WARD SH 18 (0292-04-063)

Items: 95

County: WARD
Length: 0.0000 MILES
Highway: SH 18
District: ODESSA
Control Number: 0292-04-063
DBE Goal: 3.0%
Project: F 2023(928)
Guaranty: $100,000.00
Time: 347 WORKING DAYS
Engineer's Estimate: $19,025,782.40
Date: 07/02/2025 (11 months ago) Changed
Contract Number: 7253040
Type: HIGHWAY IMPROVEMENT
Project ID: A00125917
Contract Type: Federal
Project Description: ROADWAY REHABILITATION
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
PRELETTINGQUESTIONS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$19,025,782.40
Over/Under Est: -9.18% -$1,746,062.51
$18,598,136.30
Over/Under Est: -2.25% -$427,646.10
Amt Left: 7.63% $1,318,416.41
$19,198,136.39
Over/Under Est: 0.91% $172,353.99
Amt Left: 11.1% $1,918,416.50
Delta: -3.23% -$600,000.09
$19,642,392.49
Over/Under Est: 3.24% $616,610.09
Amt Left: 13.67% $2,362,672.60
Delta: -2.31% -$444,256.10
Over/Under Est: 16.41% $3,121,578.97
Amt Left: 28.17% $4,867,641.48
Delta: -12.75% -$2,504,968.88
Over/Under Est: 20.44% $3,888,565.08
Amt Left: 32.61% $5,634,627.59
Delta: -3.46% -$766,986.11
Over/Under Est: 20.87% $3,970,645.54
Amt Left: 33.08% $5,716,708.05
Delta: -0.36% -$82,080.46
Subcontractor Percentage Amount
DESERT PAVING, INC. 3.05% $526,832.98
TEX OP CONSTRUCTION, LP 2.43% $419,739.06
WILLIS ELECTRIC CO., LP 1.67% $288,462.65
R.E.B.D. TRUCKING LLC 1.66% $286,735.33
DOUBLE A CONTRACTING, L.P. 1.34% $231,461.05
MARCOMS CONSTRUCTION LLC 0.91% $157,186.23
CONTRACTORS SERVICE, LTD. 0.56% $96,729.99
HJC FARMS, INC. 0.34% $58,728.92
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. 0.15% $25,909.82
Total: 12.11% $2,091,786.03

Bid Items & Bid Tabulations

95 Total 0 of 95
WARD  |  SH 18  |  ODESSA  |  0292-04-063  |  07/02/2025  |  $19,025,782.40  |  F 2023(928)  |  HWY IMPRV  |  347 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
FNF CONSTRUCTION, INC.
CK NEWBERRY, LLC
A. L. HELMCAMP, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
JAMES HAMILTON CONSTRUCTION CO.
RAGLE CONSTRUCTION, INC.
REMOV CONC (DRIVEWAYS)
SY 1,213.000 $34.040 $17.360 $50.000 $30.000 $40.000 $41.630 $55.000 $13.800
RMV (6") TRT/UNTRT BASE & ASPH PAV
SY 1,472.000 $40.370 $15.250 $9.000 $6.000 $12.000 $15.090 $16.500 $7.650
RMV (7") TRT/UNTRT BASE & ASPH PAV
SY 195,775.000 $8.240 $5.260 $4.500 $4.000 $8.000 $4.900 $8.000 $4.300
RMV (12") TRT/UNTRT BASE & ASPH PAV
SY 7,284.000 $18.650 $15.500 $12.000 $6.000 $16.000 $8.330 $11.000 $7.000
EXCAV (ROADWAY)
CY 1,200.000 $28.020 $5.160 $22.000 $15.000 $9.000 $45.120 $25.000 $44.000
SUBGR WIDEN (OC)
STA 96.000 $1,277.000 $690.000 $600.000 $400.000 $600.000 $1,261.850 $715.000 $722.000
EMBANK (FNL)(OC)(TY B)
CY 1,200.000 $28.530 $15.000 $26.000 $18.000 $16.000 $60.000 $34.000 $8.500
BACKFILL (TY B)
STA 686.000 $220.000 $300.000 $60.000 $100.000 $115.000 $150.000 $410.000 $218.000
BLADING
HR 120.000 $390.000 $375.000 $125.000 $175.000 $100.000 $316.140 $350.000 $147.000
PROOF ROLLING
HR 60.000 $131.000 $150.000 $80.000 $75.000 $100.000 $234.130 $140.000 $95.000
FL BS (CMP IN PLC)(TY A GR 4)(5")
SY 7,284.000 $20.000 $30.500 $16.500 $15.000 $16.000 $26.290 $25.000 $14.400
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 323,152.000 $0.550 $0.250 $0.400 $0.750 $0.500 $0.420 $1.200 $0.750
PRIME COAT (AE-P)
GAL 39,146.000 $4.960 $4.680 $5.000 $4.000 $3.500 $7.520 $5.500 $8.000
FOG SEAL (CSS-1H)
GAL 61,298.000 $5.140 $4.260 $3.000 $2.500 $3.000 $4.400 $4.200 $4.400
ASPH (AC-20-5TR)
GAL 74,395.000 $3.130 $3.750 $4.000 $4.250 $4.000 $5.000 $6.000 $4.500
AGGR (TY-PB, GR-4)(SAC-A)
CY 2,175.000 $85.000 $125.000 $160.000 $135.000 $195.000 $137.000 $210.000 $225.000
SP MIXES SP-B SAC-B PG70-22
TON 75,373.000 $87.000 $98.000 $103.000 $120.000 $118.000 $109.640 $125.000 $147.500
TACK COAT
GAL 32,342.000 $5.560 $4.190 $3.750 $4.000 $3.400 $3.750 $4.750 $4.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(7")
SY 900.000 $174.870 $87.000 $75.000 $75.000 $126.000 $166.570 $85.000 $95.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 120.000 $420.000 $440.000 $475.000 $400.000 $420.000 $476.400 $440.000 $400.000
RIPRAP (CONC)(CL B)
CY 5.000 $2,300.000 $1,045.000 $1,250.000 $1,000.000 $718.000 $3,573.040 $2,550.000 $855.000
RIPRAP (MOW STRIP)(4 IN)
CY 12.000 $783.000 $1,100.000 $1,500.000 $700.000 $1,050.000 $3,573.040 $1,100.000 $785.000
SET (TY I)(S= 5 FT)(HW= 2 FT)(6:1)(C)
EA 4.000 $19,350.000 $16,500.000 $12,000.000 $9,500.000 $14,700.000 $17,426.730 $21,000.000 $6,000.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 16.000 $5,020.000 $2,046.000 $2,100.000 $2,500.000 $2,100.000 $2,497.920 $3,460.000 $1,600.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 54.000 $4,150.000 $2,750.000 $2,750.000 $2,750.000 $2,940.000 $3,462.430 $3,680.000 $1,900.000
SET (TY II) (30 IN) (CMP) (6: 1) (C)
EA 6.000 $3,500.000 $3,850.000 $3,800.000 $3,250.000 $3,675.000 $4,333.810 $5,520.000 $3,900.000
CLEAN EXIST CULVERTS
EA 22.000 $4,000.000 $3,850.000 $1,600.000 $3,000.000 $1,225.000 $5,478.660 $3,175.000 $2,850.500
REMOVE STR (DRIVEWAY CULVERT)
EA 1.000 $5,020.000 $550.000 $1,600.000 $4,000.000 $714.000 $5,996.650 $2,650.000 $1,210.000
MOBILIZATION
LS 1.000 $2,042,215.690 $745,000.000 $1,860,000.000 $1,850,000.000 $1,200,000.000 $2,418,810.970 $1,920,000.000 $2,300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $30,000.000 $20,000.000 $30,000.000 $25,000.000 $8,650.000 $30,000.000 $30,000.000 $27,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $17,313.990 $18,700.000 $8,000.000 $16,084.060 $10,000.000 $24,434.380 $25,000.000 $20,000.000
TMA (STATIONARY)
DAY 1,020.000 $250.000 $55.000 $200.000 $100.000 $50.000 $448.000 $350.000 $197.000
TMA (MOBILE OPERATION)
DAY 40.000 $900.000 $1,650.000 $700.000 $100.000 $200.000 $851.000 $1,000.000 $805.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 2,580.000 $13.020 $7.490 $8.000 $10.000 $10.500 $8.110 $10.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,580.000 $3.280 $1.760 $2.000 $2.000 $2.100 $1.910 $4.000 $2.000
DRIVEWAYS (CONC)
SY 1,532.000 $210.640 $115.500 $140.000 $130.000 $210.000 $238.200 $162.000 $91.000
DRIVEWAYS (ACP)
SY 2,250.000 $102.540 $71.000 $45.000 $30.000 $48.000 $76.200 $75.000 $51.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 62,461.000 $0.200 $0.200 $0.150 $0.150 $0.270 $0.100 $0.080 $0.050
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 23,250.000 $0.200 $0.240 $0.250 $0.150 $0.270 $0.150 $0.130 $0.100
MTL W-BEAM GD FEN (STEEL POST)
LF 480.000 $40.000 $41.250 $45.000 $38.000 $39.000 $47.040 $41.500 $39.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $2,335.000 $1,650.000 $1,800.000 $1,500.000 $1,575.000 $1,750.790 $1,650.000 $1,470.000
CABLE BARRIER TERMINAL SECTION (REMOVE)
EA 10.000 $1,403.000 $1,650.000 $1,800.000 $1,500.000 $1,575.000 $458.540 $1,650.000 $385.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,300.000 $3,850.000 $4,000.000 $3,500.000 $3,675.000 $4,049.440 $3,850.000 $3,400.000
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 6.000 $12,100.000 $9,350.000 $10,000.000 $9,500.000 $8,925.000 $10,123.600 $9,350.000 $8,500.000
IN RD IL (TY SA) 50T-10-10(400W EQ)LED
EA 6.000 $13,600.000 $10,450.000 $12,000.000 $10,000.000 $9,975.000 $11,314.610 $10,450.000 $9,500.000
CONDT (PVC) (SCH 40) (2")
LF 2,759.000 $17.000 $9.350 $10.000 $9.000 $9.000 $10.120 $9.500 $8.500
CONDT (PVC) (SCH 40) (2") (BORE)
LF 470.000 $45.000 $38.500 $42.000 $35.000 $36.000 $41.690 $38.500 $35.000
ELEC CONDR (NO.6) BARE
LF 3,428.000 $3.670 $2.480 $3.000 $2.250 $2.400 $2.680 $2.500 $2.250
ELEC CONDR (NO.6) INSULATED
LF 6,856.000 $3.850 $2.750 $3.000 $2.500 $2.600 $2.980 $2.750 $2.500
GROUND BOX TY A (122311)W/APRON
EA 17.000 $2,000.000 $2,200.000 $2,500.000 $2,000.000 $2,100.000 $2,382.020 $2,200.000 $2,000.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 1.000 $11,400.000 $13,750.000 $15,000.000 $12,500.000 $13,125.000 $14,887.650 $13,750.000 $12,500.000
ALUMINUM SIGNS (TY A)
SF 40.000 $150.000 $25.850 $40.000 $30.000 $36.000 $29.180 $32.000 $24.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 82.000 $880.000 $847.000 $850.000 $700.000 $945.000 $792.020 $740.000 $665.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 17.000 $1,300.000 $1,045.000 $1,000.000 $1,000.000 $1,129.000 $881.350 $1,045.000 $740.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 17.000 $1,500.000 $880.000 $900.000 $800.000 $1,024.000 $940.900 $867.000 $790.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 3.000 $1,597.000 $1,089.000 $1,100.000 $1,100.000 $1,260.000 $1,137.420 $1,133.000 $955.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $1,400.000 $979.000 $1,000.000 $1,000.000 $1,129.000 $1,125.510 $1,047.000 $945.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 11.000 $1,200.000 $1,089.000 $1,100.000 $1,200.000 $1,365.000 $1,179.100 $1,274.000 $990.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 6.000 $1,300.000 $1,089.000 $1,100.000 $1,100.000 $1,260.000 $1,238.650 $1,167.000 $1,040.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $1,900.000 $1,089.000 $1,100.000 $1,200.000 $1,365.000 $1,393.480 $1,266.000 $1,170.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $1,900.000 $1,320.000 $1,300.000 $1,400.000 $1,575.000 $1,429.210 $1,463.000 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 5.000 $1,424.000 $1,540.000 $1,500.000 $1,600.000 $1,680.000 $1,679.330 $1,690.000 $1,410.000
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 1.000 $2,200.000 $2,090.000 $2,100.000 $2,500.000 $2,625.000 $2,179.550 $2,560.000 $1,830.000
REMOVE SM RD SN SUP&AM
EA 214.000 $125.000 $110.000 $120.000 $150.000 $158.000 $131.010 $117.500 $110.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 24.000 $150.000 $82.500 $90.000 $150.000 $158.000 $109.570 $84.000 $92.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 53.000 $100.000 $82.500 $90.000 $150.000 $158.000 $77.420 $59.500 $65.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 90.000 $30.000 $27.500 $30.000 $15.000 $16.000 $21.440 $70.500 $18.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 1,000.000 $1.080 $1.050 $1.150 $2.000 $0.530 $0.600 $0.550 $0.500
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 16,667.000 $0.340 $0.320 $0.350 $2.000 $0.500 $0.570 $0.550 $0.480
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 146,000.000 $0.800 $0.010 $0.750 $0.500 $0.470 $2.380 $1.200 $0.100
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 26,400.000 $1.280 $1.500 $0.750 $0.500 $0.470 $2.380 $1.200 $0.100
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 750.000 $3.180 $2.200 $2.500 $1.000 $1.050 $1.190 $1.100 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 16,000.000 $1.290 $1.050 $1.150 $1.000 $0.890 $1.010 $0.950 $0.850
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 16,000.000 $0.860 $0.830 $0.850 $1.000 $0.700 $0.800 $0.750 $0.670
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 81,000.000 $0.820 $0.630 $0.650 $0.750 $0.680 $0.770 $0.750 $0.650
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 3,300.000 $0.820 $0.940 $0.950 $0.750 $0.740 $0.830 $0.800 $0.700
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 66,669.000 $0.770 $0.690 $0.700 $0.750 $0.680 $0.770 $0.750 $0.650
PREFAB PM TY C (W)(24")(SLD)
LF 300.000 $17.630 $14.300 $15.000 $16.000 $16.000 $18.460 $17.000 $15.500
PREFAB PM TY C (W)(ARROW)
EA 72.000 $260.000 $247.500 $250.000 $250.000 $247.000 $279.890 $258.500 $235.000
PREFAB PM TY C (W)(LN REDUCT ARROW)
EA 36.000 $650.020 $605.000 $600.000 $550.000 $562.000 $637.190 $588.500 $535.000
PREFAB PM TY C (W)(WORD)
EA 36.000 $407.590 $302.500 $300.000 $350.000 $352.000 $398.990 $368.500 $335.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 90.000 $76.070 $27.500 $30.000 $60.000 $59.000 $66.700 $61.500 $56.000
REFL PAV MRKR TY I-C
EA 800.000 $5.760 $4.130 $5.000 $5.000 $5.250 $5.960 $5.500 $5.000
REFL PAV MRKR TY II-A-A
EA 4,500.000 $4.790 $3.850 $5.000 $5.000 $5.250 $5.960 $5.500 $5.000
REFL PAV MRKR TY II-C-R
EA 1,600.000 $4.920 $4.680 $5.250 $5.000 $5.250 $5.960 $5.500 $5.000
ELIM EXT PM & MRKS (4")
LF 3,000.000 $1.210 $3.200 $1.150 $5.000 $2.600 $2.980 $3.500 $2.000
BACK PLATE (12")(1 SEC)(VENTED)ALUM
EA 2.000 $471.070 $220.000 $250.000 $200.000 $210.000 $238.200 $220.000 $200.000
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 1.000 $8,342.870 $10,450.000 $12,000.000 $10,000.000 $9,975.000 $11,314.610 $10,450.000 $9,500.000
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 1.000 $1,014.100 $550.000 $600.000 $500.000 $525.000 $595.510 $550.000 $500.000
LITTER REMOVAL
AC 75.000 $55.000 $280.000 $50.000 $500.000 $125.000 $426.280 $55.000 $80.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 20.000 $208.000 $55.000 $60.000 $50.000 $53.000 $625.280 $55.000 $525.000
BONDING COURSE
GAL 32,342.000 $4.780 $2.640 $4.050 $4.000 $1.000 $5.460 $5.500 $5.140
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $10,944.280 $13,200.000 $6,000.000 $5,000.000 $10,000.000 $21,927.250 $18,830.000 $75,000.000
1
STONE-MTRX-ASPH SMAR-F SAC-A
TON 26,682.000 $125.000 $144.500 $140.000 $0.000 $0.000 $0.000 $0.000 $0.000
1A
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 26,682.000 $125.000 $0.000 $0.000 $130.000 $153.000 $166.040 $150.000 $150.000
Totals: $22,361,032.400 $17,279,719.890 $18,598,136.300 $19,198,136.390 $19,642,392.490 $22,147,361.370 $22,914,347.480 $22,996,427.940
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
Total: $20,000.00