Show Job Controls
Bid Cobra

REAGAN US 67 (0076-08-027)

Items: 109

County: REAGAN
Length: N/A
Highway: US 67
District: SAN ANGELO
Control Number: 0076-08-027
DBE Goal: N/A
Project: STP 2020(652)
Guaranty: N/A
Time: 469 WORKING DAYS
Engineer's Estimate: $25,494,788.80
Date: 03/04/2020 (6 years ago)
Contract Number: N/A
Type: ADD PASSING LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$25,494,788.80
$23,698,271.40
Over/Under Est: -7.05% -$1,796,517.40
Over/Under Est: 16.25% $4,142,998.75
Amt Left: 25.06% $5,939,516.15
$30,372,287.94
Over/Under Est: 19.13% $4,877,499.14
Amt Left: 28.16% $6,674,016.54
Delta: -2.48% -$734,500.39

Bid Items & Bid Tabulations

109 Total 0 of 109
REAGAN  |  US 67  |  SAN ANGELO  |  0076-08-027  |  03/04/2020  |  $25,494,788.80  |  STP 2020(652)  |  ADD PASSING LANES  |  469 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
REECE ALBERT, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
RK HALL, LLC
PREPARING ROW
STA 979.000 $350.000 $221.540 $283.880 $281.750
PREPARING ROW(TREE)(5" TO 12" DIA)
EA 16.000 $1,000.000 $435.620 $479.120 $1,380.000
REMOVING CONC (RIPRAP)
SY 208.000 $22.000 $10.890 $13.000 $139.190
REMOVING CONC (DRIVEWAYS)
SY 549.000 $20.000 $21.470 $194.180 $79.220
REMOVING CONCRETE(MOW STRIP)
LF 350.000 $12.000 $7.240 $29.950 $11.570
REMOVING STAB BASE AND ASPH PAV (2")
SY 21,209.000 $3.500 $1.910 $1.500 $2.640
REMOVING STAB BASE & ASPH PAV (12")
SY 77,329.000 $7.000 $1.730 $2.770 $12.080
REMOVING STAB BASE & ASPH PAV (0-2")
SY 489.000 $3.000 $11.570 $11.930 $33.240
REMOVING STAB BASE AND ASPH PAV(8")
SY 3,451.000 $6.000 $5.750 $7.950 $25.670
EXCAVATION (ROADWAY)
CY 20,594.000 $10.000 $15.880 $14.810 $6.580
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 25,936.000 $20.000 $8.430 $7.340 $7.110
BACKFILL (TY A OR B)
STA 945.000 $150.000 $139.510 $116.390 $304.820
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 153,623.000 $0.200 $0.150 $0.170 $0.150
DRILL SEEDING (TEMP) (WARM)
SY 76,811.000 $0.200 $0.130 $0.140 $0.150
DRILL SEEDING (TEMP) (COOL)
SY 76,811.000 $0.200 $0.130 $0.140 $0.150
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 46,306.000 $40.000 $43.320 $46.750 $57.240
PRIME COAT (MC-30)
GAL 35,275.000 $5.000 $4.130 $5.490 $4.970
FOG SEAL (CSS-1H)
GAL 5,627.000 $3.500 $5.130 $3.850 $5.580
AGGR(TY-PB GR-4 SAC-A)
CY 6,387.000 $115.000 $120.520 $141.460 $138.100
ASPH (AC-20-5TR OR AC-20XP)
GAL 256,743.000 $4.000 $3.370 $5.240 $4.030
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 11,040.000 $55.000 $44.860 $112.470 $60.100
PLANE ASPH CONC PAV(0" TO 2")
SY 489.000 $2.000 $7.940 $2.780 $29.650
PLANE ASPH CONC PAV (1.5")
SY 1,055.000 $2.000 $4.470 $2.910 $10.060
PLANE ASPH CONC PAV (2")
SY 21,698.000 $2.250 $2.000 $1.750 $1.910
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 634.000 $1.750 $6.520 $2.720 $20.950
CEM STABIL BKFL
CY 77.000 $200.000 $217.810 $260.030 $230.000
CONC STR REPAIR (STANDARD)
SF 3.000 $300.000 $54.450 $65.010 $57.500
RIPRAP (STONE COMMON)(GROUT)(8 IN)
CY 33.000 $255.000 $190.590 $227.540 $201.250
RIPRAP (MOW STRIP)(4 IN)
CY 36.000 $600.000 $707.890 $868.410 $747.500
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 130.000 $650.000 $735.110 $877.620 $776.250
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 6.000 $800.000 $762.340 $910.130 $805.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 51.000 $850.000 $789.570 $942.640 $833.750
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 88.000 $950.000 $871.250 $1,040.160 $920.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 67.000 $900.000 $898.470 $1,072.650 $948.750
RC PIPE (CL III)(24 IN)
LF 96.000 $140.000 $108.910 $130.020 $115.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 1.000 $8,500.000 $6,534.340 $7,801.140 $6,900.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $22,000.000 $19,603.030 $23,403.430 $20,700.000
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 18.000 $7,000.000 $6,534.340 $7,801.140 $6,900.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 1.000 $8,000.000 $8,167.930 $9,751.430 $8,625.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
EA 1.000 $8,500.000 $8,712.450 $10,401.520 $9,200.000
SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C)
EA 11.000 $9,000.000 $10,346.040 $12,351.810 $10,925.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
EA 17.000 $10,000.000 $8,712.460 $10,401.520 $9,200.000
SET (TY I)(S= 7 FT)(HW= 5 FT)(4:1) (C)
EA 3.000 $11,000.000 $13,068.690 $15,602.290 $13,800.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 16.000 $1,500.000 $2,178.110 $2,600.380 $2,300.000
CLEAN EXIST CULVERTS
EA 34.000 $2,000.000 $2,178.110 $2,600.380 $4,966.760
MOBILIZATION
LS 1.000 $2,110,000.000 $1,107,558.900 $2,791,380.480 $1,239,942.550
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 27.000 $10,000.000 $11,808.150 $25,000.000 $21,958.340
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 3,060.000 $40.000 $42.700 $46.970 $67.060
ROCK FILTER DAMS (REMOVE)
LF 3,060.000 $10.000 $12.890 $14.180 $21.040
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,638.000 $30.000 $36.270 $39.890 $27.390
CONSTRUCTION EXITS (REMOVE)
SY 1,638.000 $10.000 $11.340 $12.470 $21.040
SANDBAGS FOR EROSION CONTROL
EA 12.000 $10.000 $35.230 $38.750 $28.750
TEMP SEDMT CONT FENCE (INSTALL)
LF 44,620.000 $5.000 $2.230 $2.460 $2.360
TEMP SEDMT CONT FENCE (REMOVE)
LF 44,620.000 $1.000 $0.460 $0.500 $0.480
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 720.000 $5.000 $5.430 $5.980 $8.140
BIODEG EROSN CONT LOGS (REMOVE)
LF 720.000 $1.500 $2.070 $2.280 $2.030
CONSTRUCTING DETOURS
SY 4,171.000 $80.000 $61.040 $64.430 $73.530
DRIVEWAYS (CONC)
SY 549.000 $100.000 $130.690 $156.030 $211.660
DRIVEWAYS (SURF TREAT)
SY 1,371.000 $45.000 $35.700 $25.370 $86.930
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 186,032.000 $0.150 $0.160 $0.120 $0.170
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 95,295.000 $0.200 $0.240 $0.130 $0.250
MTL W-BEAM GD FEN (STEEL POST)
LF 475.000 $25.000 $38.120 $34.140 $32.780
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,050.000 $3,267.180 $1,617.050 $1,552.500
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 50.000 $80.000 $108.910 $65.880 $63.250
REMOVE METAL BEAM GUARD FENCE
LF 250.000 $4.000 $10.890 $4.790 $4.600
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,800.000 $4,900.760 $3,892.890 $3,737.500
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $325.000 $544.530 $479.120 $460.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 77.000 $675.000 $956.190 $1,000.170 $960.250
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 27.000 $800.000 $1,201.230 $1,161.880 $1,115.500
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 13.000 $850.000 $1,261.130 $1,251.710 $1,201.750
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $800.000 $1,102.130 $1,096.000 $1,052.250
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 13.000 $1,050.000 $1,461.510 $1,383.470 $1,328.250
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 9.000 $1,150.000 $1,599.820 $1,479.300 $1,420.250
REMOVE SM RD SN SUP&AM
EA 86.000 $150.000 $98.050 $119.780 $144.040
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 2,670.000 $0.300 $0.140 $0.160 $0.400
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 402,957.000 $0.300 $0.140 $0.160 $0.320
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 86.000 $2.500 $3.270 $3.590 $13.800
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 440,557.000 $0.300 $0.140 $0.160 $0.320
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 134.000 $4.000 $2.830 $3.110 $5.180
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 11,364.000 $4.000 $2.830 $3.110 $5.180
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 9,813.000 $3.000 $1.310 $2.400 $2.590
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 46,634.000 $3.000 $1.330 $2.400 $2.190
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
LF 2,463.000 $0.350 $0.380 $0.420 $1.380
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 8,552.000 $0.850 $0.610 $0.670 $0.980
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 136.000 $8.000 $4.440 $4.890 $13.800
REFL PAV MRK TY II (W) 4" (BRK)
LF 30,040.000 $0.150 $0.120 $0.130 $0.240
REFL PAV MRK TY II (W) 4" (DOT)
LF 4,926.000 $0.150 $0.120 $0.130 $0.320
REFL PAV MRK TY II (W) 4" (SLD)
LF 393,410.000 $0.150 $0.120 $0.130 $0.180
REFL PAV MRK TY II (W) 8" (SLD)
LF 17,104.000 $0.300 $0.270 $0.300 $0.460
REFL PAV MRK TY II (W) 24" (SLD)
LF 272.000 $2.500 $3.270 $3.590 $4.600
REFL PAV MRK TY II (Y) 4" (SLD)
LF 733,216.000 $0.150 $0.120 $0.130 $0.180
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 15,020.000 $0.350 $0.380 $0.420 $0.520
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 196,705.000 $0.350 $0.380 $0.420 $0.520
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 366,608.000 $0.350 $0.380 $0.420 $0.520
PREFAB PAV MRK TY C (W) (ARROW)
EA 19.000 $250.000 $299.490 $329.400 $287.500
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 16.000 $550.000 $707.890 $778.580 $448.500
PREFAB PAV MRK TY C (W) (WORD)
EA 19.000 $300.000 $353.940 $389.290 $322.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 24.000 $35.000 $43.560 $47.910 $51.750
REFL PAV MRKR TY I-C
EA 1,210.000 $4.000 $3.270 $3.590 $3.740
REFL PAV MRKR TY II-A-A
EA 6,185.000 $4.000 $3.270 $3.590 $3.450
REFL PAV MRKR TY II-C-R
EA 78.000 $4.000 $3.270 $3.590 $2.300
ELIM EXT PAV MRK & MRKS (4")
LF 267,515.000 $0.600 $0.820 $0.900 $0.630
FULL - WIDTH MOWING
CYC 4.000 $10,000.000 $11,761.820 $29,346.380 $12,420.000
LITTER REMOVAL
CYC 4.000 $5,000.000 $11,730.570 $18,213.720 $10,016.750
SP MIXES SP-C SAC-A PG70-22
TON 130,557.000 $100.000 $103.520 $114.900 $127.720
TACK COAT
GAL 69,337.000 $4.000 $2.200 $3.530 $4.570
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 904.000 $100.000 $44.150 $101.720 $78.130
TMA (STATIONARY)
DAY 372.000 $200.000 $248.840 $409.360 $399.620
TMA (MOBILE OPERATION)
DAY 122.000 $250.000 $525.600 $886.610 $516.550
Totals: $25,494,788.800 $23,698,271.400 $29,637,787.550 $30,372,287.940