PARMER US 60 (0168-01-029)

Items: 118

County: PARMER
Length: N/A
Highway: US 60
District: LUBBOCK
Control Number: 0168-01-029
DBE Goal: N/A
Project: C 168-1-29
Guaranty: N/A
Time: 237 WORKING DAYS
Engineer's Estimate: $19,335,373.74
Date: 05/01/2018 (8 years ago)
Contract Number: N/A
Type: REHABILITATION OF EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (8)
E
Engineer's Estimate
$19,335,373.74
$17,450,676.08
Over/Under Est: -9.75% -$1,884,697.66
$18,091,513.64
Over/Under Est: -6.43% -$1,243,860.10
Amt Left: 3.67% $640,837.56
Over/Under Est: -2.04% -$395,086.47
Amt Left: 8.54% $1,489,611.19
Delta: -4.69% -$848,773.63
Over/Under Est: 1.94% $374,467.44
Amt Left: 12.95% $2,259,165.10
Delta: -4.06% -$769,553.91
$20,251,299.74
Over/Under Est: 4.74% $915,926.00
Amt Left: 16.05% $2,800,623.66
Delta: -2.75% -$541,458.56
$20,746,975.58
Over/Under Est: 7.3% $1,411,601.84
Amt Left: 18.89% $3,296,299.50
Delta: -2.45% -$495,675.84
$20,876,918.51
Over/Under Est: 7.97% $1,541,544.77
Amt Left: 19.63% $3,426,242.43
Delta: -0.63% -$129,942.93
$21,932,583.01
Over/Under Est: 13.43% $2,597,209.27
Amt Left: 25.68% $4,481,906.93
Delta: -5.06% -$1,055,664.50

Bid Items & Bid Tabulations

118 Total 0 of 118
PARMER  |  US 60  |  LUBBOCK  |  0168-01-029  |  05/01/2018  |  $19,335,373.74  |  C 168-1-29  |  REHAB OF EXIST ROADWAY  |  237 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. LEE MILLIGAN, INC.
DUININCK, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
K. BARNETT & SONS, INC.
RK HALL, LLC
GILVIN-TERRILL, LTD.
A. L. HELMCAMP, INC.
REMOVING CONC (MEDIANS)
SY 26.600 $20.000 $23.600 $86.000 $150.000 $25.000 $50.000 $35.230 $31.000 $100.000
REMOVING CONC (DRIVEWAYS)
SY 339.000 $40.000 $16.300 $33.500 $25.000 $20.000 $20.000 $20.470 $32.000 $16.000
REMOVING CONC (CURB AND GUTTER)
LF 666.600 $9.000 $10.400 $14.000 $25.000 $5.000 $10.000 $14.030 $5.000 $16.000
REMOVE CONC (GUTTER)
LF 93.700 $9.000 $12.000 $26.000 $40.000 $9.000 $20.000 $14.070 $5.000 $16.000
REMOVING CONC (MISC)
SY 17.400 $50.000 $125.000 $53.500 $240.000 $31.000 $50.000 $19.030 $40.000 $85.000
REMOVE CONC (RAIL)
LF 36.000 $1,000.000 $120.000 $155.000 $150.000 $20.000 $50.000 $251.570 $15.000 $350.000
OBLITERATING ABANDONED ROAD
STA 7.900 $4,000.000 $1,100.000 $1,000.000 $2,000.000 $3,000.000 $1,000.000 $2,573.340 $2,500.000 $1,500.000
EXCAVATION (ROADWAY)
CY 1,657.000 $10.000 $12.000 $14.500 $20.000 $15.000 $25.000 $13.800 $12.000 $11.000
EXCAVATION (CHANNEL)
CY 600.000 $12.000 $15.150 $22.500 $20.000 $15.000 $25.000 $13.800 $13.000 $22.000
SUBGRADE WIDENING (DENS CONT)
STA 157.080 $700.000 $600.000 $605.000 $1,500.000 $400.000 $500.000 $775.950 $740.000 $240.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 624.000 $18.000 $14.000 $31.000 $20.000 $11.000 $60.000 $38.050 $25.000 $30.000
BACKFILL (TY B)
STA 572.790 $120.000 $93.500 $285.000 $200.000 $55.000 $200.000 $130.440 $225.000 $85.000
BLADING
STA 572.790 $80.000 $135.000 $47.500 $300.000 $125.000 $100.000 $98.270 $20.000 $72.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 38.430 $400.000 $380.000 $405.000 $440.000 $575.000 $500.000 $550.040 $360.000 $600.000
SPRINKLING (HOT PAVMT)
MG 25.000 $50.000 $66.500 $69.000 $50.000 $115.000 $100.000 $106.220 $160.000 $40.000
FL BS (CMP IN PLC)(TY E GR 4) (6")
SY 15,474.000 $5.000 $10.950 $7.550 $2.000 $12.000 $4.000 $10.900 $7.000 $7.500
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
CY 3,304.000 $10.000 $13.650 $35.500 $2.000 $22.000 $5.000 $60.910 $10.000 $42.000
REWORK BS MTL (TY B) (6") (DENS CONT)
SY 2,460.000 $20.000 $9.100 $15.000 $12.000 $9.000 $10.000 $23.660 $10.000 $4.400
REWORK BS MTL (TY B)(12")(DENS CONT)
SY 7,587.000 $20.000 $8.750 $8.100 $15.000 $17.000 $10.000 $20.150 $12.000 $4.600
CEMENT
TON 2,423.700 $160.000 $148.000 $160.000 $152.500 $165.000 $150.000 $171.960 $161.000 $165.000
CEMENT TREAT(EXIST MATL)(8")
SY 186,954.130 $2.500 $2.250 $2.500 $5.000 $3.500 $5.000 $3.020 $3.350 $2.400
CEMENT TREAT (EXIST MATL) (7")
SY 32,555.040 $3.000 $2.900 $2.300 $5.000 $3.500 $5.000 $3.020 $3.000 $2.400
PRIME COAT (MC-30)
GAL 44,392.000 $3.500 $3.200 $3.350 $4.000 $3.750 $4.000 $4.460 $4.000 $4.000
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 24,167.000 $3.000 $2.750 $2.850 $4.000 $3.500 $4.000 $3.760 $4.000 $3.100
FOG SEAL (CSS-1H)
GAL 23,902.000 $3.000 $2.850 $3.150 $2.530 $3.500 $4.000 $4.520 $4.000 $2.800
ASPH (AC-20-5TR)
GAL 26,373.000 $3.500 $3.250 $3.800 $6.000 $3.500 $5.000 $3.510 $4.000 $4.000
AGGR(TY-PB GR-4 SAC-B)
CY 597.000 $140.000 $138.500 $190.000 $210.000 $110.000 $150.000 $203.870 $140.000 $190.000
D-GR HMA TY-D SAC-A PG70-28
TON 876.230 $100.000 $135.600 $170.000 $280.000 $108.000 $100.000 $122.900 $110.000 $148.000
D-GR HMA TY-C SAC-A, PG70-28
TON 8,703.610 $100.000 $84.500 $84.500 $60.000 $95.000 $90.000 $105.930 $100.000 $117.000
D-GR HMA TY-B PG70-28
TON 76,258.180 $90.000 $77.850 $83.200 $75.000 $85.000 $86.000 $95.320 $95.000 $111.900
D-GR HMA TY-D PG70-28 (LEVEL-UP)
TON 4,481.510 $115.000 $94.650 $105.000 $95.000 $88.000 $100.000 $107.960 $110.000 $126.000
STONE-MTRX-ASPH SMA-D SAC-A PG70-28
TON 26,986.500 $120.000 $107.900 $120.000 $110.000 $105.000 $120.000 $126.250 $124.000 $130.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 2,333.000 $25.000 $48.250 $77.000 $105.040 $50.000 $50.000 $51.340 $54.000 $72.000
PLANE ASPH CONC PAV (2")
SY 196,261.090 $1.500 $1.150 $0.840 $2.000 $3.500 $1.500 $1.540 $3.000 $2.200
PLANE ASPH CONC PAV (3")
SY 183,017.010 $2.000 $1.650 $2.000 $3.000 $3.750 $3.500 $1.660 $3.250 $1.300
PLANE ASPH CONC PAV (6")
SY 20,908.160 $3.500 $4.450 $3.100 $3.500 $4.000 $4.000 $3.560 $4.000 $3.700
PLANE ASPH CONC PAV (5")
SY 17,606.660 $3.000 $2.700 $2.550 $3.000 $4.250 $3.750 $3.320 $3.500 $3.200
CL C CONC (MISC)
CY 3.200 $4,000.000 $1,615.000 $1,200.000 $2,640.660 $750.000 $3,000.000 $1,399.200 $3,000.000 $1,400.000
OPAQUE SEALER FINISH
SF 4,626.000 $3.000 $1.150 $1.550 $5.120 $1.200 $6.000 $2.190 $2.000 $5.300
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 600.000 $160.000 $247.600 $240.000 $262.670 $115.650 $300.000 $249.100 $100.000 $255.000
CONC STR REPAIR (STANDARD)
SF 12.000 $150.000 $421.500 $405.000 $738.910 $105.000 $1,000.000 $424.000 $100.000 $460.000
RIPRAP (CONC) (CL A )
CY 49.200 $700.000 $630.000 $510.000 $618.900 $550.000 $500.000 $555.190 $100.000 $560.000
RC PIPE (CL III)(24 IN)
LF 196.000 $100.000 $126.000 $155.000 $100.000 $150.000 $200.000 $166.560 $140.000 $160.000
SET (REPLACE PIPE RUNNER ASSEMBLY)
EA 15.000 $1,000.000 $1,700.000 $2,500.000 $600.000 $700.000 $600.000 $2,775.930 $1,000.000 $2,800.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $1,500.000 $1,550.000 $1,500.000 $4,000.000 $1,700.000 $3,000.000 $1,665.560 $2,230.000 $1,700.000
SET (TY II) (DES 4) (CMP) (6: 1) (P)
EA 6.000 $2,500.000 $2,400.000 $2,500.000 $4,000.000 $2,800.000 $4,500.000 $2,775.930 $3,320.000 $2,800.000
CLEAN EXIST CULVERTS
EA 13.000 $2,000.000 $1,700.000 $2,500.000 $2,000.000 $1,000.000 $1,500.000 $2,120.000 $2,800.000 $2,300.000
REMOV STR (PIPE)
EA 2.000 $1,000.000 $2,150.000 $155.000 $4,000.000 $1,500.000 $1,500.000 $166.560 $4,000.000 $250.000
MOBILIZATION
LS 1.000 $1,800,000.000 $1,476,400.000 $1,010,000.000 $1,752,047.330 $1,900,000.000 $1,900,000.000 $1,754,459.220 $2,000,000.000 $2,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $8,000.000 $13,800.000 $22,500.000 $40,000.000 $6,500.000 $15,000.000 $10,425.410 $20,000.000 $6,500.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 111.110 $20.000 $39.000 $51.000 $21.800 $55.000 $35.000 $55.010 $115.000 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 111.110 $10.000 $7.000 $15.500 $10.900 $12.000 $10.000 $10.290 $65.000 $7.000
SANDBAGS FOR EROSION CONTROL
EA 1,830.000 $8.000 $9.500 $5.100 $10.000 $8.000 $6.000 $8.890 $3.000 $8.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,640.000 $3.000 $4.650 $2.600 $2.700 $2.000 $3.000 $1.910 $5.000 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,640.000 $1.000 $1.650 $1.000 $1.080 $0.750 $1.500 $0.640 $1.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,888.000 $8.000 $9.100 $6.600 $6.470 $6.000 $8.000 $5.610 $5.000 $8.000
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
LF 960.000 $70.000 $31.800 $34.500 $40.570 $66.000 $100.000 $49.930 $102.000 $75.000
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
LF 960.000 $20.000 $18.400 $18.000 $18.770 $12.000 $25.000 $20.370 $3.000 $10.000
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
LF 960.000 $20.000 $16.150 $15.500 $21.270 $12.000 $20.000 $23.120 $30.000 $22.000
CONC CURB & GUTTER (TY II)
LF 148.700 $20.000 $42.750 $30.500 $62.240 $30.000 $50.000 $33.310 $150.000 $33.000
DRIVEWAYS (CONC)
SY 1,141.000 $120.000 $83.650 $86.500 $77.670 $70.000 $70.000 $94.380 $88.000 $94.000
DRIVEWAYS (ACP)
SY 3,985.000 $50.000 $19.000 $33.000 $44.970 $40.000 $35.000 $30.450 $20.000 $59.000
CONC SIDEWALKS (4")
SY 780.600 $45.000 $50.000 $71.000 $49.450 $35.000 $45.000 $77.730 $46.000 $76.000
CURB RAMPS (TY 1)
SY 12.800 $85.000 $215.000 $140.000 $139.310 $86.000 $100.000 $155.450 $130.000 $155.000
CURB RAMPS (TY 2)
SY 25.500 $85.000 $170.000 $140.000 $139.310 $86.000 $100.000 $155.450 $130.000 $155.000
CURB RAMPS (SPECIAL)
SY 122.700 $85.000 $175.000 $155.000 $161.160 $86.000 $100.000 $166.560 $150.000 $165.000
RUMBLE STRIPS (SHOULDER)
LF 76,706.000 $0.200 $0.150 $0.100 $0.170 $0.150 $0.200 $0.170 $0.180 $0.160
MTL W-BEAM GD FEN (STEEL POST)
LF 600.000 $25.000 $28.500 $29.000 $29.160 $32.000 $30.000 $28.650 $16.000 $32.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $2,120.000 $2,100.000 $2,170.340 $2,400.000 $2,200.000 $2,132.720 $1,120.000 $2,310.000
REMOVE METAL BEAM GUARD FENCE
LF 600.000 $3.000 $3.150 $2.550 $3.240 $5.000 $3.000 $3.180 $22.000 $6.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $3,100.000 $3,300.000 $3,160.590 $3,500.000 $3,000.000 $3,105.800 $1,430.000 $2,600.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $316.000 $255.000 $323.610 $700.000 $400.000 $318.000 $100.000 $550.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,000.000 $3,160.000 $2,000.000 $10,000.000 $3,500.000 $3,500.000 $3,180.000 $10,205.000 $1,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $1,055.000 $1,000.000 $5,000.000 $4,500.000 $1,200.000 $1,060.000 $1,030.000 $700.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $10,000.000 $13,000.000 $12,500.000 $15,000.000 $10,000.000 $15,000.000 $13,038.000 $1,035.000 $11,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 50.000 $500.000 $895.000 $495.000 $523.170 $550.000 $1,000.000 $901.000 $400.000 $540.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 71.000 $350.000 $845.000 $410.000 $436.870 $450.000 $800.000 $848.000 $300.000 $450.000
REMOVE SM RD SN SUP&AM
EA 12.000 $80.000 $105.000 $155.000 $161.810 $175.000 $100.000 $106.000 $70.000 $150.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 4.000 $80.000 $145.000 $66.000 $70.120 $70.000 $140.000 $143.100 $100.000 $72.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)SRF
EA 6.000 $90.000 $145.000 $61.000 $64.720 $70.000 $140.000 $143.100 $65.000 $65.000
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
EA 9.000 $80.000 $145.000 $66.000 $70.120 $70.000 $140.000 $143.100 $65.000 $72.000
INSTL DEL ASSM (D-SY)SZ 1(FLX)SRF
EA 6.000 $90.000 $145.000 $61.000 $64.720 $70.000 $140.000 $143.100 $65.000 $65.000
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
EA 24.000 $80.000 $145.000 $66.000 $70.120 $70.000 $140.000 $143.100 $60.000 $72.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 39.000 $80.000 $145.000 $66.000 $70.120 $70.000 $140.000 $143.100 $45.000 $72.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 74.000 $20.000 $16.000 $30.500 $32.360 $65.000 $16.000 $15.900 $15.000 $35.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 8.000 $50.000 $45.000 $25.500 $28.940 $35.000 $45.000 $42.400 $40.000 $61.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 10.000 $50.000 $45.000 $25.500 $26.360 $35.000 $45.000 $42.400 $35.000 $61.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 33,238.000 $0.200 $0.140 $0.130 $0.140 $0.150 $0.130 $0.140 $0.130 $0.150
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 269,512.000 $0.200 $0.140 $0.130 $0.140 $0.150 $0.130 $0.140 $0.130 $0.150
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 23,778.000 $0.600 $0.270 $0.260 $0.280 $0.300 $0.260 $0.280 $0.260 $0.300
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 3,623.000 $0.200 $0.140 $0.130 $0.140 $0.150 $0.130 $0.140 $0.130 $0.150
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 275,360.000 $0.200 $0.140 $0.130 $0.160 $0.150 $0.130 $0.140 $0.130 $0.150
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 7,243.000 $1.500 $1.100 $1.000 $1.970 $1.150 $0.800 $0.950 $1.000 $0.750
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,166.000 $1.500 $1.150 $1.000 $1.430 $1.150 $0.850 $0.950 $1.000 $0.750
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 13,658.000 $0.800 $0.930 $0.900 $0.730 $1.000 $0.900 $0.930 $0.880 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 64,600.000 $0.400 $0.460 $0.450 $0.430 $0.500 $0.450 $0.470 $0.440 $0.470
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 16,684.000 $0.700 $0.700 $0.670 $0.490 $0.750 $0.700 $0.700 $0.660 $0.750
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 1,580.000 $0.400 $0.460 $0.450 $0.510 $0.500 $0.450 $0.470 $1.000 $0.470
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 68,910.000 $0.400 $0.460 $0.450 $0.420 $0.500 $0.450 $0.470 $0.440 $0.470
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 310.000 $15.000 $23.450 $22.500 $13.480 $26.000 $25.000 $23.590 $23.000 $25.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 58.000 $200.000 $263.500 $255.000 $215.740 $290.000 $300.000 $265.000 $250.000 $280.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 1.000 $600.000 $1,010.000 $975.000 $609.040 $1,100.000 $1,000.000 $1,017.600 $960.000 $1,100.000
REFL PAV MRKR TY I-C
EA 147.000 $3.000 $3.150 $3.050 $3.280 $3.500 $3.500 $3.180 $3.000 $3.500
REFL PAV MRKR TY II-A-A
EA 214.000 $2.750 $3.150 $3.050 $2.980 $3.500 $3.500 $3.180 $3.000 $3.500
REFL PAV MRKR TY II-C-R
EA 1,419.000 $3.000 $3.150 $3.050 $3.290 $3.500 $3.500 $3.180 $3.000 $3.500
ELIM EXT PAV MRK & MRKS (4")
LF 300,639.000 $0.400 $0.450 $0.710 $0.380 $1.150 $0.500 $1.470 $1.000 $0.900
ELIM EXT PAV MRK & MRKS (8")
LF 2,000.000 $0.700 $2.100 $2.050 $0.710 $2.300 $2.000 $2.120 $2.000 $2.500
FULL - WIDTH MOWING
AC 350.320 $100.000 $67.000 $48.000 $107.870 $200.000 $180.000 $179.590 $300.000 $65.000
LITTER REMOVAL
AC 87.590 $150.000 $44.300 $51.000 $161.810 $100.000 $150.000 $465.540 $250.000 $55.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 100.000 $80.000 $94.850 $91.500 $70.650 $90.000 $70.000 $69.430 $100.000 $100.000
BRIDGE JOINT REPLACEMENT (HEADER)
LF 304.000 $300.000 $210.750 $205.000 $224.910 $250.000 $250.000 $212.000 $100.000 $230.000
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
SY 208,085.570 $5.000 $5.800 $5.450 $3.070 $6.000 $6.000 $4.070 $4.000 $5.600
ASPH FOR REINF FAB (AC-20-5TR)
GAL 41,618.000 $5.000 $3.550 $3.600 $5.880 $4.000 $5.000 $5.050 $5.000 $3.250
EMBEDDED GALVANIC ANODES
EA 100.000 $75.000 $63.250 $61.000 $57.510 $60.000 $60.000 $63.600 $30.000 $70.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $22,225.000 $7,600.000 $24,542.350 $12,000.000 $18,000.000 $40,880.580 $22,500.000 $12,000.000
TMSP RADAR SPEED CONTROL MONITOR
EA 1.000 $8,000.000 $12,050.000 $8,600.000 $24,542.350 $50,000.000 $10,000.000 $19,277.160 $6,000.000 $9,500.000
TMA (STATIONARY)
EA 3.000 $40,000.000 $51,590.000 $25,500.000 $28,076.120 $25,000.000 $20,000.000 $38,171.810 $60,000.000 $15,000.000
TMA (MOBILE OPERATION)
DAY 45.000 $1,000.000 $525.000 $1,100.000 $293.780 $125.000 $1,000.000 $800.990 $1,500.000 $300.000
Totals: $19,335,373.740 $17,450,676.143 $18,091,513.689 $18,940,287.338 $19,709,841.202 $20,251,299.755 $20,746,975.765 $20,876,918.518 $21,932,583.037