DEAF SMITH US 60 (0168-07-050)

Items: 50

County: DEAF SMITH
Length: N/A
Highway: US 60
District: AMARILLO
Control Number: 0168-07-050
DBE Goal: N/A
Project: C 168-7-50
Guaranty: N/A
Time: 194 WORKING DAYS
Engineer's Estimate: $24,184,741.42
Date: 01/06/2023 (3 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
JOE CHAPPELL
CC SYSOMBATH
KENNETH PETR
THOMAS NAGEL
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$24,184,741.42
1
$23,784,485.60
Over/Under Est: -1.65% -$400,255.82
$24,067,985.10
Over/Under Est: -0.48% -$116,756.32
Amt Left: 1.19% $283,499.50
$24,999,999.99
Over/Under Est: 3.37% $815,258.57
Amt Left: 5.11% $1,215,514.39
Delta: -3.87% -$932,014.89
Over/Under Est: 19.09% $4,616,483.44
Amt Left: 21.09% $5,016,739.26
Delta: -15.20% -$3,801,224.87
Subcontractor Percentage Amount
INDUSTRIAL FABRICS, INC. 4.38% $1,075,908.58
TRP CONSTRUCTION GROUP, LLC 1.61% $395,482.38
TEX OP CONSTRUCTION, LP 1.11% $272,661.76
W. S. CONSTRUCTION COMPANY 0.56% $137,559.09
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.33% $81,061.61
SURFACE PREPARATION TECHNOLOGIES, LLC 0.22% $54,041.07
PROFESSIONAL TRAFFIC CONTROL LLC 0.18% $44,215.42
FC TRAFFIC CONTROL, INC. 0.16% $39,302.60
Total: 8.55% $2,100,232.51

Bid Items & Bid Tabulations

50 Total 0 of 50
DEAF SMITH  |  US 60  |  AMARILLO  |  0168-07-050  |  01/06/2023  |  $24,184,741.42  |  C 168-7-50  |  REHAB EXIST ROADWAY  |  194 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
J. LEE MILLIGAN, INC.
DUININCK, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
PREPARING ROW
AC 64.000 $200.000 $178.290 $153.000 $185.000 $349.510
REMOVING STAB BASE & ASPH PAV (12")
SY 312.000 $14.000 $19.280 $26.500 $20.000 $25.680
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 150.000 $35.000 $61.580 $43.500 $160.000 $68.120
BACKFILL (TY A)
STA 1,384.000 $200.000 $222.050 $240.000 $306.000 $162.540
BLADING
HR 2.000 $300.000 $150.290 $390.000 $440.000 $400.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 67.000 $500.000 $585.360 $575.000 $570.000 $988.880
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 67.000 $450.000 $432.000 $425.000 $420.000 $821.810
PRIME COAT (MC-30)
GAL 51,889.000 $5.000 $4.270 $5.000 $5.000 $7.300
EMULS ASPH (EROSN CONT)(MULTI)
GAL 32,291.000 $4.000 $4.380 $4.000 $3.850 $6.420
FLEX PAVEMENT STRUCTURE REPAIR (2.5")
SY 5,000.000 $20.000 $26.200 $35.000 $37.000 $48.390
PLANE ASPH CONC PAV(0" TO 2")
SY 4,866.000 $3.000 $5.350 $5.450 $4.200 $3.340
PLANE ASPH CONC PAV (3")
SY 207,555.000 $2.400 $2.420 $3.350 $3.200 $3.790
CL C CONC (COLLAR)
EA 21.000 $1,300.000 $1,158.110 $1,800.000 $1,000.000 $4,117.820
CMP (GAL STL 36 IN)
LF 4.000 $300.000 $231.620 $440.000 $210.000 $823.560
RC PIPE (CL III)(24 IN)
LF 68.000 $175.000 $208.460 $385.000 $190.000 $411.780
RC PIPE (CL III)(30 IN)
LF 12.000 $300.000 $289.530 $550.000 $260.000 $529.430
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 29.000 $2,700.000 $2,316.230 $3,335.000 $2,100.000 $2,353.040
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 3.000 $3,000.000 $4,053.400 $4,200.000 $3,700.000 $5,882.610
SET (TY II) (36 IN) (CMP) (6: 1) (P)
EA 1.000 $5,000.000 $11,581.140 $9,750.000 $10,520.690 $8,823.910
REMOV STR (HEADWALL)
EA 7.000 $2,500.000 $1,158.110 $1,500.000 $1,000.000 $3,235.430
REMOV STR (PIPE)
LF 48.000 $35.000 $17.370 $130.000 $15.500 $88.730
MOBILIZATION
LS 1.000 $2,000,000.000 $951,379.420 $2,355,000.000 $1,420,000.000 $2,826,437.740
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $19,000.000 $15,532.360 $26,700.000 $24,000.000 $40,000.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 4,200.000 $4.300 $3.670 $6.900 $3.550 $4.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,200.000 $1.500 $1.080 $2.300 $1.050 $1.180
RUMBLE STRIPS (SHOULDER)
LF 268,665.000 $0.140 $0.070 $0.220 $0.100 $0.120
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 69,185.000 $0.750 $0.320 $0.320 $0.310 $0.350
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 207,555.000 $0.500 $0.300 $0.300 $0.290 $0.330
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 207,555.000 $0.500 $0.300 $0.300 $0.290 $0.330
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 17,128.000 $1.090 $1.270 $1.700 $1.400 $2.350
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 6,750.000 $2.080 $1.270 $1.700 $1.400 $2.350
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 17,000.000 $1.000 $1.080 $1.050 $1.050 $1.180
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 360.000 $9.500 $8.640 $8.450 $8.400 $9.410
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 420.000 $40.000 $43.200 $42.200 $42.000 $47.060
REFL PAV MRKR TY II-C-R
EA 3,820.000 $3.500 $4.860 $4.750 $4.700 $5.290
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
SY 192,181.000 $5.250 $6.050 $5.900 $5.850 $6.720
ASPH FOR REINF FAB (PG70-28)
GAL 42,280.000 $4.800 $4.660 $5.600 $3.900 $5.000
D-GR HMA TY-B PG64-28
TON 34,247.000 $124.000 $129.160 $123.950 $130.000 $129.650
SP MIXES SP-D SAC-A PG70-28
TON 72,613.000 $128.000 $138.410 $127.000 $150.000 $158.130
TACK COAT
GAL 20,383.000 $5.000 $7.130 $8.900 $6.400 $4.110
UNDERSEAL COURSE
GAL 77,796.000 $5.000 $7.130 $3.900 $3.850 $4.360
EMUL TRTMENT (MX EXST MTRL) 12"
SY 207,555.000 $4.820 $17.130 $3.300 $4.100 $2.150
CEMENT
TON 1,214.000 $230.000 $267.000 $225.000 $245.000 $318.000
EMULSION
GAL 871,731.000 $3.700 $0.010 $2.900 $2.950 $4.330
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $20,000.000 $25,345.860 $10,500.000 $15,500.000 $24,524.140
HPPM W/RET REQ TY I(W)6"(BRK)(090MIL)
LF 34,600.000 $0.600 $0.760 $0.750 $0.730 $0.820
HPPM W/RET REQ TY I(W)6"(SLD)(090MIL)
LF 138,370.000 $0.550 $0.700 $0.700 $0.680 $0.760
HPPM W/RET REQ TY I(Y)6"(SLD)(090MIL)
LF 138,370.000 $0.550 $0.700 $0.700 $0.680 $0.760
TMA (STATIONARY)
DAY 229.000 $250.000 $449.900 $320.000 $260.000 $608.550
TMA (MOBILE OPERATION)
HR 120.000 $105.000 $81.880 $87.000 $105.000 $112.360
Totals: $24,184,741.420 $23,784,485.600 $24,067,985.100 $24,999,999.990 $28,801,224.860