PREPARING ROW
|
STA
|
27.620
|
$7,500.000
|
$16,500.000
|
$18,458.860
|
$25,000.000
|
$3,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
4,642.000
|
$15.000
|
$20.000
|
$60.000
|
$12.000
|
$30.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
4,025.000
|
$11.000
|
$15.000
|
$17.000
|
$8.000
|
$11.000
|
|
|
REMOVING STAB BASE & ASPH PAV(16")
|
SY
|
19,801.000
|
$15.000
|
$22.000
|
$35.000
|
$8.000
|
$28.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
16,005.000
|
$26.000
|
$24.000
|
$28.000
|
$25.000
|
$28.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
22,650.000
|
$45.000
|
$20.000
|
$40.000
|
$40.000
|
$46.000
|
|
|
BULLDOZER WORK
|
HR
|
29.000
|
$155.000
|
$118.000
|
$257.570
|
$125.000
|
$200.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
18.600
|
$620.000
|
$420.000
|
$788.990
|
$625.000
|
$530.000
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
18.600
|
$540.000
|
$475.000
|
$837.230
|
$625.000
|
$580.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,453.000
|
$17.500
|
$40.000
|
$45.680
|
$25.000
|
$35.000
|
|
|
PROOF ROLLING
|
HR
|
9.000
|
$140.000
|
$240.000
|
$246.100
|
$150.000
|
$250.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
SQ
|
18,094.000
|
$50.000
|
$70.000
|
$108.000
|
$110.000
|
$85.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
5,429.000
|
$12.000
|
$12.000
|
$11.000
|
$10.000
|
$6.500
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
18,007.000
|
$4.300
|
$6.000
|
$11.000
|
$8.000
|
$5.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
7,237.000
|
$12.000
|
$20.000
|
$11.000
|
$10.000
|
$6.000
|
|
|
AGGR(TY-B GR-4 SAC-A)
|
CY
|
145.000
|
$207.100
|
$2,000.000
|
$500.000
|
$200.000
|
$550.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
1,030.000
|
$350.000
|
$260.000
|
$270.570
|
$400.000
|
$300.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
4,188.000
|
$100.000
|
$1.000
|
$95.350
|
$75.000
|
$85.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
360.000
|
$300.000
|
$155.000
|
$150.000
|
$150.000
|
$550.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
4,350.000
|
$400.000
|
$550.000
|
$475.000
|
$500.000
|
$500.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
150.000
|
$650.000
|
$760.000
|
$965.000
|
$900.000
|
$550.000
|
|
|
CL C CONC (ABUT)
|
CY
|
177.500
|
$2,000.000
|
$2,000.000
|
$1,750.000
|
$2,500.000
|
$2,000.000
|
|
|
CL C CONC (CAP)
|
CY
|
1,077.100
|
$2,200.000
|
$512.000
|
$958.800
|
$1,000.000
|
$1,300.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
499.800
|
$2,200.000
|
$1,650.000
|
$1,500.000
|
$2,500.000
|
$1,300.000
|
|
|
CL C CONC (CRASHWALL)
|
CY
|
741.000
|
$1,200.000
|
$880.000
|
$1,000.000
|
$2,500.000
|
$2,100.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
100.300
|
$600.000
|
$810.000
|
$1,000.000
|
$2,500.000
|
$1,400.000
|
|
|
REINF CONC SLAB
|
SF
|
61,472.000
|
$39.000
|
$40.000
|
$62.000
|
$40.000
|
$65.000
|
|
|
APPROACH SLAB
|
CY
|
367.100
|
$1,200.000
|
$730.000
|
$3,000.000
|
$1,500.000
|
$1,400.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
5,936.330
|
$192.000
|
$330.000
|
$255.000
|
$300.000
|
$350.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
2,884.600
|
$193.000
|
$375.000
|
$276.000
|
$325.000
|
$370.000
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
144.000
|
$150.000
|
$1,000.000
|
$249.700
|
$150.000
|
$200.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
264.000
|
$200.000
|
$1,200.000
|
$327.800
|
$200.000
|
$200.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
409.000
|
$215.000
|
$900.000
|
$302.500
|
$250.000
|
$200.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
4.700
|
$500.000
|
$2,000.000
|
$1,094.870
|
$1,000.000
|
$1,300.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
837.000
|
$650.000
|
$725.000
|
$686.420
|
$750.000
|
$1,400.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
189.000
|
$600.000
|
$832.000
|
$873.630
|
$900.000
|
$850.000
|
|
|
RAIL (TY SSTR)
|
LF
|
2,869.200
|
$130.000
|
$125.000
|
$122.360
|
$125.000
|
$150.000
|
|
|
RAIL (TY T80PP)
|
LF
|
562.500
|
$250.000
|
$280.000
|
$337.590
|
$175.000
|
$640.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
461.000
|
$225.000
|
$300.000
|
$325.000
|
$250.000
|
$350.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
26.000
|
$900.000
|
$2,100.000
|
$1,054.000
|
$450.000
|
$2,000.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 5)
|
LF
|
28.000
|
$465.250
|
$600.000
|
$640.000
|
$400.000
|
$750.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
2.000
|
$17,500.000
|
$25,000.000
|
$12,840.000
|
$12,000.000
|
$25,000.000
|
|
|
SET (TY II) (DES 5) (RCP) (6:1) (C)
|
EA
|
2.000
|
$3,050.000
|
$9,000.000
|
$13,500.000
|
$7,500.000
|
$11,000.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$1,000.000
|
$4,000.000
|
$1,115.000
|
$1,000.000
|
$2,300.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$3,000.000
|
$4,500.000
|
$1,115.000
|
$2,500.000
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
8.000
|
$28.000
|
$500.000
|
$279.000
|
$50.000
|
$50.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
8.000
|
$60.000
|
$1,200.000
|
$279.000
|
$50.000
|
$200.000
|
|
|
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
|
EA
|
2.000
|
$500,000.000
|
$510,000.000
|
$400,000.000
|
$1,800,000.000
|
$700,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,500,000.000
|
$2,450,000.000
|
$3,209,157.000
|
$3,600,000.000
|
$3,500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
35.000
|
$12,000.000
|
$26,000.000
|
$13,000.000
|
$15,000.000
|
$61,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
120.000
|
$40.000
|
$50.000
|
$78.800
|
$80.000
|
$65.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
120.000
|
$13.600
|
$30.000
|
$28.920
|
$40.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
336.000
|
$31.600
|
$24.000
|
$56.410
|
$60.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
336.000
|
$10.500
|
$17.000
|
$15.920
|
$20.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,755.000
|
$3.700
|
$3.000
|
$1.830
|
$4.000
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,755.000
|
$1.300
|
$0.900
|
$4.520
|
$2.000
|
$1.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
2,945.000
|
$8.000
|
$4.850
|
$9.360
|
$7.000
|
$7.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,945.000
|
$1.500
|
$0.900
|
$2.190
|
$2.000
|
$1.700
|
|
|
CONSTRUCTING DETOURS
|
SY
|
21,045.000
|
$85.000
|
$173.000
|
$180.000
|
$190.000
|
$160.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
14,460.000
|
$60.000
|
$95.000
|
$65.000
|
$115.000
|
$110.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
12,780.000
|
$7.000
|
$3.500
|
$5.010
|
$12.000
|
$29.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
14,460.000
|
$12.000
|
$2.000
|
$13.480
|
$8.000
|
$29.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
3,937.000
|
$33.000
|
$29.270
|
$37.400
|
$30.000
|
$32.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$2,500.000
|
$2,725.000
|
$3,305.000
|
$2,500.000
|
$3,000.000
|
|
|
MTL BEAM GD FEN TRANS (T101)
|
EA
|
2.000
|
$1,500.000
|
$1,500.000
|
$1,820.000
|
$1,750.000
|
$1,700.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$1,600.000
|
$1,535.000
|
$1,860.000
|
$1,500.000
|
$1,700.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,850.000
|
$4.000
|
$3.000
|
$4.070
|
$3.000
|
$3.500
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$300.000
|
$300.000
|
$364.000
|
$250.000
|
$350.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
4.000
|
$249.000
|
$300.000
|
$364.000
|
$200.000
|
$350.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$425.000
|
$300.000
|
$364.000
|
$200.000
|
$350.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
9.000
|
$3,500.000
|
$3,325.000
|
$4,030.000
|
$3,500.000
|
$4,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$390.000
|
$300.000
|
$368.500
|
$250.000
|
$350.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
5.000
|
$2,000.000
|
$5,000.000
|
$715.570
|
$5,000.000
|
$2,600.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$2,000.000
|
$2,500.000
|
$715.570
|
$1,500.000
|
$1,600.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
6.000
|
$30,000.000
|
$30,000.000
|
$28,102.820
|
$28,000.000
|
$32,000.000
|
|
|
CHAIN LINK FENCE (INSTALL) (8')
|
LF
|
1,743.000
|
$60.000
|
$50.000
|
$60.500
|
$100.000
|
$56.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
6.000
|
$750.000
|
$950.000
|
$764.500
|
$1,000.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$990.000
|
$1,225.000
|
$764.500
|
$1,200.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,180.000
|
$1,335.000
|
$1,281.500
|
$1,500.000
|
$1,400.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
2.000
|
$3,000.000
|
$5,000.000
|
$2,530.000
|
$2,500.000
|
$1,600.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
8.000
|
$130.000
|
$350.000
|
$110.000
|
$200.000
|
$120.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
6.000
|
$26.000
|
$18.500
|
$27.500
|
$25.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
22.000
|
$33.000
|
$18.500
|
$25.300
|
$25.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
56.000
|
$22.500
|
$18.500
|
$27.500
|
$25.000
|
$22.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
184.000
|
$1.360
|
$0.750
|
$0.830
|
$1.000
|
$0.850
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
39,247.000
|
$0.870
|
$0.700
|
$0.770
|
$1.000
|
$0.800
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
65,989.000
|
$1.000
|
$0.700
|
$0.770
|
$1.000
|
$0.800
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,445.000
|
$1.250
|
$0.500
|
$2.310
|
$1.000
|
$0.900
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
842.000
|
$0.940
|
$0.500
|
$2.420
|
$1.000
|
$0.900
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
1,225.000
|
$1.500
|
$2.000
|
$2.200
|
$1.500
|
$2.300
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
537.000
|
$1.100
|
$2.270
|
$2.500
|
$1.500
|
$2.600
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
475.000
|
$3.400
|
$3.000
|
$3.300
|
$8.000
|
$3.500
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
2.000
|
$235.000
|
$175.000
|
$192.500
|
$650.000
|
$200.000
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
1,225.000
|
$0.750
|
$1.470
|
$1.620
|
$1.000
|
$1.700
|
|
REFL PAV MRK TY II (Y) 12" (SLD)
|
LF
|
285.000
|
$1.500
|
$1.850
|
$2.040
|
$4.000
|
$2.100
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
23,280.000
|
$0.700
|
$1.000
|
$1.100
|
$1.000
|
$1.200
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
23,948.000
|
$0.600
|
$1.000
|
$1.090
|
$1.000
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
22,440.000
|
$0.600
|
$1.000
|
$1.090
|
$1.000
|
$1.100
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
345.000
|
$4.300
|
$4.000
|
$4.400
|
$8.000
|
$4.500
|
|
TRAFFIC BUTTON TY I-A
|
EA
|
898.000
|
$10.000
|
$3.850
|
$4.240
|
$6.000
|
$4.300
|
|
TRAFFIC BUTTON TY I-C
|
EA
|
482.000
|
$10.000
|
$3.850
|
$4.240
|
$6.000
|
$4.300
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
31,337.000
|
$0.480
|
$0.380
|
$0.420
|
$1.000
|
$0.450
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
584.000
|
$1.000
|
$0.420
|
$0.460
|
$3.000
|
$0.470
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
190.000
|
$1.000
|
$0.450
|
$0.500
|
$4.000
|
$0.550
|
|
|
TACK COAT
|
GAL
|
1,810.000
|
$4.300
|
$6.000
|
$11.000
|
$10.000
|
$8.000
|
|
|
SP MIXES SP-C SAC-A PG70-28(EXEMPT)
|
TON
|
3,980.000
|
$150.000
|
$240.000
|
$264.000
|
$250.000
|
$210.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$14,262.500
|
$17,500.000
|
$25,415.000
|
$20,000.000
|
$28,000.000
|
|
|
MODULAR GLARE SCREENS (FURN & INSTALL)
|
LF
|
5,750.000
|
$27.120
|
$25.000
|
$25.300
|
$20.000
|
$30.000
|
|
|
MODULAR GLARE SCREENS (REMOVE)
|
LF
|
5,750.000
|
$3.940
|
$3.000
|
$3.190
|
$1.000
|
$5.000
|
|
|
MODULAR GLARE SCREENS (MOVE)
|
LF
|
5,750.000
|
$6.320
|
$15.000
|
$10.890
|
$5.000
|
$20.000
|
|
|
TMA (STATIONARY)
|
DAY
|
540.000
|
$225.000
|
$240.000
|
$438.470
|
$50.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
96.000
|
$83.000
|
$110.000
|
$93.490
|
$150.000
|
$90.000
|
|
Totals: |
$25,479,722.730
|
$28,987,859.870
|
$32,210,205.731
|
$35,781,591.500
|
$36,673,831.630
|