MIDLAND SH 349 (0380-09-092)

Items: 57

County: MIDLAND
Length: N/A
Highway: SH 349
District: ODESSA
Control Number: 0380-09-092
DBE Goal: N/A
Project: STP 2020(389)
Guaranty: N/A
Time: 195 WORKING DAYS
Engineer's Estimate: $36,173,389.50
Date: 12/03/2019 (6 years ago)
Contract Number: N/A
Type: MILL,INLAY,SUBGRADE WIDENING,SIGNS,&PAVEMENT MARK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$36,173,389.50
Over/Under Est: -22.71% -$8,215,305.87
$33,120,640.06
Over/Under Est: -8.44% -$3,052,749.44
Amt Left: 18.47% $5,162,556.43
Over/Under Est: 6.02% $2,178,847.18
Amt Left: 37.18% $10,394,153.05
Delta: -15.80% -$5,231,596.62
Over/Under Est: 12.88% $4,659,807.90
Amt Left: 46.05% $12,875,113.77
Delta: -6.47% -$2,480,960.72
$44,349,000.00
Over/Under Est: 22.6% $8,175,610.50
Amt Left: 58.63% $16,390,916.37
Delta: -8.61% -$3,515,802.60

Bid Items & Bid Tabulations

57 Total 0 of 57
MIDLAND  |  SH 349  |  ODESSA  |  0380-09-092  |  12/03/2019  |  $36,173,389.50  |  STP 2020(389)  |  MILL,INLAY,SUBGRADE WIDENING,SIGNS,&...  |  195 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
FNF CONSTRUCTION, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
RK HALL, LLC
REMOVING CONC (RIPRAP)
SY 80.000 $18.220 $74.550 $31.000 $60.310 $8.000 $77.090
REMOVING STAB BASE AND ASPH PAV(8")
SY 483,056.000 $4.990 $3.250 $4.900 $1.400 $4.000 $8.430
SUBGRADE WIDENING (DENS CONT)
STA 92.000 $676.870 $545.000 $640.000 $174.960 $1,500.000 $1,232.430
BACKFILL (TY B)
STA 1,059.000 $139.810 $120.000 $120.000 $38.780 $300.000 $109.210
BLADING
HR 100.000 $167.480 $350.000 $142.000 $435.190 $200.000 $165.520
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 21,058.000 $0.200 $0.150 $0.500 $0.160 $0.250 $0.430
PROOF ROLLING
HR 100.000 $88.800 $150.000 $107.000 $196.350 $150.000 $143.630
FL BS(RDWY DEL)(TY A, GR4)(2")
SY 31,691.000 $20.000 $2.250 $3.780 $2.470 $10.000 $3.130
REWORK BS MTL (TY C) (6") (DENS CONT)
SY 43,153.000 $1.600 $2.400 $2.800 $2.290 $3.500 $3.270
PRIME COAT (AE-P)
GAL 96,626.000 $4.760 $3.890 $4.000 $5.080 $4.000 $4.850
ASPH (AC-20-5TR)
GAL 245,634.000 $3.710 $3.150 $3.000 $4.530 $7.500 $3.490
AGGR(TY-PB GR-4 SAC-B)
CY 5,896.000 $180.570 $78.500 $60.000 $120.140 $95.000 $138.350
SUPERPAVE MIXTURES SP-B PG70-22
TON 213,215.000 $90.360 $72.000 $81.000 $98.560 $102.000 $120.000
STONE-MTRX-ASPH SMAR-F SAC-A
TON 53,348.000 $109.060 $115.000 $110.000 $142.360 $140.750 $153.720
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 5,205.000 $47.000 $68.500 $80.000 $77.720 $50.000 $81.410
CEM STABIL BKFL
CY 44.000 $147.770 $347.550 $166.000 $256.010 $85.000 $247.500
RC PIPE (CL III)(24 IN)
LF 225.000 $75.530 $113.400 $234.000 $229.460 $75.000 $192.500
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 18.000 $1,234.680 $2,504.250 $1,930.000 $2,882.450 $1,500.000 $2,420.000
MOBILIZATION
LS 1.000 $3,288,897.820 $650,000.000 $3,285,000.000 $3,683,176.300 $4,000,000.000 $1,223,126.110
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $8,749.240 $15,000.000 $26,000.000 $50,000.000 $10,000.000 $15,000.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,680.000 $6.150 $4.850 $13.000 $5.260 $6.000 $11.960
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,680.000 $1.100 $0.890 $4.250 $0.970 $1.000 $3.890
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 98.000 $563.540 $918.750 $830.000 $921.630 $475.000 $1,226.500
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 21.000 $673.230 $1,050.000 $960.000 $1,069.540 $585.000 $1,535.600
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 5.000 $1,153.770 $1,522.500 $1,070.000 $1,198.120 $1,000.000 $2,113.100
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 3.000 $759.480 $1,218.000 $920.000 $1,024.030 $660.000 $1,833.700
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 5.000 $872.870 $1,223.250 $1,120.000 $1,251.590 $850.000 $1,784.200
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 8.000 $1,493.610 $1,795.500 $1,680.000 $1,877.390 $1,200.000 $2,697.200
REMOVE SM RD SN SUP&AM
EA 124.000 $83.810 $85.000 $102.000 $113.780 $95.000 $55.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 20.000 $116.260 $157.500 $112.000 $125.160 $65.000 $115.500
REMOVE DELIN & OBJECT MARKER ASSMS
EA 20.000 $46.940 $50.000 $51.000 $5.690 $23.000 $22.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 62,820.000 $0.280 $0.160 $0.160 $0.170 $0.300 $0.170
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 622,344.000 $0.170 $0.150 $0.150 $0.160 $0.220 $0.150
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 44,394.000 $0.440 $0.340 $0.330 $0.360 $0.600 $0.350
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 25,320.000 $0.190 $0.160 $0.160 $0.170 $0.200 $0.170
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 632,136.000 $0.180 $0.160 $0.160 $0.170 $0.250 $0.170
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 34,908.000 $1.200 $1.460 $1.700 $2.280 $0.750 $3.170
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 32,241.000 $0.950 $1.470 $1.700 $2.280 $0.750 $3.170
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 20,528.000 $0.930 $0.790 $0.800 $0.850 $1.000 $0.830
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 2,144.000 $5.620 $7.350 $7.200 $7.960 $5.000 $7.700
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 21,013.000 $0.430 $0.400 $0.400 $0.430 $0.500 $0.420
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 207,448.000 $0.400 $0.340 $0.350 $0.360 $0.350 $0.350
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 7,950.000 $0.360 $0.470 $0.500 $0.510 $0.320 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 224,594.000 $0.400 $0.340 $0.350 $0.360 $0.330 $0.350
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 45.000 $13.650 $26.250 $26.000 $28.450 $13.000 $27.500
PREFAB PAV MRK TY C (W) (ARROW)
EA 35.000 $232.980 $231.000 $225.000 $250.320 $215.000 $242.000
PREFAB PAV MRK TY C (W) (WORD)
EA 35.000 $277.960 $262.500 $254.000 $284.450 $260.000 $275.000
REFL PAV MRKR TY I-C
EA 1,290.000 $3.500 $2.840 $2.750 $3.070 $3.250 $2.970
REFL PAV MRKR TY II-A-A
EA 398.000 $3.210 $5.250 $5.100 $5.690 $3.000 $5.500
ELIM EXT PAV MRK & MRKS (4")
LF 895,080.000 $0.450 $0.300 $0.300 $0.330 $0.350 $0.320
ELIM EXT PAV MRK & MRKS (8")
LF 29,596.000 $0.660 $0.550 $0.550 $0.590 $0.650 $0.570
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 4.000 $5,453.980 $4,200.000 $4,100.000 $4,551.250 $4,000.000 $4,400.000
BONDING COURSE
GAL 90,369.000 $3.380 $4.230 $4.000 $3.690 $3.150 $4.920
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $11,919.710 $20,350.000 $20,000.000 $19,964.960 $7,000.000 $11,945.670
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $9,102.230 $16,500.000 $8,000.000 $10,779.410 $6,500.000 $11,850.860
TMA (STATIONARY)
DAY 352.000 $189.260 $260.950 $170.000 $359.200 $200.000 $396.930
TMA (MOBILE OPERATION)
HR 800.000 $69.690 $50.000 $86.000 $79.630 $30.000 $74.540
Totals: $36,173,389.500 $27,958,083.630 $33,120,640.060 $38,352,236.680 $40,833,197.400 $44,349,000.000