PREPARING ROW
|
STA
|
210.000
|
$300.000
|
$4,000.000
|
$320.580
|
$3,000.000
|
|
|
|
REMOVING CONC (PAV)
|
SY
|
10,500.000
|
$4.000
|
$3.000
|
$4.150
|
$35.000
|
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
191.000
|
$8.000
|
$11.000
|
$14.370
|
$100.000
|
|
|
|
REMOV STAB BASE AND ASPH PAV (10"-18")
|
SY
|
75,349.000
|
$2.000
|
$2.000
|
$3.420
|
$8.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
67,799.000
|
$5.000
|
$2.000
|
$2.620
|
$3.750
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
303,324.000
|
$4.500
|
$4.000
|
$5.670
|
$5.070
|
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
12,600.000
|
$0.850
|
$1.400
|
$0.880
|
$5.000
|
|
|
|
BLOCK SODDING
|
SY
|
6,893.000
|
$2.750
|
$3.700
|
$4.500
|
$4.690
|
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
360,000.000
|
$0.200
|
$0.240
|
$0.250
|
$0.260
|
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
210,000.000
|
$0.200
|
$0.230
|
$0.180
|
$0.170
|
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
150,000.000
|
$0.120
|
$0.230
|
$0.150
|
$0.170
|
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
5,000.000
|
$1.200
|
$2.500
|
$1.300
|
$1.400
|
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
5,000.000
|
$1.600
|
$2.550
|
$1.300
|
$1.400
|
|
|
|
IRRIGATION SYSTEM LOCATION A
|
LS
|
1.000
|
$70,000.000
|
$130,000.000
|
$148,700.000
|
$143,138.100
|
|
|
|
IRRIGATION SYSTEM LOCATION B
|
LS
|
1.000
|
$22,500.000
|
$24,500.000
|
$40,475.000
|
$26,967.500
|
|
|
|
PLANT MATERIAL (1-GAL)
|
EA
|
362.000
|
$20.000
|
$24.000
|
$15.000
|
$26.160
|
|
|
|
PLANT MAINTENANCE
|
MO
|
9.000
|
$1,000.000
|
$600.000
|
$480.000
|
$1,671.990
|
|
|
|
PLANT REPLACEMENT (1-GAL)
|
EA
|
70.000
|
$40.000
|
$12.000
|
$35.000
|
$26.160
|
|
|
|
VEGETATIVE WATERING
|
MG
|
411.000
|
$50.000
|
$35.000
|
$60.000
|
$40.180
|
|
|
|
IRRIGATION SYSTEM OPER AND MAINT
|
MO
|
12.000
|
$800.000
|
$250.000
|
$800.000
|
$296.640
|
|
|
|
PROOF ROLLING
|
HR
|
24.000
|
$97.000
|
$80.000
|
$55.000
|
$85.000
|
|
|
|
FL BS (RDWY DEL)(TY D GR 4)(FNAL POS)
|
CY
|
36,347.000
|
$25.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
CEMENT
|
TON
|
3,131.000
|
$150.000
|
$147.000
|
$346.290
|
$164.500
|
|
|
|
CEMENT TREAT (NEW BASE) (6")
|
SY
|
138,388.000
|
$1.250
|
$1.000
|
$0.920
|
$2.300
|
|
|
|
CEMENT TREAT (NEW BASE) (10")
|
SY
|
47,828.000
|
$1.750
|
$1.200
|
$1.590
|
$4.000
|
|
|
|
CEMENT TREAT (SUBGRADE)(12")
|
SY
|
193,068.000
|
$2.000
|
$1.250
|
$2.080
|
$4.500
|
|
|
|
PRIME COAT (MC-30)
|
GAL
|
37,249.000
|
$3.000
|
$3.250
|
$2.920
|
$3.870
|
|
|
|
ASPH (TIER II)
|
GAL
|
13,714.000
|
$3.000
|
$4.500
|
$2.690
|
$3.280
|
|
|
|
AGGR (TY-D GR-4P)(SAC-B)
|
CY
|
399.000
|
$60.000
|
$35.000
|
$82.520
|
$89.440
|
|
|
|
SUPERPAVE MIXTURES SP-B SAC-B PG64-22
|
TON
|
43,500.000
|
$56.000
|
$55.000
|
$65.050
|
$77.500
|
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
38,934.000
|
$70.000
|
$71.000
|
$82.720
|
$106.120
|
|
|
|
PLANE ASPH CONC PAV(0" TO 1")
|
SY
|
2,263.000
|
$4.000
|
$1.550
|
$1.710
|
$16.700
|
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
178,132.000
|
$1.500
|
$1.000
|
$1.070
|
$1.200
|
|
|
|
PLANE ASPH CONC PAV (8")
|
SY
|
24,280.000
|
$4.000
|
$2.300
|
$3.310
|
$4.170
|
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
272.000
|
$5.000
|
$15.000
|
$8.380
|
$3.870
|
|
|
|
CEM STABIL BKFL
|
CY
|
527.000
|
$55.000
|
$90.000
|
$111.800
|
$70.000
|
|
|
|
CUT & RESTORING PAV
|
SY
|
737.000
|
$84.000
|
$150.000
|
$50.790
|
$131.170
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
861.000
|
$2.750
|
$0.100
|
$11.840
|
$1.200
|
|
|
|
PRESTR CONC PIL (24 IN SQ)
|
LF
|
3,800.000
|
$90.000
|
$100.000
|
$180.170
|
$101.690
|
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
27.000
|
$500.000
|
$480.000
|
$480.000
|
$636.430
|
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
32.000
|
$70.000
|
$122.000
|
$95.000
|
$97.080
|
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
132.000
|
$117.000
|
$198.000
|
$135.000
|
$140.230
|
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
160.000
|
$145.000
|
$195.000
|
$195.000
|
$199.560
|
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
52.000
|
$220.000
|
$295.000
|
$295.000
|
$231.920
|
|
|
|
CL C CONC (ABUT)
|
CY
|
262.000
|
$900.000
|
$1,000.000
|
$638.650
|
$1,200.000
|
|
|
|
REINF CONC SLAB
|
SF
|
15,840.000
|
$13.000
|
$18.000
|
$129.750
|
$45.000
|
|
|
|
RETAINING WALL (MSE)
|
SF
|
85,368.000
|
$40.000
|
$50.000
|
$52.520
|
$59.000
|
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
9,513.000
|
$7.100
|
$15.000
|
$17.530
|
$21.470
|
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
810.000
|
$150.000
|
$150.000
|
$118.970
|
$230.000
|
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
1,812.000
|
$140.000
|
$140.000
|
$140.430
|
$215.000
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
45.000
|
$380.000
|
$400.000
|
$310.110
|
$377.150
|
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
138.000
|
$400.000
|
$800.000
|
$291.650
|
$377.150
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
1,345.000
|
$370.000
|
$375.000
|
$327.880
|
$377.150
|
|
|
|
RAIL (TY SSTR)
|
LF
|
5,968.600
|
$50.000
|
$50.000
|
$50.000
|
$127.860
|
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
320.200
|
$90.000
|
$100.000
|
$64.150
|
$201.200
|
|
|
|
GABION MATTRESSES (PVC)(18 IN)
|
SY
|
1,988.000
|
$80.000
|
$114.000
|
$125.000
|
$88.450
|
|
|
|
GABIONS (PVC)( 3FT X 3 FT)
|
CY
|
441.000
|
$180.000
|
$178.000
|
$325.000
|
$201.720
|
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
454.000
|
$165.000
|
$240.000
|
$349.150
|
$209.270
|
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
909.000
|
$200.000
|
$375.000
|
$313.060
|
$262.340
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
3,068.000
|
$40.000
|
$55.000
|
$37.240
|
$44.120
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
308.000
|
$57.500
|
$58.000
|
$54.240
|
$70.350
|
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
428.000
|
$65.000
|
$145.000
|
$62.870
|
$88.240
|
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
100.000
|
$60.000
|
$95.000
|
$51.820
|
$53.650
|
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
1,042.000
|
$60.000
|
$100.000
|
$51.190
|
$62.000
|
|
|
|
INLET (COMPL)(POD)(SFG)(4FTX4FT)
|
EA
|
8.000
|
$4,000.000
|
$4,000.000
|
$2,933.040
|
$3,219.590
|
|
|
|
INLET (COMPL)(TY A)(SPL)
|
EA
|
11.000
|
$5,950.000
|
$5,500.000
|
$4,420.850
|
$3,815.800
|
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
9.000
|
$6,500.000
|
$6,700.000
|
$3,481.420
|
$8,108.580
|
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (C)
|
EA
|
7.000
|
$6,000.000
|
$8,400.000
|
$4,667.430
|
$8,704.800
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
7.000
|
$850.000
|
$840.000
|
$914.470
|
$864.510
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
20.000
|
$900.000
|
$840.000
|
$886.150
|
$894.330
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$1,100.000
|
$1,000.000
|
$1,131.360
|
$1,192.440
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
12.000
|
$1,300.000
|
$1,200.000
|
$1,293.690
|
$1,192.440
|
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,600.000
|
$1,600.000
|
$1,523.640
|
$1,788.660
|
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
7.000
|
$1,600.000
|
$2,000.000
|
$1,685.960
|
$2,265.640
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$400.000
|
$1,000.000
|
$991.230
|
$2,981.100
|
|
|
|
REMOV STR (INLET)
|
EA
|
4.000
|
$700.000
|
$400.000
|
$439.750
|
$1,192.440
|
|
|
|
REMOV STR (HEADWALL)
|
EA
|
38.000
|
$925.000
|
$300.000
|
$844.350
|
$596.220
|
|
|
|
REMOV STR (PIPE)
|
LF
|
1,604.000
|
$13.500
|
$8.000
|
$6.410
|
$10.730
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,750,000.000
|
$1,412,000.000
|
$897,469.860
|
$3,200,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
24.000
|
$5,000.000
|
$5,000.000
|
$10,904.730
|
$40,000.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
880.000
|
$25.500
|
$43.000
|
$26.250
|
$28.320
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
880.000
|
$8.500
|
$15.000
|
$12.000
|
$12.940
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,638.000
|
$17.000
|
$20.000
|
$24.250
|
$26.160
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,638.000
|
$6.750
|
$10.000
|
$12.000
|
$12.940
|
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
24.000
|
$80.000
|
$85.000
|
$53.650
|
$66.850
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
200.000
|
$4.000
|
$3.000
|
$4.750
|
$5.120
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
200.000
|
$2.000
|
$1.000
|
$1.850
|
$2.000
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
6,290.000
|
$4.000
|
$4.000
|
$4.100
|
$4.420
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
6,290.000
|
$1.000
|
$1.000
|
$1.000
|
$0.860
|
|
|
|
CONSTRUCTING DETOURS
|
SY
|
107.000
|
$50.000
|
$140.000
|
$37.940
|
$101.350
|
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
35,310.000
|
$25.000
|
$20.000
|
$31.270
|
$32.150
|
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
35,310.000
|
$6.700
|
$7.000
|
$8.280
|
$8.810
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
822.000
|
$40.000
|
$37.000
|
$25.770
|
$45.320
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
67,409.000
|
$0.200
|
$0.300
|
$0.090
|
$0.120
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,031.000
|
$20.000
|
$22.000
|
$21.000
|
$23.180
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$1,500.000
|
$1,450.000
|
$1,380.000
|
$1,563.130
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,000.000
|
$996.000
|
$885.000
|
$1,073.840
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
450.000
|
$4.000
|
$2.500
|
$1.000
|
$2.690
|
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
$200.000
|
$96.000
|
$150.000
|
$103.010
|
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
17,803.000
|
$7.750
|
$14.500
|
$9.950
|
$15.630
|
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
6.000
|
$2,700.000
|
$3,450.000
|
$2,320.000
|
$3,720.530
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
7.000
|
$2,230.000
|
$2,150.000
|
$2,170.000
|
$2,318.220
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$250.000
|
$96.000
|
$270.000
|
$103.010
|
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
22.000
|
$14,000.000
|
$16,000.000
|
$15,000.000
|
$17,151.430
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
20.000
|
$800.000
|
$750.000
|
$1,085.000
|
$808.040
|
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
142.000
|
$22.000
|
$15.000
|
$55.000
|
$15.630
|
|
|
|
CHAIN LINK FENCE GATE (INSTALL)(9'X6')
|
EA
|
2.000
|
$1,000.000
|
$1,250.000
|
$3,850.000
|
$1,347.390
|
|
|
|
CHAIN LINK FENCE INSTALL (9')
|
LF
|
4,488.000
|
$35.000
|
$20.000
|
$56.000
|
$21.020
|
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
6.000
|
$650.000
|
$620.000
|
$557.750
|
$447.660
|
|
|
|
IN RD IL AM (U/P) (TY 2) (150W) S
|
EA
|
4.000
|
$2,150.000
|
$1,550.000
|
$1,400.000
|
$1,995.600
|
|
|
|
IN RD IL AM (TY SA) 40T-8 (250W) S
|
EA
|
20.000
|
$2,875.000
|
$2,600.000
|
$2,560.000
|
$3,219.920
|
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
4,047.000
|
$8.500
|
$5.000
|
$5.000
|
$8.630
|
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
297.000
|
$11.000
|
$20.000
|
$20.000
|
$14.020
|
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
60.000
|
$9.000
|
$18.000
|
$18.000
|
$12.940
|
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
56.000
|
$20.000
|
$25.000
|
$25.000
|
$48.540
|
|
|
|
CONDT (RM) (3/4")
|
LF
|
170.000
|
$15.500
|
$15.000
|
$15.000
|
$17.260
|
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
170.000
|
$1.500
|
$1.500
|
$1.500
|
$0.860
|
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
340.000
|
$1.250
|
$1.500
|
$1.500
|
$0.860
|
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
4,075.000
|
$1.200
|
$1.510
|
$1.510
|
$1.020
|
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
8,150.000
|
$1.750
|
$1.510
|
$1.510
|
$1.020
|
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
411.000
|
$1.500
|
$2.000
|
$2.000
|
$1.130
|
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
342.000
|
$3.000
|
$2.000
|
$2.000
|
$1.130
|
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
912.000
|
$3.500
|
$2.500
|
$2.500
|
$2.160
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
11.000
|
$730.000
|
$760.000
|
$760.000
|
$782.060
|
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
1.000
|
$800.000
|
$990.000
|
$990.000
|
$911.500
|
|
|
|
ELC SRV TY A 240/480 060(NS)SS(T)TP(O)
|
EA
|
6.000
|
$3,500.000
|
$3,940.000
|
$3,940.960
|
$4,854.150
|
|
|
|
ELC SRV TY T 120/240 000(NS)GS(L)TS(O)
|
EA
|
1.000
|
$3,250.000
|
$1,607.000
|
$1,606.600
|
$1,294.440
|
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
1,343.000
|
$20.000
|
$21.000
|
$21.490
|
$22.650
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
52.000
|
$550.000
|
$575.000
|
$573.490
|
$523.170
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
3.000
|
$630.000
|
$710.000
|
$705.490
|
$749.700
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
18.000
|
$700.000
|
$700.000
|
$69.490
|
$647.220
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$800.000
|
$755.000
|
$753.490
|
$846.780
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
2.000
|
$850.000
|
$820.000
|
$818.490
|
$943.860
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
1.000
|
$850.000
|
$905.000
|
$904.490
|
$846.780
|
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$2,500.000
|
$2,200.000
|
$2,050.000
|
$2,292.240
|
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
3.000
|
$2,500.000
|
$3,450.000
|
$3,449.090
|
$4,854.150
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
60.000
|
$70.000
|
$76.000
|
$75.490
|
$43.150
|
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
6,768.300
|
$4.500
|
$4.750
|
$4.490
|
$6.470
|
|
|
|
REMOVE LRSA
|
EA
|
4.000
|
$760.000
|
$550.000
|
$749.090
|
$485.420
|
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
1.000
|
$6,000.000
|
$8,500.000
|
$5,850.000
|
$3,775.450
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
80.000
|
$82.500
|
$48.000
|
$47.490
|
$51.230
|
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
47.000
|
$65.000
|
$55.000
|
$54.490
|
$58.780
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
9.000
|
$30.000
|
$15.000
|
$14.490
|
$15.630
|
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
16.000
|
$30.000
|
$15.000
|
$14.490
|
$15.630
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
1,000.000
|
$0.300
|
$0.550
|
$0.550
|
$0.590
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
40,192.000
|
$0.250
|
$0.400
|
$0.400
|
$0.430
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
2,711.000
|
$0.500
|
$0.800
|
$0.800
|
$0.860
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
208.000
|
$2.700
|
$3.800
|
$4.870
|
$4.100
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
44,441.000
|
$0.200
|
$0.450
|
$0.450
|
$0.490
|
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
7,202.000
|
$0.700
|
$0.600
|
$0.600
|
$0.650
|
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
623.000
|
$1.450
|
$2.800
|
$2.800
|
$3.020
|
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
4.000
|
$150.000
|
$160.000
|
$160.000
|
$172.590
|
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
4.000
|
$185.000
|
$220.000
|
$220.000
|
$237.310
|
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
6,310.000
|
$0.700
|
$0.800
|
$0.800
|
$0.860
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,144.000
|
$1.000
|
$1.000
|
$2.610
|
$1.200
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
14.000
|
$4.000
|
$1.000
|
$2.610
|
$1.200
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
8,082.000
|
$0.850
|
$0.950
|
$0.950
|
$1.020
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
63.000
|
$5.800
|
$12.800
|
$12.800
|
$13.810
|
|
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
1.000
|
$100.000
|
$160.000
|
$160.000
|
$172.590
|
|
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
1.000
|
$165.000
|
$280.000
|
$280.000
|
$302.040
|
|
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
1,540.000
|
$0.170
|
$0.450
|
$0.450
|
$0.490
|
|
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
5,359.000
|
$0.130
|
$0.450
|
$0.450
|
$0.490
|
|
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
1,118.000
|
$0.390
|
$0.650
|
$0.650
|
$0.700
|
|
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
1.000
|
$46.000
|
$60.000
|
$60.000
|
$64.720
|
|
|
|
REFL PAV MRK TY II (W) (DBL ARROW)
|
EA
|
1.000
|
$85.000
|
$80.000
|
$80.000
|
$86.300
|
|
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
4,433.000
|
$0.130
|
$0.450
|
$0.450
|
$0.490
|
|
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
15,860.000
|
$0.270
|
$0.360
|
$0.360
|
$0.390
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
67,520.000
|
$0.300
|
$0.340
|
$0.340
|
$0.370
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
66,050.000
|
$0.300
|
$0.340
|
$0.340
|
$0.370
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
7.000
|
$2.800
|
$6.800
|
$6.800
|
$7.340
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,194.000
|
$3.000
|
$2.800
|
$2.800
|
$3.020
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
17,375.000
|
$0.700
|
$0.450
|
$0.450
|
$0.490
|
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
660.000
|
$1.000
|
$1.600
|
$1.600
|
$1.730
|
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
624.000
|
$4.000
|
$4.600
|
$4.600
|
$4.960
|
|
|
|
INSTALL HWY TRF SIG (FLASH BEACON)
|
EA
|
1.000
|
$5,400.000
|
$1,250.000
|
$1,250.000
|
$5,393.500
|
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
4.000
|
$195.000
|
$250.000
|
$250.000
|
$264.280
|
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
8.000
|
$200.000
|
$250.000
|
$250.000
|
$264.280
|
|
|
|
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
|
LF
|
893.000
|
$2.400
|
$2.500
|
$2.500
|
$2.480
|
|
|
|
INS TRF SIG PL AM (S)STR(TY B)LUM
|
EA
|
4.000
|
$4,500.000
|
$4,000.000
|
$3,970.000
|
$5,177.760
|
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
300.000
|
$70.000
|
$42.000
|
$32.100
|
$67.970
|
|
|
|
FULL - WIDTH MOWING
|
CYC
|
6.000
|
$4,000.000
|
$3,500.000
|
$4,500.000
|
$3,221.670
|
|
|
|
LITTER REMOVAL
|
CYC
|
6.000
|
$2,000.000
|
$2,600.000
|
$2,000.000
|
$1,937.690
|
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
6.000
|
$2,000.000
|
$4,300.000
|
$1,888.700
|
$2,023.720
|
|
|
|
TRANSPLANT PLANT MATERIAL
|
EA
|
273.000
|
$120.000
|
$1,200.000
|
$495.000
|
$1,213.540
|
|
|
|
REMOVE & RELOCATE DYNAMIC MESSAGE SIGN
|
EA
|
1.000
|
$25,000.000
|
$10,500.000
|
$5,500.000
|
$28,154.070
|
|
1
|
|
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
|
CY
|
36,347.000
|
$25.000
|
$19.250
|
$25.630
|
$24.000
|
|
Totals: |
$22,075,283.630
|
$22,671,108.125
|
$26,250,465.047
|
$32,343,650.767
|