PREPARING ROW
|
AC
|
10.290
|
$325.000
|
$216.180
|
$395.000
|
$100,000.000
|
$610.160
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
383.000
|
$15.000
|
$24.490
|
$23.000
|
$8.000
|
$12.370
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
68.000
|
$15.000
|
$24.480
|
$31.000
|
$9.000
|
$27.040
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
53.000
|
$15.000
|
$24.490
|
$22.500
|
$12.000
|
$34.430
|
|
|
REMOVING CONC (FLUME)
|
SY
|
67.000
|
$15.000
|
$24.480
|
$33.000
|
$12.500
|
$27.430
|
|
|
REMOVING STAB BASE AND ASPH PAV (3")
|
SY
|
16,977.000
|
$3.000
|
$3.510
|
$3.650
|
$2.000
|
$2.570
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
5.950
|
$1,000.000
|
$1,701.530
|
$1,525.000
|
$540.000
|
$1,612.490
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
432.000
|
$30.000
|
$64.960
|
$61.550
|
$25.000
|
$55.400
|
|
|
BACKFILL (TY A)
|
STA
|
430.000
|
$180.000
|
$213.230
|
$251.000
|
$300.000
|
$103.150
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
60.000
|
$100.000
|
$49.190
|
$41.000
|
$13.000
|
$91.520
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
10.400
|
$330.000
|
$367.200
|
$370.000
|
$350.000
|
$427.110
|
|
|
REWRK BS MATL (TY B)(10")(DENS CONT)
|
SY
|
512.000
|
$10.000
|
$32.910
|
$33.750
|
$3.000
|
$8.400
|
|
|
PRIME COAT (AE-P)
|
GAL
|
4,455.000
|
$4.000
|
$5.130
|
$5.100
|
$7.000
|
$3.420
|
|
|
EMULS ASPH (EROSN CONT)(MS-2)
|
GAL
|
3,048.000
|
$3.750
|
$3.660
|
$4.800
|
$4.000
|
$4.160
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG70-28
|
TON
|
53,673.000
|
$96.000
|
$108.160
|
$103.000
|
$124.000
|
$112.400
|
|
|
TACK COAT
|
GAL
|
61,113.000
|
$4.000
|
$4.200
|
$3.000
|
$3.650
|
$3.890
|
|
|
FLEX PAVEMENT STRUCTURE REPAIR (2.5")
|
SY
|
85,873.000
|
$17.000
|
$18.810
|
$21.950
|
$13.000
|
$24.910
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
58,692.000
|
$2.500
|
$2.860
|
$3.150
|
$1.300
|
$2.710
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
53,117.000
|
$2.500
|
$3.400
|
$3.300
|
$1.400
|
$2.400
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
14.000
|
$300.000
|
$145.800
|
$142.500
|
$125.000
|
$164.740
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
30.000
|
$500.000
|
$178.200
|
$175.000
|
$176.000
|
$201.350
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
273.000
|
$450.000
|
$663.840
|
$525.000
|
$350.000
|
$608.330
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
168.000
|
$75.000
|
$23.760
|
$131.500
|
$14.000
|
$24.410
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
3.000
|
$500.000
|
$1,512.000
|
$3,060.000
|
$365.000
|
$1,525.400
|
|
|
GABION MATTRESSES (GALV)(12 IN)
|
SY
|
93.000
|
$80.000
|
$134.400
|
$125.000
|
$90.000
|
$244.060
|
|
|
INLET (COMPL)(TY SIDEWALK BRIDGE)(MOD)
|
EA
|
2.000
|
$10,000.000
|
$10,259.400
|
$13,000.000
|
$10,000.000
|
$12,203.200
|
|
|
ADJUSTING MANHOLES
|
EA
|
5.000
|
$300.000
|
$1,553.290
|
$2,135.000
|
$700.000
|
$6,101.600
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$600,000.000
|
$635,888.050
|
$979,000.000
|
$1,159,000.000
|
$1,204,741.470
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$15,000.000
|
$22,112.900
|
$25,350.000
|
$10,000.000
|
$32,331.010
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
135.000
|
$3.750
|
$10.800
|
$10.300
|
$3.300
|
$51.330
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
135.000
|
$1.500
|
$3.240
|
$4.900
|
$1.000
|
$30.960
|
|
|
CONCRETE CURB (SPECIAL)
|
LF
|
992.000
|
$25.000
|
$78.450
|
$53.950
|
$33.000
|
$64.900
|
|
|
DRIVEWAYS (CONC)
|
SY
|
116.000
|
$80.000
|
$114.660
|
$196.700
|
$71.000
|
$230.640
|
|
|
CONC SIDEWALKS (4")
|
SY
|
1,228.000
|
$45.000
|
$66.380
|
$52.000
|
$45.000
|
$60.800
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
32,660.000
|
$0.120
|
$0.210
|
$0.150
|
$0.150
|
$0.280
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
41,337.000
|
$0.250
|
$0.230
|
$0.300
|
$0.220
|
$0.370
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
4,400.000
|
$26.000
|
$25.950
|
$27.400
|
$28.000
|
$31.730
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,200.000
|
$2,340.260
|
$2,265.000
|
$1,850.000
|
$1,232.520
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
13.000
|
$1,150.000
|
$1,379.730
|
$1,635.000
|
$1,250.000
|
$1,525.400
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
3.000
|
$1,100.000
|
$1,144.890
|
$1,580.000
|
$1,200.000
|
$1,232.520
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
4,375.000
|
$3.000
|
$3.520
|
$3.150
|
$3.000
|
$14.640
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
7.000
|
$250.000
|
$352.270
|
$370.000
|
$250.000
|
$36.610
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$250.000
|
$352.270
|
$370.000
|
$250.000
|
$17.390
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
13.000
|
$2,800.000
|
$3,152.840
|
$3,160.000
|
$2,750.000
|
$3,111.820
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
7.000
|
$300.000
|
$293.560
|
$370.000
|
$267.000
|
$31.420
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
7.000
|
$1,500.000
|
$3,229.160
|
$3,160.000
|
$1,200.000
|
$31.420
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
3.000
|
$28,000.000
|
$36,166.650
|
$35,300.000
|
$25,000.000
|
$43,931.530
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
4.000
|
$35,000.000
|
$45,795.430
|
$43,730.000
|
$40,000.000
|
$57,355.060
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 4
|
EA
|
1.000
|
$270.000
|
$396.520
|
$265.000
|
$200.000
|
$305.080
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
241.000
|
$30.000
|
$32.400
|
$31.600
|
$30.000
|
$36.610
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
117.000
|
$20.000
|
$72.790
|
$47.450
|
$22.000
|
$24.410
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
61.000
|
$900.000
|
$686.510
|
$790.000
|
$500.000
|
$738.290
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
13.000
|
$1,030.000
|
$753.970
|
$845.000
|
$710.000
|
$884.730
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
5.000
|
$1,200.000
|
$858.130
|
$925.000
|
$750.000
|
$872.530
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
6.000
|
$1,100.000
|
$855.770
|
$950.000
|
$660.000
|
$860.330
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
5.000
|
$1,500.000
|
$1,047.520
|
$1,080.000
|
$810.000
|
$964.050
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
99.000
|
$115.000
|
$108.000
|
$105.000
|
$85.000
|
$40.270
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
1,420.000
|
$7.000
|
$5.400
|
$5.250
|
$10.000
|
$6.100
|
|
|
REMOVE LRSA
|
EA
|
4.000
|
$900.000
|
$1,620.000
|
$1,580.000
|
$950.000
|
$1,830.480
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
133.000
|
$95.000
|
$139.670
|
$145.000
|
$75.000
|
$164.740
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
42.000
|
$20.000
|
$38.750
|
$21.000
|
$20.000
|
$24.410
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
34.000
|
$20.000
|
$38.750
|
$21.000
|
$17.500
|
$24.410
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
|
EA
|
181.000
|
$158.000
|
$139.670
|
$145.000
|
$81.000
|
$164.740
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
154.000
|
$140.000
|
$139.670
|
$145.000
|
$90.000
|
$164.740
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
43.000
|
$35.000
|
$53.960
|
$36.800
|
$25.000
|
$42.710
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
13.000
|
$35.000
|
$53.960
|
$36.900
|
$30.000
|
$42.710
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
1,070.000
|
$0.400
|
$1.080
|
$1.050
|
$0.250
|
$1.220
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
2,140.000
|
$0.400
|
$1.080
|
$1.050
|
$0.250
|
$1.220
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
7,029.000
|
$1.000
|
$1.400
|
$1.200
|
$1.250
|
$2.440
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
8,096.000
|
$1.100
|
$1.400
|
$1.250
|
$1.250
|
$2.440
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
716.000
|
$1.300
|
$0.810
|
$0.790
|
$1.000
|
$0.920
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
65.000
|
$2.400
|
$3.240
|
$3.160
|
$3.000
|
$3.660
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
501.000
|
$8.000
|
$7.560
|
$7.380
|
$6.500
|
$8.540
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
11.000
|
$140.000
|
$135.000
|
$131.720
|
$115.000
|
$152.540
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
8.000
|
$200.000
|
$216.000
|
$210.750
|
$156.000
|
$244.060
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(090MIL)
|
EA
|
14.000
|
$50.000
|
$32.400
|
$31.610
|
$32.000
|
$36.610
|
|
REFL PAV MRK TY I (Y)8"(SLD)(090MIL)
|
LF
|
16,187.000
|
$0.330
|
$0.810
|
$0.790
|
$1.000
|
$0.920
|
|
|
PAVEMENT SEALER 4"
|
LF
|
560.000
|
$0.300
|
$0.540
|
$0.530
|
$0.100
|
$0.610
|
|
|
PAVEMENT SEALER 8"
|
LF
|
1,714.000
|
$0.400
|
$1.080
|
$1.050
|
$0.350
|
$1.220
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
4.000
|
$30.000
|
$27.000
|
$26.350
|
$35.000
|
$30.510
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
4.000
|
$35.000
|
$37.800
|
$36.880
|
$38.000
|
$42.710
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
23,430.000
|
$0.330
|
$0.390
|
$0.380
|
$0.350
|
$0.440
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
71,344.000
|
$0.300
|
$0.390
|
$0.380
|
$0.300
|
$0.440
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
12,923.000
|
$0.300
|
$0.390
|
$0.380
|
$0.300
|
$0.440
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
139,627.000
|
$0.300
|
$0.390
|
$0.380
|
$0.300
|
$0.440
|
|
REFL PAV MRKR TY I-C
|
EA
|
1,172.000
|
$3.150
|
$3.780
|
$3.690
|
$3.250
|
$4.270
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,371.000
|
$3.000
|
$3.780
|
$3.690
|
$2.800
|
$4.270
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
560.000
|
$1.000
|
$1.620
|
$1.580
|
$0.500
|
$1.830
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,714.000
|
$1.000
|
$3.240
|
$3.160
|
$0.750
|
$3.660
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
4.000
|
$65.000
|
$108.000
|
$105.380
|
$50.000
|
$122.030
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
4.000
|
$60.000
|
$108.000
|
$105.380
|
$55.000
|
$122.030
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
560.000
|
$0.200
|
$0.540
|
$0.530
|
$0.100
|
$0.610
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,714.000
|
$0.250
|
$1.080
|
$1.050
|
$0.170
|
$1.220
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
4.000
|
$20.000
|
$27.000
|
$26.350
|
$17.500
|
$30.510
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
4.000
|
$25.000
|
$37.800
|
$36.900
|
$22.000
|
$42.710
|
|
|
INSTL TIED CONCRETE EROSN CONTROL MATS
|
SF
|
13,946.000
|
$4.500
|
$6.150
|
$6.650
|
$20.000
|
$7.320
|
|
|
UNDERSEAL COURSE
|
GAL
|
38,204.000
|
$3.100
|
$4.200
|
$3.900
|
$3.500
|
$3.970
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$16,000.000
|
$4,800.230
|
$24,500.000
|
$10,000.000
|
$24,627.320
|
|
|
TMA (STATIONARY)
|
DAY
|
125.000
|
$700.000
|
$391.580
|
$675.000
|
$225.000
|
$379.970
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
660.000
|
$70.000
|
$68.150
|
$67.500
|
$50.000
|
$83.460
|
|
Totals: |
$9,417,018.460
|
$10,715,637.226
|
$11,058,362.100
|
$12,084,766.520
|
$12,169,203.456
|