GRAY SH 152 (0455-03-038)

Items: 93

County: GRAY
Length: N/A
Highway: SH 152
District: AMARILLO
Control Number: 0455-03-038
DBE Goal: 500.0%
Project: F 2B24(078)
Guaranty: N/A
Time: 193 WORKING DAYS
Engineer's Estimate: $18,393,817.44
Date: 05/02/2024 (2 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
ZACHARY MAYER
IVAN FUENTES
DARRELL CALDWELL
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$18,393,817.44
1
$17,457,097.32
Over/Under Est: -5.09% -$936,720.12
$17,566,864.25
Over/Under Est: -4.5% -$826,953.19
Amt Left: 0.63% $109,766.93
Over/Under Est: -1.57% -$288,814.36
Amt Left: 3.71% $647,905.76
Delta: -3.06% -$538,138.83
Subcontractor Percentage Amount
W. S. CONSTRUCTION COMPANY 6.31% $1,195,675.80
INDUSTRIAL FABRICS, INC. 4.33% $820,487.52
BAHENA CONSTRUCTION CO., INC. 2.91% $551,413.09
TRP CONSTRUCTION GROUP, LLC 1.77% $335,395.59
H & F TRUCKING 1.39% $263,389.76
TEXOP CONSTRUCTION 1.07% $202,753.27
DUSTIN ALLEN, INC. 0.53% $100,429.19
DK CONTRACTING, LLC 0.23% $43,582.48
BARRICADES UNLIMITED 0.16% $30,318.25
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.10% $18,948.90
PROFESSIONAL TRAFFIC CONTROL LLC 0.08% $15,159.12
ALAMO BROTHERS CONCRETE INC 0.00% $0.00
Total: 18.88% $3,577,552.97

Bid Items & Bid Tabulations

93 Total 0 of 93
GRAY  |  SH 152  |  AMARILLO  |  0455-03-038  |  05/02/2024  |  $18,393,817.44  |  F 2B24(078)  |  HWY IMPRV  |  193 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
J. LEE MILLIGAN, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
PREPARING ROW
STA 287.000 $200.000 $48.530 $16.000 $100.000
REMOVING CONC (CURB AND GUTTER)
LF 257.000 $15.000 $32.980 $61.500 $40.000
REMOVING CONC (FLUME)
SY 73.000 $60.000 $32.400 $47.000 $87.730
REMOVING CONCRETE(MOW STRIP)
LF 198.000 $16.260 $33.450 $32.000 $42.310
EXCAVATION (ROADWAY)
CY 14,842.000 $15.000 $19.440 $21.500 $17.990
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 7,342.000 $35.000 $18.080 $26.000 $16.410
BACKFILL (TY A)
STA 287.000 $179.300 $223.420 $470.000 $384.770
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 13.270 $583.870 $621.000 $610.000 $699.970
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 13.270 $500.000 $464.400 $455.000 $523.460
FL BS (CMP IN PLC)(TY A OR B GR 4)(9")
SY 69,778.000 $34.000 $30.790 $27.000 $24.390
REWORK BS MTL (TY B)(15")(DEN CONT)
SY 35,000.000 $24.000 $22.990 $22.000 $11.980
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 874.000 $340.000 $414.810 $400.000 $476.480
LIME TRT (SUBGRADE)(8")
SY 74,694.000 $6.000 $6.200 $5.500 $4.110
PRIME COAT (MC-30)
GAL 16,898.000 $5.250 $5.200 $5.150 $6.740
EMULS ASPH (EROSN CONT)(MULTI)
GAL 6,776.000 $6.000 $4.210 $5.750 $5.430
ASPH (AC-5)
GAL 25,684.000 $5.000 $3.520 $4.750 $5.270
AGGR(TY-B GR-3 SAC-A)
CY 614.000 $210.000 $217.670 $160.000 $171.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 15,814.000 $28.000 $30.000 $46.000 $41.650
PLANE ASPH CONC PAV(0" TO 3")
SY 4,384.000 $3.500 $6.490 $9.700 $8.130
PLANE ASPH CONC PAV (2")
SY 36,549.000 $1.500 $2.810 $3.250 $3.030
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 13,060.000 $1.500 $3.300 $2.550 $3.560
TEMPORARY SPL SHORING
SF 300.000 $35.000 $108.000 $110.000 $66.950
RIPRAP (CONC)(4 IN)
CY 190.000 $850.000 $783.000 $560.000 $1,305.820
RIPRAP (CONC)(5 IN)
CY 0.800 $2,500.000 $1,620.000 $650.000 $2,434.690
RIPRAP (MOW STRIP)(4 IN)
CY 147.000 $850.000 $810.000 $755.000 $870.400
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 25.000 $640.000 $1,296.000 $1,550.000 $1,156.480
RC PIPE (CL III)(18 IN)
LF 30.000 $250.000 $124.200 $220.000 $115.650
RC PIPE (CL III)(24 IN)
LF 483.000 $250.000 $172.800 $155.000 $170.430
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
EA 1.000 $11,000.000 $10,800.000 $14,500.000 $13,999.470
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)
EA 1.000 $8,640.000 $12,960.000 $15,800.000 $17,042.830
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $1,000.000 $2,160.000 $3,900.000 $2,434.690
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 30.000 $1,500.000 $2,916.000 $4,300.000 $2,921.630
ADJUSTING MANHOLES
EA 20.000 $2,500.000 $3,780.000 $2,200.000 $3,043.360
CLEAN EXIST CULVERTS
EA 5.000 $6,000.000 $1,620.000 $3,700.000 $6,086.730
REMOV STR (SET)
EA 34.000 $1,530.000 $324.000 $1,300.000 $608.670
REMOV STR (WINGWALL)
EA 2.000 $4,000.000 $2,160.000 $1,500.000 $1,217.350
REMOV STR (PIPE)
LF 463.000 $30.000 $32.400 $55.000 $14.610
REMOV STR (BOX CULVERT)
LF 4.000 $160.000 $216.000 $325.000 $243.470
REMOVE STR (PIPE SUPPORT STRUCTURE)
LF 44.000 $350.000 $54.000 $300.000 $609.220
MOBILIZATION
LS 1.000 $1,575,000.000 $872,854.860 $1,750,000.000 $1,875,138.400
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $23,000.000 $22,616.700 $35,000.000 $35,000.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,060.000 $3.500 $4.160 $10.000 $4.690
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,060.000 $1.300 $1.080 $4.000 $1.220
COLORED TEXTURED CONC (4")
SY 1,713.000 $200.000 $237.600 $104.000 $137.050
CONC CURB & GUTTER (TY II)
LF 257.000 $100.000 $91.800 $53.000 $80.000
INTERSECTIONS (ACP)
SY 9,169.000 $25.000 $27.570 $35.000 $45.220
DRIVEWAYS (CONC)
SY 200.000 $150.000 $135.000 $135.000 $200.000
TURNOUTS (ACP)
SY 37.000 $130.000 $362.750 $90.000 $332.210
DRIVEWAYS (ACP) (TYPE 2)
SY 3,838.000 $60.000 $59.230 $40.000 $54.980
CONC SIDEWALKS (4")
SY 4,895.000 $155.000 $113.400 $75.000 $102.540
CURB RAMPS (TY 7)
SY 627.000 $145.000 $226.800 $175.000 $259.230
RUMBLE STRIPS (SHOULDER)
LF 57,249.000 $0.250 $0.060 $0.350 $0.100
RUMBLE STRIPS (CENTERLINE)
LF 12,125.000 $0.400 $0.100 $0.450 $0.150
CONC DIRECTIONAL ISLAND
SY 45.000 $171.000 $151.200 $100.000 $180.060
MTL W-BEAM GD FEN (STEEL POST)
LF 2,856.000 $30.000 $32.990 $30.000 $34.090
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $2,000.000 $1,535.760 $1,800.000 $2,069.490
REMOVE METAL BEAM GUARD FENCE
LF 510.000 $3.500 $5.400 $2.150 $2.430
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,500.000 $3,465.720 $4,225.000 $4,869.380
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $400.000 $540.000 $215.000 $243.470
RELOCATE EXISTING MAILBOX
EA 3.000 $400.000 $441.720 $850.000 $497.890
ALUMINUM SIGNS (TY A)
SF 129.000 $40.000 $42.120 $79.250 $47.480
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 10.000 $1,166.370 $871.560 $1,600.000 $982.400
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $1,051.050 $1,049.760 $1,600.000 $1,183.260
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,229.910 $1,381.320 $1,640.000 $1,556.980
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,432.810 $1,435.320 $1,700.000 $1,617.850
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 20.000 $750.000 $878.040 $1,100.000 $989.700
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 30.000 $45.000 $57.190 $43.000 $48.690
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 2.000 $150.250 $136.080 $185.000 $153.390
INSTL DEL ASSM (D-DW)SZ 1(WFLX)SRF
EA 4.000 $82.290 $136.080 $200.000 $153.390
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 11.000 $139.580 $136.080 $200.000 $153.390
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 41,990.000 $0.400 $0.320 $0.350 $0.370
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 84,764.000 $0.400 $0.320 $0.350 $0.370
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 13,783.000 $0.880 $1.080 $1.050 $1.220
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
LF 396.000 $5.000 $1.080 $1.050 $1.220
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,933.000 $1.720 $1.350 $1.350 $1.520
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 503.000 $9.600 $10.800 $10.550 $12.170
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 12.000 $384.000 $243.000 $238.000 $273.900
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 12.000 $218.720 $351.000 $345.000 $395.640
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 4.000 $28.000 $108.000 $105.000 $121.730
ELIM EXT PAV MRK & MRKS (4")
LF 126,754.000 $1.000 $0.810 $0.800 $0.910
REINFORMT GRID FOR ASPHALT PVMT OVERLAY
SY 123,842.000 $9.530 $7.130 $7.000 $8.750
SP MIXES SP-D SAC-A PG70-28
TON 43,053.000 $150.000 $156.610 $143.250 $151.430
TACK COAT
GAL 35,614.000 $6.000 $4.640 $6.000 $7.220
UNDERSEAL COURSE
GAL 35,235.000 $6.000 $6.880 $5.000 $4.320
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $19,947.430 $27,000.000 $24,585.260
HPPM W/RET REQ TY I(W)6"(BRK)(090MIL)
LF 4,778.000 $0.800 $1.080 $1.050 $1.220
HPPM W/RET REQ TY I(W)6"(SLD)(090MIL)
LF 67,587.000 $0.600 $0.700 $0.700 $0.790
HPPM W/RET REQ TY I(Y)6"(BRK)(090MIL)
LF 10,199.000 $0.750 $0.910 $0.900 $1.020
HPPM W/RET REQ TY I(Y)6"(SLD)(090MIL)
LF 64,700.000 $0.600 $0.700 $0.700 $0.790
TMA (STATIONARY)
DAY 190.000 $250.000 $486.240 $510.000 $538.090
TMA (MOBILE OPERATION)
HR 100.000 $100.000 $109.860 $100.000 $105.150
REC REFL PAV MRKR TY I-C
EA 296.000 $26.000 $48.600 $47.550 $54.780
REC REFL PAV MRKR TY II-A-A
EA 1,342.000 $26.000 $48.600 $47.550 $54.780
Totals: $18,393,817.445 $17,457,097.328 $17,566,864.250 $18,105,003.088