Show Job Controls
Bid Cobra

HARTLEY FM 281 (1727-01-016)

Items: 78

County: HARTLEY
Length: N/A
Highway: FM 281
District: AMARILLO
Control Number: 1727-01-016
DBE Goal: N/A
Project: STP 2020(512)
Guaranty: N/A
Time: 120 WORKING DAYS
Engineer's Estimate: $8,444,420.72
Date: 01/09/2020 (6 years ago)
Contract Number: N/A
Type: ACP OVERLAY AND PAVEMENT REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$8,444,420.72
$10,006,009.45
Over/Under Est: 18.49% $1,561,588.73
Over/Under Est: 22.27% $1,880,226.47
Amt Left: 3.18% $318,637.74
$10,561,864.09
Over/Under Est: 25.08% $2,117,443.37
Amt Left: 5.56% $555,854.64
Delta: -2.30% -$237,216.90

Bid Items & Bid Tabulations

78 Total 0 of 78
HARTLEY  |  FM 281  |  AMARILLO  |  1727-01-016  |  01/09/2020  |  $8,444,420.72  |  STP 2020(512)  |  ACP OVERLAY AND PAVMT REPAIR  |  120 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. LEE MILLIGAN, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
RK HALL, LLC
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 653.000 $20.000 $50.000 $25.000 $60.000
BACKFILL (TY A OR B)
STA 484.000 $500.000 $472.000 $300.000 $600.000
BLADING
HR 70.000 $100.000 $375.000 $300.000 $170.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 38.420 $800.000 $320.000 $343.020 $333.500
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 38.420 $400.000 $265.000 $283.870 $276.000
EMULS ASPH (EROSN CONT)(MULTI)
GAL 18,595.000 $3.750 $4.250 $5.350 $4.330
D-GR HMA TY-B PG64-22
TON 24,515.000 $90.000 $100.750 $103.000 $114.820
TACK COAT
GAL 22,363.000 $4.000 $4.500 $5.320 $6.520
SUPERPAVE MIXTURES SP-C SAC-A PG70-28
TON 39,619.000 $102.000 $111.000 $123.000 $122.290
TACK COAT
GAL 48,591.000 $4.000 $4.500 $5.320 $6.360
PLANE ASPH CONC PAV(0" TO 1")
SY 1,422.000 $2.500 $14.600 $7.900 $8.630
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 32.000 $200.000 $360.000 $384.410 $373.750
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 52.000 $400.000 $445.000 $473.120 $460.000
CMP (GAL STL 24 IN)
LF 38.000 $200.000 $135.000 $141.940 $138.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 8.000 $800.000 $1,950.000 $827.970 $805.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 20.000 $800.000 $1,980.000 $887.110 $862.500
RC PIPE (CL III)(24 IN)
LF 544.000 $175.000 $130.000 $147.850 $143.750
RC PIPE (CL III)(30 IN)
LF 4.000 $250.000 $565.000 $236.560 $230.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 4.000 $7,000.000 $14,165.000 $11,532.410 $11,212.500
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
EA 4.000 $7,500.000 $13,000.000 $10,053.900 $9,775.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 14.000 $2,500.000 $3,445.000 $1,655.940 $2,434.890
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 36.000 $2,000.000 $3,140.000 $1,537.650 $2,319.890
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 16.000 $2,000.000 $3,350.000 $2,365.620 $3,124.890
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,500.000 $3,960.000 $3,548.430 $4,274.890
SET (TY II) (DES 5) (RCP) (6: 1) (P)
EA 2.000 $4,000.000 $8,500.000 $6,505.460 $7,149.890
CLEAN EXIST CULVERTS
EA 10.000 $2,000.000 $1,750.000 $2,957.030 $2,875.000
REMOV STR (HEADWALL)
EA 22.000 $1,000.000 $1,700.000 $591.410 $575.000
REMOV STR (PIPE)
LF 350.000 $15.000 $50.000 $17.740 $17.250
REMOV STR (BOX CULVERT)
LF 16.000 $50.000 $450.000 $118.280 $115.000
MOBILIZATION
LS 1.000 $650,000.000 $1,000,000.000 $950,985.340 $844,949.120
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $15,000.000 $28,800.000 $30,000.000 $27,482.020
TURNOUTS (ACP)
SY 173.000 $25.000 $190.000 $364.380 $135.000
DRIVEWAYS (BASE)
SY 841.000 $30.000 $42.000 $100.000 $23.000
RUMBLE STRIPS (SHOULDER)
LF 96,644.000 $0.130 $0.150 $0.200 $0.140
RUMBLE STRIPS (CENTERLINE)
LF 47,071.000 $0.250 $0.500 $0.210 $0.140
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 4.000 $300.000 $275.000 $337.100 $327.750
MAILBOX INSTALL-D (TWG-POST) TY 1
EA 1.000 $350.000 $330.000 $360.760 $350.750
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 2.000 $450.000 $500.000 $609.150 $592.250
IN RD IL (TY ST) 50T-8-8 (400W EQ) LED
EA 4.000 $4,800.000 $7,755.000 $8,279.680 $8,050.000
CONDT (PVC) (SCH 40) (2")
LF 960.000 $9.000 $6.650 $7.100 $6.900
CONDT (PVC) (SCH 40) (3")
LF 110.000 $13.000 $22.150 $23.660 $23.000
ELEC CONDR (NO.8) BARE
LF 975.000 $1.750 $1.650 $1.770 $1.730
ELEC CONDR (NO.6) BARE
LF 85.000 $2.200 $1.650 $1.770 $1.730
ELEC CONDR (NO.6) INSULATED
LF 170.000 $2.300 $2.750 $2.960 $2.880
TRAY CABLE (4 CONDR) (10 AWG)
LF 1,415.000 $2.250 $6.650 $7.100 $6.900
GROUND BOX TY B (122322)W/APRON
EA 4.000 $1,200.000 $1,550.000 $1,655.940 $1,610.000
GROUND BOX TY D (162922)W/APRON
EA 1.000 $1,300.000 $1,995.000 $2,129.060 $2,070.000
ZINC-COAT STL WIRE STRAND (3/16")
LF 355.000 $5.000 $5.550 $5.910 $5.750
ZINC-COAT STL WIRE STRAND (5/16")
LF 355.000 $6.000 $5.550 $5.910 $5.750
ELC SRV TY D 120/240 070(NS)AL(E)TP(O)
EA 1.000 $4,750.000 $8,310.000 $8,871.090 $8,625.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 13.000 $900.000 $860.000 $881.190 $856.750
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $1,000.000 $915.000 $936.790 $910.800
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $1,100.000 $1,050.000 $1,023.130 $994.750
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,100.000 $1,165.000 $1,202.920 $1,169.550
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,200.000 $1,100.000 $1,334.210 $1,297.200
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $1,000.000 $1,220.000 $1,342.490 $1,305.250
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $1,100.000 $1,385.000 $1,401.630 $1,362.750
REMOVE SM RD SN SUP&AM
EA 26.000 $110.000 $110.000 $151.770 $230.000
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND(BI)
EA 34.000 $30.000 $166.000 $139.570 $135.700
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 18.000 $40.000 $166.000 $139.570 $135.700
REMOVE DELIN & OBJECT MARKER ASSMS
EA 64.000 $20.000 $17.000 $20.590 $17.250
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 12,520.000 $1.000 $1.200 $2.370 $1.510
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 80.000 $10.000 $38.750 $41.400 $40.250
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 6.000 $17.000 $72.000 $76.880 $74.750
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 97,854.000 $0.300 $0.420 $0.450 $0.440
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 11,926.000 $0.300 $0.420 $0.450 $0.440
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 9,840.000 $0.300 $0.420 $0.450 $0.440
REFL PAV MRKR TY II-A-A
EA 724.000 $3.500 $4.700 $5.030 $4.890
INSTALL HWY TRF SIG (FLASH BEACON)
EA 1.000 $5,000.000 $5,000.000 $5,322.650 $5,175.000
VEH SIG SEC (12")LED(YEL)
EA 4.000 $220.000 $275.000 $295.700 $287.500
VEH SIG SEC (12")LED(RED)
EA 4.000 $220.000 $275.000 $295.700 $287.500
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 340.000 $3.250 $5.550 $5.910 $5.750
INS TRF SIG PL AM (S)STR(TY A)
EA 1.000 $4,000.000 $8,860.000 $9,462.490 $9,200.000
INS TRF SIG PL AM (S)STR(TY B)
EA 1.000 $4,500.000 $9,970.000 $10,645.300 $10,350.000
INS TRF SIG PL AM (S)STR(TY D)LUM
EA 2.000 $6,000.000 $12,185.000 $14,785.140 $14,375.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,500.000 $24,755.000 $24,532.320 $10,766.610
TMA (STATIONARY)
DAY 170.000 $400.000 $800.000 $380.510 $400.000
TMA (MOBILE OPERATION)
HR 700.000 $50.000 $80.000 $88.110 $75.000
Totals: $8,444,420.720 $10,006,009.450 $10,324,647.204 $10,561,864.090