CASTRO US 385 (0226-06-032)

Items: 131

County: CASTRO
Length: N/A
Highway: US 385
District: LUBBOCK
Control Number: 0226-06-032
DBE Goal: N/A
Project: STP 2018(361)
Guaranty: N/A
Time: 514 WORKING DAYS
Engineer's Estimate: $15,104,207.10
Date: 04/04/2018 (8 years ago)
Contract Number: N/A
Type: REHABILITATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$15,104,207.10
$15,741,046.83
Over/Under Est: 4.22% $636,839.73
$16,887,292.88
Over/Under Est: 11.81% $1,783,085.78
Amt Left: 7.28% $1,146,246.05
Over/Under Est: 20.78% $3,138,871.51
Amt Left: 15.89% $2,502,031.78
Delta: -8.03% -$1,355,785.73
$19,070,630.40
Over/Under Est: 26.26% $3,966,423.30
Amt Left: 21.15% $3,329,583.57
Delta: -4.54% -$827,551.79
Over/Under Est: 30.81% $4,654,335.35
Amt Left: 25.52% $4,017,495.62
Delta: -3.61% -$687,912.05
Over/Under Est: 58.36% $8,814,315.56
Amt Left: 51.95% $8,177,475.83
Delta: -21.05% -$4,159,980.21

Bid Items & Bid Tabulations

131 Total 0 of 131
CASTRO  |  US 385  |  LUBBOCK  |  0226-06-032  |  04/04/2018  |  $15,104,207.10  |  STP 2018(361)  |  REHAB  |  514 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. LEE MILLIGAN, INC.
GILVIN-TERRILL, LTD.
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
DUININCK, INC.
ALLEN BUTLER CONSTRUCTION, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
PREPARING ROW
STA 3.000 $5,000.000 $14,000.000 $12,500.000 $4,000.000 $2,000.000 $7,044.740 $1,000.000
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 5.000 $1,000.000 $1,500.000 $1,200.000 $1,200.000 $1,600.000 $1,482.650 $3,500.000
REMOVING CONC (SIDEWALKS)
SY 1,487.000 $8.000 $7.250 $15.000 $15.000 $15.000 $17.240 $77.000
REMOVING CONC (DRIVEWAYS)
SY 3,333.500 $8.000 $13.700 $15.000 $17.000 $22.500 $18.390 $43.000
REMOVING CONC (CURB AND GUTTER)
LF 2,806.000 $10.000 $6.800 $3.000 $3.000 $8.150 $9.200 $39.000
REMOVING CONC (RETAINING WALLS)
SY 64.000 $50.000 $69.000 $35.000 $17.000 $45.500 $145.970 $148.000
REMOVE CONC (GUTTER)
LF 4,178.500 $10.000 $7.000 $3.000 $2.000 $13.500 $8.310 $36.000
REMOVING CONC (WHEELCHAIR RAMP)
SY 477.500 $25.000 $11.000 $15.000 $32.000 $22.500 $26.440 $72.000
EXCAVATION (SPECIAL)
CY 746.600 $20.000 $17.350 $15.000 $24.000 $22.500 $35.150 $50.000
BACKFILL (TY B)
STA 30.000 $1,000.000 $235.000 $415.000 $770.000 $330.000 $306.520 $300.000
BLOCK SODDING
SY 145.000 $2.000 $8.450 $15.000 $25.000 $15.500 $15.770 $30.000
DRILL SEEDING (PERM) (URBAN) (SANDY)
SY 5,717.000 $0.200 $0.200 $1.000 $0.600 $5.150 $0.610 $0.450
VEGETATIVE WATERING
MG 200.000 $15.000 $38.000 $30.000 $75.000 $29.500 $110.890 $65.000
SPRINKLING (HOT PAVMT)
MG 1,000.000 $10.000 $22.000 $20.000 $75.000 $29.500 $44.350 $5.000
PROOF ROLLING
HR 40.000 $200.000 $170.000 $55.000 $225.000 $170.000 $151.170 $350.000
CEMENT
TON 977.000 $150.000 $129.000 $151.000 $145.000 $175.000 $154.760 $130.000
CEMENT TREAT (EXIST MATL) (6")
SY 115,530.000 $3.000 $2.450 $3.000 $7.000 $3.050 $2.650 $5.000
PRIME COAT (MC-30)
GAL 23,107.000 $4.000 $3.600 $5.000 $3.740 $4.150 $4.660 $3.570
FOG SEAL (CSS-1H)
GAL 600.000 $3.000 $5.000 $6.000 $4.800 $4.850 $18.010 $7.880
ASPH (AC-20-5TR)
GAL 61,842.000 $3.500 $4.000 $5.000 $3.500 $3.950 $4.100 $3.700
AGGR(TY-PB GR-4 SAC-B)
CY 1,251.000 $150.000 $130.000 $130.000 $165.000 $170.000 $320.720 $220.000
D-GR HMA TY-B PG70-28
TON 42,024.000 $90.000 $94.950 $105.000 $95.000 $97.000 $128.160 $105.120
STONE-MTRX-ASPH SMA-D SAC-A PG70-28
TON 13,632.000 $115.000 $119.200 $115.000 $130.000 $135.000 $158.620 $112.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 11,000.000 $30.000 $25.000 $43.000 $75.000 $55.000 $43.690 $69.000
PLANE ASPH CONC PAV (8")
SY 115,530.000 $6.000 $5.000 $4.000 $5.000 $5.000 $2.460 $4.550
PLANE ASPH CONC PAV (14")
SY 6,656.000 $15.000 $7.800 $6.000 $10.000 $9.500 $15.010 $16.500
CONC PVMT (CONT REINF - CRCP) (10")
SY 9,403.000 $80.000 $97.000 $90.000 $100.000 $135.000 $145.930 $150.000
CONC PVMT (CRCP)(JCT TERMINAL)(8")
SY 596.000 $100.000 $94.400 $85.000 $125.000 $255.000 $253.120 $175.000
CEM STABIL BKFL
CY 1,179.000 $150.000 $105.400 $185.000 $150.000 $175.000 $143.680 $350.000
TRENCH EXCAVATION PROTECTION
LF 255.000 $5.000 $6.350 $20.000 $20.000 $17.500 $114.940 $200.000
DRILL SHAFT (36 IN)
LF 30.000 $400.000 $790.000 $325.000 $325.000 $380.000 $172.410 $1,000.000
CL C CONC (MISC)
CY 118.000 $400.000 $895.000 $875.000 $1,000.000 $815.000 $928.050 $1,400.000
RETAINING WALL (BRICK VENEER)
SF 764.000 $70.000 $88.000 $72.000 $180.000 $140.000 $177.450 $250.000
RIPRAP (CONC)(5 IN)
CY 6.000 $500.000 $896.000 $1,135.000 $2,000.000 $525.000 $957.220 $1,400.000
RAIL (HANDRAIL)(TY B)
LF 162.000 $70.000 $107.000 $65.000 $150.000 $140.000 $84.930 $300.000
CONC BOX CULV (3 FT X 2 FT)
LF 1,075.000 $250.000 $226.500 $150.000 $256.240 $245.000 $234.420 $400.000
CONC BOX CULV (4 FT X 2 FT)
LF 1,181.000 $250.000 $253.000 $167.000 $306.610 $265.000 $252.730 $450.000
CONC BOX CULV (5 FT X 2 FT)
LF 665.000 $250.000 $337.200 $215.000 $405.170 $370.000 $305.760 $500.000
RC PIPE (CL III)(24 IN)
LF 305.000 $80.000 $205.500 $122.000 $129.210 $87.000 $139.740 $200.000
INLET (COMPL)(PCO)(5FT)(BOTH)
EA 12.000 $5,000.000 $5,500.000 $5,250.000 $7,289.690 $6,400.000 $9,022.880 $15,000.000
INLET (COMPL)(PSL)(RC)(5FTX5FT)
EA 2.000 $5,000.000 $5,585.000 $4,915.000 $6,978.700 $5,800.000 $8,536.680 $18,000.000
INLET (COMPL)(PSL)(RC)(8FTX8FT)
EA 1.000 $8,000.000 $10,100.000 $7,700.000 $11,431.130 $12,000.000 $11,742.380 $20,000.000
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
EA 2.000 $6,000.000 $5,270.000 $10,500.000 $3,832.650 $5,700.000 $7,126.350 $10,000.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
EA 1.000 $6,000.000 $15,810.000 $17,000.000 $6,022.730 $17,500.000 $8,045.880 $21,000.000
ADJUSTING MANHOLES
EA 6.000 $1,000.000 $1,350.000 $4,794.000 $711.780 $2,300.000 $2,446.060 $1,040.770
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 8.000 $700.000 $530.000 $4,370.000 $350.000 $870.000 $1,242.490 $975.690
ADJUSTING MANHOLES (WATER METER)
EA 8.000 $300.000 $530.000 $7,821.000 $350.000 $870.000 $1,036.180 $975.690
REMOV STR (RAILROAD CROSSING)
EA 1.000 $20,500.000 $9,300.000 $18,160.000 $10,000.000 $11,500.000 $18,390.580 $120,883.350
REMOV STR (PIPE)
EA 1.000 $2,000.000 $750.000 $10,000.000 $850.000 $290.000 $1,397.720 $10,567.030
MOBILIZATION
LS 1.000 $988,000.000 $1,560,000.000 $1,600,000.000 $1,674,344.000 $1,907,022.900 $1,961,000.000 $2,377,619.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 38.000 $8,000.000 $14,500.000 $15,700.000 $9,000.000 $23,500.000 $7,502.870 $60,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 444.000 $20.000 $35.450 $12.000 $70.000 $35.000 $37.030 $8.740
CONSTRUCTION EXITS (REMOVE)
SY 444.000 $10.000 $4.000 $5.000 $15.000 $14.500 $9.920 $4.370
SANDBAGS FOR EROSION CONTROL
EA 1,480.000 $5.000 $11.300 $3.000 $15.000 $11.500 $5.750 $3.280
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,000.000 $3.000 $5.000 $4.000 $10.000 $3.500 $6.730 $3.280
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,000.000 $1.000 $1.100 $2.000 $2.000 $1.150 $1.150 $1.090
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,500.000 $1.000 $6.000 $4.000 $10.000 $6.950 $4.830 $5.460
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,500.000 $1.000 $1.000 $2.000 $1.000 $2.300 $0.520 $1.090
CONSTRUCTING DETOURS (TY 1)
SY 5,554.000 $40.000 $42.550 $57.000 $52.000 $44.500 $41.830 $42.140
CONSTRUCTING DETOURS (TY 2)
SY 2,285.000 $60.000 $65.000 $210.000 $90.000 $100.000 $76.590 $82.910
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 540.000 $40.000 $100.400 $150.000 $90.000 $125.000 $102.630 $200.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 60.000 $40.000 $135.000 $400.000 $90.000 $150.000 $131.140 $200.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 1,620.000 $4.000 $14.250 $10.000 $40.000 $26.500 $3.880 $100.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 180.000 $4.000 $12.900 $20.000 $75.000 $26.500 $8.770 $100.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 540.000 $10.000 $14.700 $5.000 $75.000 $26.500 $10.430 $50.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 60.000 $10.000 $31.400 $5.000 $60.000 $26.500 $11.170 $50.000
CONC CURB & GUTTER (TY II)
LF 3,164.500 $20.000 $33.850 $33.000 $60.000 $33.500 $39.750 $46.000
CONC CURB & GUTTER (VALLEY GUTTER)
LF 2,751.500 $30.000 $31.600 $30.000 $60.000 $43.000 $57.340 $43.000
INTERSECTIONS (ACP)
SY 23,090.000 $25.000 $21.000 $37.000 $40.000 $37.000 $29.980 $63.000
DRIVEWAYS (CONC)
SY 5,993.000 $60.000 $61.850 $80.000 $90.000 $85.500 $114.660 $88.000
CONC SIDEWALKS (4")
SY 6,725.000 $50.000 $49.300 $47.000 $75.000 $88.500 $75.700 $83.000
CONC SIDEWALKS (5")
SY 28.000 $60.000 $153.000 $145.000 $85.000 $73.500 $175.450 $199.000
CURB RAMPS (TY 1)
SY 220.000 $200.000 $116.000 $110.000 $150.000 $150.000 $271.750 $154.000
CURB RAMPS (TY 2)
SY 46.000 $200.000 $142.250 $135.000 $150.000 $150.000 $187.570 $186.000
CURB RAMPS (TY 7)
SY 501.000 $200.000 $110.650 $105.000 $150.000 $150.000 $422.210 $147.000
CURB RAMPS (TY 10)
SY 101.000 $200.000 $112.750 $107.000 $150.000 $150.000 $363.410 $150.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 23.000 $300.000 $337.000 $210.000 $250.000 $175.000 $436.780 $237.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 137.000 $500.000 $450.000 $245.000 $475.000 $550.000 $545.970 $844.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $525.000 $485.000 $350.000 $600.000 $695.000 $689.650 $949.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $1,000.000 $540.000 $510.000 $685.000 $795.000 $787.350 $1,087.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 9.000 $500.000 $500.000 $340.000 $425.000 $495.000 $488.500 $882.000
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
EA 1.000 $1,000.000 $585.000 $450.000 $550.000 $640.000 $632.180 $1,087.000
REMOVE SM RD SN SUP&AM
EA 190.000 $80.000 $140.000 $40.000 $95.580 $175.000 $172.410 $110.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 5.000 $80.000 $126.000 $80.000 $75.000 $140.000 $103.450 $149.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 111,228.000 $0.300 $0.280 $0.270 $0.250 $0.310 $0.310 $0.300
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 232,716.000 $0.300 $0.280 $0.270 $0.250 $0.310 $0.310 $0.300
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 5,000.000 $0.500 $0.390 $0.370 $1.000 $0.430 $0.430 $0.410
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 438.000 $3.000 $9.130 $9.000 $7.000 $10.000 $9.950 $9.550
WK ZN PAV MRK REMOV (W)(RR XING)
EA 18.000 $400.000 $845.000 $800.000 $575.000 $930.000 $919.530 $882.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 12,000.000 $0.500 $0.400 $0.380 $1.000 $0.440 $0.440 $0.420
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 15,324.000 $2.000 $1.050 $1.000 $6.000 $1.150 $1.710 $0.460
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 13,236.000 $2.000 $1.100 $1.000 $6.000 $1.150 $1.710 $0.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,735.000 $1.000 $0.950 $1.000 $1.200 $1.050 $1.030 $0.990
PAVEMENT SEALER 4"
LF 2,815.000 $0.200 $0.120 $0.110 $0.250 $0.130 $0.130 $0.120
PAVEMENT SEALER 6"
LF 520.000 $0.400 $0.180 $1.000 $0.250 $0.200 $0.200 $0.190
PAVEMENT SEALER 8"
LF 75.000 $0.800 $0.230 $1.000 $0.500 $0.260 $0.250 $0.240
PAVEMENT SEALER 12"
LF 560.000 $1.000 $0.360 $1.000 $0.650 $0.400 $0.390 $0.380
PAVEMENT SEALER 24"
LF 170.000 $2.000 $0.720 $1.000 $2.000 $0.790 $0.920 $0.750
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 12,070.000 $0.400 $0.470 $0.450 $0.450 $0.520 $0.520 $0.500
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 7,540.000 $0.400 $0.680 $0.650 $0.700 $0.760 $0.750 $0.720
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 3,210.000 $0.400 $0.470 $1.500 $0.550 $0.520 $0.520 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 42,457.000 $0.400 $0.470 $0.450 $0.450 $0.520 $0.520 $0.500
PREFAB PAV MRK TY B (W)(4")(SLD)
LF 150.000 $1.000 $7.900 $8.000 $6.000 $8.700 $8.620 $8.270
PREFAB PAV MRK TY B (W)(6")(BRK)
LF 520.000 $1.500 $13.340 $13.000 $7.500 $14.500 $14.550 $14.000
PREFAB PAV MRK TY B (W)(8")(SLD)
LF 75.000 $2.000 $13.340 $13.000 $7.850 $14.500 $14.550 $14.000
PREFAB PAV MRK TY B (W)(12")(SLD)
LF 560.000 $5.000 $23.180 $22.000 $11.250 $25.500 $25.290 $24.000
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 170.000 $10.000 $46.370 $44.000 $20.000 $51.000 $50.570 $49.000
PREFAB PAV MRK TY B (Y)(4")(BRK)
LF 60.000 $1.000 $7.900 $8.000 $6.000 $8.700 $8.620 $8.270
PREFAB PAV MRK TY B (Y)(4")(SLD)
LF 2,605.000 $1.000 $7.900 $8.000 $6.000 $8.700 $8.620 $8.270
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 240.000 $7.000 $8.300 $8.000 $7.800 $9.150 $9.060 $8.690
PREFAB PAV MRK TY C (W) (18") (SLD)
LF 120.000 $8.000 $12.500 $12.000 $11.600 $14.000 $13.630 $13.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 255.000 $12.000 $16.620 $16.000 $14.900 $18.500 $18.130 $17.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 7.000 $300.000 $790.330 $750.000 $875.000 $870.000 $862.060 $827.000
REFL PAV MRKR TY II-A-A
EA 1,200.000 $3.000 $3.160 $3.000 $4.550 $3.500 $3.450 $3.310
REFL PAV MRKR TY II-C-R
EA 496.000 $3.000 $3.160 $3.000 $4.550 $3.500 $3.450 $3.310
ELIM EXT PAV MRK & MRKS (4")
LF 241,642.000 $0.600 $1.050 $0.100 $0.300 $0.810 $0.570 $0.550
ELIM EXT PAV MRK & MRKS (8")
LF 600.000 $1.000 $2.110 $15.000 $1.000 $0.810 $4.600 $0.770
ELIM EXT PAV MRK & MRKS (RR XING)
EA 8.000 $200.000 $52.690 $50.000 $490.000 $2,300.000 $114.960 $165.000
PAV SURF PREP FOR MRK (4")
LF 2,815.000 $0.100 $0.610 $1.000 $0.550 $0.670 $0.670 $0.640
PAV SURF PREP FOR MRK (6")
LF 520.000 $0.200 $0.930 $1.000 $0.840 $1.000 $1.010 $0.970
PAV SURF PREP FOR MRK (8")
LF 75.000 $0.500 $1.230 $2.000 $1.000 $1.350 $1.340 $1.290
PAV SURF PREP FOR MRK (12")
LF 560.000 $1.000 $1.850 $2.000 $1.650 $2.050 $2.020 $1.940
PAV SURF PREP FOR MRK (18")
LF 120.000 $1.500 $2.170 $3.000 $2.300 $2.400 $2.370 $2.270
PAV SURF PREP FOR MRK (24")
LF 170.000 $2.000 $3.720 $4.000 $2.450 $4.100 $4.060 $3.700
PAV SURF PREP FOR MRK (RR XING)
EA 7.000 $10.000 $111.650 $110.000 $170.000 $125.000 $121.780 $117.000
INS TRF SIG PL AM(S)1 ARM(40')
EA 2.000 $10,000.000 $16,175.380 $13,000.000 $7,500.000 $11,500.000 $8,620.590 $20,241.000
LITTER REMOVAL
CYC 4.000 $2,000.000 $4,300.000 $4,100.000 $8,000.000 $9,300.000 $2,873.500 $2,758.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $12,000.000 $21,800.000 $8,000.000 $16,000.000 $20,500.000 $20,641.130 $15,939.000
TMA (STATIONARY)
EA 4.000 $10,000.000 $36,140.000 $37,500.000 $15,000.000 $69,500.000 $68,964.680 $49,638.000
TMA (MOBILE OPERATION)
DAY 30.000 $250.000 $950.000 $1,100.000 $800.000 $1,200.000 $681.470 $1,434.000
WATER LINE MAIN RELOCATION
LS 1.000 $1,500,000.000 $722,000.000 $815,000.000 $650,000.000 $730,000.000 $524,953.200 $1,100,000.000
Totals: $15,104,207.100 $15,741,046.835 $16,887,292.880 $18,243,078.610 $19,070,630.400 $19,758,542.465 $23,918,522.660