OBLITERATING ABANDONED ROAD
|
STA
|
6.600
|
$1,200.000
|
$1,507.350
|
$689.280
|
$1,000.000
|
$1,877.000
|
$2,000.000
|
$400.000
|
$1,682.810
|
$4,751.220
|
$2,000.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,680.000
|
$20.000
|
$17.870
|
$8.600
|
$15.000
|
$7.500
|
$17.000
|
$10.000
|
$22.880
|
$11.440
|
$50.000
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
5,138.000
|
$20.000
|
$14.730
|
$13.790
|
$15.000
|
$11.000
|
$22.000
|
$7.000
|
$25.820
|
$17.540
|
$50.000
|
|
|
|
BLADING
|
HR
|
150.000
|
$200.000
|
$114.140
|
$148.860
|
$100.000
|
$93.100
|
$95.000
|
$103.260
|
$0.710
|
$251.950
|
$150.000
|
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
15,774.000
|
$0.500
|
$0.500
|
$0.550
|
$0.500
|
$0.300
|
$0.580
|
$0.350
|
$0.600
|
$0.550
|
$1.000
|
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
3,943.000
|
$0.350
|
$0.250
|
$1.840
|
$0.500
|
$0.280
|
$1.900
|
$0.320
|
$2.010
|
$1.840
|
$1.000
|
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
3,943.000
|
$0.350
|
$0.250
|
$1.840
|
$0.500
|
$0.280
|
$1.900
|
$0.320
|
$2.010
|
$1.840
|
$1.000
|
|
|
|
VEGETATIVE WATERING
|
MG
|
231.500
|
$30.000
|
$30.000
|
$38.450
|
$25.000
|
$16.210
|
$38.000
|
$35.000
|
$13.370
|
$42.310
|
$50.000
|
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
1,273.000
|
$75.000
|
$89.180
|
$71.580
|
$75.000
|
$80.000
|
$108.000
|
$63.900
|
$92.180
|
$106.900
|
$100.000
|
|
|
|
CEMENT
|
TON
|
46.000
|
$160.000
|
$135.000
|
$139.150
|
$200.000
|
$156.000
|
$190.000
|
$150.000
|
$149.380
|
$185.950
|
$200.000
|
|
|
|
CEMENT TREAT (SUBGRADE)(6")
|
SY
|
4,850.000
|
$2.500
|
$3.560
|
$3.510
|
$3.000
|
$8.000
|
$5.000
|
$2.000
|
$13.910
|
$9.350
|
$4.000
|
|
|
|
ASPH (RC-250)
|
GAL
|
863.000
|
$4.500
|
$8.640
|
$5.250
|
$5.000
|
$13.640
|
$5.600
|
$6.630
|
$5.700
|
$6.500
|
$5.000
|
|
|
|
AGGR(TY-E GR-5 SAC-B)
|
CY
|
31.000
|
$95.000
|
$166.110
|
$284.550
|
$90.000
|
$425.550
|
$300.000
|
$127.550
|
$309.230
|
$125.000
|
$144.000
|
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
51.000
|
$85.000
|
$166.110
|
$220.500
|
$90.000
|
$258.670
|
$240.000
|
$127.550
|
$239.630
|
$125.000
|
$171.000
|
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
1,725.000
|
$3.500
|
$4.980
|
$3.680
|
$2.500
|
$12.030
|
$4.000
|
$3.830
|
$3.990
|
$3.750
|
$5.000
|
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
909.000
|
$90.000
|
$126.240
|
$131.250
|
$85.000
|
$133.280
|
$140.000
|
$100.000
|
$146.050
|
$95.000
|
$86.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
139.500
|
$125.000
|
$54.970
|
$181.520
|
$160.000
|
$50.000
|
$250.000
|
$94.510
|
$191.370
|
$127.010
|
$100.000
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
45,592.000
|
$10.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$1.500
|
$0.000
|
$0.000
|
$39.460
|
$50.000
|
|
|
|
FOUNDATION LOAD TEST (D4945) (PILE)
|
EA
|
21.000
|
$20,000.000
|
$2,484.640
|
$4,775.170
|
$5,000.000
|
$8,000.000
|
$10,500.000
|
$7,000.000
|
$25,000.000
|
$24,743.600
|
$10,000.000
|
|
|
|
PRESTR CONC SHEET PILE (12") PAVEMENT
|
SF
|
20,026.300
|
$45.000
|
$38.590
|
$36.330
|
$40.000
|
$48.000
|
$44.000
|
$55.000
|
$75.000
|
$51.090
|
$45.000
|
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
20.000
|
$200.000
|
$260.000
|
$136.530
|
$260.000
|
$324.520
|
$250.000
|
$331.630
|
$204.270
|
$325.000
|
$325.000
|
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
44.800
|
$1,000.000
|
$1,500.000
|
$945.700
|
$1,500.000
|
$1,600.000
|
$1,700.000
|
$1,000.000
|
$1,460.000
|
$1,882.060
|
$2,700.000
|
|
|
|
CL C CONC (CAP)(HPC)(MASS)
|
CY
|
2,421.400
|
$1,000.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$1,350.000
|
$0.000
|
$0.000
|
$1,015.820
|
$1,000.000
|
|
|
|
CL C CONC (COLUMN)(HPC)(MASS)
|
CY
|
3,078.900
|
$1,000.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$1,350.000
|
$0.000
|
$0.000
|
$1,301.780
|
$1,000.000
|
|
|
|
CL C CONC (FOOTING)(HPC)(MASS)
|
CY
|
4,452.700
|
$550.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$1,050.000
|
$0.000
|
$0.000
|
$1,308.340
|
$1,000.000
|
|
|
|
CL E CONC (SEAL SLAB)
|
CY
|
4,329.000
|
$100.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$72.000
|
$0.000
|
$0.000
|
$577.950
|
$350.000
|
|
|
|
CL SS CONC (PILE PLUG)
|
CY
|
3,110.600
|
$500.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$875.000
|
$0.000
|
$0.000
|
$825.400
|
$1,000.000
|
|
|
|
CL C CONC(COPING)(HPC)
|
LF
|
594.900
|
$250.000
|
$292.460
|
$137.990
|
$180.000
|
$500.000
|
$240.000
|
$400.000
|
$730.000
|
$495.860
|
$175.000
|
|
|
|
REINF CONC SLAB (SLAB BEAM)(HPC)
|
SF
|
83,750.000
|
$18.000
|
$17.860
|
$17.990
|
$13.000
|
$19.300
|
$21.000
|
$12.000
|
$33.000
|
$33.210
|
$25.000
|
|
|
|
APPROACH SLAB (HPC)
|
CY
|
77.000
|
$400.000
|
$475.410
|
$668.500
|
$300.000
|
$564.490
|
$750.000
|
$400.000
|
$890.000
|
$849.340
|
$200.000
|
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
14,632.400
|
$200.000
|
$116.120
|
$126.360
|
$140.000
|
$175.000
|
$160.000
|
$110.000
|
$186.410
|
$223.460
|
$200.000
|
|
|
|
PT FOR SEGMENTAL BRIDGE(3 IN)
|
LF
|
4,436.000
|
$14.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$25.000
|
$0.000
|
$0.000
|
$30.940
|
$25.000
|
|
|
|
PT FOR SEGMENTAL BRIDGE(4 IN)
|
LF
|
11,916.000
|
$23.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$30.000
|
$0.000
|
$0.000
|
$31.050
|
$25.000
|
|
|
|
PT FOR SEGMENTAL BRIDGE(2.25 IN)
|
LF
|
2,760.000
|
$10.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$17.000
|
$0.000
|
$0.000
|
$31.510
|
$25.000
|
|
|
|
PT FOR SEGMENTAL BRIDGE(1X3 IN)
|
LF
|
16,250.000
|
$9.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$8.500
|
$0.000
|
$0.000
|
$31.020
|
$25.000
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
0.700
|
$400.000
|
$1,742.190
|
$1,054.270
|
$1,000.000
|
$1,665.000
|
$850.000
|
$650.000
|
$272.590
|
$2,000.000
|
$10,000.000
|
|
|
|
RIPRAP (STONE PROTECTION)(30 IN)
|
CY
|
6,569.000
|
$115.000
|
$111.280
|
$145.000
|
$150.000
|
$72.840
|
$100.000
|
$120.000
|
$105.090
|
$221.040
|
$150.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
74.000
|
$400.000
|
$653.550
|
$613.710
|
$350.000
|
$545.000
|
$675.000
|
$600.000
|
$556.250
|
$912.700
|
$1,000.000
|
|
|
|
ELASTOMERIC BEARING (LAMINATED)
|
EA
|
4.000
|
$4,000.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$2,500.000
|
$0.000
|
$0.000
|
$9,871.840
|
$7,000.000
|
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
4,096.000
|
$10.000
|
$11.400
|
$8.910
|
$15.000
|
$12.810
|
$12.000
|
$8.100
|
$11.830
|
$22.810
|
$10.000
|
|
|
|
RAIL (TY SSTR)
|
LF
|
4,759.000
|
$75.000
|
$28.330
|
$46.970
|
$82.000
|
$117.500
|
$60.000
|
$42.000
|
$65.760
|
$54.940
|
$40.000
|
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - A)
|
LF
|
613.200
|
$105.000
|
$153.900
|
$123.620
|
$125.000
|
$150.000
|
$110.000
|
$100.000
|
$105.350
|
$151.530
|
$200.000
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
86.000
|
$70.000
|
$108.650
|
$110.710
|
$40.000
|
$65.000
|
$105.000
|
$100.000
|
$88.570
|
$123.080
|
$212.150
|
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
68.000
|
$100.000
|
$180.720
|
$78.240
|
$50.000
|
$106.000
|
$130.000
|
$150.000
|
$76.630
|
$99.340
|
$128.900
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$1,500.000
|
$643.700
|
$1,043.750
|
$750.000
|
$914.670
|
$1,750.000
|
$1,500.000
|
$1,584.960
|
$1,122.030
|
$1,325.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$1,600.000
|
$748.420
|
$1,020.930
|
$1,000.000
|
$1,122.180
|
$1,900.000
|
$2,000.000
|
$1,549.500
|
$1,200.360
|
$1,325.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,700.000
|
$1,673.110
|
$1,212.860
|
$1,000.000
|
$1,431.250
|
$2,100.000
|
$2,000.000
|
$2,000.000
|
$6,987.910
|
$1,425.000
|
|
|
|
REMOV STR (LARGE)
|
EA
|
1.000
|
$350,000.000
|
$156,604.770
|
$318,001.780
|
$100,000.000
|
$263,839.000
|
$130,000.000
|
$300,000.000
|
$100,000.000
|
$354,608.460
|
$25,000.000
|
|
|
|
REMOV STR (SMALL)
|
EA
|
9.000
|
$500.000
|
$922.310
|
$591.890
|
$4,000.000
|
$1,135.860
|
$1,200.000
|
$1,500.000
|
$4,250.000
|
$879.870
|
$10,000.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,000,000.000
|
$4,000,000.000
|
$4,871,900.000
|
$4,500,000.000
|
$4,056,463.030
|
$4,610,000.000
|
$5,000,000.000
|
$5,300,000.000
|
$5,500,000.000
|
$6,377,280.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
27.000
|
$6,000.000
|
$10,100.000
|
$948.480
|
$1,500.000
|
$14,300.000
|
$8,500.000
|
$2,470.630
|
$15,000.000
|
$996.050
|
$10,140.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
100.000
|
$30.000
|
$28.850
|
$28.850
|
$100.000
|
$49.920
|
$35.000
|
$29.440
|
$31.460
|
$28.850
|
$50.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
100.000
|
$10.000
|
$15.450
|
$15.450
|
$30.000
|
$19.970
|
$15.000
|
$15.770
|
$16.850
|
$15.450
|
$15.000
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
156.000
|
$25.000
|
$80.390
|
$80.390
|
$15.000
|
$59.900
|
$88.000
|
$82.030
|
$87.650
|
$80.390
|
$50.000
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$7.500
|
$35.410
|
$35.410
|
$5.000
|
$29.950
|
$20.000
|
$36.130
|
$38.610
|
$35.410
|
$15.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,530.000
|
$3.000
|
$1.960
|
$1.960
|
$3.000
|
$3.990
|
$2.500
|
$2.000
|
$2.140
|
$1.960
|
$3.000
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,530.000
|
$2.000
|
$0.770
|
$0.770
|
$1.000
|
$2.000
|
$0.800
|
$0.790
|
$0.840
|
$0.770
|
$1.000
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
327.000
|
$50.000
|
$33.220
|
$159.200
|
$40.000
|
$78.260
|
$130.000
|
$42.140
|
$147.200
|
$25.000
|
$65.000
|
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
2,615.000
|
$30.000
|
$6.640
|
$22.880
|
$20.000
|
$36.210
|
$6.500
|
$19.970
|
$6.560
|
$5.000
|
$32.000
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
50.000
|
$25.000
|
$21.500
|
$35.350
|
$28.000
|
$21.460
|
$23.000
|
$36.260
|
$28.350
|
$21.500
|
$21.500
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,000.000
|
$1,460.000
|
$1,650.000
|
$2,000.000
|
$1,457.580
|
$1,600.000
|
$1,692.310
|
$2,943.970
|
$1,460.000
|
$1,460.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
425.000
|
$5.000
|
$2.000
|
$5.000
|
$5.000
|
$2.000
|
$2.500
|
$5.130
|
$1.640
|
$2.000
|
$4.500
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,500.000
|
$2,250.000
|
$2,600.000
|
$2,500.000
|
$2,246.270
|
$2,300.000
|
$2,666.670
|
$2,725.900
|
$2,250.000
|
$2,250.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$270.000
|
$275.000
|
$300.000
|
$269.550
|
$300.000
|
$282.050
|
$272.590
|
$270.000
|
$395.000
|
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
2.000
|
$500.000
|
$345.000
|
$185.000
|
$290.000
|
$289.520
|
$380.000
|
$352.040
|
$654.220
|
$345.000
|
$345.000
|
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
2.000
|
$2,850.000
|
$3,050.000
|
$3,959.390
|
$3,050.000
|
$3,893.530
|
$4,200.000
|
$3,979.590
|
$2,904.780
|
$3,900.000
|
$3,900.000
|
|
|
|
CONDT (PVC) (SCH 40) (1")
|
LF
|
4,975.000
|
$12.000
|
$8.500
|
$7.360
|
$8.500
|
$7.240
|
$7.750
|
$7.400
|
$12.450
|
$7.250
|
$7.250
|
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,585.000
|
$8.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$10.500
|
$0.000
|
$0.000
|
$9.950
|
$9.950
|
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
270.000
|
$25.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$18.000
|
$0.000
|
$0.000
|
$16.850
|
$16.850
|
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
195.000
|
$2.000
|
$1.600
|
$1.270
|
$1.600
|
$1.250
|
$1.500
|
$1.280
|
$1.100
|
$1.250
|
$1.250
|
|
|
|
ELEC CONDR (NO.10) BARE
|
LF
|
6,135.000
|
$1.100
|
$1.750
|
$1.320
|
$1.750
|
$1.300
|
$1.550
|
$1.330
|
$0.970
|
$1.300
|
$1.300
|
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
14,160.000
|
$1.050
|
$1.750
|
$1.370
|
$1.750
|
$1.350
|
$1.600
|
$1.380
|
$1.290
|
$1.350
|
$1.350
|
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
65.000
|
$1.500
|
$1.900
|
$1.420
|
$1.900
|
$1.400
|
$1.650
|
$1.430
|
$1.310
|
$1.400
|
$1.400
|
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
630.000
|
$1.250
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$1.750
|
$0.000
|
$0.000
|
$1.600
|
$1.600
|
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
1,890.000
|
$1.350
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$1.800
|
$0.000
|
$0.000
|
$1.650
|
$1.650
|
|
|
|
TRAY CABLE (3 CONDR) (12 AWG)
|
LF
|
65.000
|
$2.000
|
$2.400
|
$2.030
|
$2.400
|
$2.000
|
$2.250
|
$2.040
|
$2.050
|
$2.000
|
$2.000
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
11.000
|
$3,000.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$900.000
|
$0.000
|
$0.000
|
$875.000
|
$875.000
|
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)GC(O)
|
EA
|
2.000
|
$5,500.000
|
$7,300.000
|
$7,005.080
|
$7,300.000
|
$6,888.550
|
$7,500.000
|
$7,040.820
|
$6,027.410
|
$6,900.000
|
$6,900.000
|
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)GC(O)
|
EA
|
1.000
|
$5,500.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$7,200.000
|
$0.000
|
$0.000
|
$6,750.000
|
$2,975.000
|
|
|
|
ELC SRV TY T 120/240 000(NS)GS(N)TP(O)
|
EA
|
1.000
|
$3,500.000
|
$4,500.000
|
$3,020.300
|
$4,500.000
|
$2,970.070
|
$3,200.000
|
$3,035.710
|
$3,921.070
|
$2,975.000
|
$6,750.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
12.000
|
$500.000
|
$517.960
|
$478.000
|
$825.000
|
$494.180
|
$525.000
|
$505.100
|
$437.150
|
$495.000
|
$495.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$550.000
|
$664.450
|
$601.000
|
$1,100.000
|
$633.950
|
$675.000
|
$647.960
|
$572.440
|
$635.000
|
$635.000
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)UA(P)
|
EA
|
5.000
|
$450.000
|
$397.620
|
$390.000
|
$675.000
|
$379.370
|
$400.000
|
$387.760
|
$373.160
|
$380.000
|
$380.000
|
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
50.000
|
$800.000
|
$2,485.150
|
$3,160.000
|
$2,800.000
|
$2,371.060
|
$2,425.000
|
$2,423.470
|
$2,708.770
|
$2,375.000
|
$2,375.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
14.000
|
$100.000
|
$73.250
|
$89.070
|
$410.000
|
$69.880
|
$90.000
|
$71.430
|
$87.350
|
$70.000
|
$120.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
50.000
|
$35.000
|
$20.400
|
$12.000
|
$45.000
|
$19.470
|
$22.000
|
$19.900
|
$10.900
|
$19.500
|
$19.500
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
10.000
|
$40.000
|
$20.400
|
$16.000
|
$50.000
|
$19.470
|
$22.000
|
$19.900
|
$32.710
|
$19.500
|
$19.500
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
6,422.000
|
$0.400
|
$0.450
|
$0.450
|
$0.460
|
$0.460
|
$0.500
|
$0.410
|
$0.440
|
$0.520
|
$0.450
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
12,844.000
|
$0.400
|
$0.450
|
$0.450
|
$0.460
|
$0.460
|
$0.500
|
$0.410
|
$0.440
|
$0.520
|
$0.450
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
622.000
|
$3.000
|
$3.000
|
$3.000
|
$4.900
|
$4.890
|
$3.500
|
$3.060
|
$3.270
|
$9.000
|
$3.000
|
|
|
|
INSTALL RDSD FLASH BEACON ASSEMBLY
|
EA
|
1.000
|
$6,000.000
|
$8,500.000
|
$4,314.720
|
$8,500.000
|
$4,991.710
|
$4,500.000
|
$4,336.730
|
$4,969.490
|
$4,250.000
|
$4,250.000
|
|
|
|
DOLPHIN
|
EA
|
2.000
|
$500,000.000
|
$271,594.530
|
$700,000.000
|
$350,000.000
|
$293,457.600
|
$340,000.000
|
$423,265.560
|
$377,000.000
|
$585,709.130
|
$500,000.000
|
|
|
|
UHMW-PE PADS
|
EA
|
150.000
|
$800.000
|
$873.810
|
$266.110
|
$500.000
|
$821.850
|
$350.000
|
$791.440
|
$837.250
|
$2,186.400
|
$1,000.000
|
|
|
|
STEEL PIPE PILING (24" DIA)
|
LF
|
1,412.000
|
$175.000
|
$128.850
|
$147.900
|
$130.000
|
$125.000
|
$165.000
|
$375.000
|
$200.000
|
$140.780
|
$250.000
|
|
|
|
STEEL PIPE PILING (36" DIA)
|
LF
|
48,505.000
|
$225.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$265.000
|
$0.000
|
$0.000
|
$231.720
|
$393.240
|
|
|
|
TEMP SWING BRIDGE CABLE REROUTE
|
LS
|
1.000
|
$30,000.000
|
$56,439.130
|
$51,582.030
|
$40,000.000
|
$10,200.000
|
$70,000.000
|
$85,641.900
|
$50,000.000
|
$122,479.840
|
$50,000.000
|
|
|
|
CL H CONC (SEGMENTAL)(HPC)
|
CY
|
3,498.100
|
$1,200.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$1,850.000
|
$0.000
|
$0.000
|
$2,130.760
|
$1,400.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$5,000.000
|
$21,064.040
|
$10,000.000
|
$23,000.000
|
$25,000.000
|
$17,320.000
|
$35,000.000
|
$32,268.400
|
$21,395.000
|
|
|
|
CONDUIT 1-4" PVC-CDUCT (TELE)
|
LF
|
640.000
|
$10.000
|
$81.000
|
$25.380
|
$81.000
|
$24.960
|
$28.000
|
$25.510
|
$27.260
|
$25.000
|
$25.000
|
|
|
|
BRIDGE RAIL LIGHTING (INSTALL)
|
EA
|
52.000
|
$1,200.000
|
$1,400.000
|
$1,928.930
|
$1,400.000
|
$1,896.850
|
$2,200.000
|
$1,938.780
|
$1,635.540
|
$1,900.000
|
$1,900.000
|
|
|
|
INTERIOR BRG LIGHTING AND POWER(INST)
|
LS
|
1.000
|
$40,000.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$52,000.000
|
$0.000
|
$0.000
|
$49,275.000
|
$49,275.000
|
|
|
|
NAVIGATNL LT SYTM OFFSITE ALARM(INSTL)
|
LS
|
1.000
|
$50,000.000
|
$110,000.000
|
$110,441.620
|
$110,000.000
|
$108,604.550
|
$120,000.000
|
$111,005.100
|
$110,000.000
|
$108,785.000
|
$108,785.000
|
|
1
|
|
TEMPORARY SPL SHORING
|
SF
|
45,240.000
|
$10.000
|
$0.010
|
$29.700
|
$50.000
|
$8.610
|
$0.000
|
$40.100
|
$45.000
|
$0.000
|
$0.000
|
|
1
|
|
CL C CONC (CAP)(HPC)(MASS)
|
CY
|
2,445.000
|
$1,000.000
|
$1,719.000
|
$1,105.000
|
$1,300.000
|
$1,250.000
|
$0.000
|
$1,200.000
|
$1,437.000
|
$0.000
|
$0.000
|
|
1
|
|
CL C CONC (COLUMN)(HPC)(MASS)
|
CY
|
2,496.900
|
$1,000.000
|
$1,245.000
|
$1,064.110
|
$1,300.000
|
$1,250.000
|
$0.000
|
$1,100.000
|
$1,404.000
|
$0.000
|
$0.000
|
|
1
|
|
CL C CONC (FOOTING)(HPC)(MASS)
|
CY
|
4,315.300
|
$550.000
|
$1,750.000
|
$757.350
|
$1,300.000
|
$928.170
|
$0.000
|
$1,000.000
|
$1,178.000
|
$0.000
|
$0.000
|
|
1
|
|
CL E CONC (SEAL SLAB)
|
CY
|
4,259.600
|
$100.000
|
$0.010
|
$100.000
|
$225.000
|
$350.000
|
$0.000
|
$325.000
|
$500.000
|
$0.000
|
$0.000
|
|
1
|
|
CL F CONC (CAP)(HPC)(MASS)
|
CY
|
241.000
|
$1,000.000
|
$1,200.000
|
$1,433.340
|
$1,300.000
|
$1,500.000
|
$0.000
|
$1,250.000
|
$1,775.000
|
$0.000
|
$0.000
|
|
1
|
|
CL SS CONC (PILE PLUG)
|
CY
|
3,047.800
|
$500.000
|
$400.000
|
$366.280
|
$400.000
|
$431.000
|
$0.000
|
$400.000
|
$711.000
|
$0.000
|
$0.000
|
|
1
|
|
REINF CONC SLAB (HPC)
|
SF
|
34,500.000
|
$20.000
|
$28.100
|
$30.260
|
$21.000
|
$39.000
|
$0.000
|
$15.000
|
$70.000
|
$0.000
|
$0.000
|
|
1
|
|
CIP CONC SPLICES AND DIAPH
|
CY
|
330.600
|
$1,000.000
|
$1,270.900
|
$1,259.270
|
$900.000
|
$3,000.000
|
$0.000
|
$1,000.000
|
$3,000.000
|
$0.000
|
$0.000
|
|
1
|
|
CIP CLOSURE
|
CY
|
9.000
|
$2,000.000
|
$3,332.190
|
$3,640.200
|
$900.000
|
$5,500.000
|
$0.000
|
$2,500.000
|
$2,110.730
|
$0.000
|
$0.000
|
|
1
|
|
PRESTR CONC GIRDER (STX9)
|
LF
|
2,115.500
|
$900.000
|
$1,067.790
|
$1,517.510
|
$1,400.000
|
$1,678.000
|
$0.000
|
$800.000
|
$1,289.650
|
$0.000
|
$0.000
|
|
1
|
|
PRESTR CONC GIRDER (HSTX 14)
|
LF
|
1,291.700
|
$1,817.600
|
$1,796.980
|
$2,113.870
|
$2,100.000
|
$2,100.000
|
$0.000
|
$1,200.000
|
$2,038.100
|
$0.000
|
$0.000
|
|
1
|
|
PT FOR SPLICE GIRDER(3 IN)
|
LF
|
17,250.000
|
$14.000
|
$18.890
|
$21.760
|
$24.000
|
$36.000
|
$0.000
|
$22.000
|
$29.030
|
$0.000
|
$0.000
|
|
1
|
|
ELASTOMERIC BEARING (LAMINATED)
|
EA
|
10.000
|
$5,000.710
|
$4,316.630
|
$5,406.800
|
$10,000.000
|
$13,829.440
|
$0.000
|
$4,622.270
|
$4,277.140
|
$0.000
|
$0.000
|
|
1
|
|
ELASTOMERIC BEARING (SPECIAL)
|
EA
|
10.000
|
$10,000.000
|
$3,126.630
|
$5,406.800
|
$10,000.000
|
$13,716.070
|
$0.000
|
$4,622.270
|
$3,661.090
|
$0.000
|
$0.000
|
|
1
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,055.000
|
$8.000
|
$14.000
|
$10.100
|
$14.000
|
$9.930
|
$0.000
|
$10.150
|
$6.980
|
$0.000
|
$0.000
|
|
1
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
170.000
|
$25.000
|
$98.000
|
$17.250
|
$98.000
|
$16.960
|
$0.000
|
$17.340
|
$14.010
|
$0.000
|
$0.000
|
|
1
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
7.000
|
$3,000.000
|
$1,100.000
|
$888.320
|
$1,100.000
|
$873.550
|
$0.000
|
$892.860
|
$964.190
|
$0.000
|
$0.000
|
|
1
|
|
STEEL PIPE PILING (36" DIA)
|
LF
|
46,581.000
|
$225.000
|
$142.500
|
$227.980
|
$200.000
|
$200.000
|
$0.000
|
$400.000
|
$250.000
|
$0.000
|
$0.000
|
|
Totals: |
$65,366,408.520
|
$41,231,131.004
|
$44,215,649.544
|
$45,994,268.410
|
$46,344,034.916
|
$49,189,185.820
|
$51,212,088.625
|
$57,531,360.948
|
$57,990,945.055
|
$59,389,316.250
|