Show Job Controls
Bid Cobra

DEAF SMITH US 60 (0168-05-041)

Items: 67

County: DEAF SMITH
Length: N/A
Highway: US 60
District: AMARILLO
Control Number: 0168-05-041
DBE Goal: N/A
Project: F 2022(056)
Guaranty: N/A
Time: 81 WORKING DAYS
Engineer's Estimate: $5,883,459.80
Date: 10/08/2021 (4 years ago)
Contract Number: N/A
Type: PREVENTIVE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$5,883,459.80
1
$5,275,866.95
Over/Under Est: -10.33% -$607,592.85
$5,874,710.35
Over/Under Est: -0.15% -$8,749.45
Amt Left: 11.35% $598,843.40
$6,220,396.15
Over/Under Est: 5.73% $336,936.35
Amt Left: 17.9% $944,529.20
Delta: -5.88% -$345,685.80
Over/Under Est: 6.04% $355,163.17
Amt Left: 18.25% $962,756.02
Delta: -0.29% -$18,226.82
$6,250,418.35
Over/Under Est: 6.24% $366,958.55
Amt Left: 18.47% $974,551.40
Delta: -0.19% -$11,795.38

Bid Items & Bid Tabulations

67 Total 0 of 67
DEAF SMITH  |  US 60  |  AMARILLO  |  0168-05-041  |  10/08/2021  |  $5,883,459.80  |  F 2022(056)  |  PREVENT MAINT  |  81 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
DUININCK, INC.
GILVIN-TERRILL, LTD.
KIEWIT INFRASTRUCTURE SOUTH CO.
J. LEE MILLIGAN, INC.
PREPARING ROW
AC 13.180 $1,000.000 $163.560 $155.000 $200.000 $223.360 $280.000
REMOVING CONC (RIPRAP)
SY 45.000 $30.000 $52.500 $54.000 $100.000 $55.840 $62.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 693.000 $25.000 $38.070 $66.500 $40.000 $47.940 $46.500
BACKFILL (TY A)
STA 574.000 $180.000 $195.290 $200.000 $140.000 $129.330 $300.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 0.180 $750.000 $10,500.000 $1,000.000 $1,000.000 $11,167.780 $11,100.000
DRILL SEEDING (TEMP) (WARM)
AC 13.360 $750.000 $393.750 $410.000 $400.000 $418.790 $425.000
EMULS ASPH (EROSN CONT)(MULTI)
GAL 6,492.000 $4.000 $3.330 $4.100 $4.000 $4.500 $4.100
FLEX PAVEMENT STRUCTURE REPAIR (2.5")
SY 16,342.000 $23.000 $17.970 $22.000 $23.000 $25.400 $20.350
PLANE ASPH CONC PAV(0" TO 2")
SY 3,600.000 $5.000 $3.780 $4.750 $15.000 $3.230 $5.750
RIPRAP (CONC)(4 IN)
CY 18.000 $700.000 $708.750 $770.000 $600.000 $837.580 $670.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 2.000 $600.000 $1,575.000 $1,500.000 $2,500.000 $1,675.170 $4,200.000
RC PIPE (CL III)(24 IN)
LF 190.000 $200.000 $157.500 $155.000 $200.000 $167.520 $160.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (C)
EA 1.000 $10,000.000 $12,600.000 $12,500.000 $25,000.000 $13,401.340 $11,000.000
SET (TY II) (24 IN) (RCP) (8: 1) (P)
EA 18.000 $2,500.000 $3,255.000 $3,200.000 $3,500.000 $4,076.240 $3,750.000
CLEAN EXIST CULVERTS
EA 1.000 $3,000.000 $2,377.650 $3,100.000 $1,500.000 $3,401.760 $3,700.000
REMOV STR (SET)
EA 18.000 $600.000 $525.000 $510.000 $1,500.000 $558.390 $550.000
REMOV STR (HEADWALL)
EA 1.000 $1,000.000 $2,100.000 $1,000.000 $1,500.000 $1,116.780 $1,500.000
REMOV STR (PIPE)
LF 36.000 $15.000 $21.000 $20.500 $100.000 $22.340 $125.000
MOBILIZATION
LS 1.000 $440,000.000 $344,337.760 $500,000.000 $640,000.000 $582,201.620 $623,500.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $15,000.000 $8,080.860 $18,000.000 $14,000.000 $25,000.000 $20,000.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 275.000 $5.000 $4.990 $5.100 $10.000 $5.300 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 275.000 $1.500 $2.100 $2.050 $3.000 $2.230 $5.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 360.000 $125.000 $150.150 $200.000 $150.000 $558.390 $160.000
INTERSECTIONS (ACP)
SY 2,245.000 $35.000 $23.580 $47.000 $50.000 $50.840 $33.000
DRIVEWAYS (CONC)
SY 39.000 $100.000 $176.540 $155.000 $150.000 $168.230 $200.000
DRIVEWAYS (ACP)
SY 755.000 $35.000 $31.670 $44.000 $50.000 $27.230 $60.000
RUMBLE STRIPS (SHOULDER)
LF 114,825.000 $0.200 $0.160 $0.090 $0.250 $0.170 $0.200
MTL W-BEAM GD FEN (STEEL POST)
LF 225.000 $40.000 $39.380 $44.000 $44.000 $48.020 $43.300
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,500.000 $2,625.000 $3,000.000 $2,800.000 $3,238.660 $3,100.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,400.000 $1,706.250 $1,600.000 $1,650.000 $1,775.680 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 125.000 $5.000 $12.600 $1.600 $3.500 $1.730 $4.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 1.000 $300.000 $525.000 $200.000 $350.000 $217.770 $400.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $2,500.000 $3,675.000 $3,400.000 $3,500.000 $3,674.200 $3,885.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $330.000 $525.000 $210.000 $350.000 $228.940 $400.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 19.000 $800.000 $808.500 $670.000 $850.000 $732.610 $945.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 24.000 $900.000 $1,155.000 $1,100.000 $1,225.000 $1,213.940 $1,360.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 87.000 $900.000 $908.250 $765.000 $950.000 $835.350 $1,055.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 2.000 $1,400.000 $997.500 $950.000 $1,075.000 $1,038.600 $1,195.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 10.000 $1,000.000 $1,312.500 $1,200.000 $1,350.000 $1,301.050 $1,500.000
REMOVE SM RD SN SUP&AM
EA 142.000 $130.000 $105.000 $100.000 $100.000 $120.030 $110.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 6.000 $30.000 $44.100 $13.500 $20.000 $14.800 $22.200
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 20.000 $36.000 $50.400 $33.500 $35.000 $36.570 $38.850
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 265.000 $150.000 $149.100 $84.000 $138.000 $91.580 $153.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 18.000 $150.000 $149.100 $84.000 $138.000 $91.580 $153.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 14,710.000 $0.500 $1.050 $1.000 $1.000 $1.120 $1.100
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 385.000 $0.500 $1.050 $1.000 $1.000 $1.120 $1.100
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 4,140.000 $0.500 $1.050 $1.000 $1.000 $1.120 $1.100
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 11,263.000 $1.000 $1.660 $1.000 $1.000 $2.230 $1.250
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 325.000 $1.000 $1.660 $1.000 $1.000 $2.230 $1.300
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 19,460.000 $0.750 $0.950 $0.920 $0.900 $1.010 $1.000
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 243.000 $10.000 $15.750 $15.500 $15.000 $16.750 $16.650
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 72.000 $150.000 $157.500 $155.000 $150.000 $167.520 $166.500
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 72.000 $150.000 $210.000 $205.000 $200.000 $223.360 $222.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 215.000 $24.000 $42.000 $41.000 $40.000 $44.670 $44.400
REFL PAV MRKR TY I-A
EA 100.000 $3.000 $10.500 $10.000 $10.000 $11.170 $11.100
REFL PAV MRKR TY I-C
EA 1,115.000 $3.000 $4.200 $4.100 $4.000 $4.470 $4.450
REFL PAV MRKR TY II-A-A
EA 175.000 $3.000 $10.500 $10.000 $10.000 $11.170 $11.100
REFL PAV MRKR TY II-C-R
EA 600.000 $6.000 $5.250 $5.100 $5.000 $5.580 $5.550
SP MIXES SP-D SAC-A PG70-28
TON 32,707.000 $115.000 $105.100 $111.700 $114.250 $115.230 $116.400
UNDERSEAL COURSE
GAL 74,336.000 $4.300 $2.800 $3.800 $4.000 $2.510 $2.850
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $14,000.000 $8,542.680 $7,700.000 $15,500.000 $18,000.000 $22,000.000
HPPM W/RET REQ TY I(W)4"(BRK)(090MIL)
LF 15,915.000 $0.500 $0.480 $0.470 $0.460 $0.510 $0.500
HPPM W/RET REQ TY I(W)4"(SLD)(090MIL)
LF 57,515.000 $0.400 $0.470 $0.460 $0.450 $0.500 $0.500
HPPM W/RET REQ TY I(Y)4"(BRK)(090MIL)
LF 385.000 $0.500 $1.050 $1.000 $1.000 $1.120 $1.100
HPPM W/RET REQ TY I(Y)4"(SLD)(090MIL)
LF 55,680.000 $0.400 $0.470 $0.460 $0.450 $0.500 $0.500
TMA (STATIONARY)
DAY 81.000 $300.000 $362.950 $255.000 $425.000 $296.840 $550.000
TMA (MOBILE OPERATION)
HR 240.000 $80.000 $96.970 $92.000 $95.000 $77.810 $95.000
Totals: $5,883,459.800 $5,275,866.951 $5,874,710.350 $6,220,396.150 $6,238,622.980 $6,250,418.350