HANSFORD SH 207 (0355-05-046)

Items: 86

County: HANSFORD
Length: 6.4260 MILES
Highway: SH 207
District: AMARILLO
Control Number: 0355-05-046
DBE Goal: 400.0%
Project: F 2B25(129)
Guaranty: $100,000.00
Time: 152 WORKING DAYS
Engineer's Estimate: $16,235,433.64
Date: 09/05/2025 (9 months ago)
Contract Number: 9253204
Type: PREVENTIVE MAINTENANCE
Project ID: A00127834
Contract Type: Federal
Project Description: PM ACP OVERLAY, PAVEMENT REPAIR, UPGRADE MBGF, UPGRADE DRAINAGE, UPGRADE SAFETY ELEMENTS, SIGNING AND STRIPING
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$16,235,433.64
$12,484,682.59
Over/Under Est: -23.1% -$3,750,751.05
$12,947,163.65
Over/Under Est: -20.25% -$3,288,269.99
Amt Left: 3.7% $462,481.06
$13,154,210.04
Over/Under Est: -18.98% -$3,081,223.60
Amt Left: 5.36% $669,527.45
Delta: -1.60% -$207,046.39
Over/Under Est: -4.68% -$759,866.38
Amt Left: 23.96% $2,990,884.67
Delta: -17.65% -$2,321,357.22
Over/Under Est: -4.54% -$736,886.36
Amt Left: 24.14% $3,013,864.69
Delta: -0.15% -$22,980.02

Bid Items & Bid Tabulations

86 Total 0 of 86
HANSFORD  |  SH 207  |  AMARILLO  |  0355-05-046  |  09/05/2025  |  $16,235,433.64  |  F 2B25(129)  |  PREVENT MAINT  |  152 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DUININCK, INC.
J. LEE MILLIGAN, INC.
RK HALL, LLC
KIEWIT INFRASTRUCTURE SOUTH CO.
L A FULLER & SONS CONSTRUCTION, LTD.
PREPARING ROW
STA 896.000 $30.000 $7.450 $10.000 $27.470 $6.850 $18.900
REMOV CONC (DRIVEWAYS)
SY 2,332.000 $40.000 $22.500 $28.000 $27.710 $43.800 $19.500
REMOV CONC (CURB & GUTTER)
LF 1,362.000 $16.000 $17.000 $11.500 $28.880 $44.880 $7.850
RMV (6") TRT/UNTRT BASE & ASPH PAV
SY 315.000 $20.000 $25.500 $25.000 $32.660 $35.730 $12.900
RMV (12") TRT/UNTRT BASE & ASPH PAV
SY 4,320.000 $55.000 $12.000 $15.000 $15.520 $12.260 $10.450
EXCAV (ROADWAY)
CY 3,507.000 $25.000 $18.500 $27.000 $19.790 $33.870 $24.950
EMBANK (FNL)(OC)(TY B)
CY 14.000 $100.000 $50.000 $43.000 $81.700 $591.170 $198.850
EMBANK (FNL)(DC)(TY B)
CY 987.000 $50.000 $44.000 $22.000 $18.430 $19.720 $30.900
BACKFILL (TY A)
STA 896.000 $230.000 $165.000 $163.500 $206.970 $154.490 $191.800
BLADING
HR 6.000 $150.000 $540.000 $460.000 $281.350 $412.330 $336.400
DRILL SEED (PERM_RURAL_CLAY)
AC 21.000 $600.000 $555.000 $585.000 $571.650 $566.690 $638.250
DRILL SEED (TEMP_WARM_COOL)
AC 21.000 $600.000 $465.000 $495.000 $478.950 $528.670 $562.800
FL BS (CMP IN PLC)(TY A OR B GR 4)(12")
SY 8,019.000 $50.000 $35.500 $38.000 $38.570 $31.900 $30.650
CEMENT
TON 87.000 $400.000 $295.000 $318.000 $245.590 $600.000 $493.000
CEMENT TRT (SUBGRADE) (8")
SY 8,019.000 $13.000 $5.150 $8.000 $6.350 $4.530 $4.500
PRIME COAT (MC-30)
GAL 2,008.000 $8.000 $5.600 $7.000 $5.870 $6.270 $8.550
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 24,918.000 $3.700 $3.550 $3.500 $3.560 $1.660 $9.000
SP MIXES SP-D SAC-A PG70-28
TON 55,980.000 $173.000 $127.500 $123.100 $136.830 $155.000 $165.050
TACK COAT
GAL 4,327.000 $6.000 $3.100 $5.650 $8.800 $3.200 $8.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 26,372.000 $25.000 $22.000 $24.000 $18.070 $19.000 $32.700
PLANE ASPH CONC PAV(0" TO 2")
SY 1,777.000 $5.000 $5.450 $6.650 $6.420 $8.080 $5.950
PLANE ASPH CONC PAV(2")
SY 601.000 $5.000 $9.200 $10.000 $8.180 $11.660 $7.050
PLANE ASPH CONC PAV (0" TO 1.5")
SY 1,311.000 $5.000 $3.750 $4.500 $3.260 $4.690 $6.450
PLANE ASPH CONC PAV (1.5")
SY 6,397.000 $5.000 $4.400 $2.050 $2.810 $3.150 $5.500
PLANE ASPH CONC PAV (2.5")
SY 18,257.000 $3.000 $3.750 $3.550 $2.800 $4.150 $2.550
CUT & RESTORE ASPH PAVING
SY 439.000 $160.000 $230.000 $76.000 $137.150 $341.060 $222.650
CL A CONC (COLLAR)
EA 4.000 $1,200.000 $1,800.000 $1,650.000 $1,030.000 $3,770.170 $1,138.500
RIPRAP (CONC)(4 IN)
CY 5.000 $850.000 $850.000 $955.000 $824.000 $2,000.000 $1,970.900
RC PIPE (CL III)(24 IN)
LF 193.000 $175.000 $120.000 $156.000 $190.550 $178.610 $293.250
RC PIPE (ELLIP)(CL III)(DES 1)
LF 130.000 $320.000 $210.000 $215.000 $432.600 $323.340 $373.750
RC PIPE (ELLIP)(CL III)(DES 2)
LF 142.000 $360.000 $245.000 $230.000 $412.000 $386.360 $385.250
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 4.000 $3,100.000 $2,400.000 $3,900.000 $3,090.000 $1,512.430 $3,450.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 3.000 $3,100.000 $2,600.000 $4,000.000 $3,347.500 $6,179.950 $3,754.750
SET (TY II) (DES 1) (RCP) (6: 1) (P)
EA 4.000 $3,600.000 $3,200.000 $3,700.000 $3,090.000 $3,150.900 $3,852.500
SET (TY II) (DES 2) (RCP) (6: 1) (P)
EA 4.000 $4,200.000 $4,000.000 $3,875.000 $3,347.500 $3,150.900 $4,203.250
GRATE & FRAME
EA 6.000 $3,000.000 $800.000 $4,250.000 $3,605.000 $5,139.930 $4,352.750
CLEAN EXIST CULVERTS
EA 3.000 $2,200.000 $3,000.000 $1,800.000 $2,575.000 $2,650.580 $4,904.750
REMOV STR (SET)
EA 10.000 $400.000 $220.000 $1,200.000 $1,030.000 $1,255.010 $1,725.000
REMOV STR (PIPE)
LF 189.000 $60.000 $30.000 $31.000 $20.600 $43.610 $28.750
MOBILIZATION
LS 1.000 $1,350,000.000 $1,160,000.000 $1,290,000.000 $263,084.200 $1,152,655.730 $1,549,800.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $29,000.000 $30,000.000 $37,900.000 $26,494.940 $60,000.000 $4,895.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $15,000.000 $26,000.000 $17,371.980 $24,132.850 $43,825.600
TMA (STATIONARY)
DAY 152.000 $200.000 $250.000 $425.000 $427.170 $557.390 $470.600
TMA (MOBILE OPERATION)
HR 110.000 $95.000 $90.000 $97.000 $97.310 $103.410 $95.450
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 775.000 $10.000 $4.200 $9.000 $4.330 $5.290 $15.950
BIODEG EROSN CONT LOGS (REMOVE)
LF 775.000 $4.000 $1.500 $4.250 $1.550 $1.890 $9.600
COLORED TEXTURED CONC (4")
SY 1,176.000 $108.000 $135.000 $126.000 $245.640 $222.220 $95.650
CONC CURB & GUTTER (TY II)
LF 1,578.000 $40.000 $48.500 $48.000 $82.400 $150.000 $40.700
CONC CURB (SPECIAL)
LF 532.000 $52.000 $54.500 $58.500 $144.200 $109.650 $51.650
INTERSECTIONS (CONC)
SY 315.000 $195.000 $150.000 $216.000 $231.750 $284.410 $204.600
DRIVEWAYS (CONC)
SY 2,387.000 $150.000 $150.000 $180.000 $206.000 $180.000 $119.300
CONC SIDEWALKS (4")
SY 4,566.000 $103.000 $93.500 $128.000 $138.950 $170.890 $85.600
CURB RAMPS (TY 1)
SY 107.000 $170.000 $230.000 $277.000 $272.950 $347.860 $327.700
CURB RAMPS (TY 10)
SY 21.000 $170.000 $360.000 $212.000 $272.950 $395.520 $208.750
CONC SIDEWALKS (SPECIAL) (TYPE A)
SY 510.000 $150.000 $110.000 $130.000 $168.390 $175.780 $194.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 178,732.000 $0.330 $0.110 $0.300 $0.150 $0.090 $0.170
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 89,366.000 $0.330 $0.120 $0.300 $0.150 $0.110 $0.170
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 19.000 $800.000 $810.000 $765.000 $833.270 $1,039.800 $1,051.700
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 8.000 $950.000 $955.000 $865.000 $981.590 $1,228.850 $1,301.400
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 17.000 $1,250.000 $1,200.000 $1,065.000 $1,242.180 $1,449.410 $1,567.800
REMOVE SM RD SN SUP&AM
EA 44.000 $110.000 $125.000 $185.000 $51.500 $189.050 $212.750
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 66.000 $175.000 $130.000 $265.000 $132.870 $189.050 $167.700
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 22.000 $115.000 $135.000 $270.000 $138.020 $189.050 $174.200
REMOVE DELIN & OBJECT MARKER ASSMS
EA 22.000 $16.000 $25.000 $95.000 $5.150 $25.210 $57.600
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 6,107.000 $0.600 $0.400 $0.950 $0.410 $2.520 $1.040
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,198.000 $1.000 $0.400 $0.950 $0.410 $2.520 $1.040
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 10,452.000 $0.600 $0.400 $0.950 $0.410 $2.520 $1.040
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 496.000 $1.000 $1.500 $1.400 $1.730 $2.520 $7.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 7,400.000 $1.000 $1.500 $1.450 $1.730 $2.520 $6.950
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 934.000 $1.500 $1.900 $1.050 $1.960 $1.890 $1.150
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,522.000 $1.000 $0.960 $1.050 $0.990 $1.510 $1.150
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
LF 446.000 $8.000 $3.250 $11.650 $3.350 $6.300 $12.650
REFL PAV MRK TY I(Y)(MED NOSE)(090MIL)
EA 2.000 $500.000 $450.000 $530.000 $463.500 $630.180 $575.000
TY I HIGH PERF PM (W)6"(BRK)(090MIL)
LF 1,552.000 $0.900 $0.650 $0.800 $0.670 $1.260 $0.860
TY I HIGH PERF PM (W)6"(SLD)(090MIL)
LF 189,569.000 $0.800 $0.640 $0.700 $0.660 $1.130 $0.770
TY I HIGH PERF PM (Y)6"(BRK)(090MIL)
LF 31,531.000 $0.900 $0.650 $0.750 $0.670 $1.130 $0.810
TY I HIGH PERF PM (Y)6"(SLD)(090MIL)
LF 19,473.000 $0.800 $0.640 $0.750 $0.660 $1.130 $0.810
PREFAB PM TY C (W)(12")(SLD)
LF 45.000 $14.000 $5.500 $12.750 $5.670 $12.600 $13.800
PREFAB PM TY C (W)(24")(SLD)
LF 134.000 $20.000 $14.000 $19.000 $14.420 $22.690 $20.700
PREFAB PM TY C (W)(ARROW)
EA 7.000 $365.000 $210.000 $320.000 $214.240 $315.090 $345.000
PREFAB PM TY C (W)(DBL ARROW)
EA 1.000 $200.000 $320.000 $530.000 $331.660 $630.180 $575.000
PREFAB PM TY C (W)(WORD)
EA 8.000 $480.000 $250.000 $425.000 $257.500 $378.110 $460.000
RECESSED REFL PAV MRKR TY I-C
EA 91.000 $38.000 $43.500 $79.500 $44.810 $7.560 $86.250
RECESSED REFL PAV MRKR TY II-A-A
EA 1,276.000 $38.000 $43.500 $63.500 $44.810 $6.300 $69.000
UNDERSEAL COURSE
GAL 120,032.000 $6.000 $3.850 $3.650 $6.690 $4.140 $4.000
STEEL FENCE (REMOVE)
LF 8.000 $150.000 $62.500 $85.000 $515.000 $176.950 $201.500
Totals: $16,235,433.640 $12,484,682.590 $12,947,163.650 $13,154,210.040 $15,475,567.260 $15,498,547.280
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $3,000.00
Total: $13,000.00