JONES US 83 (0033-05-089)

Items: 215

County: JONES
Length: N/A
Highway: US 83
District: ABILENE
Control Number: 0033-05-089
DBE Goal: 600.0%
Project: F 2B24(277)
Guaranty: N/A
Time: 528 WORKING DAYS
Engineer's Estimate: $39,256,091.04
Date: 07/09/2024 (1 year ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD SHOULDERS
Mail/Deliver Bids To: N/A
BRYCE TURENTINE
CHAD W CARTER
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$39,256,091.04
$39,496,850.50
Over/Under Est: 0.61% $240,759.46
Over/Under Est: 6.66% $2,612,507.00
Amt Left: 6% $2,371,747.54
Over/Under Est: 17.92% $7,036,148.39
Amt Left: 17.2% $6,795,388.93
Delta: -10.57% -$4,423,641.39
Subcontractor Percentage Amount
4-WAY HAULERS, LLC 3.32% $1,315,906.26
HJC FARMS, INC. 3.27% $1,296,088.39
MAKIN' IT MOVE TRANSPORT,LLC 3.12% $1,236,634.79
HALLIGAN SERVICES LLC 2.90% $1,149,436.19
WILLIS ELECTRIC CO., LP 2.19% $868,022.50
JB PINNACLE GROUP, LLC 1.89% $749,115.31
HODGES AND SON CONSTRUCTION COMPANY, INC. 1.07% $424,102.32
PERFORMANCE EQUIPMENT SERVICE 0.94% $372,575.87
TRP CONSTRUCTION GROUP, LLC 0.69% $273,486.54
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 0.62% $245,741.53
FC TRAFFIC CONTROL, INC. 0.59% $233,850.81
AZ GRADEMAKER INC 0.58% $229,887.24
TORO BRAVO CONSTRUCTION, LLC 0.22% $87,198.61
TEJAS CONCRETE PUMPING, LLC 0.08% $31,708.58
PENHALL COMPANY 0.05% $19,817.87
TORO BRAVO CONSTRUCTION, LLC 0.04% $15,854.29
S & S BRIDGE PAINTING, INC. 0.03% $11,890.72
ACT SAW CUTTING & REMOVAL 0.03% $11,890.72
WEST TEXAS ROCK RESOURCES, LLC 0.01% $3,963.57
Total: 21.64% $8,577,172.11

Bid Items & Bid Tabulations

215 Total 0 of 215
JONES  |  US 83  |  ABILENE  |  0033-05-089  |  07/09/2024  |  $39,256,091.04  |  F 2B24(277)  |  WIDEN ROAD - ADD SHOULDERS  |  528 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FNF CONSTRUCTION, INC.
INDUS ROAD & BRIDGE, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
PREPARING ROW
STA 70.200 $8,000.000 $2,500.000 $47,428.510 $36,000.000
REMOVING CONC (DRIVEWAYS)
SY 289.000 $25.000 $20.000 $27.000 $30.000
REMOVING STAB BASE AND ASPH PAV (4")
SY 7,077.000 $15.000 $5.000 $6.170 $3.500
OBLITERATING ABANDONED ROAD
STA 7.770 $2,250.000 $1,800.000 $5,000.000 $1,500.000
EXCAVATION (ROADWAY)
CY 45,781.000 $12.000 $16.000 $17.000 $12.520
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 189,902.000 $15.600 $37.000 $17.000 $18.000
BROADCAST SEED (TEMP) (WARM)
SY 93,780.000 $0.500 $0.150 $0.150 $0.250
BROADCAST SEED (TEMP) (COOL)
SY 93,780.000 $0.500 $0.150 $0.160 $0.250
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 39.140 $800.000 $815.000 $800.000 $895.240
VEGETATIVE WATERING
MG 1,595.000 $30.000 $80.000 $24.000 $30.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 31,327.000 $57.000 $58.000 $54.000 $59.000
REWORK BS MTL (TY A)(2")(DENS CONT)
SY 17,604.000 $2.500 $2.000 $5.000 $4.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 2,045.000 $375.000 $475.000 $375.000 $345.000
LIME TRT (SUBGRADE)(6")
SY 108,163.000 $7.500 $5.000 $8.000 $6.000
PRIME COAT (AE-P)
GAL 23,108.000 $7.000 $6.000 $15.000 $11.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 2,670.000 $50.000 $45.000 $82.000 $87.000
PLANE ASPH CONC PAV(0" TO 2")
SY 767.000 $5.000 $3.000 $4.000 $8.820
PLANE ASPH CONC PAV (1")
SY 28,301.000 $5.000 $2.000 $1.300 $2.000
PLANE ASPH CONC PAV (7")
SY 14,509.000 $10.500 $8.000 $5.500 $7.000
PLANE ASPH CONC PAV (2")
SY 25,211.000 $6.500 $3.000 $2.000 $3.000
PLANE ASPH CONC PAV (5")
SY 18,991.000 $7.500 $5.000 $4.000 $5.500
CONC PVMT (CONT REINF - CRCP) (10")
SY 7,074.000 $143.000 $165.000 $110.000 $300.000
CEM STABIL BKFL
CY 332.000 $292.500 $165.000 $320.000 $250.000
CUT & RESTORE ASPH PAVING
SY 28.000 $60.000 $320.000 $100.000 $250.000
FLOWABLE BACKFILL
CY 13.000 $300.000 $335.000 $333.000 $285.000
TRENCH EXCAVATION PROTECTION
LF 190.000 $6.000 $60.000 $43.000 $61.390
TEMPORARY SPL SHORING
SF 256.000 $90.000 $100.000 $53.000 $300.000
DRILL SHAFT (18 IN)
LF 225.000 $260.000 $280.000 $160.000 $225.000
DRILL SHAFT (30 IN)
LF 320.000 $455.000 $490.000 $420.000 $425.000
DRILL SHAFT (36 IN)
LF 1,980.000 $487.500 $470.000 $265.000 $450.000
DRILL SHAFT (48 IN)
LF 21.000 $975.000 $1,255.000 $1,100.000 $1,200.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 26.000 $390.000 $270.000 $350.000 $400.000
DRILL SHAFT (SIGN MTS) (30 IN)
LF 52.000 $617.500 $460.000 $710.000 $800.000
DRILL SHAFT (SIGN MTS) (36 IN)
LF 68.000 $682.500 $570.000 $800.000 $900.000
DRILL SHAFT (SIGN MTS) (48 IN)
LF 90.000 $1,000.000 $820.000 $700.000 $800.000
CL C CONC (ABUT)(HPC)
CY 136.400 $1,560.000 $3,170.000 $1,100.000 $1,500.000
CL C CONC (CAP)(HPC)
CY 93.000 $2,000.000 $3,250.000 $1,570.000 $2,500.000
CL C CONC (COLUMN)(HPC)
CY 55.000 $2,000.000 $2,790.000 $1,900.000 $2,000.000
REINF CONC SLAB (HPC)
SF 33,120.000 $35.000 $38.000 $21.000 $40.000
APPROACH SLAB (HPC)
CY 243.000 $1,000.000 $1,140.000 $870.000 $1,200.000
RETAINING WALL (MSE)
SF 63,019.000 $125.000 $49.000 $109.000 $110.000
PRESTR CONC GIRDER (TX54)
LF 3,942.620 $400.000 $295.000 $235.000 $300.000
SILICONE RESIN PAINT FINISH
SF 1,388.000 $25.000 $11.250 $10.000 $24.190
RIPRAP (CONC)(4 IN)
CY 52.250 $780.000 $1,500.000 $655.000 $903.740
RIPRAP (CONC)(5 IN)
CY 560.500 $800.000 $1,000.000 $590.000 $1,100.000
RIPRAP (MOW STRIP)(4 IN)
CY 401.000 $780.000 $700.000 $630.000 $725.620
RAIL (TY SSTR)
LF 2,926.000 $100.000 $105.000 $111.000 $76.220
RAIL (TY SSTR)(HPC)
LF 1,528.000 $100.000 $100.000 $118.000 $112.850
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 208.000 $273.000 $300.000 $252.000 $350.000
CMP AR (GAL STL DES 2)
LF 286.000 $70.000 $125.000 $100.000 $100.000
CMP AR (GAL STL DES 3)
LF 56.000 $110.000 $150.000 $110.000 $70.000
CONC BOX CULV (4 FT X 3 FT)
LF 61.000 $450.000 $800.000 $400.000 $1,000.000
CONC BOX CULV (5 FT X 3 FT)
LF 1,893.000 $611.000 $700.000 $450.000 $680.000
CONC BOX CULV (6 FT X 3 FT)
LF 76.000 $800.000 $850.000 $550.000 $900.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 30.000 $1,000.000 $1,600.000 $1,450.000 $2,700.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 26.000 $1,200.000 $2,100.000 $1,700.000 $2,800.000
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
LF 36.000 $1,350.000 $1,650.000 $1,400.000 $4,300.000
CONC BOX CULV (8 FT X 3 FT)
LF 159.000 $1,000.000 $1,050.000 $660.000 $1,200.000
CONC BOX CULV (6 FT X 2 FT)
LF 50.000 $700.000 $950.000 $510.000 $900.000
CONC BOX CULVERT (10 FT X 4 FT)(EXTEND)
LF 78.000 $1,500.000 $2,350.000 $1,550.000 $1,700.000
RC PIPE (CL III)(18 IN)
LF 381.000 $117.000 $100.000 $93.000 $150.000
RC PIPE (CL III)(24 IN)
LF 737.000 $150.000 $150.000 $144.000 $155.000
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
EA 1.000 $10,200.000 $15,000.000 $7,000.000 $12,000.000
HEADWALL (CH - PW - S) (DIA= 24 IN)
EA 1.000 $8,000.000 $14,000.000 $16,500.000 $13,000.000
WINGWALL (FW - 0) (HW=5 FT)
EA 1.000 $4,500.000 $25,000.000 $32,500.000 $22,000.000
SET (TY I)(S=10 FT)(HW=5FT)(4:1)(C)
EA 1.000 $10,000.000 $30,000.000 $27,000.000 $32,000.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
EA 1.000 $11,250.000 $20,000.000 $25,000.000 $18,500.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(6:1) (C)
EA 1.000 $11,500.000 $40,000.000 $29,000.000 $33,000.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 4.000 $23,000.000 $14,445.000 $24,000.000 $23,000.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1) (C)
EA 2.000 $12,000.000 $18,000.000 $24,000.000 $14,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 8.000 $11,500.000 $15,755.000 $26,500.000 $14,500.000
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
EA 4.000 $18,000.000 $20,775.000 $26,000.000 $17,000.000
SET (TY I)(S= 8 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $25,000.000 $25,000.000 $25,500.000 $26,000.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 6.000 $1,250.000 $2,000.000 $3,000.000 $3,000.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000 $1,600.000 $3,500.000 $3,700.000 $3,400.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,800.000 $2,750.000 $3,500.000 $2,300.000
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 1.000 $1,800.000 $2,250.000 $3,500.000 $2,600.000
SET (TY II) (DES 2) (CMP) (6: 1) (P)
EA 10.000 $1,700.000 $1,000.000 $3,900.000 $2,800.000
SET (TY II) (DES 3) (CMP) (6: 1) (P)
EA 2.000 $2,500.000 $1,250.000 $4,100.000 $3,900.000
CLEAN EXIST CULVERTS
EA 3.000 $2,500.000 $10,000.000 $3,800.000 $13,500.000
REMOV STR (BOX CULVERT)
EA 3.000 $15,000.000 $20,000.000 $23,000.000 $12,500.000
REMOV STR (INLET)
EA 3.000 $800.000 $1,500.000 $1,900.000 $1,000.000
REMOV STR (SET)
EA 13.000 $350.000 $1,320.000 $1,300.000 $1,100.000
REMOV STR (WINGWALL)
EA 9.000 $2,000.000 $2,500.000 $11,000.000 $1,200.000
REMOV STR (HEADWALL)
EA 2.000 $1,900.000 $2,500.000 $2,500.000 $2,200.000
REMOV STR (PIPE)
LF 614.000 $30.000 $35.000 $33.000 $55.000
MOBILIZATION
LS 1.000 $3,577,156.000 $3,949,000.000 $4,200,000.000 $4,556,378.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 30.000 $20,000.000 $41,800.000 $25,000.000 $24,375.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 180.000 $50.000 $85.000 $73.000 $72.830
ROCK FILTER DAMS (REMOVE)
LF 180.000 $10.000 $30.000 $32.000 $22.410
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,134.000 $5.000 $5.000 $5.000 $4.480
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,134.000 $1.000 $1.500 $1.800 $1.120
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 860.000 $7.500 $15.000 $12.000 $7.450
BIODEG EROSN CONT LOGS (REMOVE)
LF 860.000 $2.000 $2.500 $2.500 $1.150
CONSTRUCTING DETOURS
SY 7,915.000 $60.000 $60.000 $90.000 $86.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 320.000 $35.000 $105.000 $100.000 $90.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $35.000 $140.000 $105.000 $95.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 9,420.000 $25.000 $10.000 $21.000 $35.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 12,900.000 $20.000 $5.000 $19.000 $15.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 260.000 $10.000 $8.000 $7.000 $10.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 40.000 $10.000 $60.000 $10.000 $10.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 9,420.000 $25.000 $8.000 $26.000 $12.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 320.000 $15.000 $6.000 $13.000 $12.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 40.000 $15.000 $17.000 $23.000 $12.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 4,457.000 $100.000 $130.000 $150.000 $145.000
DRIVEWAYS (SURF TREAT)
SY 735.000 $35.000 $40.000 $28.000 $25.000
TURNOUTS (RAP)
SY 443.000 $21.000 $45.000 $45.000 $145.000
RUMBLE STRIPS (SHOULDER)
LF 10,811.000 $0.500 $0.500 $0.600 $0.770
MTL W-BEAM GD FEN (TIM POST)
LF 3,750.000 $35.000 $30.000 $29.000 $27.930
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,500.000 $3,000.000 $2,400.000 $2,590.550
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 11.000 $1,550.000 $1,750.000 $1,500.000 $1,675.920
REMOVE METAL BEAM GUARD FENCE
LF 825.000 $1.500 $2.500 $11.000 $2.190
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $225.000 $525.000 $700.000 $219.070
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 1.000 $225.000 $700.000 $600.000 $219.070
GUARDRAIL END TREATMENT (INSTALL)
EA 15.000 $3,750.000 $4,000.000 $4,600.000 $4,929.170
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $300.000 $650.000 $700.000 $219.070
CRASH CUSH ATTEN (MOVE & RESET)
EA 16.000 $1,250.000 $500.000 $3,600.000 $1,725.210
CRASH CUSH ATTEN (REMOVE)
EA 13.000 $1,500.000 $1,200.000 $2,400.000 $1,369.210
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 13.000 $12,000.000 $15,525.000 $11,000.000 $14,462.820
RELOCATE EXISTING MAILBOX
EA 16.000 $500.000 $325.000 $400.000 $1,095.370
RELOCATE RD IL ASM (TRANS-BASE)
EA 1.000 $2,600.000 $3,500.000 $4,000.000 $3,559.950
REMOVE RD IL ASM (TRANS-BASE)
EA 3.000 $375.000 $550.000 $620.000 $547.680
IN RD IL (TY SA) 40B-8 (250W EQ) LED
EA 7.000 $4,000.000 $7,770.000 $9,000.000 $8,324.810
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 38.000 $7,150.000 $6,750.000 $8,000.000 $7,119.910
IN RD IL (TY SA) 40T-8-8 (250W EQ) LED
EA 1.000 $5,250.000 $9,100.000 $11,000.000 $9,858.330
CONDT (PVC) (SCH 40) (2") (CONC ENCSE)
LF 1,875.000 $40.000 $20.000 $20.000 $19.170
CONDT (PVC) (SCH 80) (2")
LF 7,660.000 $25.000 $11.000 $12.000 $10.950
CONDT (PVC) (SCH 80) (2") (BORE)
LF 880.000 $40.000 $35.000 $35.000 $32.860
ELEC CONDR (NO.8) BARE
LF 11,230.000 $2.000 $1.500 $2.000 $1.640
ELEC CONDR (NO.8) INSULATED
LF 23,710.000 $2.000 $2.000 $2.100 $1.920
GROUND BOX TY A (122311)W/APRON
EA 16.000 $700.000 $1,900.000 $2,000.000 $1,971.670
GROUND BOX TY C (162911)W/APRON
EA 1.000 $1,800.000 $2,150.000 $2,400.000 $2,300.280
REMOVE GROUND BOX
EA 3.000 $235.000 $270.000 $250.000 $219.070
REMOVE ELECTRICAL SERVICES
EA 1.000 $700.000 $500.000 $400.000 $383.380
ELC SRV TY A 240/480 100(NS)AL(E)SP(O)
EA 2.000 $11,000.000 $13,000.000 $14,500.000 $13,692.130
ELC SRV TY D 120/240 060(NS)AL(E)SP(O)
EA 1.000 $8,500.000 $11,000.000 $12,000.000 $10,953.700
ALUMINUM SIGNS (TY G)
SF 135.000 $25.000 $36.000 $45.000 $46.770
ALUMINUM SIGNS (TY O)
SF 1,185.250 $35.000 $36.000 $40.000 $41.240
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 77.000 $750.000 $790.000 $850.000 $739.370
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 16.000 $825.000 $965.000 $1,100.000 $859.870
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $1,200.000 $1,070.000 $1,200.000 $1,089.890
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 2.000 $1,400.000 $1,575.000 $1,700.000 $1,243.240
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $1,700.000 $1,050.000 $1,150.000 $816.050
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 11.000 $1,100.000 $1,140.000 $1,200.000 $942.020
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 8.000 $1,100.000 $1,350.000 $1,450.000 $1,166.570
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 2.000 $2,400.000 $3,455.000 $3,800.000 $4,959.840
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $650.000 $705.000 $800.000 $596.980
REMOVE SM RD SN SUP&AM
EA 56.000 $150.000 $100.000 $110.000 $104.060
INSTALL LRSS (STRUCT STEEL)
LB 1,219.900 $7.500 $10.000 $9.000 $8.870
REMOVE LRSA
EA 1.000 $1,100.000 $1,780.000 $1,350.000 $1,421.790
INS OH SN SUP(25 FT CANT)
EA 3.000 $40,000.000 $60,000.000 $46,000.000 $49,083.530
INS OH SN SUP(30 FT CANT)
EA 1.000 $45,000.000 $69,500.000 $59,000.000 $60,491.810
INS OH SN SUP(55 FT BRDG)
EA 1.000 $55,000.000 $91,500.000 $65,000.000 $66,193.210
INS OH SN SUP(75 FT BRDG)
EA 1.000 $75,000.000 $102,000.000 $95,000.000 $100,582.350
REMOVE OVERHD SIGN SUP
EA 1.000 $7,800.000 $11,000.000 $13,000.000 $13,577.110
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 6.000 $60.000 $90.000 $93.000 $46.550
INSTL DEL ASSM (D-DW)SZ 2(WC)GND
EA 11.000 $65.000 $90.000 $93.000 $46.550
INSTL OM ASSM (OM-2Y)(WC)GND
EA 38.000 $85.000 $90.000 $93.000 $76.680
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 39.000 $45.000 $45.000 $55.000 $47.100
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
EA 19.000 $45.000 $45.000 $55.000 $47.100
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
EA 35.000 $60.000 $45.000 $50.000 $47.100
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR)
EA 52.000 $60.000 $45.000 $50.000 $47.100
INSTL OM ASSM (OM-4)(TWT)WAS
EA 2.000 $85.000 $390.000 $420.000 $471.010
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 820.000 $2.500 $1.750 $1.500 $1.480
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 23,832.000 $1.500 $1.500 $1.300 $1.260
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 31,175.000 $1.600 $1.500 $1.300 $1.260
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,026.000 $1.600 $0.500 $1.600 $1.310
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 7,365.000 $1.250 $1.250 $1.200 $1.200
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 399.000 $1.500 $3.500 $3.200 $3.290
REFL PAV MRK TY II (Y) 6" (BRK)
LF 1,190.000 $0.200 $1.000 $1.100 $1.100
REFL PAV MRK TY II (Y) 6" (SLD)
LF 10,014.000 $0.260 $0.750 $0.800 $0.780
PAVEMENT SEALER (YLD TRI)
EA 35.000 $10.500 $25.000 $27.000 $27.380
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 3,160.000 $1.100 $1.000 $1.000 $0.990
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 47,009.000 $1.100 $1.000 $1.000 $0.930
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 1,190.000 $0.700 $1.000 $1.000 $0.990
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 40,046.000 $1.150 $1.000 $1.000 $0.930
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 1,146.000 $6.500 $10.000 $10.000 $9.860
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 167.000 $15.000 $15.000 $16.000 $16.430
PREFAB PAV MRK TY C (W) (ARROW)
EA 6.000 $300.000 $280.000 $290.000 $301.230
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 8.000 $575.000 $635.000 $655.000 $684.610
PREFAB PAV MRK TY C (W) (WORD)
EA 6.000 $425.000 $380.000 $400.000 $410.760
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 9.000 $425.000 $80.000 $80.000 $82.150
REFL PAV MRKR TY I-C
EA 34.000 $4.000 $8.000 $8.000 $8.220
REFL PAV MRKR TY II-A-A
EA 740.000 $4.000 $7.000 $7.000 $6.570
REFL PAV MRKR TY II-C-R
EA 578.000 $4.000 $7.000 $7.000 $6.570
ELIM EXT PAV MRK & MRKS (4")
LF 19,387.000 $1.250 $1.500 $1.300 $1.310
PAV SURF PREP FOR MRK (6")
LF 6,491.000 $0.050 $1.500 $1.400 $1.420
PAV SURF PREP FOR MRK (12")
LF 1,146.000 $0.500 $3.000 $3.200 $3.290
PAV SURF PREP FOR MRK (24")
LF 84.000 $0.750 $5.000 $5.300 $5.480
PAV SURF PREP FOR MRK (ARROW)
EA 1.000 $15.000 $105.000 $106.000 $109.540
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 35.000 $10.000 $25.000 $27.000 $27.380
REMOVAL OF CABLES
LF 2,145.000 $1.250 $1.000 $0.900 $0.820
REMOVE LUMINAIRE POLE
EA 4.000 $1,100.000 $700.000 $600.000 $547.680
D-GR HMA TY-B PG64-22
TON 14,087.000 $130.000 $130.000 $172.000 $209.000
D-GR HMA TY-C PG64-22
TON 6,075.000 $130.000 $150.000 $175.000 $209.000
SP MIXES SP-C SAC-B PG70-22
TON 10,020.000 $150.000 $130.000 $175.000 $209.000
SP MIXES SP-C SAC-A PG76-22
TON 4,253.000 $180.000 $165.000 $190.000 $228.000
TACK COAT
GAL 13,050.000 $7.000 $7.000 $8.500 $19.100
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $20,000.000 $25,000.000 $21,433.000
CCTV FIELD EQUIPMENT (DIGITAL)
EA 1.000 $7,650.000 $25,000.000 $20,000.000 $18,802.030
CCTV FIELD CONTROLLER
EA 1.000 $2,300.000 $10,000.000 $6,300.000 $6,024.540
CCTV MOUNT (POLE)
EA 1.000 $750.000 $3,600.000 $4,000.000 $3,833.800
CONDUIT (PREPARE)
LF 195.000 $2.000 $2.250 $2.500 $2.190
GROUND BOX (PREPARE)
EA 4.000 $310.000 $775.000 $900.000 $821.530
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 2,595.000 $5.000 $8.000 $8.000 $7.670
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 70.000 $5.000 $11.000 $11.000 $10.950
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 84.000 $10.000 $61.000 $64.000 $65.720
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 2,205.000 $5.000 $8.000 $8.000 $7.670
MULTIPOLYMER PAV MRK (W) 36" YLD TRI
EA 35.000 $7.500 $130.000 $135.000 $136.920
ITS POLE (60 FT)(90 MPH)
EA 1.000 $23,000.000 $32,000.000 $36,000.000 $33,956.470
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 1.000 $8,500.000 $9,500.000 $11,000.000 $10,077.400
TMA (STATIONARY)
DAY 136.000 $300.000 $250.000 $240.000 $422.640
TMA (MOBILE OPERATION)
DAY 34.000 $450.000 $690.000 $690.000 $916.970
INSTALL OF FIELD HARD ETHERNET SWITCH
EA 1.000 $300.000 $4,000.000 $4,300.000 $4,107.640
INSTALL OF CELLULAR MODEM
EA 1.000 $250.000 $4,000.000 $4,300.000 $4,107.640
Totals: $39,256,091.040 $39,496,850.500 $41,868,598.042 $46,292,239.442