SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
Engineer's Estimate
Average:
$9,545.90
Maximum:
$23,000.00
Minimum:
$1,750.00
Bid Information
Average Bid:
$11,358.51
