|
|
|
REMOV CONC (RIPRAP)
|
SY
|
300.000
|
$30.000
|
$45.000
|
$21.460
|
$24.000
|
$50.000
|
$30.000
|
$84.440
|
|
|
|
REMOV CONC (CURB)
|
LF
|
334.000
|
$20.000
|
$16.000
|
$4.810
|
$25.000
|
$15.000
|
$10.000
|
$16.590
|
|
|
|
REMOV CONC (FLUME)
|
SY
|
35.000
|
$50.000
|
$47.000
|
$22.430
|
$35.000
|
$50.000
|
$85.000
|
$144.460
|
|
|
|
RMV (0"-7") TRT/UNTRT BASE & ASPH PAV
|
SY
|
2,764.000
|
$8.000
|
$5.650
|
$12.310
|
$18.000
|
$10.000
|
$6.000
|
$11.890
|
|
|
|
RMV (8"-19") TRT/UNTRT BASE & ASPH PAV
|
SY
|
5,009.000
|
$20.000
|
$7.550
|
$5.920
|
$15.000
|
$15.000
|
$18.000
|
$11.410
|
|
|
|
EXCAV (ROADWAY)
|
CY
|
79,600.000
|
$13.000
|
$14.000
|
$10.350
|
$16.000
|
$16.000
|
$31.500
|
$18.060
|
|
|
|
EMBANK (FNL)(DC)(TY B)
|
CY
|
14,019.000
|
$18.000
|
$11.900
|
$6.150
|
$8.000
|
$16.000
|
$50.000
|
$27.060
|
|
|
|
BLADING
|
HR
|
127.000
|
$275.000
|
$375.000
|
$529.180
|
$200.000
|
$150.000
|
$270.000
|
$450.000
|
|
|
|
DRILL SEED (PERM_RURAL_SAND)
|
SY
|
368,824.000
|
$0.300
|
$0.130
|
$0.130
|
$0.220
|
$0.120
|
$0.150
|
$0.380
|
|
|
|
PROOF ROLLING
|
HR
|
252.000
|
$125.000
|
$150.000
|
$172.140
|
$200.000
|
$75.000
|
$100.000
|
$237.220
|
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
5,162.000
|
$30.000
|
$19.500
|
$18.030
|
$12.000
|
$15.000
|
$16.000
|
$22.740
|
|
|
|
FL BS (CMP IN PLC)(TY A GR 4)(5")
|
SY
|
179,731.000
|
$15.000
|
$6.420
|
$8.810
|
$10.000
|
$10.000
|
$7.750
|
$9.620
|
|
|
|
PRIME COAT (AE-P)
|
GAL
|
65,090.000
|
$5.000
|
$4.700
|
$0.340
|
$4.750
|
$5.000
|
$7.000
|
$6.770
|
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
59,244.000
|
$5.000
|
$3.870
|
$3.790
|
$4.750
|
$3.750
|
$3.450
|
$3.620
|
|
|
|
ASPH (CRS-2P)
|
GAL
|
59,244.000
|
$5.000
|
$4.900
|
$3.990
|
$4.750
|
$3.750
|
$3.600
|
$3.790
|
|
|
|
AGGR (TY-PB, GR-4)(SAC-B)
|
CY
|
2,855.000
|
$150.000
|
$124.000
|
$133.640
|
$200.000
|
$140.000
|
$160.000
|
$123.950
|
|
|
|
D-GR HMA TY-C SAC-B PG70-22
|
TON
|
1,120.000
|
$220.000
|
$150.000
|
$178.280
|
$215.000
|
$150.000
|
$180.000
|
$349.960
|
|
|
|
TACK COAT
|
GAL
|
502.000
|
$15.000
|
$8.760
|
$2.390
|
$4.750
|
$4.000
|
$13.000
|
$3.920
|
|
|
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
86,840.000
|
$105.000
|
$85.390
|
$112.650
|
$112.000
|
$115.000
|
$107.000
|
$104.940
|
|
|
|
TACK COAT
|
GAL
|
30,984.000
|
$5.000
|
$4.290
|
$2.390
|
$4.750
|
$4.000
|
$7.000
|
$3.920
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
28,131.000
|
$55.000
|
$41.500
|
$42.430
|
$60.000
|
$50.000
|
$30.000
|
$64.530
|
|
|
|
PLAN & TEXT CONC PAV(0" TO 1.5")
|
SY
|
137,871.000
|
$3.000
|
$1.050
|
$0.670
|
$2.850
|
$2.000
|
$1.500
|
$1.820
|
|
|
|
CUT & RESTORING PAV
|
SY
|
874.000
|
$100.000
|
$190.000
|
$78.740
|
$47.000
|
$100.000
|
$175.000
|
$184.310
|
|
|
|
CEM STABIL BKFL
|
CY
|
539.000
|
$415.000
|
$210.000
|
$341.910
|
$200.000
|
$225.000
|
$375.000
|
$256.360
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
10,554.000
|
$35.000
|
$26.250
|
$0.120
|
$22.000
|
$20.000
|
$30.000
|
$25.640
|
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
32.000
|
$540.000
|
$336.000
|
$353.230
|
$315.000
|
$325.000
|
$375.000
|
$358.900
|
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
56.000
|
$450.000
|
$525.000
|
$551.920
|
$584.000
|
$500.000
|
$600.000
|
$640.890
|
|
|
|
CL B CONC (FLUME)
|
CY
|
5.000
|
$1,800.000
|
$945.000
|
$755.830
|
$735.000
|
$1,000.000
|
$1,850.000
|
$897.250
|
|
|
|
CLASS S CONC UTILITY PROTECTION PAD
|
CY
|
243.000
|
$1,000.000
|
$630.000
|
$917.280
|
$668.000
|
$875.000
|
$1,000.000
|
$1,466.100
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
1,083.800
|
$1,500.000
|
$603.750
|
$725.060
|
$656.000
|
$600.000
|
$715.000
|
$822.370
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
52.000
|
$1,000.000
|
$603.750
|
$938.270
|
$735.000
|
$750.000
|
$1,250.000
|
$1,089.510
|
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
136.000
|
$430.000
|
$417.170
|
$361.840
|
$430.500
|
$400.000
|
$1,050.000
|
$528.930
|
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
350.000
|
$700.000
|
$610.520
|
$468.710
|
$700.000
|
$600.000
|
$1,000.000
|
$856.870
|
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
138.000
|
$800.000
|
$636.410
|
$605.070
|
$924.000
|
$800.000
|
$1,175.000
|
$1,133.220
|
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
645.000
|
$900.000
|
$951.560
|
$733.480
|
$1,050.000
|
$1,000.000
|
$1,355.000
|
$1,287.630
|
|
|
|
CONC BOX CULV (10 FT X 6 FT)
|
LF
|
142.000
|
$2,000.000
|
$1,909.220
|
$1,257.720
|
$2,100.000
|
$1,700.000
|
$2,135.000
|
$2,314.850
|
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
200.000
|
$1,500.000
|
$992.670
|
$1,365.530
|
$945.000
|
$850.000
|
$1,550.000
|
$1,207.120
|
|
|
|
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
|
LF
|
494.000
|
$1,600.000
|
$918.070
|
$788.480
|
$998.000
|
$950.000
|
$1,530.000
|
$1,241.350
|
|
|
|
CONC BOX CULV (10 FT X 6 FT)(EXTEND)
|
LF
|
100.000
|
$2,400.000
|
$1,196.690
|
$1,308.500
|
$1,470.000
|
$1,500.000
|
$2,300.000
|
$1,858.880
|
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
2.000
|
$60,000.000
|
$53,432.140
|
$36,365.370
|
$73,500.000
|
$75,000.000
|
$50,000.000
|
$89,724.760
|
|
|
|
SET (TY I)(S= 3 FT)(HW= 3 FT)(4:1)(C)
|
EA
|
4.000
|
$10,000.000
|
$5,930.140
|
$11,580.510
|
$6,825.000
|
$6,500.000
|
$8,000.000
|
$9,613.370
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
7.000
|
$12,000.000
|
$8,856.380
|
$14,508.210
|
$6,983.000
|
$8,500.000
|
$12,000.000
|
$9,613.370
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1)(C)
|
EA
|
3.000
|
$14,000.000
|
$9,386.210
|
$17,885.180
|
$12,075.000
|
$9,000.000
|
$13,000.000
|
$14,740.500
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1)(C)
|
EA
|
8.000
|
$13,000.000
|
$7,614.020
|
$7,197.120
|
$6,825.000
|
$6,500.000
|
$8,000.000
|
$10,061.990
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
28.000
|
$13,500.000
|
$8,929.460
|
$8,902.820
|
$9,240.000
|
$7,500.000
|
$8,100.000
|
$11,279.680
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1)(C)
|
EA
|
12.000
|
$28,000.000
|
$11,073.140
|
$8,412.490
|
$11,550.000
|
$11,000.000
|
$16,000.000
|
$14,099.600
|
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
56.000
|
$18,700.000
|
$9,938.880
|
$6,079.880
|
$7,875.000
|
$7,000.000
|
$10,000.000
|
$9,613.370
|
|
|
|
SET (TY I)(S= 7 FT)(HW= 6 FT)(3:1)(C)
|
EA
|
36.000
|
$40,000.000
|
$10,056.110
|
$6,660.540
|
$13,125.000
|
$10,000.000
|
$12,000.000
|
$16,022.280
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$2,000.000
|
$2,169.560
|
$1,906.190
|
$1,260.000
|
$3,000.000
|
$2,000.000
|
$1,538.140
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
48.000
|
$3,500.000
|
$2,659.810
|
$2,157.040
|
$1,680.000
|
$3,250.000
|
$2,100.000
|
$2,050.850
|
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$5,000.000
|
$7,380.330
|
$4,530.100
|
$4,935.000
|
$5,500.000
|
$5,500.000
|
$6,024.380
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
31.000
|
$3,500.000
|
$2,625.000
|
$164.470
|
$3,675.000
|
$3,000.000
|
$1,645.000
|
$8,972.480
|
|
|
|
REMOV STR (WINGWALL)
|
EA
|
28.000
|
$1,500.000
|
$1,260.000
|
$1,486.610
|
$1,050.000
|
$5,000.000
|
$4,000.000
|
$4,445.490
|
|
|
|
REMOV STR (HEADWALL)
|
EA
|
6.000
|
$1,500.000
|
$1,260.000
|
$1,486.610
|
$525.000
|
$5,000.000
|
$3,500.000
|
$5,839.800
|
|
|
|
REMOV STR (PIPE)
|
LF
|
408.000
|
$200.000
|
$21.000
|
$29.150
|
$16.000
|
$50.000
|
$60.000
|
$31.060
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$4,010,000.000
|
$1,500,000.000
|
$2,712,058.340
|
$3,000,000.000
|
$3,400,000.000
|
$3,706,000.000
|
$4,494,031.140
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$30,000.000
|
$15,000.000
|
$5,705.530
|
$25,000.000
|
$30,000.000
|
$80,000.000
|
$50,000.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$15,000.000
|
$8,250.000
|
$4,842.530
|
$15,000.000
|
$17,000.000
|
$14,560.000
|
$23,449.240
|
|
|
|
TMA (STATIONARY)
|
DAY
|
400.000
|
$200.000
|
$50.000
|
$40.790
|
$170.000
|
$325.000
|
$240.000
|
$570.170
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
50.000
|
$470.000
|
$935.000
|
$575.240
|
$704.000
|
$325.000
|
$670.000
|
$1,101.110
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,600.000
|
$15.000
|
$5.550
|
$0.380
|
$47.000
|
$10.000
|
$45.000
|
$30.120
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,600.000
|
$10.000
|
$3.260
|
$0.380
|
$15.000
|
$5.000
|
$12.000
|
$10.820
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,300.000
|
$10.000
|
$7.650
|
$6.790
|
$6.000
|
$8.000
|
$8.000
|
$7.880
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,300.000
|
$2.000
|
$1.680
|
$1.160
|
$2.000
|
$2.000
|
$1.000
|
$1.350
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
8,400.000
|
$10.000
|
$13.350
|
$7.560
|
$10.000
|
$6.000
|
$9.000
|
$8.780
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
8,400.000
|
$5.000
|
$2.100
|
$1.660
|
$2.000
|
$2.000
|
$1.500
|
$1.920
|
|
|
|
CONSTRUCTING DETOURS
|
SY
|
6,719.000
|
$70.000
|
$51.250
|
$36.110
|
$55.000
|
$50.000
|
$85.000
|
$63.640
|
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
8.000
|
$8,000.000
|
$4,410.000
|
$2,356.460
|
$5,000.000
|
$6,000.000
|
$11,000.000
|
$20,973.460
|
|
|
|
PTB (FUR&INST)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
4,020.000
|
$30.000
|
$33.600
|
$0.450
|
$59.000
|
$40.000
|
$16.000
|
$39.620
|
|
|
|
PTB (MOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
26,970.000
|
$15.000
|
$10.500
|
$0.250
|
$10.000
|
$20.000
|
$10.000
|
$10.810
|
|
|
|
PTB (REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
4,020.000
|
$25.000
|
$27.300
|
$0.510
|
$26.000
|
$25.000
|
$15.000
|
$7.140
|
|
|
|
CONC CURB (TY II)
|
LF
|
334.000
|
$75.000
|
$26.250
|
$58.360
|
$70.000
|
$15.000
|
$40.000
|
$102.540
|
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
97,384.000
|
$0.200
|
$0.190
|
$0.060
|
$0.280
|
$0.200
|
$0.150
|
$0.210
|
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
54,954.000
|
$0.200
|
$0.230
|
$0.060
|
$0.270
|
$0.200
|
$0.200
|
$0.210
|
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
2,175.000
|
$50.000
|
$35.180
|
$36.980
|
$40.000
|
$35.000
|
$40.000
|
$42.940
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,500.000
|
$3,202.500
|
$3,366.730
|
$3,600.000
|
$3,200.000
|
$3,600.000
|
$3,909.440
|
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
175.000
|
$100.000
|
$136.500
|
$143.500
|
$153.000
|
$140.000
|
$150.000
|
$166.630
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,311.000
|
$5.000
|
$5.250
|
$5.520
|
$6.000
|
$5.000
|
$6.000
|
$6.410
|
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$500.000
|
$525.000
|
$551.930
|
$587.000
|
$500.000
|
$600.000
|
$640.890
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$3,500.000
|
$3,412.500
|
$3,587.500
|
$3,818.000
|
$3,250.000
|
$3,750.000
|
$4,165.790
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
14.000
|
$500.000
|
$525.000
|
$551.920
|
$587.000
|
$500.000
|
$600.000
|
$640.890
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
82.000
|
$4,000.000
|
$1,050.000
|
$103.950
|
$2,606.000
|
$1,800.000
|
$485.000
|
$1,012.770
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
10.000
|
$3,000.000
|
$840.000
|
$426.210
|
$3,052.000
|
$1,850.000
|
$370.000
|
$523.060
|
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
10.000
|
$5,500.000
|
$7,875.000
|
$639.310
|
$10,115.000
|
$8,500.000
|
$15,850.000
|
$8,862.740
|
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
6.000
|
$500.000
|
$577.500
|
$607.120
|
$642.000
|
$550.000
|
$625.000
|
$704.980
|
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
7.000
|
$10,000.000
|
$6,510.000
|
$6,843.840
|
$7,232.000
|
$6,500.000
|
$7,500.000
|
$7,947.050
|
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
945.000
|
$20.000
|
$12.600
|
$13.250
|
$14.000
|
$13.000
|
$14.000
|
$15.380
|
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
220.000
|
$50.000
|
$36.750
|
$38.630
|
$41.000
|
$36.000
|
$40.000
|
$44.860
|
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,215.000
|
$3.000
|
$1.840
|
$1.930
|
$2.000
|
$2.000
|
$2.000
|
$2.240
|
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
2,430.000
|
$3.000
|
$2.100
|
$2.210
|
$2.300
|
$2.200
|
$2.500
|
$2.560
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
4.000
|
$3,000.000
|
$1,837.500
|
$1,931.730
|
$2,042.000
|
$1,925.000
|
$2,000.000
|
$2,243.120
|
|
|
|
REMOVE GROUND BOX
|
EA
|
1.000
|
$1,000.000
|
$525.000
|
$551.920
|
$584.000
|
$500.000
|
$575.000
|
$640.890
|
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
266.500
|
$30.000
|
$35.220
|
$37.020
|
$36.000
|
$34.000
|
$40.000
|
$41.020
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
13.000
|
$1,000.000
|
$757.050
|
$795.870
|
$953.000
|
$750.000
|
$800.000
|
$1,089.510
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
47.000
|
$1,100.000
|
$904.050
|
$950.410
|
$1,066.000
|
$900.000
|
$950.000
|
$1,217.690
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
7.000
|
$1,500.000
|
$1,215.900
|
$1,278.250
|
$1,110.000
|
$1,200.000
|
$1,300.000
|
$1,268.960
|
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
1.000
|
$1,800.000
|
$2,040.150
|
$2,144.770
|
$1,795.000
|
$1,950.000
|
$2,250.000
|
$2,050.850
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
40.000
|
$200.000
|
$105.000
|
$88.370
|
$112.000
|
$100.000
|
$175.000
|
$128.180
|
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
1,858.800
|
$5.000
|
$7.770
|
$8.170
|
$10.000
|
$7.500
|
$9.000
|
$11.410
|
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
31.000
|
$45.000
|
$47.250
|
$49.670
|
$53.000
|
$45.000
|
$53.000
|
$57.680
|
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
27.000
|
$100.000
|
$84.000
|
$88.310
|
$95.000
|
$80.000
|
$90.000
|
$108.950
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
40.000
|
$110.000
|
$89.250
|
$93.830
|
$95.000
|
$85.000
|
$92.000
|
$108.950
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
12.000
|
$150.000
|
$89.250
|
$93.830
|
$95.000
|
$85.000
|
$92.000
|
$108.950
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
48.000
|
$30.000
|
$43.500
|
$29.460
|
$22.000
|
$20.000
|
$30.000
|
$25.640
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(LNDP)
|
LF
|
698.000
|
$0.500
|
$2.100
|
$2.210
|
$2.110
|
$0.500
|
$0.400
|
$0.420
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
19,480.000
|
$0.300
|
$0.300
|
$0.320
|
$0.310
|
$0.350
|
$0.200
|
$0.240
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
2,320.000
|
$10.000
|
$0.410
|
$0.430
|
$0.410
|
$0.500
|
$0.450
|
$0.510
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
261,050.000
|
$0.300
|
$0.200
|
$0.210
|
$0.200
|
$0.350
|
$0.200
|
$0.240
|
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
LF
|
132.000
|
$10.000
|
$7.350
|
$7.730
|
$7.390
|
$10.000
|
$4.000
|
$4.490
|
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
3,978.000
|
$7.000
|
$4.730
|
$4.970
|
$4.750
|
$5.000
|
$4.000
|
$4.490
|
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
8,924.000
|
$0.600
|
$0.140
|
$0.140
|
$0.140
|
$1.000
|
$0.250
|
$0.270
|
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
222,990.000
|
$0.600
|
$0.200
|
$0.210
|
$0.200
|
$0.600
|
$0.250
|
$0.240
|
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
192.000
|
$25.000
|
$15.750
|
$16.560
|
$15.850
|
$19.000
|
$18.000
|
$18.590
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,782.000
|
$2.000
|
$2.000
|
$1.630
|
$1.100
|
$1.000
|
$1.250
|
$2.560
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
47,928.000
|
$2.000
|
$2.000
|
$1.640
|
$1.100
|
$1.000
|
$1.250
|
$2.560
|
|
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
1,054.000
|
$1.000
|
$2.100
|
$2.210
|
$2.110
|
$1.000
|
$1.500
|
$1.670
|
|
|
|
REFL PAV MRK TY I (W)6"(LNDP)(100MIL)
|
LF
|
1,353.000
|
$1.000
|
$1.580
|
$1.660
|
$1.580
|
$1.000
|
$1.000
|
$1.030
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
937.000
|
$2.000
|
$1.260
|
$1.320
|
$1.270
|
$1.000
|
$1.750
|
$1.790
|
|
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
470.000
|
$10.000
|
$3.680
|
$3.860
|
$3.700
|
$5.000
|
$3.500
|
$3.850
|
|
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
556,592.000
|
$1.000
|
$0.760
|
$0.370
|
$0.760
|
$1.100
|
$0.900
|
$1.100
|
|
|
|
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
|
LF
|
556,685.000
|
$1.000
|
$0.760
|
$0.370
|
$0.760
|
$1.100
|
$0.900
|
$1.100
|
|
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
8,576.000
|
$1.000
|
$0.680
|
$0.720
|
$0.690
|
$0.750
|
$0.750
|
$0.830
|
|
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
101,257.000
|
$1.000
|
$0.580
|
$0.610
|
$0.580
|
$0.700
|
$0.750
|
$0.810
|
|
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
111,447.000
|
$1.000
|
$0.580
|
$0.610
|
$0.580
|
$0.700
|
$0.750
|
$0.810
|
|
|
|
PREFAB PM TY B (W)(24")(SLD)
|
LF
|
75.000
|
$30.000
|
$14.700
|
$15.450
|
$15.000
|
$15.000
|
$25.000
|
$28.200
|
|
|
|
PREFAB PM TY B (W)(LN RDCT ARROW)
|
EA
|
8.000
|
$700.000
|
$630.000
|
$662.310
|
$634.000
|
$550.000
|
$650.000
|
$769.070
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
536.000
|
$8.000
|
$4.730
|
$4.970
|
$4.750
|
$6.000
|
$6.000
|
$7.050
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,931.000
|
$5.000
|
$3.940
|
$4.140
|
$3.960
|
$5.000
|
$6.000
|
$7.050
|
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
50,010.000
|
$0.500
|
$0.490
|
$0.450
|
$0.720
|
$1.000
|
$0.250
|
$1.170
|
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
470,802.000
|
$0.500
|
$0.490
|
$0.440
|
$0.690
|
$0.750
|
$0.250
|
$0.740
|
|
|
|
BONDING COURSE
|
GAL
|
61,661.000
|
$5.000
|
$2.550
|
$0.240
|
$4.860
|
$4.000
|
$5.500
|
$5.340
|
|
1
|
|
STONE-MTRX-ASPH SMAR-F SAC-A
|
TON
|
25,564.000
|
$150.000
|
$127.000
|
$147.000
|
$0.000
|
$0.000
|
$138.000
|
$0.000
|
|
1A
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
25,564.000
|
$150.000
|
$0.000
|
$0.000
|
$150.000
|
$150.000
|
$0.000
|
$156.650
|
|
2
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
316.000
|
$90.000
|
$0.000
|
$73.120
|
$0.000
|
$0.000
|
$175.000
|
$0.000
|
|
2A
|
|
THERMOPLASTIC PIPE (PP) (18")
|
LF
|
316.000
|
$90.000
|
$77.730
|
$0.000
|
$157.670
|
$85.000
|
$0.000
|
$94.340
|
|
3
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,524.000
|
$150.000
|
$0.000
|
$127.530
|
$0.000
|
$0.000
|
$225.000
|
$0.000
|
|
3A
|
|
THERMOPLASTIC PIPE (PP) (24")
|
LF
|
1,524.000
|
$150.000
|
$93.740
|
$0.000
|
$209.390
|
$95.000
|
$0.000
|
$121.290
|
|
4
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
144.000
|
$230.000
|
$0.000
|
$164.960
|
$0.000
|
$0.000
|
$345.000
|
$0.000
|
|
4A
|
|
THERMOPLASTIC PIPE (PP) (36")
|
LF
|
144.000
|
$230.000
|
$146.310
|
$0.000
|
$371.040
|
$160.000
|
$0.000
|
$188.670
|
|
Totals: |
$44,089,570.200
|
$26,858,499.316
|
$28,265,792.574
|
$34,382,889.440
|
$34,480,274.980
|
$37,066,726.900
|
$38,593,349.914
|