LIPSCOMB US 60 (0170-02-023)

Items: 85

County: LIPSCOMB
Length: N/A
Highway: US 60
District: AMARILLO
Control Number: 0170-02-023
DBE Goal: 0.0%
Project: C 170-2-23
Guaranty: N/A
Time: 114 WORKING DAYS
Engineer's Estimate: $19,830,077.75
Date: 04/04/2024 (2 years ago)
Contract Number: N/A
Type: PREVENTIVE MAINTENANCE
Mail/Deliver Bids To: N/A
ZACHARY MAYER
IVAN FUENTES
DARRELL CALDWELL
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$19,830,077.75
$19,475,600.68
Over/Under Est: -1.79% -$354,477.07
$20,289,240.45
Over/Under Est: 2.32% $459,162.70
Amt Left: 4.18% $813,639.77
Over/Under Est: 8.93% $1,770,779.96
Amt Left: 10.91% $2,125,257.03
Delta: -6.46% -$1,311,617.26
$21,606,267.82
Over/Under Est: 8.96% $1,776,190.07
Amt Left: 10.94% $2,130,667.14
Delta: -0.03% -$5,410.11
Subcontractor Percentage Amount
INTERMOUNTAIN SLURRY SEAL, INC. 7.48% $1,497,595.51
ALAMO BROTHERS CONCRETE INC 3.12% $624,665.51
W. S. CONSTRUCTION COMPANY 2.38% $476,507.66
TRP CONSTRUCTION GROUP, LLC 2.20% $440,469.27
HJC FARMS, INC. 1.46% $292,311.42
A BROTHERS MILLING, LLC 0.29% $58,061.86
BARRICADES UNLIMITED 0.23% $46,049.06
WITHERS CONSTRUCTION, LLC 0.22% $44,046.93
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.21% $42,044.79
PROFESSIONAL TRAFFIC CONTROL LLC 0.17% $34,036.26
BARRICADES UNLIMITED 0.00% $0.00
Total: 17.76% $3,555,788.27

Bid Items & Bid Tabulations

85 Total 0 of 85
LIPSCOMB  |  US 60  |  AMARILLO  |  0170-02-023  |  04/04/2024  |  $19,830,077.75  |  C 170-2-23  |  PREVENT MAINT  |  114 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
DUININCK, INC.
J. LEE MILLIGAN, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
RK HALL, LLC
PREPARING ROW (TREE) (0" TO 6" DIA)
EA 13.000 $300.000 $845.000 $455.000 $435.400 $2,012.500
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 11.000 $1,000.000 $1,700.000 $1,400.000 $1,741.580 $4,025.000
REMOVING CONC (RIPRAP)
SY 842.000 $25.000 $31.500 $56.000 $30.000 $220.720
REMOVING CONC (FOUNDATIONS)
SY 52.000 $100.000 $130.000 $185.000 $169.260 $154.100
REMOVING CONC (CURB AND GUTTER)
LF 1,307.000 $20.000 $15.000 $19.000 $20.000 $44.260
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 80.000 $75.000 $160.000 $87.000 $278.740 $123.740
BACKFILL (TY A)
STA 891.000 $230.000 $300.000 $495.000 $388.240 $294.120
BLADING
HR 13.000 $371.000 $265.000 $530.000 $291.060 $237.510
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 41.000 $750.000 $615.000 $590.000 $608.440 $626.750
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 41.000 $500.000 $450.000 $430.000 $446.560 $460.000
EMULS ASPH (EROSN CONT)(MULTI)
GAL 19,942.000 $6.000 $4.400 $5.100 $5.160 $4.280
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 24,999.000 $26.000 $26.000 $34.650 $31.270 $26.600
PLANE ASPH CONC PAV(0" TO 3")
SY 17,362.000 $5.000 $4.550 $6.350 $5.630 $3.790
PLANE ASPH CONC PAV (1.5")
SY 2,383.000 $5.000 $6.600 $7.250 $4.820 $6.580
PLANE ASPH CONC PAV (2")
SY 724.000 $5.000 $22.000 $11.250 $10.920 $11.980
CUT & RESTORE ASPH PAVING
SY 22.000 $150.000 $96.000 $135.250 $100.000 $66.450
RIPRAP (CONC)(4 IN)
CY 43.000 $850.000 $905.000 $852.000 $893.120 $1,026.880
RIPRAP (CONC)(5 IN)
CY 38.000 $850.000 $960.000 $950.000 $948.940 $1,026.880
RIPRAP (CONC)(FLUME)
CY 2.000 $1,000.000 $1,700.000 $1,100.000 $1,674.600 $1,026.880
RIPRAP (MOW STRIP)(4 IN)
CY 29.000 $850.000 $1,100.000 $700.000 $1,272.320 $1,087.290
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 8.000 $1,000.000 $990.000 $3,700.000 $976.850 $1,057.090
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 6.000 $1,000.000 $1,100.000 $2,450.000 $1,116.400 $1,208.100
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 4.000 $1,000.000 $1,400.000 $3,650.000 $1,395.500 $1,510.120
CONC BOX CULV (4 FT X 2.5 FT) (EXTEND)
LF 6.000 $1,000.000 $1,300.000 $2,500.000 $1,283.860 $1,389.310
RC PIPE (CL III)(24 IN)
LF 282.000 $150.000 $170.000 $230.000 $167.460 $181.210
INLET (COMPL)(TRENCH DRAIN)(24")
EA 2.000 $13,000.000 $3,400.000 $14,750.000 $3,349.200 $3,624.300
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 1.000 $9,000.000 $16,500.000 $15,460.000 $16,522.720 $17,879.860
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
EA 5.000 $10,500.000 $26,000.000 $19,300.000 $25,844.660 $27,967.470
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 1.000 $10,000.000 $20,500.000 $20,150.000 $20,039.380 $21,685.370
SET (TY I)(S=3 FT)(HW= 4 FT)(6:1)(C)
EA 1.000 $11,500.000 $21,500.000 $28,900.000 $21,379.060 $23,135.080
SET (TY I)(S= 4 FT)(HW= 5 FT)(6:1) (C)
EA 2.000 $15,000.000 $54,000.000 $45,550.000 $53,587.210 $57,988.710
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 16.000 $3,000.000 $2,800.000 $4,200.000 $2,791.000 $3,020.250
ADJUSTING INLETS
EA 2.000 $10,500.000 $2,300.000 $7,600.000 $2,232.800 $2,416.200
REMOV STR (SET)
EA 9.000 $500.000 $565.000 $2,000.000 $558.200 $604.050
REMOV STR (PIPE)
LF 282.000 $30.000 $17.000 $85.000 $16.750 $18.120
REMOV STR (BOX CULVERT)
LF 18.000 $155.000 $115.000 $980.000 $111.640 $120.810
REMOV STR (RET WALL)
LF 26.000 $125.000 $115.000 $150.000 $279.520 $303.910
MOBILIZATION
LS 1.000 $1,650,000.000 $1,140,000.000 $2,000,000.000 $2,281,210.020 $1,556,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $34,000.000 $57,000.000 $54,850.000 $65,000.000 $44,829.760
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 450.000 $6.450 $5.100 $8.950 $5.020 $5.180
BIODEG EROSN CONT LOGS (REMOVE)
LF 450.000 $2.000 $3.400 $4.500 $3.350 $3.450
COLORED TEXTURED CONC (4")
SY 36.000 $200.000 $165.000 $156.000 $160.760 $302.020
CONC CURB & GUTTER (TY II)
LF 1,156.000 $50.000 $34.000 $42.250 $50.000 $96.650
CONC CURB (TY C1)
LF 545.000 $80.000 $100.000 $121.000 $115.320 $102.690
DRIVEWAYS (CONC)
SY 958.000 $140.000 $130.000 $161.000 $153.150 $181.210
CONC SIDEWALKS (4")
SY 2,263.000 $110.000 $100.000 $85.000 $110.010 $120.810
CURB RAMPS (TY 7)
EA 28.000 $2,450.000 $2,300.000 $1,925.000 $2,232.800 $2,416.200
CURB RAMPS (TY 10)
EA 11.000 $2,450.000 $2,500.000 $1,925.000 $2,456.080 $2,416.200
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 159,809.000 $0.200 $0.080 $0.350 $0.080 $0.140
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 79,904.000 $0.200 $0.080 $0.350 $0.080 $0.140
MTL W-BEAM GD FEN (STEEL POST)
LF 4,400.000 $35.000 $33.000 $28.200 $29.190 $30.070
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 6.000 $2,750.000 $3,400.000 $2,535.000 $2,623.540 $2,702.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,800.000 $1,600.000 $1,565.000 $1,618.780 $1,667.500
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 2.000 $450.000 $1,200.000 $1,025.000 $1,060.580 $1,092.500
REMOVE METAL BEAM GUARD FENCE
LF 4,175.000 $6.000 $3.950 $2.150 $2.230 $2.300
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $400.000 $450.000 $216.000 $223.280 $230.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 6.000 $300.000 $565.000 $216.000 $223.280 $230.000
GUARDRAIL END TREATMENT (INSTALL)
EA 15.000 $4,000.000 $3,400.000 $3,600.000 $3,712.030 $3,823.750
GUARDRAIL END TREATMENT (REMOVE)
EA 13.000 $1,200.000 $565.000 $216.000 $223.280 $230.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 15.000 $900.000 $880.000 $865.000 $893.120 $920.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 38.000 $1,000.000 $1,100.000 $1,025.000 $1,060.580 $1,092.500
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $1,200.000 $1,300.000 $1,180.000 $1,222.460 $1,259.250
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $1,250.000 $1,400.000 $1,290.000 $1,334.100 $1,374.250
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $1,500.000 $1,700.000 $1,545.000 $1,596.450 $1,644.500
REMOVE SM RD SN SUP&AM
EA 5.000 $120.000 $180.000 $110.000 $111.640 $115.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 44.000 $46.000 $45.000 $55.000 $55.820 $57.500
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND(BI)
EA 144.000 $150.000 $145.000 $160.000 $167.460 $172.500
WK ZN PAV MRK NON-REMOV (W)8"(LNDP)
LF 3,479.000 $2.000 $1.150 $1.100 $1.120 $1.150
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,075.000 $1.000 $1.650 $1.700 $2.230 $1.920
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 100.000 $10.000 $22.500 $21.600 $22.330 $23.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 2.000 $300.000 $680.000 $645.000 $669.840 $690.000
REFL PAV MRKR TY II-A-A
EA 650.000 $6.000 $9.050 $8.650 $8.930 $9.200
TREE TRIMMING
EA 5.000 $900.000 $450.000 $1,795.000 $736.820 $632.500
D-GR HMA TY-F SAC-A PG70-22
TON 11,580.000 $131.200 $160.000 $163.000 $0.000 $198.310
SP MIXES SP-D SAC-A PG70-28
TON 74,303.000 $173.000 $165.000 $157.250 $163.400 $176.610
TACK COAT
GAL 59,013.000 $6.000 $8.550 $7.300 $7.030 $8.220
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $16,000.000 $11,500.000 $9,500.000 $22,875.260 $17,041.060
HPPM W/RET REQ TY I(W)6"(BRK)(090MIL)
LF 16,095.000 $0.800 $0.790 $0.750 $0.780 $0.810
HPPM W/RET REQ TY I(W)6"(SLD)(090MIL)
LF 330,940.000 $0.750 $0.730 $0.700 $0.730 $0.750
HPPM W/RET REQ TY I(Y)6"(BRK)(090MIL)
LF 73,583.000 $0.800 $0.780 $0.750 $0.770 $0.790
HPPM W/RET REQ TY I(Y)6"(SLD)(090MIL)
LF 175,965.000 $0.750 $0.730 $0.700 $0.730 $0.750
TMA (STATIONARY)
DAY 150.000 $325.000 $280.000 $460.000 $499.130 $532.100
TMA (MOBILE OPERATION)
HR 100.000 $110.000 $115.000 $96.000 $104.030 $121.210
REC REFL PAV MRKR TY II-C-R
EA 633.000 $35.000 $68.000 $64.700 $66.980 $69.000
1
MICROSURFACING
TON 6,317.000 $240.500 $0.000 $0.000 $415.000 $0.000
Totals: $21,349,373.750 $19,475,600.680 $20,289,240.450 $21,600,857.710 $21,606,267.820