REMOVING CONC (CURB)
|
LF
|
706.000
|
$11.600
|
$7.000
|
$15.490
|
$15.000
|
$22.640
|
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
855.000
|
$10.000
|
$19.000
|
$15.510
|
$11.000
|
$17.450
|
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
182,149.000
|
$10.000
|
$5.690
|
$1.990
|
$8.000
|
$5.180
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
46,102.000
|
$20.000
|
$15.000
|
$8.080
|
$22.000
|
$19.860
|
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
28,308.000
|
$25.000
|
$12.750
|
$9.060
|
$15.000
|
$17.780
|
|
|
|
BLADING
|
HR
|
102.000
|
$140.000
|
$400.000
|
$177.140
|
$315.000
|
$303.880
|
|
|
|
EROSION CONTROL COMPOST
|
CY
|
1,348.000
|
$25.280
|
$66.000
|
$66.000
|
$75.000
|
$55.680
|
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
391,114.000
|
$0.320
|
$0.200
|
$0.200
|
$0.200
|
$0.330
|
|
|
|
PROOF ROLLING
|
HR
|
100.000
|
$150.000
|
$150.000
|
$155.200
|
$120.000
|
$231.920
|
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
2,864.000
|
$27.500
|
$24.000
|
$36.640
|
$22.000
|
$26.950
|
|
|
|
REWORK BS MTL (TY C) (6") (ORD COMP)
|
SY
|
25,166.000
|
$5.000
|
$5.250
|
$20.360
|
$7.000
|
$7.250
|
|
|
|
REWORK BS MTL (TY D)(SURF)(ORD COMP)
|
SY
|
6,400.000
|
$10.000
|
$28.000
|
$19.990
|
$15.000
|
$7.920
|
|
|
|
PRIME COAT (AE-P)
|
GAL
|
62,830.000
|
$5.200
|
$4.570
|
$6.520
|
$5.000
|
$6.900
|
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
59,061.000
|
$6.080
|
$4.120
|
$4.140
|
$3.500
|
$6.000
|
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
112,515.000
|
$5.000
|
$4.070
|
$4.820
|
$3.500
|
$4.500
|
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
2,703.000
|
$225.000
|
$131.490
|
$259.570
|
$160.000
|
$240.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
489.000
|
$260.000
|
$203.500
|
$330.000
|
$200.000
|
$371.200
|
|
|
|
CUT & RESTORING PAV
|
SY
|
479.000
|
$165.000
|
$209.260
|
$161.390
|
$200.000
|
$129.280
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
159.000
|
$27.000
|
$33.000
|
$27.500
|
$45.000
|
$30.930
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
566.000
|
$60.000
|
$49.500
|
$107.180
|
$50.000
|
$92.800
|
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
504.000
|
$376.220
|
$385.000
|
$324.500
|
$345.000
|
$437.780
|
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
210.000
|
$279.660
|
$412.500
|
$412.500
|
$450.000
|
$464.000
|
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
46.800
|
$1,700.000
|
$2,585.000
|
$2,475.000
|
$4,225.000
|
$2,687.400
|
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
4,598.000
|
$39.500
|
$35.200
|
$35.200
|
$55.000
|
$51.540
|
|
|
|
APPROACH SLAB (HPC)
|
CY
|
70.900
|
$900.000
|
$1,072.500
|
$1,650.000
|
$2,000.000
|
$1,766.270
|
|
|
|
PRESTR CONC BOX BEAM (4B34)
|
LF
|
396.000
|
$308.000
|
$495.000
|
$558.800
|
$450.000
|
$412.630
|
|
|
|
PRESTR CONC BOX BEAM (5B34)
|
LF
|
594.000
|
$325.000
|
$495.000
|
$550.000
|
$430.000
|
$394.890
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
14.300
|
$650.000
|
$715.000
|
$935.000
|
$1,500.000
|
$1,051.740
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
17.000
|
$669.000
|
$1,100.000
|
$1,100.000
|
$1,400.000
|
$1,346.530
|
|
|
|
STR STEEL (NBIS)
|
LB
|
56.000
|
$22.360
|
$110.000
|
$34.100
|
$35.000
|
$38.360
|
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOT) (HPC)
|
LF
|
247.000
|
$173.500
|
$220.000
|
$204.600
|
$300.000
|
$430.060
|
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
92.000
|
$268.050
|
$385.000
|
$330.000
|
$345.000
|
$232.100
|
|
|
|
GABION MATTRESSES (GALV)(18 IN)
|
SY
|
600.000
|
$200.000
|
$330.000
|
$319.000
|
$180.000
|
$391.830
|
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (P)
|
EA
|
12.000
|
$3,100.000
|
$2,471.700
|
$1,870.000
|
$2,000.000
|
$2,103.490
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$2,873.500
|
$2,864.400
|
$2,530.000
|
$2,500.000
|
$2,845.890
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
48.000
|
$2,140.000
|
$2,864.400
|
$2,530.000
|
$2,500.000
|
$2,845.890
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
40.000
|
$2,711.700
|
$3,249.400
|
$3,190.000
|
$2,750.000
|
$3,588.300
|
|
|
|
REMOV STR (SET)
|
EA
|
20.000
|
$1,188.560
|
$1,650.000
|
$550.000
|
$1,800.000
|
$816.650
|
|
|
|
REMOV STR (PIPE)
|
LF
|
1,294.000
|
$40.000
|
$16.500
|
$22.000
|
$65.000
|
$30.770
|
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$100,000.000
|
$55,000.000
|
$85,800.000
|
$105,000.000
|
$54,363.770
|
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
4.000
|
$3,500.000
|
$1,650.000
|
$550.000
|
$2,000.000
|
$1,392.010
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,028,090.340
|
$1,412,000.000
|
$1,003,960.560
|
$3,246,000.000
|
$4,074,558.320
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
27.000
|
$16,885.000
|
$30,000.000
|
$15,000.000
|
$60,000.000
|
$55,000.000
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,092.000
|
$35.000
|
$20.000
|
$43.670
|
$42.000
|
$46.400
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,092.000
|
$12.000
|
$10.000
|
$19.560
|
$9.000
|
$15.550
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
2,943.000
|
$12.370
|
$7.700
|
$8.220
|
$9.000
|
$9.900
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,943.000
|
$2.480
|
$1.100
|
$2.670
|
$1.000
|
$2.470
|
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
330.000
|
$97.500
|
$66.000
|
$66.000
|
$150.000
|
$74.240
|
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
330.000
|
$12.000
|
$27.500
|
$27.500
|
$15.000
|
$30.930
|
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
330.000
|
$27.670
|
$33.000
|
$33.000
|
$20.000
|
$37.120
|
|
|
|
CONC CURB (TY I)
|
LF
|
708.000
|
$69.000
|
$44.000
|
$88.000
|
$50.000
|
$98.990
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
115,972.000
|
$0.320
|
$0.210
|
$0.080
|
$0.150
|
$0.160
|
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
57,326.000
|
$0.320
|
$0.280
|
$0.080
|
$0.150
|
$0.190
|
|
|
|
MTL THRIE-BEAM GD FEN (STEEL POST)
|
LF
|
138.000
|
$1,440.000
|
$45.100
|
$45.100
|
$50.000
|
$50.730
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,400.000
|
$4,400.000
|
$4,400.000
|
$5,200.000
|
$4,949.380
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,614.010
|
$2,255.000
|
$2,255.000
|
$2,700.000
|
$2,536.560
|
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
2.000
|
$1,000.000
|
$1,925.000
|
$1,925.000
|
$2,300.000
|
$2,165.350
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
413.000
|
$4.820
|
$5.500
|
$5.500
|
$6.000
|
$6.190
|
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$358.810
|
$550.000
|
$550.000
|
$1,050.000
|
$618.670
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,903.710
|
$4,812.500
|
$4,812.500
|
$5,800.000
|
$5,413.390
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,200.000
|
$2,750.000
|
$2,750.000
|
$500.000
|
$3,093.360
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,802.980
|
$1,100.000
|
$1,100.000
|
$1,200.000
|
$1,237.350
|
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$13,082.470
|
$8,250.000
|
$8,250.000
|
$18,000.000
|
$9,280.090
|
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
2.000
|
$540.830
|
$599.500
|
$605.000
|
$600.000
|
$680.540
|
|
|
|
IN RD IL (TY SA) 50T-10 (400W EQ) LED
|
EA
|
21.000
|
$5,712.950
|
$9,350.000
|
$9,350.000
|
$11,000.000
|
$10,517.440
|
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
3,426.000
|
$18.680
|
$8.800
|
$8.800
|
$10.000
|
$9.900
|
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
384.000
|
$34.000
|
$44.000
|
$44.000
|
$50.000
|
$49.490
|
|
|
|
CONDT (RM) (2")
|
LF
|
75.000
|
$35.000
|
$49.500
|
$49.500
|
$55.000
|
$55.680
|
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
3,810.000
|
$1.260
|
$1.100
|
$1.100
|
$1.250
|
$1.240
|
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
7,620.000
|
$1.280
|
$1.380
|
$1.380
|
$1.500
|
$1.550
|
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
58.000
|
$2.680
|
$2.200
|
$2.200
|
$2.250
|
$2.470
|
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
116.000
|
$2.670
|
$2.480
|
$2.480
|
$2.500
|
$2.780
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
14.000
|
$1,400.000
|
$1,925.000
|
$1,925.000
|
$2,000.000
|
$2,165.350
|
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
3.000
|
$8,757.670
|
$11,000.000
|
$11,000.000
|
$15,000.000
|
$12,373.450
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
41.000
|
$934.240
|
$880.000
|
$902.000
|
$900.000
|
$1,014.620
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
26.000
|
$980.000
|
$1,072.500
|
$979.000
|
$1,150.000
|
$1,101.240
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
4.000
|
$950.000
|
$1,474.000
|
$1,320.000
|
$1,500.000
|
$1,484.810
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
72.000
|
$134.700
|
$150.000
|
$125.690
|
$200.000
|
$123.730
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
172.000
|
$21.380
|
$25.000
|
$26.310
|
$85.000
|
$24.750
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
172.000
|
$100.000
|
$132.000
|
$86.900
|
$175.000
|
$97.750
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
506,233.000
|
$0.450
|
$0.200
|
$0.200
|
$0.250
|
$0.220
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
576.000
|
$6.180
|
$8.800
|
$8.800
|
$4.000
|
$9.900
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
587,793.000
|
$0.450
|
$0.200
|
$0.200
|
$0.250
|
$0.220
|
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
7,347.000
|
$5.000
|
$5.500
|
$5.500
|
$5.000
|
$6.190
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
46,900.000
|
$1.650
|
$1.750
|
$2.000
|
$0.500
|
$2.470
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
2,400.000
|
$2.100
|
$1.750
|
$9.780
|
$0.750
|
$2.470
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,638.000
|
$1.680
|
$1.100
|
$1.100
|
$1.250
|
$1.240
|
|
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
1.000
|
$565.260
|
$330.000
|
$330.000
|
$650.000
|
$371.200
|
|
|
|
PAVEMENT SEALER 6"
|
LF
|
400.000
|
$0.270
|
$1.100
|
$1.100
|
$1.250
|
$1.240
|
|
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
117,235.000
|
$0.750
|
$0.720
|
$0.720
|
$0.750
|
$0.800
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
14,080.000
|
$0.750
|
$0.750
|
$0.750
|
$1.000
|
$0.840
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
12,689.000
|
$1.060
|
$0.750
|
$0.750
|
$0.750
|
$0.840
|
|
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
419.000
|
$17.000
|
$13.200
|
$13.200
|
$15.000
|
$14.850
|
|
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
5.000
|
$285.200
|
$275.000
|
$275.000
|
$350.000
|
$309.340
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
5.000
|
$331.040
|
$330.000
|
$330.000
|
$390.000
|
$371.200
|
|
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
6.000
|
$63.000
|
$82.500
|
$82.500
|
$50.000
|
$92.800
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
84.000
|
$7.960
|
$4.680
|
$4.680
|
$4.500
|
$5.260
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
889.000
|
$6.010
|
$4.680
|
$4.680
|
$4.000
|
$5.260
|
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
37,920.000
|
$0.610
|
$1.620
|
$2.500
|
$1.250
|
$2.120
|
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
400.000
|
$0.180
|
$1.100
|
$1.100
|
$2.250
|
$1.240
|
|
|
|
D-GR HMA TY-D SAC-B PG64-22
|
TON
|
889.000
|
$250.000
|
$350.000
|
$246.760
|
$258.000
|
$331.660
|
|
|
|
D-GR HMA TY-D PG70-22 (LEVEL-UP)
|
TON
|
998.000
|
$115.000
|
$180.000
|
$218.670
|
$188.000
|
$176.640
|
|
|
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
99,605.000
|
$155.000
|
$121.000
|
$133.800
|
$138.500
|
$164.610
|
|
|
|
TACK COAT
|
GAL
|
30,765.000
|
$5.500
|
$4.050
|
$7.860
|
$5.000
|
$4.310
|
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
24,331.000
|
$190.000
|
$165.000
|
$198.460
|
$0.000
|
$209.720
|
|
|
|
BONDING COURSE
|
GAL
|
25,114.000
|
$5.000
|
$4.470
|
$5.520
|
$5.000
|
$6.720
|
|
|
|
THERMOPLASTIC PIPE (PP) (18")
|
LF
|
194.000
|
$100.000
|
$0.000
|
$0.000
|
$125.000
|
$0.000
|
|
|
|
THERMOPLASTIC PIPE (PP) (24")
|
LF
|
2,420.000
|
$158.280
|
$0.000
|
$0.000
|
$133.000
|
$0.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$13,000.000
|
$20,350.000
|
$14,117.530
|
$23,100.000
|
$25,099.020
|
|
|
|
TMA (STATIONARY)
|
DAY
|
508.000
|
$325.000
|
$165.000
|
$250.000
|
$255.000
|
$550.960
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
76.000
|
$1,000.000
|
$935.000
|
$500.000
|
$665.000
|
$1,076.680
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
194.000
|
$100.000
|
$82.500
|
$104.500
|
$0.000
|
$117.550
|
|
2
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
2,420.000
|
$158.280
|
$116.600
|
$137.500
|
$0.000
|
$154.670
|
|
3
|
|
STONE-MTRX-ASPH SMAR-F SAC-A
|
TON
|
24,331.000
|
$190.000
|
$0.000
|
$0.000
|
$165.000
|
$0.000
|
|
Totals: |
$39,137,793.890
|
$26,967,769.440
|
$28,365,168.700
|
$32,469,431.000
|
$37,415,775.095
|