CRANE US 385 (0229-03-035)

Items: 124

County: CRANE
Length: N/A
Highway: US 385
District: ODESSA
Control Number: 0229-03-035
DBE Goal: N/A
Project: NH 2018(881)
Guaranty: N/A
Time: 390 WORKING DAYS
Engineer's Estimate: $25,971,706.30
Date: 05/02/2018 (8 years ago)
Contract Number: N/A
Type: WIDENING TO AN ULTIMATE 4-LANE DIVIDED HIGHWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$25,971,706.30
$20,285,448.77
Over/Under Est: -21.89% -$5,686,257.53
Over/Under Est: -14.56% -$3,780,563.84
Amt Left: 9.39% $1,905,693.69
$23,833,277.52
Over/Under Est: -8.23% -$2,138,428.78
Amt Left: 17.49% $3,547,828.75
Delta: -7.40% -$1,642,135.06
$24,575,225.47
Over/Under Est: -5.38% -$1,396,480.83
Amt Left: 21.15% $4,289,776.70
Delta: -3.11% -$741,947.95
Over/Under Est: 0.52% $135,432.24
Amt Left: 28.7% $5,821,689.77
Delta: -6.23% -$1,531,913.07
Over/Under Est: 14.94% $3,880,397.99
Amt Left: 47.16% $9,566,655.52
Delta: -14.34% -$3,744,965.75

Bid Items & Bid Tabulations

124 Total 0 of 124
CRANE  |  US 385  |  ODESSA  |  0229-03-035  |  05/02/2018  |  $25,971,706.30  |  NH 2018(881)  |  WIDENING TO AN ULTIMATE 4-LANE DIVID...  |  390 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DELHUR INDUSTRIES, INC.
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
REECE ALBERT, INC.
RK HALL, LLC
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
KIEWIT INFRASTRUCTURE SOUTH CO.
PREPARING ROW
AC 2.300 $30,000.000 $1,200.000 $2,000.000 $3,493.550 $3,375.870 $1,000.000 $6,000.000
PREPARING ROW
STA 306.000 $2,500.000 $480.000 $612.000 $317.700 $402.460 $80.000 $3,338.000
REMOVING CONC (RIPRAP)
SY 2,619.000 $15.000 $24.000 $7.980 $6.360 $12.300 $15.000 $4.000
REMOVING STAB BASE & ASPH PAV (0-6")
SY 1,214.000 $10.000 $3.600 $6.000 $4.730 $2.660 $3.500 $20.000
REMOVING STAB BASE & ASPH PAV (8"-12")
SY 2,055.000 $15.000 $3.600 $7.000 $5.800 $5.120 $5.500 $25.000
EXCAVATION (ROADWAY)
CY 42,352.000 $8.000 $2.800 $4.320 $8.820 $9.270 $4.000 $4.000
EXCAVATION (CHANNEL)
CY 661.000 $15.000 $12.000 $12.000 $14.570 $12.380 $8.000 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 219,120.000 $11.000 $8.520 $14.550 $15.340 $15.710 $10.000 $12.500
EMBANKMENT (FINAL)(DENS CONT)(TY D)
CY 42,352.000 $11.000 $2.980 $7.250 $8.000 $3.960 $3.000 $4.000
BACKFILL (TY A OR B)
STA 306.000 $100.000 $539.300 $210.000 $34.540 $133.400 $150.000 $160.000
BLADING
HR 270.000 $200.000 $180.000 $350.000 $239.410 $154.350 $115.000 $200.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 612,163.000 $0.200 $0.140 $0.080 $0.100 $0.110 $0.120 $0.110
PROOF ROLLING
HR 301.000 $100.000 $120.000 $125.000 $64.100 $105.410 $80.000 $93.000
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 3,767.000 $9.000 $6.230 $21.630 $13.510 $17.430 $13.000 $15.000
FL BS (CMP IN PLC)(TY A GR 4)(12")
SY 151,146.000 $18.000 $9.280 $13.250 $12.360 $12.730 $22.000 $20.000
REWORK BS MTL (TY C) (6") (ORD COMP)
STA 306.000 $18.000 $594.500 $95.000 $88.030 $124.090 $925.000 $20.000
PRIME COAT (AE-P)
GAL 1,758.000 $4.000 $7.150 $4.280 $4.450 $4.920 $4.000 $1.900
PRIME COAT (MC-30)
GAL 29,487.000 $4.000 $5.230 $3.760 $4.430 $4.020 $4.000 $3.770
FOG SEAL (CSS-1H)
GAL 31,336.000 $4.000 $3.410 $2.880 $3.620 $2.800 $4.000 $2.000
SUPERPAVE MIXTURES SP-B PG70-22
TON 54,590.000 $70.000 $75.040 $70.750 $78.510 $76.560 $85.000 $93.000
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
TON 607.000 $100.000 $94.030 $152.000 $171.400 $90.560 $90.000 $123.000
SUPERPAVE MIXTURES SP-C PG64-22(LEV-UP)
TON 21,034.000 $85.000 $74.230 $67.000 $83.380 $78.840 $80.000 $97.000
STONE-MTRX-ASPH SMAR-F SAC-A
TON 23,029.000 $125.000 $127.110 $111.000 $132.490 $118.010 $124.000 $153.000
CEM STABIL BKFL
CY 470.000 $100.000 $180.000 $79.800 $213.640 $84.000 $75.000 $390.000
CUT & RESTORING PAV
SY 525.000 $100.000 $36.000 $56.000 $83.010 $8.400 $33.000 $112.000
TEMPORARY SPL SHORING
SF 3,130.000 $50.000 $18.000 $10.820 $21.210 $11.340 $13.000 $11.000
CLASS S CONC UTILITY PROTECTION PADDING
CY 73.000 $1,350.000 $780.000 $730.800 $686.300 $766.500 $1,000.000 $1,000.000
RIPRAP (CONC)(5 IN)
CY 623.000 $500.000 $544.000 $651.000 $530.390 $683.550 $400.000 $1,100.000
RIPRAP (CONC)(DISSIPATER)
CY 16.000 $900.000 $1,200.000 $2,072.700 $941.100 $2,176.650 $450.000 $3,500.000
GABION MATTRESSES (GALV)(12 IN)
SY 2,199.000 $115.000 $34.240 $87.150 $59.670 $59.830 $75.000 $157.000
CONC BOX CULV (4 FT X 2 FT)
LF 370.000 $250.000 $199.570 $299.250 $241.460 $314.160 $275.000 $432.000
CONC BOX CULV (7 FT X 3 FT)
LF 257.000 $550.000 $385.470 $531.830 $461.470 $558.390 $470.000 $745.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 87.000 $420.000 $178.830 $316.160 $240.420 $331.910 $480.000 $475.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 1,245.000 $470.000 $183.840 $292.430 $365.970 $307.130 $575.000 $372.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 214.000 $500.000 $221.020 $331.700 $266.840 $348.290 $520.000 $454.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 291.000 $550.000 $241.750 $359.940 $289.910 $378.000 $550.000 $330.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 610.000 $550.000 $251.760 $473.870 $317.790 $497.600 $550.000 $542.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 671.000 $550.000 $261.760 $425.670 $331.010 $446.990 $565.000 $290.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 782.000 $550.000 $323.980 $443.940 $459.880 $466.200 $600.000 $550.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 411.000 $600.000 $348.290 $523.220 $410.510 $549.360 $650.000 $600.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 1,736.000 $650.000 $396.190 $359.420 $541.150 $377.370 $700.000 $700.000
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
LF 505.000 $600.000 $385.470 $567.320 $504.500 $595.670 $675.000 $630.000
CONC BOX CULV (7 FT X 4 FT)(EXTEND)
LF 147.000 $600.000 $412.640 $652.160 $478.610 $684.810 $700.000 $750.000
CONC BOX CULV (7 FT X 2 FT)(EXTEND)
LF 87.000 $1,000.000 $352.580 $514.920 $413.190 $540.650 $785.000 $770.000
RC PIPE (CL III)(18 IN)
LF 126.000 $65.000 $88.000 $74.760 $63.330 $78.440 $85.000 $180.000
RC PIPE (CL III)(24 IN)
LF 1,070.000 $70.000 $99.000 $93.660 $78.450 $98.390 $90.000 $190.000
RC PIPE (CL V)(24 IN)
LF 78.000 $250.000 $99.000 $109.620 $91.200 $115.080 $84.000 $200.000
INLET (COMPL)(TY S)
EA 14.000 $3,200.000 $3,551.750 $661.500 $5,262.910 $703.500 $4,000.000 $4,000.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 4.000 $4,200.000 $5,542.660 $3,727.500 $4,303.280 $3,916.500 $6,000.000 $10,000.000
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 8.000 $6,000.000 $5,390.000 $7,854.000 $6,749.570 $8,946.000 $4,775.000 $5,450.000
SET (TY I)(S=3 FT)(HW= 4 FT)(6:1)(C)
EA 5.000 $7,000.000 $6,600.000 $11,256.000 $9,495.010 $12,810.000 $6,400.000 $7,000.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (P)
EA 10.000 $7,000.000 $6,600.000 $7,854.000 $7,063.880 $8,935.500 $8,200.000 $5,000.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
EA 4.000 $9,500.000 $7,700.000 $8,221.500 $12,195.990 $9,366.000 $7,600.000 $12,000.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(6:1) (C)
EA 2.000 $7,500.000 $9,460.000 $13,041.000 $11,361.230 $14,857.500 $9,400.000 $10,000.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
EA 8.000 $5,000.000 $8,250.000 $6,636.000 $7,741.940 $7,560.000 $8,700.000 $7,800.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $5,500.000 $8,800.000 $9,072.000 $9,490.920 $10,332.000 $8,000.000 $9,000.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (C)
EA 7.000 $9,000.000 $12,100.000 $11,728.500 $11,172.970 $13,356.000 $10,500.000 $16,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 3.000 $9,000.000 $8,360.000 $12,400.500 $7,642.220 $14,122.500 $6,600.000 $4,000.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(6:1) (C)
EA 8.000 $10,000.000 $13,200.000 $8,421.000 $9,200.560 $9,586.500 $10,500.000 $10,500.000
SET (TY I)(S= 6 FT)(HW= 7 FT)(4:1) (C)
EA 28.000 $12,500.000 $11,000.000 $4,168.500 $6,505.120 $4,746.000 $10,000.000 $10,000.000
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1) (C)
EA 3.000 $10,000.000 $7,370.000 $7,864.500 $7,254.790 $8,956.500 $10,000.000 $5,500.000
SET (TY I)(S= 7 FT)(HW= 4 FT)(6:1) (C)
EA 6.000 $10,000.000 $14,300.000 $11,308.500 $11,096.430 $12,873.000 $11,500.000 $10,000.000
SET (TY I)(S= 7 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $9,000.000 $13,200.000 $19,288.500 $13,625.620 $21,955.500 $10,500.000 $15,000.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,200.000 $1,320.000 $2,646.000 $2,424.270 $2,782.500 $1,650.000 $2,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 4.000 $1,200.000 $2,200.000 $3,643.500 $2,369.700 $3,822.000 $2,100.000 $2,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 12.000 $1,200.000 $2,200.000 $3,643.500 $2,238.770 $3,822.000 $1,800.000 $2,000.000
CLEAN EXIST CULVERTS
EA 62.000 $2,000.000 $2,200.000 $2,121.000 $1,244.240 $2,226.000 $1,100.000 $750.000
REMOV STR (SET)
EA 11.000 $500.000 $220.000 $1,365.000 $1,277.160 $1,428.000 $600.000 $450.000
REMOV STR (WINGWALL)
EA 2.000 $1,500.000 $880.000 $472.500 $2,554.330 $493.500 $2,700.000 $1,000.000
REMOV STR (HEADWALL)
EA 14.000 $1,500.000 $880.000 $472.500 $1,277.160 $493.500 $2,000.000 $1,000.000
REMOV STR (PIPE)
LF 204.000 $15.000 $16.500 $18.900 $12.780 $18.900 $30.000 $10.000
REMOV STR (BOX CULVERT)
LF 95.000 $130.000 $16.500 $144.900 $74.040 $152.250 $60.000 $500.000
MOBILIZATION
LS 1.000 $2,416,000.000 $1,561,130.000 $1,300,000.000 $1,776,000.000 $2,162,584.290 $2,600,000.000 $2,880,714.140
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $7,000.000 $15,447.900 $15,000.000 $14,510.160 $20,443.110 $7,500.000 $10,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 448.000 $20.000 $18.000 $29.000 $37.300 $12.060 $40.000 $41.000
CONSTRUCTION EXITS (REMOVE)
SY 448.000 $10.000 $12.000 $11.000 $8.620 $3.700 $9.000 $9.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 3,392.000 $5.000 $5.500 $5.550 $5.330 $5.840 $6.000 $5.800
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,392.000 $1.000 $1.100 $0.440 $0.420 $1.390 $0.490 $0.500
CONSTRUCTING DETOURS
SY 1,645.000 $40.000 $36.000 $35.000 $34.760 $30.360 $52.000 $15.000
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
LF 7,350.000 $16.000 $11.880 $36.560 $32.370 $78.750 $56.000 $81.000
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
LF 450.000 $12.000 $27.610 $21.110 $23.070 $15.750 $17.000 $16.200
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
LF 7,350.000 $11.000 $11.880 $20.060 $6.160 $21.000 $6.000 $21.600
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 119,920.000 $0.150 $0.140 $0.130 $0.140 $0.130 $0.100 $0.130
REMOVE METAL BEAM GUARD FENCE
LF 700.000 $3.000 $2.200 $10.500 $3.720 $4.200 $3.000 $4.320
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $250.000 $1,650.000 $2,625.000 $581.350 $420.000 $500.000 $431.500
CRASH CUSH ATTEN (INSTL)
EA 32.000 $12,500.000 $6,814.500 $8,411.300 $8,111.580 $9,450.000 $3,200.000 $9,710.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,000.000 $1,200.000 $2,750.000 $496.550 $2,100.000 $2,500.000 $2,160.000
CRASH CUSH ATTEN (REMOVE)
EA 32.000 $1,000.000 $220.000 $1,371.300 $439.010 $1,575.000 $1,237.310 $1,620.000
WIRE FENCE (TY A)
LF 1,559.000 $20.000 $24.000 $15.750 $22.670 $21.000 $16.350 $22.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 10.000 $550.000 $489.500 $677.250 $448.340 $677.250 $513.950 $696.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 8.000 $550.000 $742.500 $929.250 $680.060 $929.250 $779.590 $955.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 33.000 $600.000 $577.500 $798.000 $528.940 $798.000 $606.340 $820.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 16.000 $750.000 $665.500 $813.750 $609.540 $813.750 $698.740 $836.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U-EXAL)
EA 1.000 $800.000 $781.000 $992.250 $715.330 $992.250 $820.010 $1,019.000
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
EA 1.000 $1,000.000 $671.000 $861.000 $614.580 $861.000 $704.510 $885.000
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 1.000 $1,200.000 $935.000 $1,260.000 $856.380 $1,260.000 $981.700 $1,294.000
REMOVE SM RD SN SUP&AM
EA 14.000 $80.000 $93.500 $100.000 $85.640 $51.600 $98.170 $94.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 19.000 $70.000 $71.500 $92.400 $65.490 $92.400 $67.110 $95.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)SRF
EA 11.000 $90.000 $93.500 $112.350 $85.640 $112.350 $87.310 $115.000
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
EA 8.000 $100.000 $68.200 $92.400 $62.470 $92.400 $54.280 $95.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 52.000 $75.000 $71.500 $92.400 $65.490 $92.400 $64.860 $95.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 40.000 $50.000 $22.000 $25.000 $20.150 $45.150 $25.940 $20.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 64,355.000 $0.300 $0.150 $0.150 $0.140 $0.150 $0.100 $0.160
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 5,593.000 $0.200 $0.150 $0.150 $0.140 $0.150 $0.100 $0.160
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 22,830.000 $0.200 $0.150 $0.150 $0.140 $0.150 $0.100 $0.160
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 566.000 $5.000 $9.900 $9.450 $9.070 $9.450 $5.330 $9.710
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 9,593.000 $1.000 $1.100 $1.350 $1.770 $2.690 $1.150 $1.070
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,315.000 $1.000 $1.100 $1.350 $1.770 $2.690 $1.150 $0.690
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 7,599.000 $1.000 $0.830 $0.790 $0.760 $0.790 $0.740 $0.810
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 16.000 $105.000 $198.000 $189.000 $181.350 $189.000 $106.560 $194.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 16.000 $175.000 $242.000 $231.000 $221.650 $231.000 $106.560 $237.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 96.000 $35.000 $16.500 $15.750 $15.110 $15.750 $20.530 $16.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 1,476.000 $3.000 $3.300 $3.150 $3.020 $3.150 $2.910 $3.250
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 12,428.000 $0.400 $0.390 $0.370 $0.350 $0.370 $0.370 $0.380
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 64,085.000 $0.400 $0.350 $0.340 $0.320 $0.340 $0.370 $0.350
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 70,998.000 $0.300 $0.350 $0.340 $0.320 $0.340 $0.370 $0.350
REFL PAV MRKR TY II-A-A
EA 373.000 $3.000 $3.300 $3.150 $3.020 $3.150 $3.840 $3.250
REFL PAV MRKR TY II-C-R
EA 1,006.000 $3.000 $3.300 $3.150 $3.020 $3.150 $3.840 $3.250
ELIM EXT PAV MRK & MRKS (4")
LF 9,860.000 $1.000 $0.410 $0.390 $0.370 $0.390 $0.450 $0.400
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $15,400.000 $25,200.000 $19,296.030 $10,251.960 $16,252.910 $16,180.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $10,000.000 $8,800.000 $3,500.000 $5,917.450 $10,594.220 $8,084.590 $15,000.000
DEAD END ROADWAY BARRICADE
LF 50.000 $100.000 $110.000 $86.100 $70.530 $86.100 $173.240 $100.000
TMA (STATIONARY)
EA 2.000 $50,000.000 $22,000.000 $24,080.000 $27,850.610 $26,460.610 $55,670.220 $5,000.000
TMA (MOBILE OPERATION)
HR 1,120.000 $50.000 $120.000 $14.000 $1.290 $75.600 $84.710 $71.000
Totals: $25,971,706.300 $20,285,448.770 $22,191,142.460 $23,833,277.525 $24,575,225.471 $26,107,138.540 $29,852,104.290