REMOVING CONC (FLUME)
|
SY
|
40.000
|
$9.140
|
$50.000
|
$100.000
|
$84.660
|
$154.810
|
$30.000
|
$40.000
|
$120.000
|
|
|
REMOVING STAB BASE & ASPH PAV (10"-12")
|
SY
|
21,329.000
|
$9.000
|
$2.380
|
$6.000
|
$1.050
|
$2.620
|
$5.000
|
$5.000
|
$4.770
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
93,564.000
|
$8.560
|
$7.450
|
$11.000
|
$11.000
|
$9.110
|
$10.000
|
$25.000
|
$4.140
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY D)
|
CY
|
111,568.000
|
$8.580
|
$4.300
|
$0.900
|
$5.000
|
$4.730
|
$12.000
|
$5.000
|
$11.300
|
|
|
BLADING
|
HR
|
100.000
|
$112.230
|
$300.000
|
$250.000
|
$521.370
|
$275.870
|
$150.000
|
$200.000
|
$216.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
393,634.000
|
$0.120
|
$0.130
|
$0.400
|
$0.100
|
$0.120
|
$0.100
|
$0.090
|
$0.140
|
|
|
PROOF ROLLING
|
HR
|
100.000
|
$58.000
|
$125.000
|
$110.000
|
$80.320
|
$220.160
|
$100.000
|
$120.000
|
$240.000
|
|
|
FL BS (COMP IN PLACE)(TY A)(GR 4)(11")
|
SY
|
496,380.000
|
$12.000
|
$10.000
|
$8.500
|
$10.840
|
$9.460
|
$11.770
|
$14.000
|
$13.710
|
|
|
PRIME COAT (MC-30)
|
GAL
|
179,625.000
|
$4.150
|
$4.070
|
$4.000
|
$4.660
|
$4.120
|
$4.200
|
$4.000
|
$5.310
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
763,404.000
|
$2.900
|
$3.370
|
$3.000
|
$3.820
|
$3.000
|
$4.000
|
$3.500
|
$4.740
|
|
|
AGGR(TY-PB GR-3 SAC-A)
|
CY
|
8,981.000
|
$95.000
|
$73.000
|
$99.000
|
$139.380
|
$94.850
|
$100.000
|
$150.000
|
$131.410
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
7,484.000
|
$89.350
|
$74.000
|
$99.000
|
$97.810
|
$94.820
|
$110.000
|
$150.000
|
$132.730
|
|
|
STONE-MTRX-ASPH SMAR-F SAC-A
|
TON
|
98,794.000
|
$105.000
|
$106.500
|
$119.000
|
$112.000
|
$114.600
|
$151.340
|
$160.000
|
$144.930
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
704,747.000
|
$1.490
|
$0.600
|
$0.900
|
$0.430
|
$0.650
|
$1.500
|
$1.250
|
$0.660
|
|
|
CEM STABIL BKFL
|
CY
|
180.000
|
$124.990
|
$138.600
|
$375.000
|
$145.910
|
$215.530
|
$240.000
|
$150.000
|
$330.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
44.000
|
$5.140
|
$21.000
|
$650.000
|
$22.110
|
$142.920
|
$10.000
|
$1.000
|
$275.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
212.000
|
$22.950
|
$36.750
|
$110.000
|
$38.690
|
$488.740
|
$70.000
|
$45.000
|
$73.500
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
70.000
|
$70.390
|
$136.500
|
$200.000
|
$143.700
|
$381.940
|
$220.000
|
$150.000
|
$124.950
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
735.000
|
$209.910
|
$262.500
|
$300.000
|
$276.340
|
$216.350
|
$400.000
|
$200.000
|
$346.500
|
|
|
CL C CONC (ABUT)
|
CY
|
85.600
|
$882.810
|
$948.150
|
$2,400.000
|
$998.130
|
$1,095.370
|
$1,400.000
|
$1,800.000
|
$1,260.000
|
|
|
CL C CONC (CAP)
|
CY
|
103.600
|
$844.720
|
$1,271.550
|
$2,100.000
|
$1,338.580
|
$1,430.830
|
$1,100.000
|
$2,000.000
|
$1,260.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
30.200
|
$900.000
|
$1,597.050
|
$2,700.000
|
$1,681.240
|
$1,582.570
|
$1,700.000
|
$2,500.000
|
$1,575.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
30,598.000
|
$17.540
|
$17.850
|
$24.000
|
$18.790
|
$17.380
|
$21.000
|
$25.000
|
$27.300
|
|
|
APPROACH SLAB
|
CY
|
90.000
|
$426.050
|
$876.490
|
$900.000
|
$922.690
|
$576.310
|
$850.000
|
$600.000
|
$682.500
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
3,675.000
|
$147.390
|
$183.750
|
$192.000
|
$193.440
|
$142.820
|
$200.000
|
$170.000
|
$231.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
40.000
|
$453.360
|
$588.000
|
$1,000.000
|
$619.000
|
$746.080
|
$728.000
|
$850.000
|
$802.500
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
256.000
|
$511.650
|
$708.750
|
$550.000
|
$619.000
|
$446.190
|
$572.000
|
$550.000
|
$525.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
1,127.000
|
$105.000
|
$99.740
|
$100.000
|
$105.000
|
$193.790
|
$160.000
|
$110.000
|
$141.750
|
|
|
RETROFIT RAIL (TY T221)(HPC)
|
LF
|
768.000
|
$110.000
|
$136.780
|
$70.000
|
$143.990
|
$230.290
|
$156.000
|
$100.000
|
$367.500
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
174.000
|
$112.180
|
$596.820
|
$175.000
|
$628.280
|
$118.930
|
$200.000
|
$140.000
|
$157.500
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
210.000
|
$216.150
|
$423.360
|
$440.000
|
$445.680
|
$517.290
|
$475.000
|
$300.000
|
$394.590
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
420.000
|
$340.000
|
$438.800
|
$400.000
|
$461.930
|
$539.750
|
$500.000
|
$340.000
|
$417.200
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
144.000
|
$364.910
|
$537.210
|
$500.000
|
$565.530
|
$641.040
|
$600.000
|
$420.000
|
$491.970
|
|
|
CONC BOX CULV (6 FT X 5 FT)
|
LF
|
184.000
|
$412.680
|
$611.520
|
$375.000
|
$643.760
|
$867.590
|
$700.000
|
$600.000
|
$581.360
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
200.000
|
$415.970
|
$624.750
|
$475.000
|
$657.680
|
$719.010
|
$800.000
|
$490.000
|
$565.350
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
721.000
|
$550.000
|
$610.050
|
$350.000
|
$642.210
|
$610.530
|
$650.000
|
$700.000
|
$543.900
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
579.000
|
$670.000
|
$661.500
|
$325.000
|
$696.370
|
$641.360
|
$700.000
|
$800.000
|
$559.650
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
970.000
|
$700.000
|
$624.750
|
$425.000
|
$657.680
|
$884.650
|
$750.000
|
$750.000
|
$701.400
|
|
|
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
|
LF
|
58.000
|
$490.560
|
$801.150
|
$750.000
|
$843.380
|
$893.390
|
$750.000
|
$800.000
|
$878.850
|
|
|
CONC BOX CULV (7 FT X 4 FT)(EXTEND)
|
LF
|
300.000
|
$755.000
|
$867.300
|
$475.000
|
$913.020
|
$878.010
|
$900.000
|
$800.000
|
$955.500
|
|
|
SET (TY I) (30 IN) (4: 1) (C)
|
EA
|
3.000
|
$3,500.000
|
$4,238.380
|
$1,500.000
|
$4,461.810
|
$4,814.520
|
$5,000.000
|
$4,300.000
|
$5,598.600
|
|
|
SET (TY I) (30 IN) (6: 1) (C)
|
EA
|
3.000
|
$3,500.000
|
$5,371.450
|
$1,900.000
|
$5,654.620
|
$7,198.210
|
$5,500.000
|
$3,800.000
|
$5,748.750
|
|
|
SET (TY I) (36 IN) (4: 1) (C)
|
EA
|
1.000
|
$6,000.000
|
$7,898.380
|
$2,500.000
|
$8,314.760
|
$9,992.990
|
$6,000.000
|
$4,000.000
|
$6,982.500
|
|
|
SET (TY I) (36 IN) (6: 1) (C)
|
EA
|
3.000
|
$4,300.000
|
$10,926.300
|
$3,000.000
|
$11,502.300
|
$21,713.780
|
$6,500.000
|
$4,000.000
|
$7,418.250
|
|
|
SET (TY I)(S=3 FT)(HW=2FT)(6:1)(C)
|
EA
|
2.000
|
$4,100.000
|
$4,851.000
|
$4,500.000
|
$5,106.730
|
$6,357.510
|
$4,500.000
|
$8,000.000
|
$9,681.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
22.000
|
$8,500.000
|
$5,586.000
|
$3,400.000
|
$5,880.480
|
$5,249.910
|
$4,500.000
|
$5,000.000
|
$12,075.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
2.000
|
$5,250.000
|
$6,027.000
|
$8,000.000
|
$6,344.730
|
$10,254.440
|
$5,000.000
|
$6,500.000
|
$8,862.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
1.000
|
$4,200.000
|
$5,387.550
|
$7,000.000
|
$5,671.560
|
$7,048.910
|
$5,000.000
|
$7,000.000
|
$7,612.500
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
3.000
|
$9,000.000
|
$5,387.550
|
$7,500.000
|
$5,671.560
|
$9,232.800
|
$6,000.000
|
$7,000.000
|
$11,534.250
|
|
|
SET (TY I)(S= 5 FT)(HW= 2 FT)(4:1) (C)
|
EA
|
111.000
|
$8,187.500
|
$4,748.100
|
$2,900.000
|
$4,998.410
|
$4,062.250
|
$4,500.000
|
$4,500.000
|
$10,248.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 2 FT)(6:1) (C)
|
EA
|
85.000
|
$6,700.000
|
$5,225.850
|
$3,400.000
|
$5,501.340
|
$5,312.790
|
$5,000.000
|
$6,000.000
|
$11,067.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
2.000
|
$7,500.000
|
$6,027.000
|
$4,100.000
|
$6,344.730
|
$5,535.300
|
$4,500.000
|
$6,000.000
|
$11,828.250
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
15.000
|
$6,724.100
|
$5,600.700
|
$5,300.000
|
$5,895.950
|
$2,701.420
|
$6,000.000
|
$6,000.000
|
$13,009.500
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
81.000
|
$8,967.820
|
$8,158.500
|
$3,800.000
|
$8,588.590
|
$6,342.690
|
$7,000.000
|
$8,500.000
|
$14,259.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
12.000
|
$8,642.860
|
$5,159.700
|
$5,000.000
|
$5,431.700
|
$5,937.050
|
$5,000.000
|
$6,500.000
|
$12,180.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
107.000
|
$8,500.000
|
$5,710.950
|
$4,300.000
|
$6,012.010
|
$4,784.320
|
$5,000.000
|
$5,000.000
|
$15,167.250
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
31.000
|
$10,002.860
|
$7,511.700
|
$12,500.000
|
$7,907.690
|
$11,016.040
|
$5,000.000
|
$6,500.000
|
$15,309.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
18.000
|
$6,985.060
|
$6,343.050
|
$3,800.000
|
$6,677.440
|
$4,576.110
|
$7,000.000
|
$8,000.000
|
$12,810.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
22.000
|
$10,242.060
|
$8,687.700
|
$8,100.000
|
$9,145.690
|
$11,483.810
|
$6,500.000
|
$5,500.000
|
$15,375.150
|
|
|
SET (TY I)(S= 7 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
8.000
|
$9,500.000
|
$6,004.950
|
$4,300.000
|
$6,321.510
|
$6,571.770
|
$5,500.000
|
$6,500.000
|
$14,332.500
|
|
|
SET (TY I)(S= 7 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
10.000
|
$9,500.000
|
$6,335.700
|
$4,700.000
|
$6,669.700
|
$6,386.200
|
$6,000.000
|
$9,000.000
|
$16,275.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
10.000
|
$9,500.000
|
$10,892.700
|
$10,000.000
|
$11,466.930
|
$12,995.280
|
$8,000.000
|
$8,500.000
|
$19,845.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
64.000
|
$8,515.330
|
$7,254.450
|
$6,000.000
|
$7,636.880
|
$8,544.260
|
$7,000.000
|
$6,400.000
|
$17,535.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(6:1) (C)
|
EA
|
2.000
|
$5,628.870
|
$10,128.300
|
$11,000.000
|
$10,662.240
|
$16,167.480
|
$5,000.000
|
$8,000.000
|
$24,200.000
|
|
|
SET (REMOV & REINSTALL)
|
EA
|
128.000
|
$4,000.000
|
$26.250
|
$675.000
|
$27.630
|
$5,128.190
|
$3,200.000
|
$1,000.000
|
$2,530.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
298.000
|
$1,814.130
|
$840.000
|
$300.000
|
$884.280
|
$708.080
|
$2,600.000
|
$500.000
|
$1,200.000
|
|
|
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
|
EA
|
1.000
|
$250,000.000
|
$219,187.500
|
$304,000.000
|
$221,070.550
|
$216,491.310
|
$350,000.000
|
$500,000.000
|
$1,471,100.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
768.000
|
$4.060
|
$52.500
|
$51.000
|
$55.270
|
$42.770
|
$38.000
|
$20.000
|
$11.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$500,000.000
|
$2,300,000.000
|
$3,707,500.000
|
$3,458,670.000
|
$4,889,246.900
|
$4,500,000.000
|
$4,500,000.000
|
$2,497,705.890
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
27.000
|
$13,763.130
|
$13,900.000
|
$32,000.000
|
$13,504.330
|
$35,000.000
|
$4,000.000
|
$60,000.000
|
$32,441.200
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
7,350.000
|
$5.240
|
$9.000
|
$9.000
|
$8.500
|
$8.580
|
$8.000
|
$7.690
|
$8.800
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
7,350.000
|
$1.440
|
$1.000
|
$0.700
|
$0.650
|
$0.660
|
$0.600
|
$0.590
|
$2.200
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,025.000
|
$77.190
|
$90.000
|
$62.000
|
$78.290
|
$86.090
|
$74.000
|
$50.000
|
$62.880
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
36.000
|
$72.530
|
$75.000
|
$46.000
|
$1,507.790
|
$80.490
|
$88.000
|
$100.000
|
$165.000
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
36.000
|
$84.990
|
$95.000
|
$75.000
|
$1,507.790
|
$212.400
|
$100.000
|
$150.000
|
$275.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
2.000
|
$3,500.000
|
$4,200.000
|
$12,000.000
|
$7,236.190
|
$22,637.520
|
$8,000.000
|
$12,500.000
|
$4,227.170
|
|
|
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
2,880.000
|
$54.840
|
$84.000
|
$75.000
|
$81.800
|
$13.600
|
$50.000
|
$75.000
|
$31.810
|
|
|
DRIVEWAYS (ACP)
|
SY
|
3,074.000
|
$55.000
|
$70.000
|
$50.000
|
$49.460
|
$54.820
|
$85.000
|
$35.000
|
$78.800
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
288,562.000
|
$0.120
|
$0.140
|
$0.200
|
$0.110
|
$0.150
|
$0.100
|
$0.120
|
$0.140
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
170,865.000
|
$0.130
|
$0.160
|
$0.200
|
$0.110
|
$0.150
|
$0.160
|
$0.120
|
$0.170
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
5,489.000
|
$28.000
|
$34.910
|
$40.000
|
$35.430
|
$35.750
|
$33.000
|
$37.000
|
$31.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,571.620
|
$2,598.750
|
$2,700.000
|
$2,525.730
|
$2,548.850
|
$3,000.000
|
$4,000.000
|
$2,625.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$973.420
|
$1,601.250
|
$1,600.000
|
$1,533.130
|
$1,547.160
|
$1,400.000
|
$2,000.000
|
$1,627.500
|
|
|
MTL THRIE-BEAM GD FEN (STEEL POST)
|
EA
|
8.000
|
$2,294.530
|
$2,598.750
|
$2,700.000
|
$2,525.730
|
$2,548.850
|
$3,000.000
|
$4,000.000
|
$2,835.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
4,156.000
|
$3.180
|
$3.150
|
$2.000
|
$1.930
|
$1.950
|
$2.000
|
$5.000
|
$3.150
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$237.920
|
$315.000
|
$220.000
|
$221.070
|
$223.090
|
$200.000
|
$500.000
|
$315.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
28.000
|
$2,470.530
|
$3,438.750
|
$3,500.000
|
$3,205.520
|
$3,234.870
|
$2,900.000
|
$3,700.000
|
$3,675.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$253.540
|
$315.000
|
$250.000
|
$226.600
|
$228.670
|
$210.000
|
$500.000
|
$367.500
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$2,080.100
|
$3,675.000
|
$500.000
|
$2,001.430
|
$3,904.150
|
$5,400.000
|
$2,200.000
|
$1,800.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$618.210
|
$1,575.000
|
$900.000
|
$1,480.640
|
$1,673.210
|
$1,800.000
|
$1,500.000
|
$1,800.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
6.000
|
$20,070.000
|
$26,775.000
|
$900.000
|
$27,081.140
|
$14,501.140
|
$35,000.000
|
$21,000.000
|
$21,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
49.000
|
$507.810
|
$640.500
|
$650.000
|
$674.270
|
$680.440
|
$610.000
|
$610.000
|
$671.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
35.000
|
$681.200
|
$682.500
|
$700.000
|
$718.480
|
$725.060
|
$650.000
|
$650.000
|
$715.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$770.270
|
$1,260.000
|
$1,300.000
|
$1,326.430
|
$1,338.570
|
$1,200.000
|
$1,200.000
|
$1,320.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
80.000
|
$105.000
|
$100.000
|
$130.000
|
$132.640
|
$133.860
|
$120.000
|
$120.000
|
$132.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
150.000
|
$10.140
|
$25.000
|
$35.000
|
$33.160
|
$19.520
|
$30.000
|
$30.000
|
$33.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)SRF
|
EA
|
3.000
|
$25.000
|
$78.750
|
$80.000
|
$82.900
|
$96.210
|
$75.000
|
$75.000
|
$82.500
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
214.000
|
$25.000
|
$78.750
|
$80.000
|
$82.900
|
$74.460
|
$75.000
|
$75.000
|
$82.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
572,284.000
|
$0.260
|
$0.130
|
$0.150
|
$0.120
|
$0.120
|
$0.110
|
$0.110
|
$0.120
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
285,056.000
|
$0.690
|
$0.120
|
$0.150
|
$0.120
|
$0.120
|
$0.110
|
$0.110
|
$0.120
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
4,356.000
|
$1.160
|
$1.050
|
$1.200
|
$2.870
|
$2.900
|
$2.600
|
$2.600
|
$2.860
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
2,185.000
|
$1.120
|
$1.050
|
$1.200
|
$2.870
|
$2.900
|
$2.600
|
$2.600
|
$2.860
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
24.000
|
$6.290
|
$23.100
|
$17.000
|
$27.630
|
$27.890
|
$25.000
|
$25.000
|
$27.500
|
|
REFL PAV MRK TY I (Y)4"(DOT)(090MIL)
|
LF
|
17,922.000
|
$0.750
|
$0.010
|
$0.600
|
$0.380
|
$0.380
|
$0.340
|
$0.340
|
$0.370
|
|
REFL PAV MRK TY II (W) 4" (DOT)
|
LF
|
11,287.000
|
$0.750
|
$0.130
|
$0.300
|
$0.440
|
$0.450
|
$0.400
|
$0.400
|
$0.440
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
288,562.000
|
$0.100
|
$0.360
|
$0.400
|
$0.380
|
$0.380
|
$0.340
|
$0.340
|
$0.370
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
28,460.000
|
$0.150
|
$0.010
|
$0.400
|
$0.380
|
$0.380
|
$0.340
|
$0.340
|
$0.370
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
336,930.000
|
$0.100
|
$0.360
|
$0.400
|
$0.380
|
$0.380
|
$0.340
|
$0.340
|
$0.370
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
17.000
|
$475.000
|
$546.000
|
$500.000
|
$801.380
|
$808.720
|
$725.000
|
$725.000
|
$797.500
|
|
REFL PAV MRKR TY I-C
|
EA
|
413.000
|
$3.030
|
$8.400
|
$4.000
|
$3.320
|
$3.350
|
$3.000
|
$413.000
|
$3.300
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
8,667.000
|
$2.960
|
$3.410
|
$4.000
|
$3.320
|
$3.350
|
$3.000
|
$3.000
|
$3.300
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
2.000
|
$5,890.000
|
$7,896.000
|
$10,000.000
|
$8,312.260
|
$8,388.350
|
$7,700.000
|
$7,520.000
|
$8,272.000
|
|
|
BONDING COURSE
|
GAL
|
179,625.000
|
$3.480
|
$2.250
|
$4.000
|
$2.580
|
$3.400
|
$3.600
|
$4.000
|
$4.910
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$11,774.230
|
$15,000.000
|
$18,000.000
|
$21,342.090
|
$18,000.000
|
$45,000.000
|
$25,000.000
|
$17,490.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
40.000
|
$2.990
|
$78.750
|
$13.000
|
$55.270
|
$55.770
|
$50.000
|
$50.000
|
$55.000
|
|
|
TMA (STATIONARY)
|
DAY
|
1,161.000
|
$238.150
|
$55.000
|
$150.000
|
$271.920
|
$94.190
|
$175.000
|
$75.000
|
$220.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
314.000
|
$126.130
|
$250.000
|
$550.000
|
$539.050
|
$257.820
|
$600.000
|
$400.000
|
$1,045.000
|
|
Totals: |
$37,570,691.238
|
$35,754,470.170
|
$37,656,769.800
|
$40,241,525.314
|
$40,718,946.494
|
$47,457,037.020
|
$50,840,297.010
|
$52,424,010.280
|