVERLAY,PVMT REPAIR,MBGF,RUMBLE STRI...  |  120 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KIEWIT INFRASTRUCTURE SOUTH CO.
RK HALL, LLC
DUININCK, INC.
J. LEE MILLIGAN, INC.
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
GILVIN-TERRILL, LTD.
PREPARING ROW
AC 41.330 $300.000 $250.000 $180.720 $120.000 $115.000 $500.000 $300.000
BACKFILL (TY A)
STA 1,715.950 $200.000 $150.000 $156.210 $155.000 $158.500 $126.000 $155.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 42.000 $800.000 $625.000 $563.070 $650.000 $630.000 $550.000 $300.000
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 42.000 $800.000 $550.000 $476.950 $300.000 $410.000 $450.000 $300.000
EMULS ASPH (EROSN CONT)(MULTI)
GAL 12,505.000 $3.000 $3.500 $3.230 $3.250 $3.200 $3.850 $3.000
SUPERPAVE MIXTURES SP-C SAC-A PG70-28
TON 98,022.000 $87.000 $73.000 $87.110 $82.500 $82.400 $92.000 $92.000
PLANE ASPH CONC PAV(0" TO 2")
SY 15,809.000 $5.000 $2.000 $1.450 $1.650 $1.350 $3.000 $3.000
PLANE ASPH CONC PAV(0" TO 3")
SY 5,070.000 $5.000 $3.500 $4.460 $4.850 $3.850 $3.000 $5.000
PLANE ASPH CONC PAV (3")
SY 20,697.000 $5.000 $1.500 $1.950 $3.200 $2.250 $3.000 $4.000
MULTI-LAYER POLYMER OVERLAY
SY 1,260.000 $45.000 $112.000 $93.810 $120.000 $93.250 $100.000 $74.000
MOBILIZATION
LS 1.000 $950,000.000 $974,048.000 $367,000.000 $580,000.000 $978,750.000 $1,200,000.000 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $12,000.000 $30,000.000 $5,482.270 $18,500.000 $15,955.000 $7,500.000 $27,000.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 352,554.000 $0.200 $0.110 $0.110 $0.100 $0.110 $0.100 $0.100
MTL W-BEAM GD FEN (STEEL POST)
LF 850.000 $25.000 $27.220 $25.440 $24.500 $28.450 $29.000 $24.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,500.000 $1,803.060 $1,685.400 $1,900.000 $2,320.000 $2,000.000 $1,590.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $3.000 $2.270 $2.120 $2.050 $4.200 $5.000 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $125.000 $170.100 $159.000 $150.000 $425.000 $575.000 $150.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 6.000 $325.000 $204.120 $190.800 $185.000 $425.000 $575.000 $180.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,500.000 $2,438.100 $2,279.000 $2,200.000 $3,160.000 $2,700.000 $2,150.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $250.000 $226.800 $212.000 $205.000 $425.000 $500.000 $200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 19.000 $1,000.000 $1,020.600 $954.000 $915.000 $950.000 $1,000.000 $450.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 8.000 $1,000.000 $1,247.400 $1,166.000 $1,100.000 $1,160.000 $1,000.000 $675.000
REMOVE SM RD SN SUP&AM
EA 27.000 $250.000 $141.750 $132.500 $125.000 $132.000 $150.000 $35.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 14.000 $40.000 $22.680 $21.200 $20.500 $52.650 $55.000 $40.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 14.000 $25.000 $23.810 $22.260 $21.500 $52.650 $55.000 $40.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 14,598.000 $1.000 $2.270 $0.830 $1.000 $1.100 $1.000 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,400.000 $1.000 $2.270 $0.830 $1.000 $1.150 $1.000 $1.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 14,925.000 $1.200 $0.700 $0.910 $0.630 $0.650 $1.000 $1.000
REF PAV MRK TY I(W)18"(YLD TRI)(090MIL)
EA 1,012.000 $30.000 $51.030 $0.270 $45.500 $47.400 $30.000 $45.000
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 63,747.000 $0.350 $0.350 $0.380 $0.320 $0.330 $0.400 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 188,724.000 $0.350 $0.350 $0.380 $0.320 $0.330 $0.400 $0.310
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 5,327.000 $0.350 $0.350 $0.380 $0.320 $0.330 $0.400 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 183,064.000 $0.350 $0.350 $0.380 $0.320 $0.330 $0.400 $0.310
UNDERSEAL COURSE
GAL 211,944.000 $3.050 $3.120 $3.490 $4.200 $3.200 $5.500 $6.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $20,000.000 $4,618.870 $9,100.000 $13,000.000 $10,000.000 $22,500.000
TMA (STATIONARY)
EA 2.000 $15,000.000 $20,000.000 $38,168.310 $15,000.000 $22,750.000 $20,000.000 $50,500.000
Totals: $11,386,917.700 $10,092,335.710 $10,649,914.637 $10,709,663.640 $10,859,704.475 $12,446,986.150 $12,619,180.930