PREPARING ROW
|
STA
|
23.180
|
$3,000.000
|
$10,000.000
|
$4,000.000
|
$8,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
155.000
|
$20.000
|
$27.000
|
$127.050
|
$35.000
|
|
|
REMOVING STAB BASE & ASPH PAV(14")
|
SY
|
10,698.000
|
$5.000
|
$7.500
|
$6.920
|
$8.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
21,536.000
|
$14.000
|
$8.000
|
$5.270
|
$12.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
9,709.000
|
$15.000
|
$12.500
|
$2.570
|
$18.000
|
|
|
BLADING
|
HR
|
25.000
|
$100.000
|
$105.000
|
$133.070
|
$45.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
14,383.000
|
$1.000
|
$1.000
|
$0.460
|
$4.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
26,827.000
|
$0.300
|
$0.300
|
$0.300
|
$0.550
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
6,708.000
|
$0.250
|
$0.250
|
$0.270
|
$0.400
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
6,708.000
|
$0.250
|
$0.250
|
$0.270
|
$0.400
|
|
|
VEGETATIVE WATERING
|
MG
|
338.000
|
$30.000
|
$24.500
|
$16.410
|
$100.000
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
4,511.000
|
$80.000
|
$85.000
|
$72.360
|
$45.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
14,552.000
|
$3.000
|
$5.000
|
$2.350
|
$7.500
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
91.000
|
$170.000
|
$153.000
|
$184.430
|
$165.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
3,114.000
|
$5.000
|
$10.000
|
$4.380
|
$6.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
124.000
|
$150.000
|
$310.000
|
$142.190
|
$200.000
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
5,292.000
|
$4.500
|
$13.000
|
$5.470
|
$5.000
|
|
|
D-GR HMA TY-D PG70-22
|
TON
|
4,334.000
|
$100.000
|
$137.500
|
$120.310
|
$125.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
6,117.000
|
$3.000
|
$11.500
|
$3.580
|
$4.500
|
|
|
CONC PVMT (CONT REINF - CRCP) (6")
|
SY
|
89.000
|
$100.000
|
$156.000
|
$422.340
|
$65.000
|
|
|
CEM STABIL BKFL
|
CY
|
203.000
|
$100.000
|
$86.000
|
$133.540
|
$120.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
802.000
|
$10.000
|
$3.500
|
$8.730
|
$5.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
50.000
|
$25.000
|
$83.000
|
$109.380
|
$100.000
|
|
|
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
|
EA
|
6.000
|
$30,000.000
|
$7,500.000
|
$3,463.940
|
$26,000.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,626.000
|
$225.000
|
$220.000
|
$293.040
|
$300.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
516.000
|
$350.000
|
$290.000
|
$454.010
|
$600.000
|
|
|
DRILL SHAFT (60 IN)
|
LF
|
692.000
|
$500.000
|
$660.000
|
$691.160
|
$850.000
|
|
|
CL C CONC (ABUT)
|
CY
|
66.000
|
$1,000.000
|
$940.000
|
$864.250
|
$1,500.000
|
|
|
CL C CONC (CAP)
|
CY
|
264.200
|
$750.000
|
$790.000
|
$773.710
|
$1,800.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
159.600
|
$800.000
|
$550.000
|
$955.130
|
$1,900.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
74.000
|
$400.000
|
$725.000
|
$302.940
|
$1,200.000
|
|
|
CL C CONC (MISC)
|
CY
|
9.000
|
$500.000
|
$1,000.000
|
$377.160
|
$1,900.000
|
|
|
REINF CONC SLAB
|
SF
|
55,147.000
|
$15.000
|
$14.000
|
$40.000
|
$18.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
2,250.000
|
$75.000
|
$59.000
|
$68.840
|
$48.000
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
523.000
|
$100.000
|
$35.000
|
$76.160
|
$120.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
2,160.000
|
$120.000
|
$126.000
|
$147.440
|
$150.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
115.000
|
$450.000
|
$450.000
|
$480.840
|
$850.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
104.000
|
$100.000
|
$130.000
|
$221.860
|
$250.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
27.000
|
$125.000
|
$160.000
|
$528.010
|
$400.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
17.000
|
$500.000
|
$590.000
|
$599.280
|
$600.000
|
|
|
ELASTOMERIC BEARING (E9)
|
EA
|
6.000
|
$2,500.000
|
$3,000.000
|
$2,799.470
|
$3,000.000
|
|
|
ELASTOMERIC BEARING (F9)
|
EA
|
6.000
|
$2,500.000
|
$3,000.000
|
$2,799.470
|
$3,000.000
|
|
|
SLIDING ELASTOMERIC BEARING (ES 7)
|
EA
|
12.000
|
$2,500.000
|
$2,500.000
|
$2,148.680
|
$3,000.000
|
|
|
STR STEEL (PLATE GIRDER)
|
LB
|
2,070,000.000
|
$1.500
|
$1.800
|
$2.240
|
$2.250
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
385.000
|
$15.000
|
$18.000
|
$11.560
|
$25.000
|
|
|
RAIL (TY T223)
|
LF
|
1,062.500
|
$90.000
|
$75.000
|
$70.260
|
$150.000
|
|
|
RAIL (TY SSTR)
|
LF
|
1,555.500
|
$44.000
|
$61.000
|
$47.350
|
$95.000
|
|
|
RAIL (TY C223)
|
LF
|
1,292.500
|
$95.000
|
$100.000
|
$106.660
|
$125.000
|
|
|
RAIL (HANDRAIL)(TY E)
|
LF
|
155.000
|
$110.000
|
$57.000
|
$88.280
|
$110.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
135.000
|
$100.000
|
$83.000
|
$106.230
|
$85.000
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - A)
|
LF
|
90.000
|
$100.000
|
$87.000
|
$118.260
|
$95.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
38.000
|
$60.000
|
$125.000
|
$331.180
|
$100.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,121.000
|
$65.000
|
$75.000
|
$91.440
|
$150.000
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
109.000
|
$60.000
|
$79.000
|
$119.190
|
$120.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
45.000
|
$70.000
|
$92.000
|
$173.490
|
$150.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
1.000
|
$3,200.000
|
$4,700.000
|
$5,176.940
|
$5,500.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
7.000
|
$2,500.000
|
$2,600.000
|
$4,900.080
|
$6,000.000
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
1.000
|
$5,000.000
|
$4,600.000
|
$5,329.960
|
$6,000.000
|
|
|
INLET (COMPL)(POD)(SFG)(3FTX3FT)
|
EA
|
4.000
|
$3,500.000
|
$2,800.000
|
$3,426.000
|
$6,000.000
|
|
|
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
3.000
|
$3,000.000
|
$3,700.000
|
$4,498.590
|
$6,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,200.000
|
$1,250.000
|
$2,197.770
|
$1,700.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,400.000
|
$1,100.000
|
$899.800
|
$1,900.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$1,500.000
|
$1,300.000
|
$1,269.420
|
$1,900.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,800.000
|
$1,500.000
|
$1,620.550
|
$2,000.000
|
|
|
GRATE AND FRAME (BRIDGE DRAIN)
|
EA
|
1.000
|
$2,700.000
|
$2,500.000
|
$3,058.600
|
$3,000.000
|
|
|
PIPE (PVC) (SCH 40) (10 IN)
|
LF
|
150.000
|
$40.000
|
$185.000
|
$39.210
|
$65.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$800,000.000
|
$1,000,000.000
|
$1,200,000.000
|
$1,350,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
25.000
|
$3,500.000
|
$2,500.000
|
$15,000.000
|
$5,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
80.000
|
$20.000
|
$25.000
|
$26.800
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
80.000
|
$10.000
|
$14.000
|
$7.660
|
$12.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$20.000
|
$30.000
|
$26.680
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$10.000
|
$7.000
|
$7.660
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,170.000
|
$2.500
|
$2.250
|
$2.360
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,170.000
|
$1.000
|
$0.500
|
$0.270
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
95.000
|
$4.000
|
$4.000
|
$4.210
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
60.000
|
$5.000
|
$5.500
|
$4.650
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
155.000
|
$2.000
|
$2.000
|
$1.640
|
$2.500
|
|
|
CONSTRUCTING DETOURS
|
SY
|
894.000
|
$60.000
|
$36.000
|
$60.890
|
$55.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
720.000
|
$50.000
|
$90.000
|
$42.560
|
$75.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
200.000
|
$100.000
|
$10.000
|
$70.800
|
$70.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$100.000
|
$10.000
|
$94.070
|
$70.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
330.000
|
$15.000
|
$25.000
|
$7.700
|
$10.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
120.000
|
$10.000
|
$5.000
|
$7.660
|
$10.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$10.000
|
$5.000
|
$7.660
|
$10.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
360.000
|
$20.000
|
$28.000
|
$5.490
|
$20.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
200.000
|
$20.000
|
$7.500
|
$8.300
|
$20.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$16.000
|
$7.000
|
$7.910
|
$20.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
112.000
|
$25.000
|
$55.000
|
$27.340
|
$45.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
251.000
|
$95.000
|
$49.000
|
$82.030
|
$100.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
3.000
|
$1,500.000
|
$1,750.000
|
$546.880
|
$2,000.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
318.750
|
$20.000
|
$20.000
|
$21.820
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$1,500.000
|
$2,000.000
|
$1,480.080
|
$1,600.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
1.000
|
$1,500.000
|
$875.000
|
$672.660
|
$800.000
|
|
|
SHORT RADIUS
|
LF
|
9.550
|
$50.000
|
$51.000
|
$32.980
|
$40.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$800.000
|
$835.000
|
$574.220
|
$650.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,000.000
|
$1,200.000
|
$1,095.460
|
$1,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
650.000
|
$3.000
|
$2.500
|
$1.090
|
$4.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
8.000
|
$150.000
|
$100.000
|
$109.380
|
$150.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$2,200.000
|
$2,600.000
|
$2,547.370
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
1.000
|
$10,000.000
|
$13,500.000
|
$9,078.210
|
$15,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$1,000.000
|
$1,650.000
|
$1,093.760
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$800.000
|
$585.000
|
$546.880
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL2)
|
EA
|
1.000
|
$12,000.000
|
$9,300.000
|
$10,151.190
|
$12,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
1.000
|
$15,000.000
|
$9,850.000
|
$15,969.990
|
$16,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(W)(TL2)
|
EA
|
1.000
|
$12,000.000
|
$13,500.000
|
$17,315.310
|
$15,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(W)(TL3)
|
EA
|
1.000
|
$22,000.000
|
$13,500.000
|
$26,420.870
|
$30,000.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
586.000
|
$15.000
|
$10.000
|
$26.250
|
$25.000
|
|
|
GATE (TY 1)
|
EA
|
1.000
|
$1,500.000
|
$1,300.000
|
$1,640.640
|
$3,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
6.000
|
$250.000
|
$170.000
|
$164.180
|
$300.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
2.000
|
$300.000
|
$170.000
|
$380.200
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$400.000
|
$725.000
|
$560.980
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
1.000
|
$625.000
|
$725.000
|
$591.010
|
$550.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$600.000
|
$415.000
|
$675.790
|
$550.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
$500.000
|
$725.000
|
$517.950
|
$500.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
14.000
|
$325.000
|
$325.000
|
$367.010
|
$400.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
3.000
|
$400.000
|
$385.000
|
$422.400
|
$400.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
$300.000
|
$415.000
|
$552.460
|
$450.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
22.000
|
$80.000
|
$105.000
|
$82.030
|
$150.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
53.000
|
$20.000
|
$17.000
|
$14.220
|
$20.000
|
|
|
INSTL OM ASSM (OM-4)(FLX)GND
|
EA
|
6.000
|
$100.000
|
$255.000
|
$302.820
|
$300.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
6.000
|
$25.000
|
$25.000
|
$16.680
|
$20.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
9,874.000
|
$0.500
|
$1.000
|
$0.770
|
$0.850
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
2.000
|
$150.000
|
$27.800
|
$148.060
|
$250.000
|
|
|
WK ZN PAV MRK REMOV (W)18"(YLD TRI)
|
EA
|
11.000
|
$21.000
|
$50.000
|
$17.760
|
$55.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
9,632.000
|
$0.500
|
$1.000
|
$0.770
|
$0.850
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
119.000
|
$1.500
|
$0.500
|
$2.190
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
186.000
|
$1.500
|
$0.500
|
$2.190
|
$2.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
2,081.000
|
$0.100
|
$0.600
|
$0.300
|
$0.550
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
2,081.000
|
$0.100
|
$0.600
|
$0.300
|
$0.550
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
7,163.000
|
$0.400
|
$0.700
|
$0.770
|
$0.850
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
167.000
|
$0.400
|
$1.700
|
$0.830
|
$3.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
6,920.000
|
$0.400
|
$0.700
|
$0.770
|
$0.850
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
115.000
|
$15.000
|
$13.000
|
$14.740
|
$20.000
|
|
PREFAB PAV MRK TY C (Y) (12") (SLD)
|
LF
|
244.000
|
$8.000
|
$4.500
|
$12.560
|
$10.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
136.000
|
$4.000
|
$4.500
|
$4.740
|
$10.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
9,790.000
|
$0.500
|
$0.500
|
$0.540
|
$1.500
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
242.000
|
$1.000
|
$5.600
|
$1.600
|
$2.500
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
26.000
|
$3.000
|
$5.600
|
$3.190
|
$3.500
|
|
|
ELIM EXT PAV MRK & MRKS (JIGGLE)
|
EA
|
96.000
|
$2.000
|
$4.500
|
$4.740
|
$20.000
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
6.000
|
$2,800.000
|
$9,000.000
|
$14,547.010
|
$15,000.000
|
|
|
GEOGRID BASE REINFORCEMENT (TY I)
|
SY
|
91.000
|
$5.000
|
$4.000
|
$41.890
|
$10.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$13,500.000
|
$21,875.200
|
$20,000.000
|
|
|
DEAD END ROADWAY BARRICADE
|
LF
|
48.000
|
$100.000
|
$56.000
|
$21.880
|
$75.000
|
|
Totals: |
$9,384,797.800
|
$10,459,588.750
|
$13,193,902.399
|
$13,582,737.750
|